Ditemukan 4 data
169 — 124 — Berkekuatan Hukum Tetap
Brunei123 03/08/2008 463 410 53 9,130 483,890Sitanggang DarussalamDjatmiko Bris Brunei124 03/08/2008 463 410 53 9,130 483,890Witiaksono DarussalamFranciska Brunei125 03/08/2008 463 410 53 9,130 483,890Simanjuntak DarussalamRita Putri126 Salma Lima 10/08/2008 5,970 3,475 2,495 9,245 23,066,275Algamar127 Suhodo Lima 10/08/2008 5,970 3,475 2,495 9,245 23,066,275128 Suwoto Lima 10/08/2008 5,970 3,715 2,255 9,245 20,847,475129 Werdi Ariyani Lima 10/08/2008 5,970 3,475 2,495 9,245 23,066,275Iman130 Kuala
Brunei123 03/08/2008 463 410 53 9,130 483,890Sitanggang DarussalamDjatmiko Bris Brunei124 03/08/2008 463 410 53 9,130 483,890Witiaksono DarussalamFranciska Brunei125 03/08/2008 463 410 53 9,130 483,890Simanjuntak DarussalamRita Putri126 Salma Lima 10/08/2008 5,970 3,475 2,495 9,245 23,066,275Algamar127 Suhodo Lima 10/08/2008 5,970 3,475 2,495 9,245 23,066,275128 Suwoto Lima 10/08/2008 5,970 3,715 2,255 9,245 20,847,475129 Werdi Ariyani Lima 10/08/2008 5,970 3,475 2,495 9,245 23,066,275 Hal. 32 dari
Desi Yumenti, SH
Terdakwa:
Sora bin Ali Nurdin
17 — 4
Menetapkan barang bukti berupa:
- 1 (satu) bungkus narkotika jenis sabu dengan berat 9,245 (sembilan koma dua empat lima) gram, dirampas untuk dimusnahkan;
- 1 (satu) unit sepeda motor merk Yamaha Mio Sporty warna merah tanpa nopol, dikembalikan kepada terdakwa;
6. Membebankan kepadaTerdakwa membayar biaya perkara sejumlahRp.2.000,00 (Dua ribu rupiah);
34 — 32 — Berkekuatan Hukum Tetap
karena adanya selisih antara jumlah obyek PPN (Revenue)menurut SPT PPh Badan/GL yang dianggap lebih besar dari obyek PPNmenurut SPM PPN, dengan perician sebagai berikut : Uraian (USD)Obyek PPN:Mutasi Kredit Deferred Income Account 8,242,850.08Income from extra use of AC 114,046.51Income from interior work, power supply etc 44,946.47Secure Parking 178,335.24Reimbursement Electricity 122,914.91Reimbursement Telepon 516,598.34Maintenance Supply 2,798.28Proceed from Sale of Fixed Assets 22,954.00Jumlah 9,245
Terbanding/Terdakwa : H. MAHYUDIN, S.T., M.T. Bin H. MASTAWI ISMAIL
91 — 48
Bend 90 steel3,300 10.4 galvanis ND. 100 m 11.00 300,000.00 000.00 11.00 300,000.00 3,300,000.00 0.00mm , ,Mekanikal Joint 5.50010.5 steel galvanis buah 1.00 5,500,000.00 ; 1.00 5,500,000.00 5,500,000.00 0.00,000.00ND. 100 mmButterfly Valve10.6 ND. 100 mm, buah 1.00 9,245,000.00 9,245 1.00 9,245,000.00 9,245,000.00 0.00hand lever ,000.00operatedCheck valve 7,48210.7 ND.100 mm buah 1.00 7,482,000.00 000.00 1.00 7,482 ,000.00 7,482,000.00 0.0010g Beltvalvet buah 1.00 437,500.00 at 1.00 437,500.00 437,500.00
Teel air, buah 1.00 9,245,000.00 9,245 1.00 9,245,000.00 9,245,000.00 0.00hand lever operated ,000.0010.7 Check valve ND.100 mm buah 1.00 7,482,000.00 300 00 1.00 7,482,000.00 7,482,000.00 0.0010.8 Belt valve 1" broonze buah 1.00 437,500.00 soo 00 1.00 437,500.00 437,500.00 0.0010.9 Savety valve 1" buah 1.00 11,875,000.00 sono 1.00 11,875,000.00 11,875,000.00 0.0010.10 Loose flange ND.100 mm buah 8.00 600,000.00 306 00 8.00 600,000.00 4,800,000.00 0.0016.11 PAE!