Ditemukan 273 data

Urut Berdasarkan
 
Putus : 10-10-2014 — Upload : 26-08-2015
Putusan PT KUPANG Nomor 51/PID.SUS/2014/PTK
Tanggal 10 Oktober 2014 — PHILIP BENEDICTUS WADHI, Amd., Cs.
6051
  • Angker 18,000 18,000 Buah 3,500,00 63.000,00 Pas Engsel 6,000 4,000 2,000 Buah 15.107,50 30,215,00 Pas. Jelusi 1,860 1,770 0,090 M2 167,700,00 15.093,00130.234,406. Felix Neno Pas Engsel 6,000 4,000 2,000 Buah 15.107,50 30.215,00 Pas Jelusi 1,860 1,770 0,090 M2 167,700,00 15.093,0045 308,507.
    Angker 18,000 18,000 Buah 3,500,00 63.000,00 Pas Jelusi 1,860 1,770 0,090 M2 167,700,00 15.093,00 Plat Strip 12,000 4,000 8,000 Buah 12,500,00 100.000,00 Pas Engsel 6,000 4,000 2,000 Buah 15.107,50 30,215,00 Pek Ikatan 0,400 0,368 0,032 M3 1,370.400,00 43.852,80Angin252,160,803. Mikhael Mano Pas. Angker 18,000 18,000 Buah 3,500,00 63.000,00 Pas Engsel 6,000 4,000 2,000 Buah 15.107,50 30,215,00 Pas.
    Sebastian Mano Pas Angker 18,000 18,000 Buah 3,500,00 63.000,00 Pas Engsel 6,000 4,000 2,000 Buah 15.107,50 30.215,00 Pek Ikatan 0,400 0,368 0,032 M3 1.370.400,00 43,852,80Angin 12,000 4,000 8,000 Buah 12,500,00 100.000,00 Plat strip237,067,805. Elisabeth Rae Pas. Angker 18,000 18,000 Buah 3,500,00 63.000,00 Plat Strip 12.000 8,000 4,000 Buah 12,000,00 50,000,00 Pek Ikatan 0,400 0,336 0,064 M3 1.370.400,00 87.705,60Angin 6,000 4,000 2,000 Buah 15.107,50 30.215,00 Pas. Engsel230.920,606.
    Sebastian Mano Pas Angker 18,000 18,000 Buah 3,500,00 63.000,00 Pas Engsel 6,000 4,000 2,000 Buah 15.107,50 30.215,00 Pek Ikatan 0,400 0,368 0,032 M3 1.370.400,00 43,852,80 90 Angin 12,000 4,000 8,000 Buah 12,500,00 100.000,00 Plat strip237,067 ,805. Elisabeth Rae Pas. Angker 18,000 18,000 Buah 3,500,00 63.000,00 Plat Strip 12.000 8,000 4,000 Buah 12,000,00 50,000,00 Pek Ikatan 0,400 0,336 0,064 M3 1.370.400,00 87.705,60Angin 6,000 4,000 2,000 Buah 15.107,50 30.215,00 Pas. Engsel6.
Putus : 08-04-2015 — Upload : 19-05-2016
Putusan MAHKAMAH AGUNG Nomor 629 K/Pid.Sus/2015
Tanggal 8 April 2015 — YOSAFAT SALIM Alias ALEONG
5513 Berkekuatan Hukum Tetap
  • Angker 18,000 18,000 Buah 3,500,00 63.000,00 Pas Engsel 6,000 4,000 2,000 Buah 15.107,50 30,215,00 Pas. Jelusi 1,860 1,770 0,090 M2 167,700,00 15.093,00130.234,406. Felix Neno Pas Engsel 6,000 4,000 2,000 Buah 15.107,50 30.215,00 Pas Jelusi 1,860 1,770 0,090 M2 167,700,00 15.093,0045,308,507.
    Angker 18,000 18,000 Buah 3,500,00 63.000,00 Pas Jelusi 1,860 1,770 0,090 M2 167,700,00 15.093,00 Plat Strip 12,000 4,000 8,000 Buah 12,500,00 100.000,00 Hal. 53 dari 174 hal. Put. Nomor 629 K/Pid.Sus/2015 Pas Engsel 6,000 4,000 2,000 Buah 15.107,50 30,215,00 Pek Ikatan 0,400 0,368 0,032 M3 1,370.400,00 43.852,80Angin252,160,80Mikhael Mano Pas. Angker 18,000 18,000 Buah 3,500,00 63.000,00 Pas Engsel 6,000 4,000 2,000 Buah 15.107,50 30,215,00 Pas.
