Ditemukan 47 data

Urut Berdasarkan
 
Putus : 10-04-2015 — Upload : 01-07-2015
Putusan PN AMBON Nomor 29/Pid.Sus/TPK/2014/PN.Amb
Tanggal 10 April 2015 — ELIAS SOPLANTILA, S.Sos
196125
  • LOGISTICDimension WxDxH (mm) : 792 x 596 x 391;Weight (kg) : 487 Meja GRACE 29 Unit 625,000 /18,125,00Komputer 08 Stavol MONTERO SVC 1000 VA 29 Unit1,750,000 50,750,000Type SCV 1000VACapacity 175 V 850 VA190 V 900 VA220 V 1000 VAInput 175 230 V/50 HzOutput 220 V / 50 HzTime 20 NSReguilatetWeight 2 kgB.
Register : 30-09-2014 — Putus : 10-04-2015 — Upload : 01-07-2015
Putusan PN AMBON Nomor 28/Pid.Sus/TPK/2014/PN.Amb
Tanggal 10 April 2015 — Ir. MARTHIN AUGUSTINUS LATUPEIRISSA
111226
  • 5,000,000 145,000,000 PICTUREScreen size : 29;Pure Flat Slim CRT;XD PictureInput Signal Type : RF; Image Scan :50 Hz; NanoFluorescene; Doming Mask Free; ColorStatus MemorySOUNDAudio Output (RSM) : 7w + 2; Speaker: 2; Nicam A2Turbo Sound; Auto Volume LeverterFEATURE PIP; Teletex; Aout Off; Timer; Clock;Child clock IN/OUT JACKSideAV; Side SVidio; Side HeadPhone; Rear RF;Rear Vidio Input; Rear Componen;Vidio Out; Scart; HDMILOGISTICDimension WxDxH (mm) : 792 x 596x 391;Weight (kg) : 487 Meja GRACE 29 Unit 625,000
Putus : 13-03-2012 — Upload : 07-08-2017
Putusan PN BANJARMASIN Nomor 11/Pid.SUS/TIPIKOR/2011/PN.Bjm
Tanggal 13 Maret 2012 —
5914
  • Pembuatan papan nama 1 bh 625,000 625,000proyek2. Pengukuran dan pemasangan 1 Is 2,400,000 2,400,000bowplank3. Pembersihan, perapihan dan 1 Is 1,500,000 1,500.000pembuangan sisasisa bahanbekas bangunanll PENGADAAN DAN PEMASANGAN PAKET IPA 1,822,000,0001. IPA kapasitas 20 L/det termasuk 1 unit 1,600,000,000 1,600,000,000sistem backwash lengkap denganmeter air baku accesories, atasdan transportasi / mobilisasiperalatan ke lokasi2.
Register : 24-01-2020 — Putus : 11-06-2020 — Upload : 25-06-2020
Putusan PN AMBON Nomor 1/Pid.Sus-TPK/2020/PN Amb
Tanggal 11 Juni 2020 — Penuntut Umum:
1.RIYADI, SH
2.ENDANG ANAKODA, SH
3.RASYID WIRAPUTRA, SH
4.REINALDO SAMPE, SH.MH
Terdakwa:
AISA A.RUMONIN
12379
  • MCK3 Unit1 nehancavicen dan 5 .625,000, 3.510.000, 2.115.000,2 Seng Gelombang 1.449.000, 1.008.000, 432.000,3 Kloset 900.000, 570.000, 330.000,4 Pipa paralon 4 600.000, 405.000, 195.000,5 Elbo 225.000, 210.000, 150.000, 6 Triplek 990.000, 576.000, 414.000,7 Pakuseng 150.000, 135.000, 15.000,8 Pakubesi 75.000, 60.000, 15.000,Q Kawar bendrat 200.000, 20.000, 180.000,10 BiayaBatu 675.000, 510.000, 165.000,11 BiayaPasir 600.000, 480.000, 120.000,JUMLAH 136.546.000, Menimbang, bahwa selanjutnya Majelis
Putus : 25-05-2015 — Upload : 30-09-2015
Putusan PN PALEMBANG Nomor 138/Pid.B/2015/PN.Plg
Tanggal 25 Mei 2015 — A. RASYID BIN GANI
899
  • Rekening Rekening1 15/01/2010 465,000,000 Juliani 110401000226108 KPR2 15/01/2010 450,000,000 Doddy Irawan 110401000227104 KPR3 15/01/2010 475,000,000 Husnul Wafa 110401000150153 KMKCV Umi Riski, 15/01/2010 460,000,000 cq Nilawati 110401000149152 KMK5 15/01/2010 450,000,000 IBRAHIM 110401000151159 KMKCV KELANA: 15/01/2010 438,033,000 PRESTASI 11040100002530815/01/2010 330,135,666 ABDUL RASYID 1104010000191537ASURANSI: 15/01/2010 482,970 IBRAHIM 110401000008990BIAYA15/01/2010 NOTARIS 1104010001 19939 $,625,000
Register : 14-10-2019 — Putus : 20-01-2020 — Upload : 10-08-2021
Putusan PN ARGA MAKMUR Nomor 130/Pid.Sus/2019/PN Agm
Tanggal 20 Januari 2020 — Penuntut Umum:
ICHXAN ELXANDHI,SH.
Terdakwa:
MURIZAL Bin MUNAF
1510
  • Montalin

    TR

    053348358

    Hrbanusa, PJ

    25

    Box

    25,000

    625,000

    OT TIE / BKO

    45

    Pace Ginseng

    TDP

    11082600024

    Putri tunggal, pj

Register : 29-06-2015 — Putus : 21-10-2015 — Upload : 01-12-2015
Putusan PN BANDUNG Nomor 123/PID.SUS/TPK/2015/PN.Bdg.
Tanggal 21 Oktober 2015 — RADEN TITAN BISASTI binti (alm) H. SURYATMAN
11827
  • 700,000 2 5% 1,540,000Staf 1 500,000 2 5% 50,000Staf 3 700,000 2 5% 210,0001,800,000PESERTA QTY RATE NIGHT FEE JUMLAHTicket GA + BPPrint Fee 29 25,000 0 0 725,000725,000Halaman 218 dari 363Putusan No. 123/Pid.Sus/TPK/2015/PN.BDG SEKRETARIAT (TRANSPORT) DPRD CIMAHI 21 Jul 2011HOTEL ROOM RATE NIGHT FEE JUMLAHStaf 1 1,000,000 1 5% 50,000Staf 1 500,000 1 5% 25,000Staf 1 250,000 1 5% 12,50087,500JOGYA (BANGGAR) DPRD CIMAHI 4 6 Aug2011HOTEL ROOM RATE NIGHT FEE JUMLAHAnggota 22 700,000 2 5% 1,540,000Staf 3 625,000