Ditemukan 247 data

Urut Berdasarkan
 
Register : 19-02-2021 — Putus : 07-04-2021 — Upload : 08-04-2021
Putusan PT PALEMBANG Nomor 4/PID.TPK/2021/PT PLG
Tanggal 7 April 2021 — Pembanding/Penuntut Umum II : DIAN FEBRIANI, SH
Terbanding/Terdakwa : KHAIRUL RIZAL, ST.,MTP Bin H. NAHROWI
11447
  • Penanaman Kabel NYY 4x2,5 MM 60,00 M1 33,587.40 2019.244.0Pak. Pas. Lampu Sorot Replextor 250 W/220 20,00 Set 779.707.50 Pas. Penangkal Petir Konvesional + Ground 2,00 Set 1.019.617.50 2.039.235.0orien mm, Box Control, Groundrrod dan 2,00 Set 7.657.127.50 19.314.256.Pek. Inst + Lampu SL 18 + Sklar + Stop Kontac 2,00 Unit 210.720.95 421.441.90lan emer + Pipa Besi Galv. @ 2 Lintas 50,00 M1 143.066.33 7153.3105Pek.
    Peralatan Areal Trotoar Lapisan Pasir 60,00 Me 99.993.47 5.999.607.90Pas. Conblock 600,00 wm 166,713.74 100.028.2438.Pas. Kanstin 612,00 mw 1asmpian SsePek. Cat Kanstin 540,00 wm? 22,951.39 143937506Sub Jumlah 183.216.04BIAYA UMUMD Biaya Listrik Kerja dan RambuRambu Lalu 4,00 Bin 1.799.325.00 7.197.300.00Pek. Tambahan Akhir 1,00 Ls 1.399.475.00 1.399.475.00Sub Jumlah eile Bahwa selanjutnya pada tanggal 05 Agustus 2013 Terdakwa KhairulRizal, ST., MT. Bin H.
Register : 15-10-2014 — Putus : 25-11-2014 — Upload : 11-01-2022
Putusan PT JAMBI Nomor 11/PID.TPK/2014/PT JMB
Tanggal 25 Nopember 2014 — Pembanding/Jaksa Penuntut : ERIK RUSNANDAR ,SH Diwakili Oleh : ERIK RUSNANDAR ,SH
Terbanding/Terdakwa : WAHIDIN Bin SARJO
11547
  • 7,781,125.0027,500 79. 2,172,535 Cat Plapond Kg Tidak Ada Dalam Perhitungan PU.0O 00 00.0056,700,00 56,700,036 Upah Upah0.00 00.00HargaKaca Mati 5 mm 11 4,370,037 Tidak Ada Dalam SPJ 38.00 Kpg Kabupaten 0/(0,60 x 1,20 ) 5,000.00 00.00Dinas PUToko Jaya1 376,3538 Tidak Ada Dalam SPJ Cat Meni 25.09 Kg Makmur5,000.00 0.00Pasar PelitaToko Jaya175,0039 Tidak Ada Dalam SPJ Minyak Cat 25.00 Ltr Makmur7,000.00 0.00Pasar Pelita25,00 Asumsi40 Tidak Ada Dalam SPJ Kuas Cat 4" 5.00 Bh5,000.00 0.00 Setempat2 60,00
    Kaca Rangka Kayu Bh Tidak Ad0.00 00 00.0018,00 60. 1,080,025 Tarikan Jendela Bh Tarikan Je0.00 00 00.00165,00 3. 495,00 Kunci Dot26 Kunci Double Slaag Bh0.00 00 0.00 Slaag36,00 65. 2,340,027 List Plapond Btg Tidak Ad0.00 00 00.0085,00 26. 2,210,028 Listplank Kayu Kpg Tidak Ad0.00 00 00.0022,00 53. 1,166,029 Plamir Kg Plamir0.00 00 00.0048,00 230. 11,040,0 Seng Gelc30 Atap Seng BJLS Kpg0.00 00 00.00 BJLS 2040,00 27. 1,080,031 Bubungan Seng Plat m1 Seng Plat0.00 00 00.00Listplank + Bubungan Seng 60,00
    00.0037 Tidak Ada Dalam SPJ Kaca Mati 5 mm 11 38.00 Kpg 4,370,0 Harga 58 Kabupaten 0/ (0,60 x 1,20 ) 5,000.00 00.00 Dinas PUToko Jaya 3 1 376,3538 Tidak Ada Dalam SPJ Cat Meni 5,000.00 25.09 Kg 0.00 MalenicrPasar Pelita175.00 Toko Jaya39 Tidak Ada Dalam SPJ Minyak Cat 7,000.00 25.00 Ltr 0.00 RaknaPasar Pelita5 i 25,00 Asumsi40 Tidak Ada Dalam SPJ Kuas Cat 4 5,000.00 5.00 Bh 0.00 setempat. 2 60,00 Asumsi41 Tidak Ada Dalam SPJ Roll Cat 0,000.00 3.00 BH 0.00 setempatTotal Jumlah Realisasi 266,380,250.00
    Btg 2,340,0 Tidak Ada Dalam Perhitungan PU 68 0.00 00 00.0085,00 26. 2,210,028 Listplank Kayu Kpg Tidak Ada Dalam Perhitungan PU0.00 00 00.0022,00 53. 1,166,0 2 1,625,3629 Plamir Kg Plamir 73.88 Kg0.00 00 00.00 2,000.00 0.0048,00 230. 11,040,0 Seng Gelombang 4 18,432,030 Atap Seng BJLS Kpg 384.00 Kpg0.00 00 00.00 BJLS 20 8,000.00 00.0040,00 27. 1,080,0 4 1,480,0031 Bubungan Seng Plat m1 Seng Plat L.30 37.00 M'0.00 00 00.00 0,000.00 0.00Listplank + Bubungan Seng 60,00 30. 1,800,032 Kpg Tidak Ada Dalam
