Ditemukan 82 data
49 — 19
. % %I MobilisasiAlat/Demob 1.00 00 oga 99 0.76 90%1 ilisas 30,000,00 % 27,000,00 %5 0,.00 0,.003 PEKERJAAN 1,208.49 100TANAH M3 0.19 0.19 %Striping 3,406.00 779,628. % 6,779,628. % coop1 Timbunan tanah M3 90 803 909 5.43 prepdidatangkan 1139.00 285:579.0 % 192,935,1 % Meratakan / M3 70.00 9.44 92.892 939memadatkan Tanah 15,769,45 % 10,619,15 %9, didatangkan 5.00 0.9973 32%PEKERJAANSTRUKTUR 4,842.00Ln.M 50.38 15.98 22%Pengadaan & 1,791,540, % 568,276,4 %Transpotasi Tiang 000.00 88.000Site Pile 20x50
PJenis Kegiatan Jumlah Bobot Jumlah Bobot orsoO Volume entaUang (%) uang (%) seL PEKERJAAN PERSIAPAN 1.00 2,400,000. 0,07 2,400,000. 0.07 1002 Pengukuran/ M 00 % 000 % %3 Bowplank 1.00 0,01 0.01 100Papan nama proyek Bh 430,000.0 % 430.000.0 % %4Pondok Kerja / 1.00 0.08 00) 0.08 100Direksi Keet Unit 2,900,000. % 2,900,000. % %II MobilisasiAlat/Demob 1.00. 00) 0.84 00 0.76 90%1 ilisas 30,000,00 % 27,000.00!
80 — 24
Biaya mob demob (pemindahan) 2 unit mesin bandsaw dariBereng Malaka ke Luwuk Takau beserta ongkos pasangbececenees Rp. 10.000.000,i. Biaya transportasi mendatangkan karyawan ...... Rp. 6.400.000,j. Biaya tunggu selama karyawan tidak bekerja Thn 20122014..Rp.38.00.000,k. Biaya Operasional dan pembelian bahan baku~ kayuBulat...... Rp. 600.000.000.. Biaya Upah Tukang......................0.cceee ee eee ees Rp. 36.000.00,Total Kerugian Materiil sebesar ................
surat tersebut diberi tanda P46;Asli dan fotokopi berupa Pengeluaran biaya pembangunan gudang, mesinbangsaw, kantor dll sebesar Rp. 225.000.000,, selanjutnya pada fotokopibukti surat tersebut diberi tanda P47;Asli dan fotokopi berupa Kwitansi Pembayaran 2 Unit Mesin bandsawsebesar Rp. 100.000.000,, selanjutnya pada fotokopi bukti surat tersebutdiberi tanda P48;Halaman 69 dari 94 Putusan Nomor 117/Pdt.G/2016/PN Pik49.50.51.52.53.54.55.56.57.58.59.60.61.Asli dan fotokopi berupa Kwitansi biaya mob demob
62 — 19
Mob/Demob. Vibro Ls 1 7.000.000,00 7.000.000,003. Excapator Jam 27 400.000,00 10.800.000,004. Vibro Roller Hari 2 4.000.000,00 8.000.000,005. Tasirtu M3 1.377 54.650,00 75.254.050,00Jumlah 108.053.050,00 Dalam Perjanjian tersebut di atas, diatur ketentuanketentuan sebagai berikut : Jangka waktu sewa menyewa dan pengadaan meterial selama 120 (seratus duapuluh) Hari Kalender terhitung sejak ditanda tangam Perjanjian imi.
Mob/ Demob. Vibro Ls 1 7.000.000,00 7.000.000,003. Excapator Jam 27 400.000,00 10.800.000,00 4. Vibro Roller....19 19 4. Vibro Roller Hari 2 4.000.000,00 8.000.000,005.
