Ditemukan 71 data

Urut Berdasarkan
 
Register : 18-10-2011 — Putus : 21-02-2008 — Upload : 17-10-2011
Putusan PN PALU Nomor 61K/PDT.G/2007/PN.PL
Tanggal 21 Februari 2008 — PERDATA PT. CIPTA BETON SINAR PERKASA VS CITRA NUANSA ELOK
12362
  • 31,500 9,450,000 51Sea Semen Bosowa 50 Zak 50 31,500 1,575,000 52aoe Semen Bosowa 300 Zak 300 31,500 9,450,000 53sooe Semen Bosowa 50 Zak 50 31,500 1,575,000 5A5000 Semen Bosowa 20 Zak 20 31,500 4,187,500 5531Ad 2006 Semen Tonasa 50 125 Zak 50 33,500 630 000 5643Au 2006 Semen Tonasa 100 Zak 100 33,500 3,350,000 583Au 2006 Semen Tonasa 100 Zak 10 33,500 3,350,000 593Au 2006 Semen Tonasa 5 Zak 5 33,500 167,500 602Au 2006 Semen Tonasa 50 Zak 50 33,500 1,675,000 6110 Au 2006 Semen Bosowa 60 Zak 60 32,000
    1,920,000 628Au 2006 Semen Bosowa 150 Zak 150 32,000 4,800,000 6310Au 2006 Semen Bosowa 5 Zak 5 32,000 160,000 645Au 2006 Semen Bosowa 110 Zak 110 32,000 3,520,000 65 11Au 2006 Semen Bosowa 15 Zak 15 33,500 502,500 T. 667Au 2006 Semen Bosowa 50 Zak 50 32,000 1,600,000 T. 674Au 2006 Semen Bosowa 20 Zak 20 32,000 640,000 T. 6812 Au 2006 Semen Bosowa 100 Zak 100 32,000 3,200,000 T. 6913Au 2006 Semen Bosowa 100 Zak 100 32,000 3,200,000 T. 7012Au 2006 Semen Bosowa 50 Zak 50 32,000 1,600,000 T. 7115Au
    2006 Semen Bosowa 3 Zak 3 32,000 96,000 T. 7222 Au 2006 Semen Bosowa 7 Zak 7 32,000 224,000 T. 7322Au 2006 Semen Bosowa 8 Zak 8 32,000 256,000 T. 7422Au 2006 Semen Bosowa 5 Zak 5 32,000 160,000 T. 7523 Au 2006 Semen Bosowa 5 Zak 5 32,000 160,000 T. 7623 Au 2006 Semen Bosowa 10 Zak 10 32,000 320,000 T. 7721 Au 2006 Semen Bosowa 15 zak 15 32,000 480,000 T. 7823 Au 2006 Semen Bsowa 2 Zak 2 32,000 64,000 T. 7923 Au 2006 Semen Bosowa 50 Zak 50 32,000 1,600,000 T. 8018Au 2006 Semen Tonasa 3 Zak + 2 Zak
    5 33,500 167,500 T. 8119Au 2006 Semen Tonasa 20 Zak 20 33,500 670,000 T. 8218Au 2006 Semen Tonasa 2 Zak 2 33,500 67,000 T. 8322Au 2006 Semen Tonasa 8 Zak 8 33,500 268,000 T. 8420 Au 2006 Semen Tonasa 15 Zak 15 33,500 502,500 T. 8519Au 2006 Semen Tonasa 30 Zak 30 33,500 1,005,000 T. 8625Au 2006 Semen Bosa 10 Zak 10 32,000 320,000 T. 8727 Au 2006 Semen Bosowa 5 Zak 5 32,000 160,000 T. 8824 Au 2006 Semen Bosowa 20 Zak 20 32,000 640,000 T. 8928Au 2006 Semen Bosowa 10 Zak 10 32,000 320,000 T. 90zoos
    semen eosowa 40 zek 401 ee 000 1 annm 1 T 9,26Au 2006 Semen Bosowa 10 Zak 10 32,000 320,000 T. 93 24 Au g 30 (20 2006 Semen Bosowa 10 Zak 10 32,000 320,000 9425Au 2006 Semen Bosowa 50 Zak 50 32,000 1,600,000 . 954S 2006 Semen Bosowa 20 Zak 20 30,000 640,000 . 964,450 181990 447,877,500Besi Ulir3Jun2008 Besi Ulir 10 m/m 150 Bt 150 50,000 8,250,000 T. 976Jun2006 Besi Ulir 10 m/m 200 Bt 200 55,000 11,000,000 . 98b1Jun2006 Besi Ulir 200 Bt 200 55,000 11,000,000 a)7Ju1 2006 Be N00. mish TBicveaiat 1S
Register : 11-05-2012 — Putus : 28-05-2013 — Upload : 08-11-2013
Putusan PENGADILAN PAJAK Nomor Put-45213/PP/M.IX/19/2013
Tanggal 28 Mei 2013 — Pemohon Banding dan Terbanding
11227
  • ., melakukanpemesanan Alat Bagian Sepeda (9 jenis barang sesuai lembar lanjutan PIB)berdasarkan Purchase Order Nomor: POCN09001 tanggal 18 September2011 dengan perincian sebagai berikut: NO PRODUCT QUANTITY UNIT PRICE (USD) TOTAL(USD)1 Small Pedal for Children Cycle 3,000 0.30 900.002 Freewheel 18/20T 32,000 0.20 6,400.003 Wire Basket 5,400 0.25 1,350.004 Chain 3,500 0.30 1,050.005 BB Axle 500 1.20 600.006 Hub Spindle 1,200 0.48 576.007 BB Cup R/L 6,000 0.12 720.008 Hub F/R 400 0.40 160.009 Bicycle
    Steel Ball 35,000 0.14 4,900.00TOTAL USD 16,656.00 bahwa Pemohon Banding dan Supplier Grand Ocean Trading Co., melakukanperjanjian berdasarkan Sales Contract Nomor: GEOC1720 tanggal 05September 2011, dengan perincian sebagai berikut: NO PRODUCT QUANTITY UNIT PRICE TOTAL(USD) (USD)1 Small Pedal for Children Cycle 3,000 0.30 900.002 Freewheel 18/20T 32,000 0.20 6,400.003 Wire Basket 5,400 0.25 1,350.004 Chain 3,500 0.30 1,050.005 BB Axle 500 1.20 600.006 Hub Spindle 1,200 0.48 576.007 BB Cup R/L 6,000
    0.12 720.008 Hub F/R 400 0.40 160.009 Bicycle Steel Ball 35,000 0.14 4,900.00TOTAL C&F JAKARTA 16,656.00USD bahwa Grand Ocean Trading Co., selanjutnya menerbitkan Invoice Nomor:PG11110091 tanggal 05 Oktober 2011, dengan rincian sebagai berikut: NO PRODUCT QUANTITY UNIT PRICE TOTAL(USD) (USD)1 Small Pedal for Children Cycle 3,000 0.30 900.002 Freewheel 18/20T 32,000 0.20 6,400.003 Wire Basket 5,400 0.25 1,350.004 Chain 3,500 0.30 1,050.005 BB Axle 500 1.20 600.006 Hub Spindle 1,200 0.48 576.007 BB