    Angker 18,000 18,000 Buah 3,500,00 63.000,00 Plat Strip 12.000 8,000 4,000 Buah 12,000,00 50,000,00 Pek Ikatan 0,400 0,336 0,064 M3 1.370.400,00 87.705,60Angin 6,000 4,000 2,000 Buah 15.107,50 30.215,00 Pas.
    Angker 18,000 18,000 Buah 00 63.000,00 Pas Engsel 6,000 4,000 2,000 Buah 3,500,00 30,215,00 Pas.
    Angker 18,000 18,000 Buah 3,500,00 63.000,00 Pas Jelusi 1,860 1,770 0,090 M2 167,700,00 15.093,00 Plat Strip 12,000 4,000 8,000 Buah 12,500,00 100.000,00 Pas Engsel 6,000 4,000 2,000 Buah 15.107,50 30,215,00 Pek Ikatan 0,400 0,368 0,032 M3 1,370.400, 43.852,80Angin 00252, 160,803. Mikhael Mano Pas. Angker 18,000 18,000 Buah 3,500,00 63.000,00 Pas Engsel 6,000 4,000 2,000 Buah 15.107,50 30,215,00 Pas.
Putus : 14-10-2014 — Upload : 26-08-2015
Putusan PT KUPANG Nomor 53/Pid.Sus/2014/PT.KPG
Tanggal 14 Oktober 2014 — NURDIN HAJI RUSMAN
6714
  • ) 00 Pas Engsel 18,000 18,00) Buah 63,000 a7 6,000 4,000 0 Buah 3.500,00 ,002,000 15.107,50 30,215,00134,327,007.
    Jelusi 6,000 4,000 Buah 30.215,002,000 15.107,5012,000 10,000 Buah 25.000,002,000 12.500,001,860 1,770 M2 15.093,000,090 167.700,00174.420,002. Martinus Kolo 39 Pas Angker 18,000 18,00) Buah 3.500,00 63.000,00 Pas Engsel ) Pas Jelusi 6,000 4,000 Buah 15.107,50 30.215,002,0001,860 1,770 M2 167.700,00 15.093,000,090108.308,00Yakobus Kusi Pas Angker 18,000 18,00) Buah 3.500,00 63.000,00 Pas Engsel 06,000 4,000 Buah 15.107,50 30.215,002,00093.215,00Imanuel Abi Pek.
    David Malafu Pas Angker 18.000 18,00 Buah 3.500,00 63.000,00 Pas Engsel 0)6,000 4,000 Buah 15.107,50 30,215,002,00093,215,009. Yulita Mamo Pas Angker 18,000 18,00) Buah Pas Engsel 0 Plat Strip 6,000 4,000 Buah2,00012,000 10,000 Buah2,000118.215,001 Paulus Berek0. Pas Angker 18,000 18,00 Buah 3.500,00 63,000,00 Pas Engsel 06,000 4,000 Buah 15,107,50 30,215,002,00093.215,001 Martinus Batu1.
    Engsel 06,000 4,000 Buah 15.107,50 30.215,002,000117.882,202. Silvester UluManu0,400 0,382 0,018 M3 1.370.400,00 24.667,20 Pek.Penyokong 18,000 18,00) Buah 3.500,00 63.000,00 Pas. Angker 0 Pas. Engsel 6,000 4,000 Buah 15.107,50 30.215,002,000117.882,203. Leonardus Falo Pek. 0,400 0,382 0,018 M3 1.370.400,00 24.667,20Penyokong Pas. Angker 18,000 18,00) Buah 3.500,00 63.000,00 Pas. Engsel 06,000 4,000 Buah 15.107,50 30.215,002,000117.882,204.
    BertolomeusTeme0,400 0,370 0,30 Ms 1.370.40 41,112,00 Pek 0,00Penyokong 18,00 18.00 Buah 63,000,00 Pas Angker 0 0) 3.500,00 Pas Engsel 4,000 Buah 30,215,006,000 2,000 15.107,50134,327,008. David Malafu Pas Angker 18.00 18,00 Buah 3.500,00 63.000,00 Pas Engsel 0 0)4,000 Buah 15.107,5 30,215,006,000 2,000 093,215,009. Yulita Mamo Pas Angker 18,00 18,00) Buah Pas Engsel 0 0 Plat Strip 4,000 Buah6,000 2,00010,000 Buah12,00 2,0000118.215,001 Paulus Berek0.