    7,500.00 25.0027,50 79. 2,172,535 Cat Plapond Kg Tidak Ada Dalam Perhitungan PU0.00 00 00.0056,700,00 56,700,036 Upah Upah0.00 00.00HargaKaca Mati 5 mm 11 4,370,037 Tidak Ada Dalam SPJ 38.00 Kpg Kabupaten 0/(0,60 x 1,20 ) 5,000.00 00.00Dinas PUToko Jaya1 376,3538 Tidak Ada Dalam SPJ Cat Meni 25.09 Kg Makmur Pasar5,000.00 0.00PelitaToko Jaya175,0039 Tidak Ada Dalam SPJ Minyak Cat 25.00 Ltr Makmur Pasar7,000.00 0.00 Pelita 69 25,00 Asumsi40 Tidak Ada Dalam SPJ Kuas Cat 4" 5.00 Bh5,000.00 0.00 Setempat2 60,00
Register : 04-02-2015 — Putus : 26-06-2015 — Upload : 18-08-2015
Putusan PN PALU Nomor 10/Pid.SusTPK/2015/PN.Pal
Tanggal 26 Juni 2015 — MUHAMMAD FARHAN AL HASNI, S.Sos
8018
  • Model Rumbai 136,6 M 355.000, 48.493.000,Fitras Kiisal3 Perak 70,00 Set 126.000, 8.820.000,Tali4, 24,00 set 250. 000, 6.000.000,Besi gorden 60,00 biji 35.000, 2.100.000,Mahkota Bahwa Saksi menandatangani berita acara tersebut pada saat pak IWAN datang membawadokumen 1 (satu) bundle yang sudah ditanda tangani oleh semua tim pemeriksa barangkemudian saksi menghubungi pak firman untuk menanyakan apakah gorden sudah terpasangdan dijawabnya sudah terpasang lengkap, kemudian saksi menanda tangani berita
    kerja adalah FARHAN, dan nilai Kontrakdalam pekerjaan tersebut sebesar Rp.297.633.000, (dua ratus Sembilan puluh tujuh jutaenam ratus tiga puluh tig ribu rupiah), dengan perincian sebagai berikut : Harga dalam kontrak :Nama jenis Spesifikasi Volume Harga Satuan Jumlabarang pekerjaanGorden dan Jenis satin sutra 136,60 M 1.700.000, 232.220.000,poni ; ;Jenis OrgandiModel Rumbai 136,6 M 355.000, 48.493.000,Fitras KristalPerak 70,00 Set 126.000, 8.820.000,Tali24,00 set 250. 000, 6.000.000,Besi gorden 60,00
    Umar (Anggota).Bahwa sesuai dengan Berita Acara Pemeriksaan Barang dan Berita Acara Penerima Barangyang ada pada saksi, barangbarang yang diadakan pada kegiatan Pengadaan Kain/Besi Gordentersebut adalah :33 Nama jenis Spesifikasi Volume Harga Satuan Jumlabarang pekerjaanGorden dan Jenis satin sutra 136,60 M 1.700.000, 232.220.000,poniJenis OrgandiModel Rumbai 136,6 M 355.000, 48.493.000,Fitras KiisalPerak 70,00 Set 126.000, 8.820.000,Tali24,00 set 250. 000, 6.000.000,Besi gorden 60,00 biji 35.000
    Besi gorden 24,00 set 250. 000, 6.000.000,Mahkota 60,00 biji 35.000, 2.100.000, Bahwa sumber dana dari kegiatan Pengadaan Kain/Besi Gorden pada Sekretariat DaerahKabupaten Tolitoli Tahun Anggaran 2012 tersebut bersumber dari APBD Kab.
Register : 21-06-2013 — Putus : 19-08-2013 — Upload : 19-09-2013
Putusan PT BENGKULU Nomor 13/PID.TIPIKOR/2013/PT.BKL
Tanggal 19 Agustus 2013 — INDRANSONO, BE BIN (ALM) TOMAN
5940
  • 12.500,00 5.750.000,00Dewatering 60,00 Hari 10.000,00 600.000,00 3 2 e 60,00 Hari 10.000,00 600.000,00Pipa rembes PVC dia 34 900,00 Bh 2.500,00 2.250.000,00 + 900.00 = 2.250.000,00 0,00 = 2.500,00Pipa rembes PVC dia 1,5" 450,00 2.250.000,00 450,00 Bh 5.000,00 2.250.000,00Ml PEKERJAAN PEMBANGUNAN BOX CULVERT1 Pekerjaan TanahGalian Tanah Biasa 262,50 m? 25.850,00 6.285.625,00 268,38 = 6.937.623,00 530,88 ms 25.850,00 13.723.248,00sedalam 1 M ?
    12.500,00 5.750.000,00pengeringan 0 0,00Dewatering 60,00 Hari 10.000,00 600.000, 60,00 Hari 10.000,00 600.000,0000Pipa rembes PVC 900,0 Bh 2.500,00 2.250.00 900.00 2.250.000,00 0,00 2.500,00 dia % 0 0,00Pipa rembes PVC 450,00 2.250.000,00 450,00 Bh 5.000,00 2.250.000,00dia 1,5WW PEKERJAAN PEMBANGUNAN BOX CULVERT1 Pekerjaan TanahGalian Tanah Biasa 262,5 m> 25.850,00 6.285.62 268,38 6.937.623,00 530,88 m? 25.850,00 13.723.248,0sedalam 1 M ?