Putus : 26-06-2011 — Upload : 20-10-2011
Putusan PTA MATARAM Nomor 26/Pdt.G/2011/PTA.MTR
Tanggal 26 Juni 2011 — pembanding v terbanding
4419
  • 90.000TUTUP KOTAK 30 4,000 120,000GANTUNGAN KOTAK 10 2,500 25,000ENGSEL BIASA 110 ENGSEL H 80 7 600,000 4,200,000ENGSEL NILON 3 4 36,000 144,000ENGSEL NILON 4 4 46,000 184,000ENGSEL HPP 3 3 60,000 180,000ENGSEL HPP 4 3 84,000 252,000ENGSEL HPP 5 3 120,000 360,000ENGSEL GOMEO 5 3 216,000 648,000ENGSEL IMPRIAL 3 1 150,000 150,000ENGSEL IMPRIAL 4 1 15,000 15,000ENGSEL IMPRIAL 5 1 21,000 21,000GRENDEL 2 7 25,000 175,000GRENDEL KUNINGAN 3 4 35,000 140,000GRENDEL KUNINGAN 4 5 40,000 200,000GRENDEL 3 5 32,000
    1,800,000TERPAL SILVER BIASA6 x 8 4 240,000 960,000TERPAL GAJAH BIASA2 x 3 3 24,000 72,000TERPAL GAJAH BIASA5 x 6 12 120,000 1,440,000TERPAL GAJAH BIASA6x 7 6 168,000 1,008,000TERPAL GAJAH BIASA6 x 8 4 142,000 568,000TERPAL GAJAH BIASA 2 13 10 x 12 480,000 960,000KEROROK PUTIH 7 2,000 14,000KEROROK TERPAL 4 4,000 16,000PAYUNG 12 15,000 180,000SELANG 5/8 20 100,000 2,000,000KARUNG 25 KG 5 900,000 4,500,000SOK TALANG 1/2 I 15 3,000 45,000TUTUP 10 6,000 60,000GANTUNGAN 12 6,000 72,000SANGER TALANG 1/2 I16 IN 6 32,000
    144,000 576,000LEM RAJAWALI HITAM 6 120,000 720,000SHOWER CEBOK 30 40,000 1,200,000PEWARNA PLITURCOKLAT+KUNING 19 500 9,500ASAH PISAU 17 17,000 289,000ASAH GERINDA TCT 4IN 6 150,000 900,000KARET SERUT BIASA 20 10,000 200,000GUNTING KODOK 50 15,000 750,000KELSIBAT 108 15,000 1,620,000 27 KOLAKER ARCO 150 10,000 1,500,000KEREKAN SUMUR 35 30,000 1,050,000KUNCI BESI 250 15,000 3,750,000BAT TAP 1 700,000KERETA DORONG BARANG 20 300,000 6,000,000CAMPURAN CAT TEMBOK 600 10,000 6,000,000KALSIUM 40 KG 200 32,000
    6,400,000KALSIUM 25 KG 200 25,000 5,000,000SEMEN GRK 30 47,000 1,410,000KALSIUM 55 2,600 143,000MILL 650 6,000 3,900,000KAPUR 700 7,000 4,900,000BESI 14 K 60 68,000 4,080,000BEST 12 G 105 57,000 5,985,000BESI 12 K 200 47,000 9,400,000BESI 10 G 280 38,000 10,640,000BESI 8 G 280 32,000 8,960,000BEST ULIR 40 100,000 4,000,000PIPA Gl 40 40,000 1,600,000PIPA Gl 30 50,000 1,500,000PIPA Gl 30 65,000 1,950,000PIPA Gl 10 90,000 900,000PIPA Gl 10 150,000 1,500,000PIPA Gl 7 160,000 1,120,000PIPA KOTAK 80 25,000
Putus : 21-09-2018 — Upload : 16-11-2018
Putusan PN KENDARI Nomor 33/Pid.Sus-TPK/2018/PN.Kdi
Tanggal 21 September 2018 — - SAHRIN Bin ALI BINA
275176
  • DAKA MIGAS Bulan Tanggal 2011 (Liter) 2012 (Liter) 2013 (Liter)114 50,000 16,000 16,000Januari1531 10,000 44,000 44,000114 50,000 24,000 24,000Februari15 28 10,000 36,000 36,000114 32,000 37,000 56,000Maret1531 28,000 23,000 4,000114 55,000 29,000 40,000April15 30 5,000 31,000 20,000114 47,000 32,000 Mei1531 13,000 28,000 60,000Juni 114 37,000 10,000 16,000 Halaman ke 16 dari 101 halaman, Putusan Perkara No.33/Pid.SusTPK/2018/PN.
    Kdi 1530 23,000 50,000 40,000i 114 32,000 8,000 28,000uli1531 28,000 36,000 32,000114 29,000 55,000 40,000Agustus1531 31,000 20,000114 32,000 16,000 32,000September1530 28,000 44,000 28,000114 36,000 32,000 32,000Oktober1531 24,000 28,000 20,000114 24,000 32,000 8,000November1530 36,000 24,000 114 40,000 24,000 Desember1531 20,000 36,000 JUMLAH 720,000 695,000 596,000JUMLAH TOTAL 2,011,000 Bahwa terdakwa telah melakukan manipulasi laporan yaitu periode bulan Januari2011 sampai dengan bulan Oktober
Register : 11-12-2017 — Putus : 31-01-2018 — Upload : 07-03-2018
Putusan PN STABAT Nomor 1068/Pid.Sus/2017/PN STB
Tanggal 31 Januari 2018 — Penuntut Umum:
ENDHIE FADILLA.SH
Terdakwa:
FADLI IRAWAN
5616
    • Uang tunai Rp 32,000 (tiga puluh dua ribu rupiah)

    Dirampas untuk Negara.

    1. Membebankan kepada Terdakwa membayar biaya perkara sejumlah Rp 5000,. (lima ribu rupiah);

    Menetapkan barang bukti berupa :e 1 (satu) amplop daun, biji ganja yang dibungkus dengan kertas timahrokok.e 2 (dua) bungkus kertas tembakau cap wayang.e 1 (Satu) linting kertas rokok berisi ndaun ganja yang sudah dipakai.Dirampas untuk dimusnahkan.e Uang tunai Rp 32,000 (tiga puluh dua ribu rupiah)Dirampas untuk Negara.4.