70 — 37 — Berkekuatan Hukum Tetap
Karya Aceh perihal DemobilisasiPersonil Konsultan Supervisi Paket PW 11/2011, Nomor746/DBC/PPTKPW/Demob.XII/2011, tanggal 20 Desember 2011, beserta lampiran;Asli Surat dari Dinas Bina Marga dan Cipta Karya Aceh perihal DemobilisasiPersonil Konsultan Supervisi Paket PW 11/2011, Nomor732/DBC/PPTKPW/Demob.xXII/2011, tanggal 20 Desember 2011, beserta lampiran;Asli Surat dari Dinas Bina Marga dan Cipta Karya Aceh perihal DemobilisasiPersonil Konsultan Supervisi Paket PW 11/2011, Nomor671/DBC/PPTKPW/Demob
Terbanding/Terdakwa : Trisnawan Widianto
144 — 64
PRELIMINARIES 2.147.100.000, Investigation 0,0551 Hal. 10.Put.Nomor 38/Pid.SusTpk/2020/PT.DKI Survey & Seting Out 0,1262Temporary Facilities 0,2757Detail Engineering 0,9721Administrations, Insurances bonds 0,3838Mob/Demob Personil dan 0;3555peralatanCIVIL PLANT WORKS 8.305.400.000,Cut & Fill/Kupasan, urugan dan pemadatan tanah, 0,409Foundation/Pondasiu semua 0peralatan (minimal) 0,024Pondasi separator 2Pondasi Exchanger 0,036Pondasi Boiler 4Pondasi Collum 0,054Pondasi Air Fin Coller 5Pondasi hot
PRELIMINARIES 2.147.100.000,Investigation 0,0551Survey & Seting Out 0,1262Temporary Facilities 0,2757Detail Engineering 0,9721Administrations, Insurances bonds 0,3838Mob/Demob Personil dan peralatan 0,35552.
Terbanding/Terdakwa : Trisnawan Widianto
167 — 161
PRELIMINARIES 2.147.100.000, Investigation 0,0551 Hal. 10.Put.Nomor 38/Pid.SusTpk/2020/PT.DKI Survey & Seting Out 0,1262Temporary Facilities 0,2757Detail Engineering 0,9721Administrations, Insurances bonds 0,3838Mob/Demob Personil dan 0;3555peralatanCIVIL PLANT WORKS 8.305.400.000,Cut & Fill/Kupasan, urugan dan pemadatan tanah, 0,409Foundation/Pondasiu semua 0peralatan (minimal) 0,024Pondasi separator 2Pondasi Exchanger 0,036Pondasi Boiler 4Pondasi Collum 0,054Pondasi Air Fin Coller 5Pondasi hot
PRELIMINARIES 2.147.100.000,Investigation 0,0551Survey & Seting Out 0,1262Temporary Facilities 0,2757Detail Engineering 0,9721Administrations, Insurances bonds 0,3838Mob/Demob Personil dan peralatan 0,35552.
136 — 32
Data yangdisiapkan :e Mobilisation Demob ; Accomodation ;e Duty Trips ;e Communication ;e Reporting ;e Office and computer consumable &Supplies ;Bahwa yang membuat Joint Venture Agreement forAssistance for Basin Water Resources Management(BWRM) Water Resources and Irrigation ManagementProject (WISMP) IBRD Loan No. 4711IND/credit No. 3807IND/Grant TF No. 052124IND adalah C. LOTTI dan saksiikut menandatanganinya. Joint Venture Agreement tersebutmerupakan perjanjian antara C.
Data yang disiapkan :e Mobilisation Demob ;e Accomodation ;e Duty Trips ; Communication ;e Reporting ;e Office and computer consumable &Supplies ;Bahwa rincian isi pembagian kontrak sebagaimana yang dimuat dalamdokumen Joint Venture Agreement :Remuneration : Jumlah DikelolaProfesional 1.814.0 PT. Jasa Mitra Manunggalstaf 00.000Sub 6 bulan (Oktober 2007 s/.d April 2008)Profesional 330.00 C. LOTTIstaf 0.000Supportif 6 bulan (Oktober 2007 s/.d April 2008)staf 313.20 C.