Register : 04-02-2015 — Putus : 26-06-2015 — Upload : 18-08-2015
Putusan PN PALU Nomor 11/Pid.SusTPK/2015/PN.Pal
Tanggal 26 Juni 2015 — Drs. MOHAMMAD SABRAN, M.Si
8226
  • Nama jenis Spesifikasi Volume Harga Satuan jJJumlabarang pekerjaanGorden dan Jenis satin sutra 136,60 M 1.700.000, 232.220.000,poni ; ;Jenis OrgandiModel Rumbai 136,6 M 355.000, 48.493.000,Fitras KiistalPerak 70,00 Set 126.000, 8.820.000,Tali4. 24,00 set 250. 000, 6.000.000,Besi gorden 60,00 biji 35.000, 2.100.000,Mahkota Bahwa Saksi menandatangani berita acara tersebut pada saat pak IWAN datang membawadokumen 1 (satu) bundle yang sudah ditanda tangani oleh semua tim pemeriksa barangkemudian saksi
    Besi gorden 60,00 biji 35.000, 2.100.000,Mahkota Bahwa saksi menandatangani berita acara tersebut pada saat pak IWAN datang membawadokumen (satu) bundle namun waktunya saksi tidak ingat lagi.e Bahwa saksi tidak tahu dengan pasti karena saksi tidak pernah melakukan pemeriksaan saksihanya disodorkan berita acara pemeriksaan barang oleh pak IWAN untuk di tanda tangani.Atas keterangan tersebut Terdakwa membenarkan.7.
    Besi gorden 60,00 biji 35.000, 2.100.000,Mahkota e Bahwa sumber dana dari kegiatan Pengadaan Kain/Besi Gorden pada Sekretariat DaerahKabupaten Tolitoli Tahun Anggaran 2012 tersebut bersumber dari APBD Kab.
    Besi gorden 24,00 set 250. 000, 6.000.000,Mahkota 60,00 biji 35.000, 2.100.000, Bahwasumber dana dari kegiatan Pengadaan Kain/Besi Gorden pada Sekretariat DaerahKabupaten Tolitoli Tahun Anggaran 2012 tersebut bersumber dari APBD Kab.
Register : 02-01-2019 — Putus : 14-08-2018 — Upload : 02-01-2019
Putusan PT KENDARI Nomor 7/PID.SUS-TPK/2018/PT KDI
Tanggal 14 Agustus 2018 — - TERDAKWA : NURLINA SAADE, S.Pd.
16370
  • Pekerjaan Pembangunan Jaringan Perpipaan Air Bersih No Uraian Volum Satua Harga Satuan Jumlah (Rp)e n (Rp)I Bahan1 Bahan campuran 1,00 Ls 9.700.000,00 9.700.000,002 Kayu Kalang 6x610,00 Batang 30.000,00 300.000,00cm3 Paku 7cm 31,00 Kg 25.000,00 775.000,004 Semen 50 kg 132,00 Zak 80.000,00 10.560.000,005 Besi 12mm 60,00 Batang 120.000,00 7.200.000,006 Batu pecah 4,00 ms 800.000,00 3.200.000,00(kerikil)7 Batu gunung 2,00 Ret 500.000,00 1.000.000,008 Pasir 4,00 Ret 500.000,00 2.000.000,00Besi beton
    Pekerjaan Pembangunan Jaringan Perpipaan Air Bersih No Uraian Volum Satua Harga Satuan Jumlah (Rp)e n (Rp)I Bahan1 Bahan campuran 1,00 Ls 9.700.000,00 9.700.000,002 Kayu Kalang 6x610,00 Batang 30.000,00 300.000,00cm3 Paku 7cm 31,00 Kg 25.000,00 775.000,004 Semen 50 kg 132,00 Zak 80.000,00 10.560.000,005 Besi 12mm 60,00 Batang 120.000,00 7.200.000,006 Batu pecah 4,00 ms 800.000,00 3.200.000,00(kerikil)7 Batu gunung 2,00 Ret 500.000,00 1.000.000,008 Pasir 4,00 Ret 500.000,00 2.000.000,009 Besi beton
Putus : 14-08-2013 — Upload : 17-10-2016
Putusan PN SEMARANG Nomor 40/Pid.Sus-TPK/2013/PN.Smg
Tanggal 14 Agustus 2013 — Drs. AGUS SANTOSO, MM
6633
  • HARYANTO.Luas Tanah = 550m2 @ 935,00 75,00 701,25Rp.1.700.000,Luas bangunan = 540m2 @ 1.296,00 60,00 777,60Rp. 2.400.000,Luas bangunan = 160m2@ 422,40 60,00 253,44Rp. 2.640.000,Luas bangunan=30m @ 87,12 60,00 52,27Rp. 2.900.000,IMB N0.03247/IMB/2001 2.740,52 1.784,56tanggal 26042001, luas =115m2 an. Drs.Pamulpul Oloan Sihombing. 2.5 (lima) bidang tanah kosongdi Ds. Kembangan UtaraKec. Kembangan JakartaBarat vide SHM 182 tanggai 127 3.866,80 75,00 2.900,101995L.