    Bahwa terdakwa mengakui dan menyesali atas perbuatannya.Menimbang, bahwa Penuntut Umum mengajukan barang bukti sebagaiberikut:1 (Satu) amplop daun, biji ganja yang dibungkus dengan kertas timahrokok.e 2 (dua) bungkus kertas tembakau cap wayang.e 1 (Satu) linting kertas rokok berisi ndaun ganja yang sudah dipakai.e Uang tunai Rp 32,000 (tiga puluh dua ribu rupiah)Halaman 7 dari 13 Putusan Nomor 1068/Pid.Sus/2017/PN STBMenimbang, bahwa berdasarkan alat bukti dan barang bukti yangdiajukan diperoleh
    dipertimbangkan sebagai berikut:Menimbang, bahwa barang bukti berupa 1 (satu) amplop daun, bijiganja yang dibungkus dengan kertas timah rokok, 2 (dua) bungkus kertastembakau cap wayang, 1 (satu) linting kertas rokok berisi ndaun ganja yangsudah dipakai yang telah dipergunakan untuk melakukan kejahatan dandikhawatirkan akan dipergunakan untuk mengulangi kejahatan, maka perluditetapkan agar barang bukti tersebut seluruhnya dirampas untuk dimusnahkan;Menimbang, bahwa barang bukti berupa Uang tunai Rp 32,000
    Menetapkan barang bukti berupa:e 1 (satu) amplop daun, biji ganja yang dibungkus dengan kertas timahrokok.e 2 (dua) bungkus kertas tembakau cap wayang.e 1 (Satu) linting kertas rokok berisi ndaun ganja yang sudah dipakai.Dirampas untyuk dimusnahkan.e Uang tunai Rp 32,000 (tiga puluh dua ribu rupiah)Dirampas untuk Negara.6. Membebankan kepada Terdakwa membayar biaya perkara sejumlah Rp5000,.
Register : 02-01-2020 — Putus : 18-02-2020 — Upload : 18-02-2020
Putusan PT PALU Nomor 3/Pid.Sus-TPK/2020/PT PAL
Tanggal 18 Februari 2020 — Pembanding/Terbanding/Penuntut Umum : PALUPI WIRYAWAN SH
Terbanding/Pembanding/Terdakwa : ARSYAD PANGERAN ENTEDAIM, S. Sos., M. Ap.
7550
  • Paku Seng 10 Kg Rp. 32,000 Rp. 3:11 Paku Triplek 5 Kg Rp. 21.800 Rp. 112 Seng Plat 50 Meter Rp. 21.500 Rp. 1.0)13. Kawat Beton 10 Kg Rp. 23.400 Rp. 2.14 Kayu Kelas II 7,9 Me Rp.2.250.000 Rp. 16.815 Tripleks 35 Lembar Rp. 60.000 Rp 2.1 Halaman 5 dari 121 Putusan Nomor 3/Pid.SusTPK/2020/PT PAL 16. Engsel Pintu 15 Pasang Rp. 31.000 Rp. A17. Engsel Jendela 15 Pasang Rp. 28.000 Rp. 4Jumlah Rp. 100.01b.
    Paku Seng 12 kg Rp. 32,000 Rp. 3%11 Paku Triplek 6 Kg Rp. 24.900 Rp. 112 Seng Plat 60 Meter Rp. 21.000 Rp. 1.213. Kawat Beton 12 kg Rp. 21.000 Rp. 2!14 Kayu Kelas II 9 Ms Rp.2.250.000 Rp. 20.2!15 Triplek 42 lembar Rp. 60.000 Rp. 2.5.16. Engsel Pintu 18 Pasang Rp. 33.000 Rp. 517. Engsel Jendela 18 Pasang Rp. 28.000 Rp. 5Jumlah Rp. 120.01 C.
    Paku Seng 10 Kg Rp. 32,000 Rp. 320.00011 Paku Triplek 5 Kg Rp. 21.700 Rp. 108.50012 Seng Plat 50 Meter Rp. 21.500 Rp. 1.075.00013. Kawat Beton 10 Kg Rp. 23.400 Rp. 234.00014 Kayu Kelas II 7,5 M3 Rp.2.250.000 Rp. 16.875.00015 Triplek 35 lembar Rp. 57.000 Rp. 1.995.00016. Engsel Pintu 15 Pasang Rp. 31.000 Rp. 465.00017. Engsel Jendela 15 Pasang Rp. 28.000 Rp. 420.000Jumlah Rp. 100.000.000 d.
    Paku Seng 20 Kg Rp. 32,000 Rp. 611 Paku Triplek 10 Kg Rp. 21.800 Rp. 212 Seng Plat 80 Meter Rp. 21.500 Rp. 1.713. Kawat Beton 30 Kg Rp. 24.000 Rp. %14 Kayu Kelas II 15 Ms Rp.2.250.000 Rp. 33.715 Triplek 100 Lembar Rp. 60.000 Rp. 6.016. Engsel Pintu 40 Pasang Rp. 31.000 Rp. 1.217. Engsel Jendela 40 Pasang Rp. 28.000 Rp. 1,1Jumlah Rp. 200.0! e.
    Paku Seng 12 kg Rp. 32,000 Rp. 3%11 Paku Triplek 6 Kg Rp. 24.900 Rp. 1.12 Seng Plat 60 Meter Rp. 21.000 Rp. 1.213. Kawat Beton 12 kg Rp. 21.000 Rp. 2!14 Kayu Kelas II 9 Ms Rp.2.250.000 Rp. 20.2!15 Triplek 42 lembar Rp. 60.000 Rp 2.5;16. Engsel Pintu 18 Pasang Rp. 33.000 Rp. 517. Engsel Jendela 18 Pasang Rp. 28.000 Rp. 5Jumlah Rp. 120.01 C.
Register : 22-06-2012 — Putus : 28-05-2013 — Upload : 08-11-2013
Putusan PENGADILAN PAJAK Nomor Put-45222/PP/M.IX/19/2013
Tanggal 28 Mei 2013 — Pemohon Banding dan Terbanding
11132
  • tansJanuari 2012;Fotokopi Certificate of Analysis Nomor: 2999 tanggal 22 Desember 2011;Fotokopi Pembukuan; bahwa hasil pemeriksaan atas dokumen impor dan buktibukti yang diserahkan Pemohon Bandingpersidangan adalah sebagai berikut:bahwa Pemohon Banding dengan Purchase Order Nomor: CHP3011BASF tanggal 30 Novembmengajukan pembelian Expandable Polystyrene Styropor MP 303 kepada supplier BASF Sdndengan perincian sebagai berikut: Commodity Quantity (MT) Price/MT TExpandable Polystyrene Styropor MP 303 32,000
    Bhd. melakukan kontrak penjualan dengan Pemohon Banding sesuaiAcknowlodge Nomor: 6000034247 tanggal 13 Desember 2011, dengan perincian sebagai berikut: Description Qty Unit Price AStyropor MP 303 32,000 1,540.00 4Total Amount CIF Jakarta 4 bahwa BASF Sdn. Bhd. selanjutnya menerbitkan Invoice Nomor: 6500010129 tanggal 22 Desembdengan perincian sebagai berikut: Description Qty Unit Price AStyropor MP 303 16,000 1,540.00 2Styropor MP 303 16,000 1,540.00 2Total Amount CIF Jakarta 4 bahwa BASF Sdn.