Register : 19-02-2018 — Putus : 22-05-2018 — Upload : 01-07-2019
Putusan PT SURABAYA Nomor 114/PDT/2018/PT SBY
Tanggal 22 Mei 2018 — Pembanding/Tergugat : PT. ARDILA INSAN SEJAHTERA Diwakili Oleh : YULIANA HERIYANTININGSIH, S.H., M.H.
Terbanding/Penggugat : PT. DEVI PERMATA PUSPA dalam hal ini diwakili Direktur Utama ASMANU ABADI, SE
9145
  • PEKERJAAN VOLUME SATUAN SATUAN HARGAC PEKERJAAN MEKANIKALC.1 Instalasi PMK1 Main Pump EBARA FS2J515 1,000 m3 31,500,000 31,500,000Jockey Pump VerticalGRUNDFOS 1,000 m3 23,500,000 23,500,000Outdoor Box Hydrant 4,000 m3 12,800,000 51,200,000 Halaman 7 dari 40 Perkara Nomor 114/PDT/2018/PT SBY Hydrant Pilar 4,000 m3 2,750,000 11,000,000APAR ABC 5kg 6,000 bh 1,200,000 7,200,000Dry Chemical Powder 25kg6 Troley 4,000 bh 17,000,000 68,000,0007 Sprinkler 36,000 bh 150,000 5,400,0008 Testing Comisioning 1,000
    Bh 7.150.000 28.600.00021 Flexible Joint 100 mm 4,000 Bh 11.000.000 44.000.00022 Pressure gauge 4,000 Bh 1.500.000 6.000.00023 Pressure switch 4,000 Bh 1.750.000 7.000.00024 Safety Valve 3,000 Bh 6.500.000 19.500.00025 Automatic Relief Valve 3,000 Bh 7.450.000 22.350.00026 Panel SD, DOL 3,000 Bh 15.700.000 47.100.0002?
    Ls 2.000.000 8.000.000Pasir Urug Halaman 15 dari 40 Perkara Nomor 114/PDT/2018/PT SBY 12 Material Support 3,000 Ls 10.000.000 30.000.000 Sub Total D.1 399.081.250D.2 Grounding &Penangkal Petir1 Tuas Petir / Splitzer 4,000 Unit 1.050.000 4.200.0002 Therminal 4,000 Unit 1.837.500 7.350.000Protektion3 Conductor BC 70 60,000 M 38.850 2.331.000mm4 Ground Road % m2 6,000 Bh 577.500 3.465.000panjang 4 m5 Ground Road % m2 40,000 Bh 577.500 23.100.000panjang 4m6 Bar Konduktor cu 70 400,000 M 38.850 15.540.000mm27
    Bar Konduktor cu 50 300,000 M 31.500 9.450.000mm28 Bar cu15x3cm 65,000 Bh 25.750 1.673.750c/w Bolt, Nut TabHos9 Ground Box 15,000 Bh 525.000 7.875.000W/Flexible CableClam10 Ground Road % m2 8,000 Bh 577.500 4.620.000panjang 4m11 Bar Konduktor cu 70 200,000 M 38.850 7.770.000mm212 Barcu1i5x3cm 4,000 Bh 15.750 63.000c/w Bolt, Nut TabHos13 Ground Road % m2 4,000 Bh 577.500 2.310.000panjang 4m14 Bar Conductor cu 50 70,000 M 31.500 2.205.000mm215 Barcui5x3cm 2,000 Bh 257.500 51.500c/w Bolt, Nut TabHos16
    Galian Tanah Pasir 3,000 Ls 4.200.000 12.600.000Urug17 Material Support 15,000 Ls 5.000.000 75.000.000Sub Total D.2 179.604.250D.3 LampuPenerangan1 Lampu FL2 x 40W 25,000 Bh 404.750 10.118.7502 Lampu FL1x40W 6,000 Bh 213.400 1.280.4003 Downlight PL 20 W 4,000 Bh 194.500 778.0004 Saklar Lp 220 V 18,000 Bh 45.000 810.0005 Stop Kontak 13 A/ 18,000 Bh 35.000 630.000220 V6 Saklar Lp 220 V 4,000 Bh 1.837.500 7.350.000Explosion Proof7 Kabel NYM 3 x 2,5 700,000 M 25.000 17.500.000mm28 Dual Proof 220 V FL
Putus : 26-06-2011 — Upload : 20-10-2011
Putusan PTA MATARAM Nomor 26/Pdt.G/2011/PTA.MTR
Tanggal 26 Juni 2011 — pembanding v terbanding