    Yupi Haryanto.Luas Tanah = 550m2 @ Pp. 935,00 75,00 701,251.700.000,Luas bangunan = 540m2 @ Rp. 1.296,00 60,00 777,602.400.000,Luas bangunan = 160m2 @ Rp. 422,40 60,00 253,442.640.000,Luas bangunan = 30m @ Rp. 87,12 60,00 52,272.900.000,IMB NO.03247/IMB/2001 tanggal 2.740,52 1.784,5626042001, luas =115m2 an. Drs. Pamulpul OloanSihombing. 2. 5 (lima) bidang tanah kosongdi Ds.Kembangan Utara Kec.Kembangan Jakarta Barat vide SHM 182 tanggai 1271995 3.866,80 75,00 2.900,10L.
Register : 04-12-2015 — Putus : 20-04-2016 — Upload : 30-05-2016
Putusan PN JAMBI Nomor 50/Pid.Sus/TPK/2015/PN.Jmb
Tanggal 20 April 2016 — SISWATI, S.Pd Binti YAHMIN
14862
  • sebagai berikut : NO Uraian Vol SatuanBAHAN :1 Pasir 38,64 M32 Semen (50 Kg/ 258 ZakZak) Putusan No.50/Pid.SusTPK/2015/PN.Jmb.Halaman 1516 3 Batu Koral 20,93 M34 Kawat Beton 38,78 Kg5 Besi O 12 42,00 Btg6 Besi 10 76,00 Btgi Besi 8 116,00 Btg8 Besi 0 6 7,00 Btg9 Kayu Kelas II 7,18 M310 Kayu KelaslV 2,30 M311 Kayu Bulat 221,00 Btg12 Paku 25 65,16 Kg13 GRC 100,00 Lbr14 Daun Jendela 23,00 BhKayu Kls Il+Kaca5 mm (0,7x0,92)15 Kaca Mati5 mm /11,00 Bh(0,7x0,9)16 Engsel Pintu 4 12,00 Bh17 Engsel Jendela 60,00
    Engsel 60,00 BH 12.000, 720.000,Jendela 318. Grendel 30,00 BH 12.000, 360.000,Jendela19. Hak Angin 30,00 BH 12.000, 360.000, Putusan No.50/Pid.SusTPK/2015/PN.Jmb.Halaman 17 18 20. Tarikan 30,00 BH 18.000, 540.000,Jendela21. Kunci 3,00 Set 165.000, 495.000,Double 2Slaag22. Plamir 39,38 Kg 22.000, 866.360,23. Cat Meni 17,17 Kg 27.500, 472.175,24. Cat Tembok/251 ,00 Kg 27.500, 6.902.500,(20 Kg/Pail)25. Cat Minyak 82,00 Kg 45.000, 1.440.000,26. Minyak Cat 14,00 Ltr 7.000, 98.000,27.
    fisik di lapangan untukMIS AL FAJAR dengan hasil sebagai berikut : NO Uraian Vol SatuanBAHAN :1 Pasir 38,64 M32 Semen (50 Kg/ = 258 ZakZak)3 Batu Koral 20,93 M34 Kawat Beton 38,78 Kg5 Besi @ 12 42,00 Btg6 Besi 10 76,00 Btg7 Besi 8 116,00 Btg8 Besi 0 6 7,00 Btg9 Kayu Kelas II 7,18 M310 Kayu KelaslV 2,30 M311 Kayu Bulat 221,00 Btg12 Paku 25 65,16 Kg13 GRC 100,00 Lbr14 Daun Jendela 23,00 BhKayu Kls Il+Kaca5 mm (0,7x0,92)15 Kaca Mati5 mm /11,00 Bh(0,7x0,9)16 Engsel Pintu 4 12,00 Bh17 Engsel Jendela 60,00
    Engsel 60,00 BH 12.000, 720.000.,Jendela 318. Grendel 30,00 BH 12.000, 360.000.Jendela19. Hak Angin 30,00 BH 12.000, 360.000.20. Tarikan 30,00 BH 18.000, 540.000.Jendela21. Kunci 3,00 Set 165.000, 495.000.Double 2Slaag22. Plamir 39,38 Kg 22.000., 866.360.,23. Cat Meni = /17,17 Kg 27.500, 472.175,24. Cat Tembok251 ,00 Kg 27.500, 6.902.500,(20 Kg/Pail)25. Cat Minyak 82,00 Kg 45.000. 1.440.000,26. Minyak Cat 14,00 Ltr 7.000, 98.000.27. Seng 184,00 Kpg 46.000. 8.4664.000,Gelombang :BJLS 2028.
Putus : 27-07-2011 — Upload : 21-10-2013
Putusan MAHKAMAH AGUNG Nomor 1086 K/Pid.Sus/2010
Tanggal 27 Juli 2011 — NURMALIA S.Sos BINTI ARAHAM
3022 Berkekuatan Hukum Tetap
  • UMUM Ls 1,00 1,00 0,001.2 MobilisasiBiv DRAINASE M3 60,00 77,44 17,44 (lebih)2.1 Pek. Galian, Selokan,Preinass M3 35,00 79,56 44,56 (lebih)2.2 Pasangan Batu denganMortarDiv. II J/PEKERJAAN TANAH M3 25,00 21,3 3,70 (kurang)3.1 (1) Galian Tanah Biasa M3 35,00 47,18 12,18 (lebih)M3 7,20 7,85. 0,65 (lebih)3.2 (8) Timbunan pilihanBiv IPERERIAABASPAL ites 35,00 153,00 118,00 (lebih)6.1 (2) Lapis Perakat 1,50 (lebih)M3 3,60 5,10Div.