Register : 20-12-2019 — Putus : 14-02-2020 — Upload : 21-02-2020
Putusan PT PALU Nomor 9/Pid.Sus-TPK/2019/PT PAL
Tanggal 14 Februari 2020 — Pembanding/Penuntut Umum : PALUPI WIRYAWAN SH
Terbanding/Terdakwa : KAHARUDDIN
14257
  • Paku Seng 10 Kg Rp. 32,000 Rp. 320.00011 Paku Triplek 5 Kg Rp. 21.800 Rp. 109.00012 Seng Plat 50 Meter Rp. 21.500 Rp. 1.075.00013. Kawat Beton 10 Kg Rp. 23.400 Rp. 234.00014 Kayu Kelas II 7,9 Me Rp.2.250.000 Rp. 16.875.00015 Tripleks 35 Lembar Rp. 60.000 Rp. 2.100.00016. Engsel Pintu 15 Pasang Rp. 31.000 Rp. 465.00017. Engsel Jendela 15 Pasang Rp. 28.000 Rp. 420.000Jumlah Rp. 100.000.000 b.
    Paku Seng 12 kg Rp. 32,000 Rp. 384.00011 Paku Triplek 6 Kg Rp. 24.900 Rp. 149.40012 Seng Plat 60 Meter Rp. 21.000 Rp. 1.260.00013. Kawat Beton 12 kg Rp. 21.000 Rp. 252.00014 Kayu Kelas Il 9 Ms Rp.2.250.000 Rp. 20.250.00015 Triplek 42 lembar Rp. 60.000 Rp 2.520.00016. Engsel Pintu 18 Pasang Rp. 33.000 Rp 594.00017. Engsel Jendela 18 Pasang Rp. 28.000 Rp. 504.000Jumlah Rp. 120.000.000 c.
    Paku Seng 10 Kg Rp. 32,000 Rp. 320.00011 Paku Triplek 5 Kg Rp. 21.700 Rp. 108.50012 Seng Plat 50 Meter Rp. 21.500 Rp. 1.075.00013. Kawat Beton 10 Kg Rp. 23.400 Rp. 234.00014 Kayu Kelas Il 7,9 Me Rp.2.250.000 Rp. 16.875.00015 Triplek 35 lembar Rp. 57.000 Rp 1.995.00016. Engsel Pintu 15 Pasang Rp. 31.000 Rp. 465.00017.
    Paku Seng 12 Kg Rp. 32,000 Rp. 384.00011 Paku Triplek 6 Kg Rp. 24.900 Rp. 149.40012 Seng Plat 60 Meter Rp. 21.000 Rp. 1.260.00013. Kawat Beton 12 Kg Rp. 21.000 Rp. 252.00014 Kayu Kelas Il 9 Ms Rp.2.250.000 Rp. 20.250.00015 Triplek 42 Lembar Rp. 60.000 Rp 2.520.00016. Engsel Pintu 18 Pasang Rp. 33.000 Rp 594.00017. Engsel Jendela 18 Pasang Rp. 28.000 Rp. 504.000Jumlah Rp. 120.000.000 c.
    Paku Seng 10 Kg Rp. 32,000 Rp. 320.00011 Paku Triplek 5 Kg Rp. 21.700 Rp. 108.50012 Seng Plat 50 Meter Rp. 21.500 Rp. 1.075.00013. Kawat Beton 10 Kg Rp. 23.400 Rp. 234.00014 Kayu Kelas Il 7,9 Ms Rp.2.250.000 Rp. 16.875.00015 Triplek 35 lembar Rp. 57.000 Rp 1.995.00016. Engsel Pintu 15 Pasang Rp. 31.000 Rp 465.00017. Engsel Jendela 15 Pasang Rp. 28.000 Rp 420.000Jumlah Rp. 100.000.000 d.
Register : 03-01-2020 — Putus : 14-02-2020 — Upload : 14-02-2020
Putusan PT PALU Nomor 4/Pid.Sus-TPK/2020/PT PAL
Tanggal 14 Februari 2020 — Pembanding/Penuntut Umum : PALUPI WIRYAWAN SH
Terbanding/Terdakwa : ANDI BASO PATADUNGI
10499
  • Paku Seng 10 Kg Rp. 32,000 Rp. 320.00011 Paku Triplek 5 Kg Rp. 21.800 Rp. 109.00012 Seng Plat 50 Meter Rp. 21.500 Rp. 1.075.00013. Kawat Beton 10 Kg Rp. 23.400 Rp. 234.00014 Kayu Kelas II 7,9 Me Rp.2.250.000 Rp. 16.875.00015 Tripleks 35 Lembar Rp. 60.000 Rp. 2.100.00016. Engsel Pintu 15 Pasang Rp. 31.000 Rp. 465.00017. Engsel Jendela 15 Pasang Rp. 28.000 Rp. 420.000Jumlah Rp. 100.000.000 .
    Paku Seng 12 kg Rp. 32,000 Rp. 384.00011 Paku Triplek 6 Kg Rp. 24.900 Rp. 149.40012 Seng Plat 60 Meter Rp. 21.000 Rp. 1.260.00013. Kawat Beton 12 kg Rp. 21.000 Rp. 252.00014 Kayu Kelas Il 9 Ms Rp.2.250.000 Rp. 20.250.00015 Triplek 42 lembar Rp. 60.000 Rp 2.520.00016. Engsel Pintu 18 Pasang Rp. 33.000 Rp 594.00017. Engsel Jendela 18 Pasang Rp. 28.000 Rp. 504.000Jumlah Rp. 120.000.000 c.
    Paku Seng 10 Kg Rp. 32,000 Rp. 320.00011 Paku Triplek 5 Kg Rp. 21.700 Rp. 108.50012 Seng Plat 50 Meter Rp. 21.500 Rp. 1.075.00013. Kawat Beton 10 Kg Rp. 23.400 Rp. 234.00014 Kayu Kelas Il 7,9 Me Rp.2.250.000 Rp. 16.875.00015 Triplek 35 lembar Rp. 57.000 Rp 1.995.00016. Engsel Pintu 15 Pasang Rp. 31.000 Rp. 465.00017.
    Paku Seng 12 Kg Rp. 32,000 Rp. 384.00011 Paku Triplek 6 Kg Rp. 24.900 Rp. 149.40012 Seng Plat 60 Meter Rp. 21.000 Rp. 1.260.00013. Kawat Beton 12 Kg Rp. 21.000 Rp. 252.00014 Kayu Kelas Il 9 Ms Rp.2.250.000 Rp. 20.250.00015 Triplek 42 Lembar Rp. 60.000 Rp 2.520.00016. Engsel Pintu 18 Pasang Rp. 33.000 Rp 594.00017. Engsel Jendela 18 Pasang Rp. 28.000 Rp. 504.000Jumlah Rp. 120.000.000 c.