Terbanding/Terdakwa : Trisnawan Widianto
176 — 85
PRELIMINARIES 2.147.100.000, Investigation 0,0551 Hal. 10.Put.Nomor 38/Pid.SusTpk/2020/PT.DKI Survey & Seting Out 0,1262Temporary Facilities 0,2757Detail Engineering 0,9721Administrations, Insurances bonds 0,3838Mob/Demob Personil dan 0;3555peralatanCIVIL PLANT WORKS 8.305.400.000,Cut & Fill/Kupasan, urugan dan pemadatan tanah, 0,409Foundation/Pondasiu semua 0peralatan (minimal) 0,024Pondasi separator 2Pondasi Exchanger 0,036Pondasi Boiler 4Pondasi Collum 0,054Pondasi Air Fin Coller 5Pondasi hot
PRELIMINARIES 2.147.100.000,Investigation 0,0551Survey & Seting Out 0,1262Temporary Facilities 0,2757Detail Engineering 0,9721Administrations, Insurances bonds 0,3838Mob/Demob Personil dan peralatan 0,35552.
HERI ANTONI, S.H
Terdakwa:
SUKARDI Bin AHMAD RIFAI
124 — 86
Demob Rp.10.000.000 =Rp.2.857.000,Hal 22 dari 136 hal Putusan Nomor 24/Pid.SusTPK/2021/PN BglJumlah = Rp. 275.287.000,Il. PEKERJAAN PEMASANGAN LAMPU JALAN135 UNIT (DD) Nilai Biaya Fisik : Rp. 56.898.400,a. Pembayaran yang sudah dibayarkan 100 % , dengan perincian biayab.7oa290T0pantara lain :a. Biaya Perencanaan =Rp 1.100.000,b. Honor PKPKD dan PTPKD =Rp 800.000,c. Belanja Benda Pos =Rp 234.000,Belanja Foto Copi dand. Pengadaan =Rp 500.000,e. Belanja Alat Tulis Kantor =Rp 15.000,f.
Demob Rp.10.000.000 =Rp.2.857.000,Jumlah = Rp. 275.287.000,I. PEKERJAAN PEMASANGAN LAMPU JALAN135 UNIT (DD) Nilai Biaya Fisik : Rp.56.898.400,a. Pembayaran yang sudah dibayarkan 100 % , dengan perincianbiaya antara lain :a.
124 — 46
Salarydriver Rp.36.000.000 (tiga pulunh enam juta rupiah).Foto copy dari foto copy service order kepada PT Sentra Prima Services dari PT IEVGas Mob Demob Surabaya Cikarang for rental 2 unit of tube skid totalRp.35.714.286, (tiga puluh lima juta tujuh ratus empat belas ribu dua ratus delapanpuluh enam rupiah) tanggal 8 Juni 2015 (bukti P27.B).Foto Copy dari foto copy Service Order kepada PT.