    I J/DRAINASEVv = M3 60,00 77,44 17,44 (lebih)2.1 Pek. Galian, Selokan,Dralnase M3 35,00 79,56 44,56 (lebih)2.2 Pasangan Batu denganMortarDiv. II /PEKERJAAN TANAHVv M3 25,00 21,3 3,70 (kurang)3.1(1) Galian Tanah Biasa M3 35,00 47,18 12,18 (lebih)3.2 (1) Timbunan Biasa dariselain galian sumberbahan M3 7,20 7,85 0,65 (lebih)3.2 (8) Timbunan pilihanDiv.
Register : 14-03-2019 — Putus : 29-07-2019 — Upload : 18-09-2019
Putusan PN BANDUNG Nomor 28/Pid.Sus/TPK/2019/PN.Bdg
Tanggal 29 Juli 2019 — Ir. Yudi Wahono, Dess Bin Alm Radi
8239
  • 36.943,75 3.842.150,003Urugan Sirtu 12,00 60,00 m? 98.900,00 5.934.000,004Pasang Batu Kali 1:4 23,18 238,00 m2 758.838,00 180.603.444,005Pasang Plesteran 1:3 96,40 352,00 m? 53.185,00 18.721.120,006Pasang Pipa Paralon 04 " 48,00 m?
    36.510,50 3.797.092,002Buangan Bekas Kupasan 24,00 104,00 m3 36.943,75 3.842.150,003Urugan Sirtu 12,00 60,00 m2 98.900,00 5.934.000,004Pasang Batu Kali 1:4 23,18 238,00 m? 758.838,00 180.603.444,005Pasang Plesteran 1:3 96,40 352,00 m2 53.185,00 18.721.120,006Pasang Pipa Paralon 04 " 48,00 m?
    36.943,75 3.842.150,003Urugan Sirtu 12,00 60,00 m2 98.900,00 5.934.000,004Pasang Batu Kali 1:4 23,18 238,00 m2 758.838,00 180.603.444,005Pasang Plesteran 1:3 96,40 352,00 m?
    36.943,75 3.842.150,003Urugan Sirtu 12,00 60,00 m? 98.900,00 5.934.000,004Pasang Batu Kali 1:4 23,18 238,00 m2 758.838,00 180.603.444,005Pasang Plesteran 1:3 96,40 352,00 m? 53.185,00 18.721.120,006Pasang Pipa Paralon 04" 48,00 m?
    36.943,75 3.842.150,003Urugan Sirtu 12,00 60,00 m? 98.900,00 5.934.000,004Pasang Batu Kali 1:4 23,18 238,00 m? 758.838,00 180.603.444,005Pasang Plesteran 1:3 96,40 352,00 m?2 53.185,00 18.721.120,006Pasang Pipa Paralon 04" 48,00 m2 55.000,00 2.640.000,00Jumlah Sub Total 215.537.806,00Nilai Pekerjaan 10% 545.454.284,33PPN 10% 54.545.428,43Jumlah Total 599.999.712,77Bahwa berdasarkan Kontrak :04.
Putus : 14-05-2010 — Upload : 18-12-2011
Putusan MAHKAMAH AGUNG Nomor 1541 K/Pdt/2008
Tanggal 14 Mei 2010 — PT. MAHINDRA REKADAYA UTAMA, DKK ; PT.SIERAD PANGAN
7655 Berkekuatan Hukum Tetap
  • Selisin kurs Sub LicenseFee tahap sebesar USD10,000.00 x Rp. 60,00 (kurspasar Rp. 8.460,00 per Usd1.00) 600.000. 20.600.000.5. Training tanggal 4 6Februari 2004 288.000, 20.888.000,6. Topi, name tag dan mealHCB 1.128.000, 22.016.000,fs Security Deposite tahap Il 30.000.000, 52.016.000.,8. Topi, name tag dan mealHCB 382.000, 52.398.000,9. Topi danname tag HCB 36.000, 0 52.434.000.,10. Crew Trainig Meal 2./44.000. 55.1 78.000,11. Crew Trainig Meal 2.320.500, 0 57.498.500.12.
Register : 24-02-2023 — Putus : 17-04-2023 — Upload : 26-04-2023
Putusan PN BANJARMASIN Nomor 154/Pid.Sus/2023/PN Bjm
Tanggal 17 April 2023 — Penuntut Umum:
Nonie Ervina Rais, SH
Terdakwa:
Zainal M Als Inal Bin Bahrun Alm
3019
  • Menetapkan barang bukti berupa :
    • 1 satu) paket sabu berat kotor 60,96 gram (berat bersih 60,00 gram)
    • 1 (satu) paket sabu berat kotor 0,44 gram (berat bersih 0,27 gram)
    • 100 (seratus) butir pil ekstasi logo minion warna hijau berat bersih 34,59 gram
    • 11 (sebelas) butir pil ekstasi logo minion warna hijau berat bersih 3,78 gram
    • 2 (dua) lembar plastic warna hitam
    • 1 (satu) buah spidol merk SNOWMAN warna biru
    • 1
Register : 20-01-2014 — Putus : 11-06-2014 — Upload : 09-06-2015
Putusan PN BANDUNG Nomor 07 /Pid.Sus./TPK/2014/PN.Bdg
Tanggal 11 Juni 2014 — ENDANG ROCHMAN
6014
  • Papan Bouplank 60,0 m 6.082,23 364.933,8 60,00 m2 6.082,23 364.933,8 Bouplank 00 =? 0 0 0JJUMLAH I 364.933, 364.933, 80 80ll PEKERJAAN GALIAN DAN URUGAN1 Pek. Galian Tanah 32,4 Jm 15.477,00 501.454,8 32,40 m? 15.477,00 501.454,8 Untuk Pondasi 00 3 0 0 02 Pek. Urugan Tanah 16,2 m 7.773,92 125.937,5 16,20 m3 7.773,92 125.937,5 Kembali Dipadatkan 00 3 0 0 03 Pek. Urugan Tanah 11,4 m 42.973,88 490.246,0 44.64 m3 42.973,88 1.918.354,/33.232 1.428.107, Peninggian Lantai 08 3 2 0 00 984 Pek.