    Paku Seng 10 Kg Rp. 32,000 Rp. 320.00011 Paku Triplek 5 Kg Rp. 21.700 Rp. 108.50012 Seng Plat 50 Meter Rp. 21.500 Rp. 1.075.00013. Kawat Beton 10 Kg Rp. 23.400 Rp. 234.00014 Kayu Kelas Il 7,9 Ms Rp.2.250.000 Rp. 16.875.00015 Triplek 35 lembar Rp. 57.000 Rp 1.995.00016. Engsel Pintu 15 Pasang Rp. 31.000 Rp 465.00017. Engsel Jendela 15 Pasang Rp. 28.000 Rp 420.000Jumlah Rp. 100.000.000 d.
Register : 02-01-2020 — Putus : 14-02-2020 — Upload : 14-02-2020
Putusan PT PALU Nomor 2/Pid.Sus-TPK/2020/PT PAL
Tanggal 14 Februari 2020 — Pembanding/Terbanding/Penuntut Umum : PALUPI WIRYAWAN SH
Terbanding/Pembanding/Terdakwa : ABD HARIS M. NUR
138113
  • Paku Seng 10 Kg Rp. 32,000 Rp. 320.00011 Paku Triplek 5 Kg Rp. 21.800 Rp. 109.00012 Seng Plat 50 Meter Rp. 21.500 Rp. 1.075.00013. Kawat Beton 10 Kg Rp. 23.400 Rp. 234.00014 Kayu Kelas II 7,5 Ms Rp.2.250.000 Rp. 16.875.00015 Tripleks 35 Lembar Rp. 60.000 Rp. 2.100.00016. Engsel Pintu 15 Pasang Rp. 31.000 Rp. 465.00017. Engsel Jendela 15 Pasang Rp. 28.000 Rp. 420.000Jumlah Rp. 100.000.000 b.
    Paku Seng 12 kg Rp. 32,000 Rp. 384.00011 Paku Triplek 6 Kg Rp. 24.900 Rp. 149.40012 Seng Plat 60 Meter Rp. 21.000 Rp. 1.260.00013. Kawat Beton 12 kg Rp. 21.000 Rp. 252.00014 Kayu Kelas Il 9 Ms Rp.2.250.000 Rp. 20.250.00015 Triplek 42 lembar Rp. 60.000 Rp 2.520.00016. Engsel Pintu 18 Pasang Rp. 33.000 Rp. 594.00017. Engsel Jendela 18 Pasang Rp. 28.000 Rp. 504.000Jumlah Rp. 120.000.000 c.
    Paku Seng 10 Kg Rp. 32,000 Rp. 320.00011 Paku Triplek 5 Kg Rp. 21.700 Rp. 108.50012 Seng Plat 50 Meter Rp. 21.500 Rp. 1.075.00013. Kawat Beton 10 Kg Rp. 23.400 Rp. 234.00014 Kayu Kelas II 7,9 Ms Rp.2.250.000 Rp. 16.875.00015 Triplek 35 lembar Rp. 57.000 Rp. 1.995.00016. Engsel Pintu 15 Pasang Rp. 31.000 Rp. 465.00017.
    Paku Seng 10 Kg Rp. 32,000 Rp. 320.00011 Paku Triplek 5 Kg Rp. 21.700 Rp. 108.50012 Seng Plat 50 Meter Rp. 21.500 Rp. 1.075.00013. Kawat Beton 10 Kg Rp. 23.400 Rp. 234.00014 Kayu Kelas Il 7,9 Ms Rp.2.250.000 Rp. 16.875.00015 Triplek 35 lembar Rp. 57.000 Rp. 1.995.00016. Engsel Pintu 15 Pasang Rp. 31.000 Rp. 465.00017. Engsel Jendela 15 Pasang Rp. 28.000 Rp. 420.000Jumlah Rp. 100.000.000 d.
    Paku Seng 10 Kg Rp. 32,000 Rp. 320.00011 Paku Triplek 5 Kg Rp. 21.700 Rp. 108.50012 Seng Plat 50 Meter Rp. 21.500 Rp. 1.075.00013. Kawat Beton 10 Kg Rp. 23.400 Rp. 234.00014 Kayu Kelas Il 7,9 Me Rp.2.250.000 Rp. 16.875.00015 Triplek 35 lembar Rp. 57.000 Rp. 1.995.00016. Engsel Pintu 15 Pasang Rp. 31.000 Rp. 465.00017. Engsel Jendela 15 Pasang Rp. 28.000 Rp 420.000Jumlah Rp. 100.000.000 d.
Register : 18-06-2019 — Putus : 24-09-2019 — Upload : 24-09-2019
Putusan PA BADUNG Nomor 0121/Pdt.G/2019/PA.Bdg
Tanggal 24 September 2019 — Penggugat melawan Tergugat
4817
  • Jelas keterangan yang diberikan oleh Termohon kepada tetanggatersebut adalah bohong dan tidak benar, oleh karena saat perkiraanTermohon pergi dari rumah, Pemohon sedang berada di Jakarta;ALASAN TERMOHON PERGI DARI RUMAH SECARA DIAMDIAM, TANPAIZINDAN TANPA SEPENGETAHUAN PEMOHON14.15.Bahwa pada saat Termohon pergi meninggalkan rumah secara diamdiam, tanpa izin dan sepengetahuan Pemohon, Termohon juga diketahuimembawa kabur uang tunai milik Pemohon sebesar USD 32,000 atausetara Rp. 500.000.000, yang
    Pemohon dengan kejadian perginya Termohon secara diamdiamdengan membawa semua harta milik keluarga uang tunai milikPemohon sebesar USD 32,000 atau setara Rp. 500.000.000, yangdisimpan di rumah, 1 (satu) unit Mobil Mazda CX5 dengan NomorPolisi DK 1547 FZ, perhiasan milik Pemohon, dan dokumendokumen pribadi Pemohon, semakin yakin bahwa memang benarsatusatunya alasan Termohon pergi adalah diduga untukmeninggalkan Pemohon dan menikah lagi dengan orang lain.Bahkan Pemohon menduga Termohon telah cukup
    dilakukan Termohon:Halaman 8 dari 37 hal.Putusan Nomor 0XXX/Pat.G/2019/PA Bag.f.Pergi/Kabur dari rumah malam hari pada tanggal 19 November 2018tanpa izin dan sepengetahuan Pemohon, dan alasan pergi/kaburpatut diduga karena ingin menikah lagi dengan orang lain;Turut membawa ANAK ke Wonogiri, sampai akhirnya pihak sekolahBlue Dolphin di Bali tempat ANAK selama ini sekolah,mengkonfirmasi dan menanyakan kepada Pemohon mengapa ANAKtidak masuk sekolah lagi;Turut membawa uang tunai milik Pemohon sebesar USD 32,000
    kesalahan besar, dan membahayakan kondisiANAK;Oleh karena itu, Pemohon kemudian berinisiatif untuk kembali ke Wonogiriuntuk menjemput dan meminta ANAK ikut dengan Pemohon, danterhitung sejak bulan Januari 2019 sampai saat ini, ANAK tinggal bersamadengan Pemohon dan diasuh Pemohon, dan melalui pembicaraan denganTermohon, maka Termohon sepakat dan setuju bahwa yang bertanggungjawab untuk mengasuh anak adalah Pemohon, karena kondisi terakhirTermohon mengatakan kepada Pemohon bahwa uang Pemohon sebesarUSD 32,000
    Termohon menyatakan dirinya tidak mampu mengasuh ANAK karenatidak memiliki penghasilan, dan uang sebesar USD 32,000 yangdibawa kabur dari Bali ke Wonogiri telah habis dipakai untuk konsumsipribadi dan belanja;f. Termohon juga menyatakan setuju agar ANAK diasuh oleh Pemohon;g.