4115
  • 3 23,000 115,000KABEL PERTAMA 3 x2,5 6 184,000 1,104,000KABEL DS 2 x 1,5 10 338,000 3,380,000KABEL DAIFU 2 x 2,5 2 48,500 97,000KABEL DAIFU 3 x 1,5 2 430,000 860,000KABEL DAIFU 3 x 2,5 3 630,000 1,890,000KABEL SHIGERU 2x2,5100 M 3 475,000 1,425,000KABEL SHIGERU 2x1,5100 M 4 225,000 900,000KABEL SHIGERU 2x2,5100 M 3 675,000 2,025,000SENG PLAT 30 x 50 M 2 9,600 19,200 SENG PLAT 40 1 11,500 11,500SENG PLAT 50 1 13,000 13,000SENG PLAT 60 1 17,000 17,000SENG PLAT 70 1 21,000 21,000KARPET 40 x 50 M 2 4,000
    8,000KARPET 45 x 50 M 2 4,000 8,000KARPET 50 x 50 M 1 5,500 5,500KARPET 60 x 50 M 3 6,500 19,500KLOSET PK+DR 1 100 80,000 8,000,000KLOSET MARON 30 100,000 3,000,000KLOSET INA BR + PK 15 100,000 1,500,000BUNA ASBES 200 20,000 4,000,00030 KG PAKU TRIPLEK 2 12,000 24,00030 KG PAKU TRIPLEK 3 1 12,000 12,00030 KG PAKU TRIPLEK 4 2 12,000 24,00030 KG PAKU TRIPLEK 5 4 10,000 40,00030 KG PAKU TRIPLEK 6 2 20,000 40,00030 KG PAKU TRIPLEK 7 5 10,000 50,00030 KG PAKU TRIPLEK 9 2 12,000 24,00030 KG PAKU TRIPLEK12
    120,000KENE 2 30 4,000 120,000SOK 2 % 50 3,000 150,000KENE 2 2 70 4,000 280,000TEE 2 % 60 5,000 300,000SOK 3 10 3,500 35,000TEE 3 10 8,000 80,000KENE 3 30 5,000 150,000SOK 4 7 8,000 56,000TEE 4 6 15,000 90,000KENE 4 60 8,000 480,000SOK DD 2 90 1,000 90,000 11 SOK DD % 40 2,000 80,000SOK DD 1 IN 10 2,000 20,000SOK DD 1 % 10 2,500 25,000SOK DL 40 3,000 120,000SOK DL % 40 2,000 80,000SOK DL 1 x % 10 1,000 10,000SOK DL 1 % 4 2,000 8,000OPERSOK 1/2 x % 40 1.500 60.000OPERSOK 3/4 x 1 20 2,000 40,000OPERSOK
    16,000PAYUNG 12 15,000 180,000SELANG 5/8 20 100,000 2,000,000KARUNG 25 KG 5 900,000 4,500,000SOK TALANG 1/2 I 15 3,000 45,000TUTUP 10 6,000 60,000GANTUNGAN 12 6,000 72,000SANGER TALANG 1/2 I16 IN 6 32,000 192,000SANGER TALANG 1/2 I8 IN 6 40,000 240,000TALANG KOTAK BIASA 6 30,000 180,000SOK TALANG 1/2 I 8IN 20 3,000 60,000TUTUP 20 3,000 60,000GANTUNGAN 10 7,000 70,000CORONG 10 35,000 350,000PIPA WAPIN '% 80 12,000 960,000PIPA WAPIN 1 20 22,000 440,000PIPA BIASA 5/8 150 4,000 600,000PIPA BIASA % 120
    9,000 1,080,000PIPA BIASA % 120 11,000 1,320,000PIPA BIASA 1 70 14,000 980,000PIPA BIASA 1 % 20 16,000 320,000PIPA BIASA 1 % 20 18,000 360,000PIPA BIASA 2 15 20,000 300,000PIPA BIASA 2 % 15 25,000 375,000PIPA BIASA 4 20 45,000 900,000DOP '%2 20 1,000 20,000DOP %4 30 1,500 45,000DOP 1 12 2,000 24,000 14 DOP 2 10 4,000 40,000DOP 2 % 10 4,000 40,000DOP 3 8 5,000 40,000DOP 4 10 5,000 50,000RODA KASTER 7 25,000 175,000RODA TERALI HIDUP +MATI 12 85,000 1,020,000RODA PAGAR 8 20 22,000 440,000RODA PAGAR
Register : 30-11-2017 — Putus : 19-09-2018 — Upload : 23-10-2018
Putusan PN BATAM Nomor 301/Pdt.G/2017/PN Btm
Tanggal 19 September 2018 — Penggugat:
PT APPLE POLYPRINT PTE LTD
Tergugat:
PT ASIA RAYA BATAMINDO
6732