    Papan Bouplank 60,0 m 6.082,23 364.933,8 60,00 m?2 6.082,23 364.933,8 Bouplank 00 =? 0 0 0JUMLAH 364.933, 364.933, 80 80ll PEKERJAAN GALIAN DAN URUGAN1 Pek. Galian Tanah 32,4 m 15.477,00 501.454,8 32,40 m3 15.477,00 501.454,8 Untuk Pondasi oo =3 0 0 02 Pek. Urugan Tanah 16,2 m 7.773,92 125.937,516,20 m3 7.773,92 125.937,5 Kembali Dipadatkan 00 3 0 0 03 Pek. Urugan Tanah 11,4 m 42.973,88 490.246,0 11,408 490.246,02Peninggian Lantai os =f8 24 Pek.
    Papan Bouplank 60,0 m2/6.082,23 364.933,8 60,00 m2 6.082,23 364.933,8 Bouplank 00 0 0 0JUMLAH 364.933, 364.933, 80 80ll PEKERJAAN GALIAN DAN URUGANL Pek. Galian Tanah 32,4 m3/15.477,00 501.454,8 32,40 m3 15.477,00 501.454,8 Untuk Pondasi 00 0 0 02 Pek. Urugan Tanah 16,2 m37.773,92 125.937,5 16,20 m3 7.773,92 125.937,5 Kembali Dipadatkan 00 0 0 03 Pek. Urugan Tanah 11,4 m342.973,88 490.246,0 44.64 m3 42.973,88 1.918.354,33.232 1.428.107, Peninggian Lantai 08 2 0 00 984 Pek.
    Papan Bouplank 60,0 m 6.082,23 364.933,8 60,00 m2 6.082,23 364.933,8 Bouplank oo 2 0 0 0JUMLAH 364.933, 364.933, 80 80il PEKERJAAN GALIAN DAN URUGAN1 Pek. Galian Tanah 32,4 m 15.477,00 501.454,8 32,40 m3 15.477,00 501.454,8 Untuk Pondasi 00 3 0 0 02 Pek. Urugan Tanah 16,2 m 7.773,92 125.937,5 16,20 m3 7.773,92 125.937,5 Kembali Dipadatkan 00 3 0 0 03 Pek. Urugan Tanah 11,4 m 42.973,88 490.246,0 11,408 490.246,02Peninggian Lantai os =3 2 66 4 Pek.
    Papan Bouplank 60,0 m 6.082,23 364.933,8 60,00 m2 6.082,23 364.933,8 Bouplank 00 2 0 0 0JUMLAH 364.933, 364.933, 80 80ll PEKERJAAN GALIAN DAN URUGANI Pek. Galian Tanah 32,4 m 15.477,00 501.454,8 32,40 m8 15.477,00 501.454,8 Untuk Pondasi oo 3 0 0 02 Pek. Urugan Tanah 16,2 m 7.773,92 125.937,5 16,20 m 7.773,92 125.937,5 Kembali Dipadatkan 00 3 0 0 03 Pek. Urugan Tanah 11,4 m 42.973,88 490.246,0 11,408 490.246,02Peninggian Lantai os 3 24 Pek.