Putus : 31-03-2011 — Upload : 08-05-2012
Putusan PN PURBALINGGA Nomor 52/Pid.B/2011/PN. Pbg.
Tanggal 31 Maret 2011 — DARWIN alias AWING Bin WAJIB
332
  • HARYANTO awalnya terdakwa tidak mengakuinya tetapi penjualayam tersebut hafal dan paham dengan terdakwa dan mengakuitelah membeli mentok dari terdakwa seharga Rp. 32,000 (tiga puluhdua ribu rupiah), Akhirnya terdakwa mengakui telah mengambi!mentok milik Sdr.
Putus : 24-04-2012 — Upload : 13-11-2012
Putusan MAHKAMAH AGUNG Nomor 109 K/Pdt.Sus/2012
Tanggal 24 April 2012 — PT. LEGONG BALI NUSANTARA, dk. vs JULIANTO/JULIUS TJAHJONO
290164 Berkekuatan Hukum Tetap
  • SIOK yang tidak dapat dijual selama periode mulai daritahun 2003 sampai dengan tahun 2009 baik di dalam negeri maupun di luarnegeri adalah sebesar :Tahun 2003 Dalam negeri/Lokal 192 x 16 x 32,000 98.304.000.Belanda 304 x 16 x 32,000 155.648.000,Singapore 153 x 16 x 32,000 78.336.000,Total 332.288.000,Tahun 2004 Dalam negeri/Lokal 240 x 16 x 33,000 126.720.000,Belanda 263 x 16 x 33,000 138.864.000,Singapore 167 x 16x 33,000 88.176.000,hal. 13 dari 30 hal. Put.
Putus : 28-01-2016 — Upload : 17-05-2016
Putusan MAHKAMAH AGUNG Nomor 2125 K/Pdt/2014
Tanggal 28 Januari 2016 — PT. SEKAWAN MAKMUR BERSAMA VS QUADRA COMMODITIES, SA
11569 Berkekuatan Hukum Tetap
  • Kg; Kontrak Nomor 07/07/3ASMB/2010 tertanggal 1 Juli 2010 untuk jual belikedelai sebanyak 31,500 Metrik Ton dengan harga Rp4.500, per Kg; Kontrak Nomor 08/07/3ASMB/2010 tertanggal 29 Juli 2010 untuk jualbeli kedelai sebanyak 40,000 Metrik Ton dengan harga Rp4.500, per Kg; Kontrak Nomor 09/09/3ASMB/2010 tertanggal 2 September 2010 untukjual beli kedelai sebanyak 28,500 Metrik Ton dengan harga Rp4.600, perKg; Kontrak Nomor 10/10/3ASMB/2010 tertanggal 12 Oktober 2010 untukjuga beli kedelai sebanyak 32,000
    Nomor 2125 K/Pdt/2014Kontrak Nomor 08/07/3ASMB/2010 tertanggal 29 Juli 2010 untuk jualbeli kedelai sebanyak 40,000 Metrik Ton dengan harga Rp4.500, per Kg;Kontrak Nomor 09/09/3ASMB/2010 tertanggal 2 September 2010 untukjual beli kedelai sebanyak 28,500 Metrik Ton dengan harga Rp4.600,per Kg;Kontrak Nomor 10/10/3ASMB/2010 tertanggal 12 Oktober 2010 untukjual beli kedelai sebanyak 32,000 Metrik Ton dengan harga Rp4.800, perKg;Kontrak Nomor 11/11/8ASMB/2010 tertanggal 8 November 2010 untukjual beli
    , perKg;Kontrak Nomor 07/07/3ASMB/2010 tertanggal 1 Juli 2010 untuk jualbeli kedelai sebanyak 31,500 Metrik Ton dengan harga Rp4.500, perKg;Kontrak Nomor 08/07/3ASMB/2010 tertanggal 29 Juli 2010 untuk jualbeli kedelai sebanyak 40,000 Metrik Ton dengan harga Rp4.500, perKg;Kontrak Nomor 09/09/3ASMB/2010 tertanggal 2 September 2010untuk jual beli kedelai sebanyak 28,500 Metrik Ton dengan hargaRp4.600, per Kg;Kontrak Nomor 10/10/3ASMB/2010 tertanggal 12 Oktober 2010untuk jual beli kedelai sebanyak 32,000
Register : 15-04-2016 — Putus : 18-05-2016 — Upload : 01-08-2016
Putusan PT PALU Nomor 3/Pid.Sus-TPK/2016/PT PAL
Tanggal 18 Mei 2016 — YUSNITA FITARINI SIBAY, S.T.
6434
  • Paking karet 4 Bh 36,000 32,000 4,000 17.500,00 70.000,005. Mur baut Bh 288,000 64.000 224 8.775,00 1.965.600,006. Pengelasan Cm 360,000 320,000 40,000 3.156,80 644.124,60Flanged Steel7.
    104.106.69PEMBUATAN HIDRAN UMUMTangki Air Bh 2,000 2,000 0,000 1.800.000,00 0,00 Dihitung1000 liter tersendirisebagaispesifikasiyang tidaksesuaiPEMBUATAN PENGURASPEKERJAAN STREET BOX PENGURASPEKERJAAN ACCESSORIES PENGURASMur Baut Bh 40,000 24,000 16,000 8.775,00 140.400,005/8 3 PEKERJAAN PERLINTASAN 12 MFlanged Bh 24,000 16,000 8,000 135.937,50Steel 4 1.087.500,00Flamged Bh 16,000 0,000 16,000 163.125,00 2.610.000,0Socket 4 0Flanged Bh 8,000 0,000 8,000 163.125,00 1.305.000,0Spigot 0Paking karet Bh 36,000 32,000
    Paking karet Bh 36,000 32,000 4,000 17.500,00 70.000,0045. Mur baut Bh 288,000 64.000 224 8.775,00 1.965.600,006. Pengelasan Cm 360,000 320,000 40,000 3.156,80 644.124,60FlangedSteel7. Pengecatan M? 28,000 0,000 28,000 23.004,45 644.124,60TOTAL KEKURANGAN PEKERJAAN 38.218.824,29PENGHITUNGAN BIAYA KEMAHALAN PENGELASAN PIPA GIP 4 NO. URAIAN HARGA HARGA SELISIH VOLUME TOTALLOKASI SATUAN SATUAN HARGA KONTRAK SELISIHPENGERJAAN KONTRAK KONTRAK 2(RP) (RP)1.
