Ditemukan 3 data

Urut Berdasarkan
 
Register : 01-07-2013 — Putus : 19-09-2013 — Upload : 09-01-2017
Putusan PT BANGKA BELITUNG Nomor 7/PID/TPK/2013/PT.BABEL
Tanggal 19 September 2013 — - IMRON, SST Bin RADEN SALEH
8424
  • Pek = Jembatan Darurat = Ls 5,08 100,00 5,082. Pek = Pembongkaran Jembatan Lama Ls * 0,71 100,00 0,713. Pek = Bowplank Ls 0,20 100,00 0,204. Pek Pengedaman Ls 1,02 100,00 1,025. Pek Galian Pondasi SNI 61,60 m3 0,69 100,00 0,696. Pek Urugan Pasir SNI 5,04 m3 0,19 100,00 0,197. Pek Lantai Kerja SNI 5,04 m3 1,78 100,00 1,788. Pek Pondasi Batu Belah 7.9 98,20 m3 38,56 100,00 38,569. Pek Urugan Galian 1/3 Galian 3.2.(1)a 20,54 m3 0,71 100,00 0,7110.
    Pek = Jembatan Darurat Ls = 5,08 100,00 5,082. Pek = Pembongkaran Jembatan Lama Ls * 0,71 100,00 0,713. Pek Bowplank : Ls : 0,20 100,00 0,204. Pek Pengedaman = Ls 1,02 100,00 1,025. Pek Galian Pondasi SNI 61,60 m3 0,69 100,00 0,696. Pek Urugan Pasir SNI 5,04 m3 0,19 100,00 0,197. Pek Lantai Kerja SNI 5,04 m3 1,78 100,00 1,788. Pek = Pondasi Batu Belah 192 98,20 m3 38,56 100,00 38,569. Pek Urugan Galian 1/3 Galian 3.2.(1)a 20,54 m3 0,71 100,00 0,7110.
Register : 08-08-2022 — Putus : 12-12-2022 — Upload : 05-01-2023
Putusan PN MAKASSAR Nomor 954/Pid.Sus/2022/PN Mks
Tanggal 12 Desember 2022 — Penuntut Umum:
ANDI SYAHRIR, SH.,MH
Terdakwa:
SALAHUDDIN TOTO HARTONO, S.Hut ALIAS TOTO
12230
  • Meter Kubik, Tgl. 08 -11-2017, Nota, Volume = 5,292 Meter Kubik, Tgl. 17-11-2017, Nota, Volume = 4,956 Meter Kubik, Tgl. 17-11-2017, Nota, Volume = 4.83 Meter Kubik, Tgl. 21-11-2017, Nota, Volume = 4,92 Meter Kubik, Tgl. 21-11-2017, Nota,Volume = 4,997 Meter Kubik, Tgl. 23-11-2017, Nota,Volume = 5,050 Meter Kubik, Tgl. 25-11-2017, Nota, Volume = 5,305 Meter Kubik, Tgl. 25-11-2017, Nota,Volume = - Meter Kubik, Tgl. 27-11-2017, Nota, Volume = - Meter Kubik, Tgl. 27-11-2017, Nota,Volume = 5,082
Register : 26-01-2023 — Putus : 13-03-2023 — Upload : 13-03-2023
Putusan PT MAKASSAR Nomor 66/PID.SUS/2023/PT MKS
Tanggal 13 Maret 2023 — Pembanding/Penuntut Umum : ANDI SYAHRIR, SH.,MH
Terbanding/Terdakwa : SALAHUDDIN TOTO HARTONO, S.Hut ALIAS TOTO
10911
  • 5.330 m3, Tgl. 7-11-2017, Nota, Volume = 5.700 m3, Tgl. 7-11-2017, Nota, Volume = 5.082 m3, Tgl. 08 -11-2017, Nota, Volume = 5,292 m3, Tgl. 17-11-2017, Nota, Volume = 4,956 m3, Tgl. 17-11-2017, Nota, Volume = 4.83 m3, Tgl. 21-11-2017, Nota, Volume = 4,92 m3, Tgl. 21-11-2017, Nota,Volume = 4,997 m3, Tgl. 23-11-2017, Nota,Volume = 5,050 m3, Tgl. 25-11-2017, Nota, Volume = 5,305 m3, Tgl. 25-11-2017, Nota,Volume = - m3, Tgl. 27-11-2017, Nota, Volume = - m3, Tgl. 27-11-2017, Nota,Volume = 5,082