Putus : 30-10-2013 — Upload : 20-05-2014
Putusan MAHKAMAH AGUNG Nomor 1600 K/Pid.Sus/2013
Tanggal 30 Oktober 2013 — MAHMUD SYAFRUDIN. ST
5825 Berkekuatan Hukum Tetap
  • 9,73 838.033,88 8.154.066,65Beton siklop K 175 pada pondasi M3 28,32 1.006.979,05 28.517.646,70Beton K 125 lantai kerja M3 4,04 912.516,74 3.686.567,63Baja tulangan U24 polos Kg 12.652,57 20.752,16 262.568.157,05Penyediaan dinding sumuran M 12,00 9.252.657,08 111.031.884,96silinder,diameter 250 cmMenurunkan sumuran bentuk M 12,00 381.625,27 4.579.503,24silinderPasangan batu M3 180,63 962.567,07 173.868.489,85Jumlah Harga 792.739.912,87PEKERJAAN MINOR 5.872.400,00Pipa sandaran jembatan diameter M3 60,00
    No. 1600 K/Pid.Sus/2013 4 PEKERJAAN MINOR 5.872.400,00Pipa sandaran jembatan diameter M3 60,00 37.500,00 2.250.000,003Pipa drainase diameter 3 bh 8,00 15.300,00 122.400,00Pengecatan jembatan Ls 1,00 3.500.000,00 3.500.000,00Jumlah Harga 5.872.400,00Jumlah total harga terkoreksi 1.035.453.507,10PPN10 % 103.545.350,71Jumlah total harga terkoreksi 1.138.998.857,81Jumlah total harga terkoreksi 1.138.998.000,00(dibulatkan) Kemudian Atas dasar kontrak tersebut diatas kemudian JAINAL MUSmemerintahkan SUHARDI
Register : 17-09-2018 — Putus : 13-06-2019 — Upload : 13-06-2019
Putusan PN PEMATANG SIANTAR Nomor 92/Pdt.G/2018/PN Pms
Tanggal 13 Juni 2019 — Penggugat:
1.Lenni Mariati Saragih
2.John Sabiden Purba
3.Jasmen Saragih
Tergugat:
Lerpianna Br sidauruk
Turut Tergugat:
1.Asni Julia, SH
2.PTPN III Kebun Bangun
8813
  • dan mengetahui bahwa yang mengusahai dan bercocoktanamtanaman di obyek lahan tersebut adalah PENGGUGAT danPENGGUGAT Il,Bahwa adapun batasbatas atas sebidang Tanah seluas kurang lebihTiga (3) Hektar yang terletak di Jalan Ring Road D (Dahulu disebutBlok 29 dan Blok 30) Kelurahan Tanjung Tongah (Dahulu PondokSayur) Kecamatan Siantar Martoba Kota Pematang Siantar adalahsebagai berikut : Sebelah Utara berbatasan dengan tanah Jasmen saragih 90,30M Sebelah selatan berbatasan dengan jalan ring road : 60,00
Putus : 03-04-2013 — Upload : 06-04-2017
Putusan PN MEDAN Nomor 6/Pid.Sus.K/2013/PN Mdn
Tanggal 3 April 2013 — - FRANS MATEUS HARIONY PANGGABEAN, SE alias ONNI
6210
  • Pasangan Bronjong El7103 M3 321,75 280.728,03 90.324.243,652 Timbunan Tanah El321 M3 1.170,00 11.760,06 13.759.270,20dipadatkanSub Jumlah 104.083.513,85PEKERJAANBRONJONG BARUBentang AA = 3 M1) Membersihkan K422 M2 15,00 670,67 10.060,052 Rumput/Tanaman El321 b M3 1,20 33.655,08 40.386,103 Galian Tanah EI7103 M3 42,00 280.728,03 11.790.577,264 Pasangan Bronjong El321 M3 60,00 11.760,06 705.603,60Timbunan TanahSub Jumlah 12.546.627,01Bentang B C = 77,40 MMembersihkan1 Rumput/Tanaman K422 M2 428,50
    Ill PEKERJAAN BRONJONG BARUA Bentang AA=3M1 Membersihkan K422 M2 15,00 670,67 10.060,052 Rumput/Tanaman El321 b M3 1,20 33.655,08 40.386,103 Galian Tanah El7103 M3 42,00 280.728,03 11.790.577,264 Pasangan Bronjong El321 M3 60,00 11.760,06 705.603,60Timbunan TanahSub Jumlah IllA 12.546.627,01B Bentang BC =77,40M1 Membersihkan K422 M2 428,50 670,67 287.382,102 Rumput/Tanaman El321 b M3 119,98 33.655,08 4.037.936,503 Galian Tanah El7103 M3 1.199,80 280.728,03 336.81 7.490,394 Pasangan Bronjong El321
Register : 14-11-2017 — Putus : 27-12-2017 — Upload : 03-12-2019
Putusan MS PROP NAD Nomor 81/Pdt.G/2017/MS.Aceh
Tanggal 27 Desember 2017 — Pembanding/Terbanding/Penggugat : Hj. Mariana binti Johan Diwakili Oleh : SANUSI HAMZAH, SH
Terbanding/Pembanding/Tergugat : H. Sayuti bin Adam Diwakili Oleh : Muhammad Isa Yahya, S.H dkk
28037
  • Wahab, 60,00 M;
  • Selatan dengan Simpang Air, 18,50 M;
  • Utara dengan tanah sawah H. Abd. Masjid Ahmad, 17,60 M. (objek 3.12 gugatan);
    1. 1 (satu) petak tanah sawah terletak di Blang Raya Tiba Mesjid, Kecamatan Mutiara Timur, Kabupaten Pidie, dengan batas-batas sebagai berikut:
  • Timur dengan tanah sawah Cupo Gade, 60,10 M;
  • Barat dengan tanah sawah Nurma H.
    Wahab, 60,00 Selatan dengan Simpang Air, 18,50 M; Utara dengan tanah sawah H. Abd. Masjid Anmad, 17,60M. (objek 3.12 gugatan);2.13. 1 (satu) petak tanah sawah terletak di Blang Raya TibaMesjid, Kecamatan Mutiara Timur, Kabupaten Pidie, denganbatasbatas sebagai berikut: Timur dengan tanah sawah Cupo Gade, 60,10 M; Barat dengan tanah sawah Nurma H. Jalil, 61,30 M; Selatan dengan tanah sawah M. Ali Saad, 50,20 M, dan Utara dengan tanah sawah Cupo Jeumpa, 48,10 M.Hal. 31 dari 34 hal.
Register : 14-03-2019 — Putus : 29-07-2019 — Upload : 18-09-2019
Putusan PN BANDUNG Nomor 26/Pid.Sus/TPK/2019/PN.Bdg
Tanggal 29 Juli 2019 — Sumargo, BE, SE Msi bin alm Suwardji
6833
  • 36.510,50 3.797.092,002Buangan Bekas Kupasan 24,00 104,00 ms 36.943,75 3.842.150,003Urugan Sirtu 12,00 60,00 m2 98.900,00 5.934.000,004Pasang Batu Kali 1:4 23,18 238,00 m? 758.838,00 180.603.444,005Pasang Plesteran 1:3 96,40 352,00 m?