Register : 01-12-2014 — Putus : 16-01-2015 — Upload : 03-09-2020
Putusan PT PALU Nomor 35/PID.TPK/2014/PT PAL
Tanggal 16 Januari 2015 — Pembanding/Terdakwa : HAERUDDIN
Terbanding/Jaksa Penuntut : BASO BARAHIMA, SH
4322
  • Balok Lantai 20/40 cm K275 Bagian Tengah (400 m'),kuantitas sesuai kontrak = 32,000 m3 dengan harga sebesar Rp.142.692.016,00 sedangkan kuantitas terlaksana = 30,200 m3Halaman 6 dari 30 Putusan Nomor 35/Pid.Sus.TPK/2014/PT PALdengan harga sebesar Rp. 134.665.590,10 dengan selisin kuantitas= 1,800m3 sehingga selisin kuantitas sebesar Rp. 8.026.425,90;d.
    Balok Lantai 20/40 cm K275 Bagian Tengah (400 m),kuantitas sesuai kontrak = 32,000 m3 dengan harga sebesarRp. 142.692.016,00 sedangkan kuantitas terlaksana = 30,200 m3dengan harga sebesar Rp. 134.665.590,10 dengan selisin kuantitas= 1,800 m3 sehingga selisin kuantitas sebesarRp. 8.026.425,90;d.
Register : 15-04-2016 — Putus : 18-05-2016 — Upload : 02-08-2016
Putusan PT PALU Nomor 6/Pid.Sus-TPK/2016/PT PAL
Tanggal 18 Mei 2016 — WAHYUDIN M. GAGARAMUSU, S.Sos. alias Budo
8331
  • Dihitung1000 liter tersendirisebagaispesifikasiyang tidaksesuaiIVPEMBUATAN PENGURAS Halaman 1 dari 52 Putusan Nomor 6/Pid.SusTPK/2016/PT PAL PEKERJAAN STREET BOX PENGURAS PEKERJAAN ACCESSORIES PENGURAS Mur Baut 5/83 Bh 40,000 24,000 16,000 8.775,00 140.400,00 VIPEKERJAAN PERLINTASAN 12 M Flanged Steel 4 Bh 24,000 16,000 8,000 135.937,50 1.087.500,00 4Flamged Socket Bh 16,000 0,000 16,000 163.125,00 2.610.000,00 Flanged Spigot Bh 8,000 0,000 8,000 163.125,00 1.305.000,00 Paking karet 4 Bh 36,000 32,000
    Paking karet Bh 36,000 32,000 4,000 17.500,004 70.000,005: Mur baut Bh 288,000 64.000 224 8.775,00 1.965.600,006. Pengelasan Cm 360,000 320,000 40,000 3.156,80Flanged 644.124,60Steelhe Pengecatan M? 28,000 0,000 28,000 23.004,45644.124,60TOTAL KEKURANGAN PEKERJAAN 38.218.824,29PENGHITUNGAN BIAYA KEMAHALAN PENGELASAN PIPA GIP 4 NO. URAIAN HARGA HARGA SELISTH VOLUME TOTALLOKASI SATUAN SATUAN HARGA KONTRAK SELISIHPENGERJAAN KONTRAK KONTRAK 2(RP) (RP)1.
    104.106.69PEMBUATAN HIDRAN UMUMTangki Air Bh 2,000 2,000 0,000 1.800.000,00 0,00 Dihitung1000 liter tersendirisebagaispesifikasiyang tidaksesuaiPEMBUATAN PENGURASPEKERJAAN STREET BOX PENGURASPEKERJAAN ACCESSORIES PENGURASMur Baut Bh 40,000 24,000 16,000 8.775,00 140.400,005/8 3PEKERJAAN PERLINTASAN 12 MFlanged Bh 24,000 16,000 8,000 135.937,50 1.087.500,0Steel 4 0Flamged Bh 16,000 0,000 16,000 163.125,00 2.610.000,0Socket 4 0Flanged Bh 8,000 0,000 8,000 163.125,00 1.305.000,0Spigot 0Paking karet Bh 36,000 32,000
Register : 15-04-2016 — Putus : 18-05-2016 — Upload : 01-08-2016
Putusan PT PALU Nomor 5/Pid.Sus-TPK/2016/PT PAL
Tanggal 18 Mei 2016 — JONI B. RAMLI, S.T.
6525
  • Paking karet 4 Bh 36,000 32,000 4,000 17.500,00 70.000,005. Mur baut Bh 288,000 64.000 224 8.775,00 1.965.600,006. Pengelasan Cm 360,000 320,000 40,000 3.156,80 644.124,60Flanged Steel7. Pengecatan M2? 28,000 0,000 28,000 23.004,45 644.124,60TOTAL KEKURANGAN PEKERJAAN 38.218.824,29PENGHITUNGAN BIAYA KEMAHALAN PENGELASAN PIPA GIP 4 NO!URAIAN LOKASI HARGA HARGA SELISIH VOLUME TOTAL SELISIHPENGERJAAN SATUAN SATUAN HARGA KONTRAKKONTRAK KONTRAK2(RP) (RP)1.
    104.106.69PEMBUATAN HIDRAN UMUMTangki Air Bh 2,000 2,000 0,000 1.800.000,00 0,00 Dihitung1000 liter tersendirisebagaispesifikasiyang tidaksesuaiPEMBUATAN PENGURASPEKERJAAN STREET BOX PENGURASPEKERJAAN ACCESSORIES PENGURASMur Baut Bh 40,000 24,000 16,000 8.775,00 140.400,005/8 3 PEKERJAAN PERLINTASAN 12 MFlanged Bh 24,000 16,000 8,000 135.937,50Steel 4 1.087.500,00Flamged Bh 16,000 0,000 16,000 163.125,00 2.610.000,0Socket 4 0Flanged Bh 8,000 0,000 8,000 163.125,00 1.305.000,0Spigot 0Paking karet Bh 36,000 32,000
    Paking karet Bh 36,000 32,000 4,000 17.500,00 70.000,0045: Mur baut Bh 288,000 64.000 224 8.775,00 1.965.600,006. Pengelasan Cm 360,000 320,000 40,000 3.156,80 644.124,60FlangedSteel7. Pengecatan M? 28,000 0,000 28,000 23.004,45 644.124,60TOTAL KEKURANGAN PEKERJAAN 38.218.824,29PENGHITUNGAN BIAYA KEMAHALAN PENGELASAN PIPA GIP 4 NO. URAIAN HARGA HARGA SELISIH VOLUME TOTALLOKASI SATUAN SATUAN HARGA KONTRAK SELISIHPENGERJAAN KONTRAK KONTRAK 2(RP) (RP)1.