  • Pembayaran ke lima belas, Januari 2017 sebesar $2,000 Pembayaran ke enam belas, Februari 2017 sebesar $2,000 Pembayaran ke tujunh belas, Maret 2017 sebesar $2,000 Pembayaran ke delapan belas, April 2017 sebesar $2,000 Pembayaran ke Sembilan belas, Mei 2017 sebesar $2,000 Pembayaran ke dua puluh, Juni 2017 sebesar $ 2,000 Pembayaran ke dua puluh satu, Juli 2017 sebesar $4,000 Pembayaran ke dua puluh dua, Agustus 2017 sebesar$ 4,000 Pembayaran ke dua puluh tiga, September 2017sebesar $ 4,000 Pembayaran
    ke dua puluh empat, Oktober 2017sebesar $ 4,000 Pembayaran ke dua puluh lima, November 2017sebesar $ 4,000 Pembayaran ke dua puluh enam, Desember 2017sebesar $ 4,000 Pembayaran ke dua puluh tujuh, Januari 2018 sebesar$ 4,000 Pembayaran ke dua puluh delapan, Februari 2018sebesar $ 4,000 Pembayaran ke dua puluh sembilan, Maret 2018sebesar $ 4,000 Pembayaran ke tiga puluh, April 2018 sebesar $4,718,80Dengan jumlah keseluruhan adalah, sebesar : $ 76,718.80 sen;23.
Register : 25-07-2018 — Putus : 05-09-2018 — Upload : 19-11-2019
Putusan PN TANAH GROGOT Nomor 234/Pid.B/LH/2018/PN Tgt
Tanggal 5 September 2018 — Penuntut Umum:
JHONSON EVENDI TAMBUNAN, SH
Terdakwa:
EDI PURNOMO Bin WAGINO
33612
  • barang bukti berupa : 1 (satu) unit mobil Dump Truck merek MITSUBISHI Canter Nomor Polisi KT 8771 EI warna kuning beserta kunci kontaknya yang bermuatan kayu masak jenis rimba campuran (RC) dengan jumlah 7,1104 m3 (tujuh koma satu satu kosong empat) meter kubik dengan rincian ukuran tebal 4 cm x lebar 18 cm x panjang 4 m sebanyak 108 potong atau total jumlah 3,1104 m3, ukuran tebal 2 cm x lebar 20 cm x panjang 4 m sebanyak 250 keping atau total jumlah 4,000
    (tujuh koma satu satu kosong empat) meter kubik denganrincian ukuran tebal 4 cm x lebar 18 cm x panjang 4 m sebanyak 108potong atau total jumlah 3,1104 m%, ukuran tebal 2 cm x lebar 20 cm xpanjang 4 m sebanyak 250 keping atau total jumlah 4,000 m?, dirampasuntuk Negara;5.
    ( tujuhkoma satu satu kosong empat) dengan rincian ukuran tebal 4 Cm x lebar 18Cm x panjang 4 M sebanyak 108 potong atau total jumlah 3,1104 M,ukuran tebal 2 Cm x lebar 20 Cm x panjang 4 M sebanyak 250 keping atautotal jumlah 4,000 M?, kemudian pada saat melintas di jalan Negara DesaPaser Blengkong Kec. Tanah Grogot Kab.
    , ukuran tebal 2 Cm x lebar 20 Cm x panjang 4 M sebanyak 250 kepingatau total jumlah 4,000 M, atau total jumlah 7,1104 M?
Putus : 28-11-2014 — Upload : 03-12-2015
Putusan MAHKAMAH AGUNG Nomor 616 K/Pdt.Sus-PHI/2014
Tanggal 28 Nopember 2014 — Mr. HONG KYUNG HEE VS 1. PT M & S APPAREL, DK
22950 Berkekuatan Hukum Tetap
  • Upah atau gaji pokok dari Penggugatadalah sebesar US$ 4,000 (empatribu Dollar Amerika Serikat) per bulan;b. Biaya Pendidikan Anak per semester 2,280US$ x 2 = US$ 4,560c. Penyediaan Akomodasi sebesar 400US$ perbulan dan setahun = 12 xUS$ 400 = US$ 4,800d.
