Ditemukan 4 data

Urut Berdasarkan
 
Register : 01-10-2014 — Putus : 19-01-2015 — Upload : 02-06-2016
Putusan PN TANJUNG PINANG Nomor 24/PID.SUS/TPK/2014/PN TPG
Tanggal 19 Januari 2015 — Binsar Simanjuntak Bin A. Simanjuntak
8521
  • (15,743.35)humus6.5 Lantai kerja (Beton M3 1.58 1.58 912,090.00 1,440,190.11 1,441,102.20 912.09K.125)6.6 Pasangan Dinding = M3 5.73 .73 1,152,447.00 6,603,521.31 6,603,521.31 1/2 bata6.7 Profil beton LS 1.00 1.00 2,500,000.00 2,500,000.00 2,500,000.00 6.8 Pengadaan Bunga LS 1.00 1.00 5,000,000.00 5,000,000.00 5,000,000.00 BAB 7.PEKERJAANKERAMIK7.1 Keramik Lantai 40 M2 148.00 140.00 147,715.00 21,861,820.00 20,680, 100.00 (1,181,720.00)x 40BAB 8.PEKERJAANPENGECATAN8.1 Cat Kilat / cat M2 158.14 281.14
    (15,743.35)humus6.5 Lantai kerja (Beton M3 1.58 1.58 912,090.00 1,440,190.11 1,441,102.20 912.09K.125)6.6 Pasangan Dinding M3 5.73 5.73 1,152,447.00 6,603,521.31 6,603,521.31 1/2 bata6.7 Profil beton ILS 1.00 1.00 2,500,000.00 2,500,000.00 2,500,000.00 6.8 Pengadaan Bunga = LS 1.00 1.00 5,000,000.00 5,000,000.00 5,000,000.00 BAB 7.PEKERJAANKERAMIK71 Keramik Lantai 40 M2 148.00 140.00 147,715.00 21,861,820.00 20,680, 100.00 (1,181,720.00)x 40BAB 8.PEKERJAANPENGECATAN8.1 Cat Kilat / cat M2 158.14 281.14
    PEKERJAANPENGECATAN8.1 Cat Kilat / cat minyak M2 158.14 281.14 249.81 13,800.00 18,990.00 475,783.21 5,338,848.60 4,743,950.10 (594,898.50) HargaSatuanTimpangBAB 9. PEKERJAANLAIN LAIN9.1 Lampu Philips X1 25 Watt BH 44.00 41.00 135,000.00 5,940,000.00 5,535,000.00 (405,000.00)9.2 Saklar BH 11.00 11.00 50,000.00 550,000.00 550,000.00 6,508,415.11 413,824,674.12 324,536,382.43 (89,288,291.69)5. PEMBUATAN TAMANBAB 1.
Register : 23-04-2015 — Putus : 08-09-2015 — Upload : 08-12-2015
Putusan PN BANDUNG Nomor 01 / Pdt.Sus/ KPPU / 2015 / PN.Bdg.
Tanggal 8 September 2015 —
13261
  • Copy 166 anggaran dasar PAD/ 1990 lembarPKPRI KWK.10/21.1990317 C31 Akta perubahan n/a 14 Mei 1987/PKPRI /Copy /167 anggaran dasar lembarPKPRI318 C31 /Akta perubahan 574/BH/ j17 PKPRI /Copy /168 anggaran dasar IX.19/12 Desember lembarPKPRI .67 1968319 C31 Surat Keputusan 32.K/O1)18 Februari PKPRI /Copy 29 Pengurus PKPRI /1991 = 1991 lembar320 C32 Sertifikasi usaha 518/050 10 PKPRI Copy 90 koperasi Nopember lembarKUKM&P2009erindag/Tahun2009321 C32 Nomor pokok wajib 01.219. n/a PKPRI Copy j11 pajak 281.14
Register : 01-10-2014 — Putus : 19-01-2015 — Upload : 02-06-2016
Putusan PN TANJUNG PINANG Nomor 25/PID.SUS/TPK/2014/PN TPG
Tanggal 19 Januari 2015 — Firmansyah Chomsani, S. Sos
11119
  • 15,743.35)6.5 Lantai kerja (Beton K.125) M3 1.58 1.58 912,090.00 1,440,190.11 1,441,102.20 912.096.6 Pasangan Dinding 1/2 bata M3 5.73 5.73 1,152,447.00 6,603,521.31 6,603,521.31 6.7 Profil beton LS 1.00 1.00 2,500,000.00 2,500,000.00 2,500,000.00 6.8 Pengadaan Bunga LS 1.00 1.00 5,000,000.00 5,000,000.00 5,000,000.00 BAB 7.PEKERJAAN KERAMIK7.1 Keramik Lantai 40 x 40 M2 148.00 140.00 147,715.00 21,861,820.00 20,680,100.00 (1,181,720.00)BAB 8.PEKERJAAN PENGECATAN8.1 Cat Kilat / cat minyak M2 158.14 281.14
Register : 09-02-2018 — Putus : 30-05-2018 — Upload : 27-08-2018
Putusan PN DEPOK Nomor 83/Pid.B/2018/PN.Dpk
Tanggal 30 Mei 2018 — ANDIKA SURACHMAN ; ANNIESA DESVITASARI HASIBUAN
97304480
  • ESTI AGUSTIN dan SITI NURAIDA HASIBUAN; 281.14. 1 (satu) Bundel Foto Copy Sertifikat Hak Milik (SHM) No. 413/Obel-obel, Luas 13.270 m2 sebagian dinyatakan dalam surat ukur Tgl. 12 Mei 1997, Nomor 1215/97. Tercatat A.N. AZHAR; 281.15. 1 (satu) Bundel Foto Copy berwarna Sertifikat Hak Milik (SHM) No. 467/Obel-obel, Luas 9.460 m2 sebagian dinyatakan dalam surat ukur Tgl. 19 Februari 1998, Nomor 34/obel-obel/98. Tercatat A.N.