111 — 335
TONI JUNIANTO,kemudian yang kedua diserahkan sekitar sepuluh hari sesudaha penyerahanpertamapada bulan puasa yang menyerahkan adalah saya dan diantar olehanak buah saya, untuk penyerahan ke empat alat tersebut ada dibuatkan beritaacaranya yang saya tanda tangani namun untuk saat ini belum saya bawa.Sepengetahuan saya sampai saat ini belum ada pembayaran yang diserahkanoleh sdr TONI kepada saya maupun kepihak perusahaan, namun demikian adabiaya yang dikeluarkan TONI yaitu hanya untyk Mob Demob saja
422 — 615
sebelumnyabahwa dalam keikutsertaan dalam tender iniPT COSL INDO mengajukan penawaransebesar US$ 0 (nol dollar Amerika) untukitem: mobilisasi, demobilisasi serta lodgingand meals sebagaimana berikut: Total Days Unit Rates ($) Sub TotalA B (AxB) EXPLORATION AND APPRAISALWELLSOperating Rate/day *** 215 $89,800 $19,307,000Moving Rate/day (90% of the 12 $80,820 $969,840Operating Rate) ***Completing Rate/day (80% of the 48 $71,840 $3,448,320Operating Rate) ***Il MOB COSTMobilization JackUp Rig **Ill DEMOB
Bidder seeks clarification concerningContractual requirement for proposed JUDrilling Rig Services Contract.Would Company accept the introduction ofan Early Termination Fee for Contracttermination at Companys convenience,whereby, if this Contract is terminated forCompanys convenience, then Companyshall pay Contractor all dues for workalready done, inclusive of the Mob fee, aways and means to Demob the Rig, anyand all committed upgrades andmodifications costs and a % of ODR for theremaining number
dollar Amerika)untuk item: mobilisasi, demobilisasi serta lodgingand meals sebagaimana berikut: Total Unit Rates ($) Sub TotalDaysA B (AxB) EXPLORATION AND APPRAISALWELLS Operating Rate/day *** 215 $89,800 $19,307,000 Moving Rate/day (90% of the 12 $80,820 $969,840Operating Rate) *** Completing Rate/day (80% of 48 $71,840 $3,448,320the Operating Rate)KKKHal256 dari 434 Hal Putusan Nomor 907/Pdt.GKPPU/2016/PN Jkt.SelMOB COSTMobilization JackUp Rig **DEMOB COSTDemobilization JackUp Rig ** LODGING AND
COSLINDO mengajukan penawaran sebesar US$ 0(nol dollar Amerika) untuk item: mobilisasi,demobilisasi serta lodging and mealssebagaimana berikut:Hal269 dari 434 Hal Putusan Nomor 907/Pdt.GKPPU/2016/PN Jkt.Sel Total Days Unit Rates ($) Sub Total A B (AxB) EXPLORATION AND APPRAISALWELLS Operating Rate/day *** 215 $89,800 $19,307,000 Moving Rate/day (90% of the 12 $80,820 $969,840Operating Rate) *** Completing Rate/day (80% of the 48 $71,840 $3,448,320Operating Rate) ***MOB COSTMobilization JackUp Rig **DEMOB
HARYONO, SH.MH
Terdakwa:
ANANG BAKTI Bin SUWANDI
153 — 48
Aan sebesarRp.1.020.000,00 (satu juta dua puluh ribu rupiah) pada tanggal 14Januari 2017, selanjutnya diberi tanda P.50;Foto copy Kwitansi No. 51 Pembayaran Mob Demob eksavator komatsuPC 200 melalui Sdr. Nunung kepada Sdr. Joko Sutrisno sebsar Rp.3.000.000,00 (tiga juta rupiah) tanggal 14 Januari 2017, selanjutnya diberitanda P.51;Foto copy Kwitansi No. 52 pembayaran biaya akomodasi pertemuankuari dengan warga Dusun Sidorejo Ds Sidolaju melalui Sdr.
82 — 40
Jalan Tasirtu, berupa sewa alat (termasuk mobilisasi / demobilisasi) dan pengadaanbahan material lokal (Sirtu) dengan nilai pengadaan/kontrak sebesar Rp.108.053.050.00, terdiri atas : Uraian Sat Vol Harga Satuan Jumlah (Rp)(Rp)1 2 3 4 5Mobilisasi dan Ls 1 7.000.000.00 7.000.000.00Demobilisasi ExcapatorMob/Demob. Vibro.
Mob/Demob. Vibro. Ls 1 7.000.000.00 7.000.000.003. Excapator Jam 27 400.000.00 10.800.000.004. Vibro Roller Hari 2 4.000.000.00 8.000.000.005. Tasirtu M3 1.377 54.650.00 75.253.050.00Jumlah 108.053.050.00 Catatan : ada tambahan sewa alat sebesar Rp. 18.000.000, Sehingga totalkeseluruhan menjadi sebesar Rp. 126.053.050, (Rp. 108.053.050, + Rp.18.000.000,).d.