    Pembayaran gaji dari sisa masa kerja yang ada, yaitu 9 (Sembilan) bulanditambah gaji bulan Oktober 2012 yang belum dibayar sehingga totalkeseluruhannya adalah 10 (sepuluh) bulan = 10 x US$ 4,000 = US$40,000 (empat puluh Dollar Amerika Serikat);b. Upah atau gaji pokok dari Penggugat adalah sebesar US$ 4,000 (empatribu Dollar Amerika Serikat) per bulan;c. Biaya pendidikan anak selama 2 semester US$ 2,280$ x 2 = US$ 4,560;d.
    Pembayaran gaji dari sisa masa kerja yang ada, yaitu 9 (Sembilan) bulanditambah gaji bulan Oktober 2012 yang belum dibayar sehingga totalkeseluruhannya adalah 10 (sepuluh) bulan = 10 x US$ 4,000 = US$40,000 (empat puluh Dollar Amerika Serikat);b. Upah atau gaji pokok dari Penggugat adalah sebesar US$ 4,000 (empatribu Dollar Amerika Serikat) per bulan;c. Biaya pendidikan anak per semester 2,280$ x 2 = US$ 4,560d. Penyediaan Akomodasi sebesar 400$ perbulan dan setahun =12 x US$400 = US$ 4,800e.
    Pembayaran gaji dari sisa masa kerja yang ada, yaitu 9 (Sembilan)bulan ditambah gaji bulan Oktober 2012 yang belum dibayar sehinggatotal keseluruhannya adalah 10 (sepuluh) bulan = 10 x US$ 4,000 =US$ 40,000 (empat puluh Dollar Amerika Serikat);b. Upah atau gaji pokok dari Penggugat adalah sebesar US$ 4,000(empat ribu Dollar Amerika Serikat) per bulan;Biaya Pendidikan Anak per semester 2,280$ x 2 = US$ 4,560Penyediaan Akomodasi sebesar 400$ perbulan dan setahun = 12 x400$ = US$ 4,800e.
    Pembayaran gaji dari sisa masa kerja yang ada, yaitu 9 (Sembilan)bulan ditambah gaji bulan Oktober 2012 yang belum dibayar sehinggatotal keseluruhannya adalah 10 (sepuluh) bulan = 10 x US$ 4,000 =US$ 40,000 (empat puluh Dollar Amerika Serikat);b. Upah atau gaji pokok dari Penggugat adalah sebesar US$ 4,000(empat ribu Dollar Amerika Serikat) per bulan;Biaya Pendidikan Anak persemester 2,280$ x 2 = US$ 4,560PenyediaanAkomodasi sebesar 400$ perbulan dan setahun sebesar12 x 400 $ = US$ 4,800;e.
Putus : 03-11-2014 — Upload : 05-02-2015
Putusan PN AMURANG Nomor 66/Pid.B/2014/PN.Amr
Tanggal 3 Nopember 2014 — Terdakwa I. Deker Tambuwun alias Deker, Terdakwa II. Arifin Runtuwene, Terdakwa III. Luis Rantung
8516
  • Luis Rantung sedang bermain kartu domino dengan permainanqyuqyu,Bahwa permainan tersebut menggunakan taruahan uang;Bahwa cara bermain dengan membagikan kartu dan jika angkanyalebih tinggi dari yang lain bisa menambah yang dari taruhan Rp.1.000, (seribu rupiah) ditambah menjadi Rp. 2.000, (dua ribu rupiah)dan bisa menambah sampai Rp. 4,000, (empat ribu rupiah);Bahwa saat dilakukan penangkapan didapati barang bukti berupaUang berjumlah Rp. 251.000, (dua ratus lima puluh satu ribu rupiah)dengan rincian
    Coco Prima Desa PopontolenKecamatan Tumpaan Kabupaten Minahasa Selatan Terdakwabersama dengan, Terdakwa Il Arifin Runtuwene dan Terdakwa lll.Luis Rantung sedang bermain kartu domino dengan permainan qyuqyu; Bahwa permainan tersebut menggunakan taruhan uang; Bahwa cara bermain dengan membagikan kartu dan jika angkanyalebih tinggi dari yang lain bisa menambah yang dari taruhan Rp.1.000, (seribu rupiah) ditambah menjadi Rp. 2.000, (dua ribu rupiah)dan bisa menambah sampai Rp. 4,000, (empat ribu rupiah