Register : 25-07-2011 — Putus : 15-08-2012 — Upload : 14-04-2014
Putusan PN JAKARTA SELATAN Nomor 444/Pdt.G/2011/PN.Jkt.Sel.
Tanggal 15 Agustus 2012 —
12374
  • Kontrak Nomor 07/07/3ASMB/2010 tertanggal 1 Juli 2010untuk jual beli kKedelai sebanyak 31,500 Metrik Ton denganharga Rp. 4.500, per Kg ;Kontrak Nomor 08/07/3ASMB/2010 tertanggal 29 Juli 2010untuk jual beli kKedelai sebanyak 40,000 Metrik Ton denganharga Rp. 4.500, per Kg ;Kontrak Nomor 09/09/3ASMB/2010 tertanggal 2 September2010 untuk jual beli kedelai sebanyak 28,500 Metrik Tondengan harga Rp. 4.600, per Kg;Kontrak Nomor 10/10/3ASMB/2010 tertanggal 12 Oktober2010 untuk jugal beli kedelai sebanyak 32,000
    Kontrak Nomor 07/07/3ASMB/2010 tertanggal 1 Juli 2010untuk jual beli kedelai sebanyak 31,500 Metrik Ton denganharga Rp. 4.500, per Kg ;Kontrak Nomor 08/07/3ASMB/2010 tertanggal 29 Juli 2010untuk jual beli kedelai sebanyak 40,000 Metrik Ton denganharga Rp. 4.500, per Kg ;Kontrak Nomor 09/09/3ASMB/2010 tertanggal 2September 2010 untuk jual beli kedelai sebanyak 28,500Metrik Ton dengan harga Rp. 4.600, per Kg;Kontrak Nomor 10/10/3ASMB/2010 tertanggal 12 Oktober2010 untuk jugal beli kedelai sebanyak 32,000
    harga Rp.4.500, per Kg (Sesuai dengan aslinya);Bukti P6 Kontrak Nomor 09/09/3ASMB/2010 tertanggal2 September 2010 untuk jual beli kedelaisebanyak 28,500 Metrik Ton dengan harga Rp.4.600, per Kg (Sesuai dengan aslinya);Bukti P6a : Terjemahan Kontrak Nomor 09/09/3ASMB/2010tertanggal 2 September 2010 untuk jual belikedelai sebanyak 28,500 Metrik Ton denganharga Rp. 4.600, per Kg (sesuai denganaslinya);Bukti P7 Kontrak Nomor 10/10/3ASMB/2010 tertanggal12 Oktober 2010 untuk jual beli kedelaisebanyak 32,000
    Metrik Ton dengan harga Rp.4.800, per Kg (Sesuai dengan aslinya);Bukti P7a : Terjemahan Kontrak Nomor 10/10/3ASMB/2010tertanggal 12 Oktober 2010 untuk jual belikedelai sebanyak 32,000 Metrik Ton denganharga Rp. 4.800, per Kg (sesuai denganaslinya);Bukti P8 Kontrak Nomor 11/11/8ASMB/2010 tertanggal8 November 2010 untuk jual beli kedelaisebanyak 36,300 Metrik Ton dengan harga Rp.4.900, per Kg (Sesuai dengan aslinya);Bukti P8a : Terjemahan Kontrak Nomor 11/11/3ASMB/2010tertanggal 8 November 2010 untuk
    Nomor 07/07/3ASMB/2010tertanggal 1 Juli 2010 untuk jual beli kedelai sebanyak31,500 Metrik Ton dengan harga Rp. 4.500, per Kg ; oKontrak Nomor 08/07/3ASMB/2010 tertanggal 29 Juli 2010untuk jual beli kedelai sebanyak 40,000 Metrik Ton denganharga Rp. 4.500, per Kg ; o Kontrak Nomor 09/09/3ASMB/2010 tertanggal 2 September 2010 untuk jual belikedelai sebanyak 28,500 Metrik Ton dengan harga Rp.4.600, per Kg; o Kontrak Nomor 10/10/3ASMB/2010tertanggal 12 Oktober2010 untuk jugal beli kedelai sebanyak 32,000
Register : 19-04-2016 — Putus : 18-05-2016 — Upload : 03-09-2020
Putusan PT PALU Nomor 5/PID.TPK/2016/PT PAL
Tanggal 18 Mei 2016 — Pembanding/Terbanding/Terdakwa : JONI B. RAMLI, ST Diwakili Oleh : JONI B. RAMLI, ST
Terbanding/Pembanding/Penuntut Umum : PALUPI WIRYAWAN, SH
9844
  • Paking Bh 36,000 32,000 4,000 17.500,00 70.000,00karet 45. Mur baut Bh 288,000 64.000 224 8.775,00 1.965.600,006. Pengelasa Cm 360,000 320,000 40,000 3.156,80 644.124,60n FlangedSteel7. Pengecatan M? 28,000 0,000 28,000 23.004,45 644.124,60TOTAL KEKURANGAN PEKERJAAN 38.218.824,29PENGHITUNGAN BIAYA KEMAHALAN PENGELASAN PIPA GIP 4NO URAIAN LOKASI HARGA HARGA SELISIH VOLUME TOTALPENGERJAAN SATUAN SATUAN HARGA KONTRAK SELISIHKONTRAK KONTRAK 2(RP) (RP)1.
    Paking karet Bh 36,000 32,000 17.500,00 70.000,04 4,000 05. Mur baut Bh 288,000 64.000 224 8.775,00 1.965.600,006. Pengelasan Cm 360,000 320,000 40,00 3.156,80 644.124,6Flanged 0 0Steel7. Pengecatan M? 28,000 0,000 28,000 23.004,45 644.124,60TOTAL KEKURANGAN PEKERJAAN f+38.218.824,29PENGHITUNGAN BIAYA KEMAHALAN PENGELASAN PIPA GIP 4 NO.
    Paking karet Bh 36,000 32,000 17.500,00 70.000,004 4,0005. Mur baut Bh 288,000 64.000 224 8.775,00 1.965.600,006. Pengelasan cm 360,000 320,000 3.156,80 Flanged 40,0 644.124,6Steel 00 07. Pengecatan M2 28,000 0,000 28,000 23.004,45 644.124,60TOTAL KEKURANGAN PEKERJAAN 38.218.824,29PENGHITUNGAN BIAYA KEMAHALAN PENGELASAN PIPA GIP 4NO. URAIAN LOKASI HARGA HARGA SELISIH VOLUME TOTALPENGERJAAN SATUAN SATUAN HARGA KONTRAK SELISIHKONTRAK KONTRAK 2(RP) (RP)1.