129 — 270
batubara kalori high;c. pada tanggal 27 Desember 2013 Rp. 2.125.000.000, (dua milyar seratus duapuluh lima ribu rupiah) ditransfer oleh GUSTI HADI NATA ke rekening BankBNI Syariah Nomer 702638888 atas nama GUSil HADI NATA;d. pada tanggal 2 Januari 2014 Rp. 110.022.361, (seratus sepuluh juta duapuluh dua ribu tiga ratus enam puluh satu rupiah) ditransfer oleh GUSTI HADINATA ke rekening Bank BNI syariah Nomer 7026388888 atas nama GUSTIHADI NATA dengan keterangan digunakan untuk biaya sewa wheloaderTMOB DEMOB
Terbanding/Pembanding/Terdakwa : FARIDA WEDIANINGSIH Binti alm. WACHJUDIN
Turut Terbanding/Jaksa Penuntut : FERDIANSYAH, SH
76 — 16
PEKERJAAN1 PERSIAPAN 1.00 2,400,000. 0,07 2,400,000. 0.07 1005 Pengukuran/ M 00 % 000 % %4 Bowplank 1.00 430,000. 0,01 430.000. 0.01 100Papan nama proyek Bh 00 % 000 % %APondok Kerja / 1.00 2,900,000. 0.08 2,900,000. 0.08 100Direksi Keet Unit 00 % 00 % %II MobilisasiAlat/Demob 1.00 30,000,00 0.84 27,000,00 0.76 90% halaman 38 dari 94 halaman, No. 15/Pid.Tipikor/2014/PTBNA IoN OD wm &NR ilisasPEKERJAANTANAHStripingTimbunan tanahdidatangkanMeratakan /memadatkan TanahdidatangkanPEKERJAANSTRUKTURPengadaan
M. AGRA DWADIMA PUTRA, S.H
Terdakwa:
Irwin, S.T., M.T. Bin Jamaluddin
72 — 45
- Fotocopy yang dilegalisir Surat Demobilisasi Personil Konsultan Supervisi Jalan dan Jembatan (PW-JLJB/31/2018) Nomor 057/DEMOB.04/PW.31/PW-JLJB/PUPR/2018 tanggal 13 Desember 2018.
- Fotocopy yang dilegalisir Surat Demobilisasi Personil Konsultan Supervisi Jalan dan Jembatan (PW-JLJB/31/2018) Nomor 057/DEMOB.05/PW.31/PW-JLJB/PUPR/2018 tanggal 26 Desember 2018.
- Fotocopy yang dilegalisir Surat Demobilisasi Personil Konsultan Supervisi Jalan dan Jembatan (PW-JLJB/31/2018) Nomor 057/DEMOB.06/PW.31/PW-JLJB/PUPR/2018 tanggal 27 Desember 2018.
- Fotocopy yang dilegalisir Laporan Pelaksanaan Hasil Pelelangan Pekerjaan : Pengawasan Teknis Jalan dan Jembatan Wilayah Kabupaten Bener Meriah (DOKA) POKJA Konsultasi XII T.A 2018.
Terbanding/Pembanding/Penuntut Umum : M. AGRA DWADIMA PUTRA, S.H
70 — 47
- Fotocopy yang dilegalisir Surat Demobilisasi Personil Konsultan Supervisi Jalan dan Jembatan (PW-JLJB/31/2018) Nomor 057/DEMOB.04/PW.31/PW-JLJB/PUPR/2018 tanggal 13 Desember 2018.
- Fotocopy yang dilegalisir Surat Demobilisasi Personil Konsultan Supervisi Jalan dan Jembatan (PW-JLJB/31/2018) Nomor 057/DEMOB.05/PW.31/PW-JLJB/PUPR/2018 tanggal 26 Desember 2018.