    Coco Prima Desa PopontolenKecamatan Tumpaan Kabupaten Minahasa Selatan Terdakwabersama dengan Terdakwa Deker Tambuwun alias Deker, danTerdakwa Ill Luis Rantung sedang bermain kartu domino denganpermainan qyuqyu;Bahwa permainan tersebut menggunakan taruahan uang;Bahwa cara bermain dengan membagikan kartu dan jika angkanyalebih tinggi dari yang lain bisa menambah yang dari taruhan Rp.1.000, (seribu rupiah) ditambah menjadi Rp. 2.000, (dua ribu rupiah)dan bisa menambah sampai Rp. 4,000, (empat ribu
    Arifin Runtuwene alias Mimi sedang bermain kartudomino dengan permainan qyuqyu;Bahwa permainan tersebut menggunakan taruahan uang;Bahwa cara bermain dengan membagikan kartu dan jika angkanyalebih tinggi dari yang lain bisa menambah yang dari taruhan Rp.1.000, (seribu rupiah) ditambah menjadi Rp. 2.000, (dua ribu rupiah)dan bisa menambah sampai Rp. 4,000, (empat ribu rupiah);Bahwa saat dilakukan penangkapan didapati barang bukti berupaUang berjumlah Rp. 251.000, (dua ratus lima puluh satu ribu rupiah
Register : 01-04-2016 — Putus : 11-04-2016 — Upload : 11-03-2020
Putusan PA MOROTAI Nomor 1305/Pdt.P/2016/PA.MORTB
Tanggal 11 April 2016 — Pemohon melawan Termohon
114
  • Bahwa Pemohon dan Pemohon II adalah suami istri sah yang menikahdi Desa Sopi, Kecamatan Morotai Utara, Kabupaten Pulau Morotai padatanggal 15 Agustus 1980 dihadapan Wali Nikah Abdul Tenang dan MaharHalaman 1 / 12 Penetapan Nomor 1305/Pdt.P/2016/PA MORTBberupa Uang sejumlah Rp. 4,000, dibayar tunai dan disaksikan oleh 2orang saksi lakilaki masingmasing bernama Senen Mahdea dan HamsaMandea, namun perkawinan Pemohon dan Pemohon II tidak memilikibuku Kutipan Akta Nikah, untuk itu saat ini Pemohon mohon
    berikut : Bahwa saksi kenal, dengan Pemohon dan Pemohon II sebagaisuami Istri; Bahwa saksi Tidak Hadir acara perkawinan Pemohon danPemohon II; Bahwa Pemohon menikah dengan Pemohon II pada 15 Agustus1980 di Desa Sopi, Kecamatan Morotai Utara, Kabupaten Pulau Morotai; Bahwa yang menjadi wali nikah adalah Abdul Tenang; Bahwa akad nikah menggunakan Bahasa Indonesia; Bahwa yang menjadi saksi pernikahan Pemohon denganPemohon II adalah Senen Mahdea dan Hamsa Mandea; Bahwa maharnya berupa Uang sejumlah Rp. 4,000
    sebagai berikut : Bahwa saksi kenal Pemohon dan Pemohon II sebagai suamiistri; Bahwa saksi Tidak Hadir perkawinan Pemohon dan Pemohon Il; Bahwa Pemohon menikahi Pemohon II pada 15 Agustus 1980 diDesa Sopi Kecamatan Morotai Utara Kabupaten Pulau Morotai; Bahwa Abdul Tenang sebagai wali nikah pada perkawinanPemohon dan Pemohon II dan akad nikah menggunakan BahasaIndonesia; Bahwa saksi pernikahan Pemohon dengan Pemohon II adalahSenen Mahdea dan Hamsa Mandea sedangkan maharnya berupa Uangsejumlah Rp. 4,000
    PemohonIl, bukti Surat serta keterangan para saksi yang diajukan oleh Pemohon danPemohon II, maka Hakim telah dapat menemukan atas kebenaran faktafaktakejadian sebagai berikut :Halaman 7 / 12 Penetapan Nomor 1305/Pdt.P/2016/PA MORTBBahwa Pemohon dan Pemohon II menikah pada 15 Agustus 1980 namuntidak tercatat di Kantor Urusan Agama Kecamatan Morotai Utara;wo Pada waktu akad nikah Pemohon berstatus Jejaka dan Pemohon Ilberstatus Perawan;Sa Bahwa wali nikahnya Abdul Tenang, dan maharnya Uang sejumlah Rp.4,000