    36.943,75 3.842.150,003/Urugan Sirtu 12,00 60,00 m? 98.900,00 5.934.000,004Pasang Batu Kali 1:4 23,18 238,00 m? 758.838,00 180.603.444,005Pasang Plesteran 1:3 96,40 352,00 m? 53.185,00 18.721.120,006Pasang Pipa Paralon 04" 48,00 m?
    36.943,75 3.842.150,003Urugan Sirtu 12,00 60,00 m2 98.900,00 5.934.000,004Pasang Batu Kali 1:4 23,18 238,00 m? 758.838,00 180.603.444,005Pasang Plesteran 1:3 96,40 352,00 m?
    36.943,75 3.842.150,003Urugan Sirtu 12,00 60,00 m? 98.900,00 5.934.000,004Pasang Batu Kali 1:4 23,18 238,00 m? 758.838,00 180.603.444,005Pasang Plesteran 1:3 96,40 352,00 m?
Register : 25-03-2015 — Putus : 10-08-2015 — Upload : 15-01-2016
Putusan PN KUPANG Nomor 20/Pid.Sus-TPK/2015/PN.Kpg
Tanggal 10 Agustus 2015 — ZAKARIAS HERIANDO SIKU, ST Alias HERI SIKU
7228
  • 150,00 105,00 45,00 102.580,5 10.770.95 4.616.122,g talang 0 2,50 50patahanJumlah IV 263.385.1 96.674.6502,43 8,84Vv PEKERJAANPENGGANTUNG DANPENGUNCIPekerjaan Bh 1,00 30,00 30,00 151.250,0 4.537.500, pasang 0 00kuncitanam 2slaagPasang Bh 1,00 30,00 30,00 15.000,00 450.000,0 kunci 0gembokPasang Bh 12,00 360,00 360,00 12.100,00 4.356.000, engsel 00pintuPasang Bh 4,00 120,00 120,00 12.500,00 1.500.000, grendel 00pintuJumlah V 10.843.50 0,00VI PEKERJAANINSTALASILISTRIK Biaya Titik 5,00 150,00 90,00 60,00
    200.000,0 18.000.00 12.000.00instalasi 0 0,00 0,00Lampu TL Bh 2,00 60,00 60,00 105.200,0 6.312.000, 40 Watt 0 00PhilipskomplitLampu Bh 1,00 30,00 30,00 6.000,00 180.000,0 pijar 20 0WattSaklar Bh 1,00 30,00 30,00 4.840,00 145.200,0 ganda 0Saklar Bh 1,00 30,00 30,00 4.235,00 127.050,0 tunggal 0Kotak Unit 1,00 30,00 30,00 355.000,0 10.650.00 sekring 0 0,00Arde M 6,00 180,00 120,00 60,00 90.000,00 10.800.00 5.400.000,0,00 00Stop Titk 1,00 30,00 30,00 4.840,00 145.200,0 kontak 0Jumlah VI 46.359.45 17.400.000,00
    PEKERJAAN ALAT ALATPENGGANTUNGPekerjaan pasang kunci Bh 1,00 5,00 5,00 tanam 2 slaagPasang kunci gembok Bh 1,00 5,00 5,00 =Pasang engsel pintu Bh 14,00 70,00 60,00 10,00Pasang grendel pintu Bh 2,00 10,00 20,00 (10,00)JJumlah VVi.
    PEKERJAAN ALAT ALATPENGGANTUNGPekerjaan pasang kunci Bh 1,00 5,00 5,00 3tanam 2 slaagPasang kunci gembok Bh 1,00 5,00 5,00 =Pasang engsel pintu Bh 14,00 70,00 60,00 10,00Pasang grendel pintu Bh 2,00 10,00 20,00 (10,00)Jumlah VVI.
Putus : 18-05-2010 — Upload : 12-12-2011
Putusan MAHKAMAH AGUNG Nomor 829 K/Pid.Sus/2010
Tanggal 18 Mei 2010 — ADE RAHMAT PURNAMA ;
4429 Berkekuatan Hukum Tetap
  • No.829 K/Pid.Sus/2010Berita Acara Pembayaran Termyn Nomor : 003.2/BAP.TM/ PLA/VIV2006tanggal 27 Juli 2006 dan Surat Perjanjian Kerja (Kontrak) Nomor07/KONTRAK/DISTBUNBBNIS PATM/VI/2006 tanggal 16 Juni 2006 namunBerita Acara tersebut tidak diuji dan tidak diteliti kebenarannya oleh Ir.AHMAD SOLEMAN, MBA bahwa Prestasi Penyelesaian Pekerjaan 60,00 %namun Ir.
    AHMAD SOLEMAN, MBA bahwa PrestasiPenyelesaian Pekerjaan 60,00 % namun Ir. AHMAD SOLEMAN, MBAmembuat suratsurat untuk pencairan dana termyn yaitu. RingkasanKontrak tertanggal 27 Juli 2006 dan Surat Tanggung Jawab Belanja Nomor :003/SPTBP/PLA/VIV2006 tanggal 27 Juli 2006, setelah itu SYAFRUDINDJAMIL, Amd menerbitkan Surat Permintaan Pembayaran PembangunanNomor : 03/LS/PLABUN/BB/V1V/2006 tanggal 27 Juli 2006 yang diterima FATMA K.