- Fotocopy yang dilegalisir Surat Demobilisasi Personil Konsultan Supervisi Jalan dan Jembatan (PW-JLJB/31/2018) Nomor 057/DEMOB.06/PW.31/PW-JLJB/PUPR/2018 tanggal 27 Desember 2018.
- Fotocopy yang dilegalisir Laporan Pelaksanaan Hasil Pelelangan Pekerjaan : Pengawasan Teknis Jalan dan Jembatan Wilayah Kabupaten Bener Meriah (DOKA) POKJA Konsultasi XII T.A 2018.
M. AGRA DWADIMA PUTRA, S.H
Terdakwa:
Erwinsyah, S.E.AK Bin Ali Udin
91 — 55
- Fotocopy yang dilegalisir Surat Demobilisasi Personil Konsultan Supervisi Jalan dan Jembatan (PW-JLJB/31/2018) Nomor 057/DEMOB.04/PW.31/PW-JLJB/PUPR/2018 tanggal 13 Desember 2018.
- Fotocopy yang dilegalisir Surat Demobilisasi Personil Konsultan Supervisi Jalan dan Jembatan (PW-JLJB/31/2018) Nomor 057/DEMOB.05/PW.31/PW-JLJB/PUPR/2018 tanggal 26 Desember 2018.
- Fotocopy yang dilegalisir Surat Demobilisasi Personil Konsultan Supervisi Jalan dan Jembatan (PW-JLJB/31/2018) Nomor 057/DEMOB.06/PW.31/PW-JLJB/PUPR/2018 tanggal 27 Desember 2018.
- Fotocopy yang dilegalisir Laporan Pelaksanaan Hasil Pelelangan Pekerjaan : Pengawasan Teknis Jalan dan Jembatan Wilayah Kabupaten Bener Meriah (DOKA) POKJA Konsultasi XII T.A 2018.
Terbanding/Pembanding/Penuntut Umum : Yanuar Utomo, SH., M.Hum
537 — 2325
GRAHA MUSTIKA MULYANomor S.PenGMM/2014.2 Pperihal: penawaran harga akses jalandan lokasi sumur NGBT 01, kepada: Pertamina EPC ADK up BapakPerry Widyananda tanggal 5 Februari 2014;M.49: 1 (Satu) lembar KLARIFIKASI HPS BIAYA MOB/DEMOB RIG,PT.
ABS Kepada SubKontraktor pelaksanaHal . 114 Putusan No.39/PidSusTPK/2020/PT.DKI.641)642)643)644)645)646)647)Pekerjaan dalam pelaksanaan Manajemen Proyek PemboranTerpadu Pertamina EPC ADK 2014; MOB DEMOB;0.51: 1 (satu) bundel Dokumen fotocopy bukti PembayaranPelaksanaan Pekerjaan PT. ABS Kepada SubKontraktor pelaksanaPekerjaan dalam pelaksanaan Manajemen Proyek PemboranTerpadu.
GRAHA MUSTIKAMULYA Nomor S.PenGMM/2014.2 Pperihal: penawaranharga akses jalan dan lokasi sumur NGBT 01, kepada:Pertamina EPC ADK up Bapak Perry Widyananda tanggal5 Februari 2014;455) M.49: 1 (satu) lembar KLARIFIKASI HPS BIAYAMOB/DEMOB RIG, PT.
ABS KepadaSubKontraktor pelaksana Pekerjaan dalam pelaksanaanManajemen Proyek Pemboran Terpadu Pertamina EPCADK 2014; MOB DEMOB;641) O.51: 1 (satu) bundel Dokumen fotocopy buktiPembayaran Pelaksanaan Pekerjaan PT. ABS KepadaSubKontraktor pelaksana Pekerjaan dalam pelaksanaanManajemen Proyek Pemboran Terpadu Pertamina EPCADK 2014; Atas Nama PT. SCHLUMBERGER;642) O.52: 1 (satu) Bundel Dokumen fotocopy buktiPembayaran Pelaksanaan Pekerjaan PT.