Register : 14-10-2020 — Putus : 05-11-2020 — Upload : 05-11-2020
Putusan PT PONTIANAK Nomor 86/PDT/2020/PT PTK
Tanggal 5 Nopember 2020 — Pembanding/Tergugat : AGUSTINUS KLARAN Diwakili Oleh : AGUSTINUS KLARAN
Terbanding/Penggugat : DARMEDI KUNTO HIBONO
12742
  • BETON 6 28,000 840,0003,290,0001/21/201426 SET DOWN LIGHT 5" 50,000 1,300,00020 SET DOWN LIGHT 4" 40,000 800,00010 BATANG PIPA PVC 2" 60,000 600,00010 BATANG PIPA PVC 3/4" 20,000 200,00010 BUAH ELBOW 1/2" 4,000 40,0004 KEPING TRIPLEK 3MM 60,000 240,0008 BUAH BAUT 10 2,000 16,0003,196,0001/26/2014220 SAK SEMEN HOLCIM 93,500 20,570,00020,570,0002/8/2014110 SAK SEMEN HOLCIM 93,500 10,285,00010,285,0002/6/201410 ROL KAWAT IKAT 200,000 2,000,00030 BUNGKUS PAKU SADEL 8,9,10 8,500 255,0002 BUNGKUS PAKU
    SEMEN HOLCIM 93,500 11,220,00011,220,0002/11/20141 PAKS SARUNG TANGAN 50,000 50,00010 BUAH EMBER COR 5,000 50,0001 ROL KABEL 2 x 1,5 350,000 350,0001 ROL KABEL 2 x 2,5 450,000 450,0005 METER SELANG SPIRAL 2" 40,000 200,0002 BUAH SARINGAN SPIRAL 2" 40,000 80,0001,180,0002/13/201410 BATANG BESI BETON 10 58,000 580,00020 BATANG BESI BETON 8 40,000 800,00010 BATANG BESI BETON 6 28,000 280,0001,660,0002/14/2014100 PAKS AMPLAS NO. 100 3,000 300,0005 BUAH ELBOW 4" 25,000 125,00010 BUAH ELBOW DRAT DALAM 4,000
    40,0003/4"10 BUAH TEE 3/4" 4,000 40,0001 ROL KABEL NYM 2x 1,5 350,000 350,0001 ROL KABEL NYM 2x 2,5 450,000 450,0005 ROL LAKBAN GYPSUM 25,000 125,00010 BUAH ELBOW 3/4" 4,000 40,0001,470,0002/17/2014 Halaman 7 dari 37 PutusanPerdata Gugatan Nomor 86/PDT/2020/PT PTK 150 SAK SEMEN GRESIK 75,000 11,250,00011,250,0002/20/201420 KEPING GYPSUM BOARD 80,000 1,600,00012 KALENG TINER 20,000 240,0005 SAK SEMEN PUTIH 125,000 625,00010 BUAH KAPI MERAH 5,000 50,0005 BUAH KUPASAN BAK 15,000 75,0005 BUAH DRAIN
    FLOOR 15,000 75,0002,665,0002/23/2014162 SAK SEMEN MERAH PUTIH 92,500 14,985,00014,985,0002/25/2014130 SAK SEMEN GRESIK 76,000 9,880,0009,880,0002/28/201430 BATANG BESI BETON 10 58,000 1,740,00038 BATANG BESI BETON 8 40,000 1,520,0001 ROL KABEL NYM 3 x 2,5 600,000 600,00020 BUAH INBOW DUOS 4,000 80,0001 DUS PAKU 2" 300,000 300,0004,240,0003/1/2014130 SAK SEMEN GRESIK 76,000 9,880,000150 ISAK SEMEN GRESIK (4/3/14) 76,000 11,400,000150 SAK SEMEN GRESIK (6/3/14) 76,000 11,400,00032,680,0002/7/20144
    40,00010 BUAH TEE v1" 4,000 40,0002 KALENG LEM ASAHI 35,000 70,00010 BATANG PIPA 5/8" 9,000 90,0002,490,0004/12/201415 KALENG TINER 20,000 300,00017.
Register : 13-08-2018 — Putus : 13-02-2019 — Upload : 14-08-2019
Putusan PN JAKARTA PUSAT Nomor 236/Pdt.Sus-PHI.G/2018/PN.JKT.PST.
Tanggal 13 Februari 2019 — EDWIN FADLEN CORPUS >< PT PANEN LESTARI INTERNUSA
246103
  • Tunjangan tetap sebesar USD 4,000.Halaman 2 dari 34 Putusan Nomor 236/Pdt.SusPHI. G/2018/PN.JKT.PST THR 2017 sebesar USD 11,000.Sehingga total ganti rugi yang diterima oleh Penggugat hanya USD 37,000.(tiga puluh tujuh ribu Dolar Amerika).ill. TERGUGAT TELAH MELANGGAR UNDANGUNDANG NOMOR 13 TAHUN2013 TENTANG KETENAGAKERJAAN DAN PERATURAN PERUNDANGUNDANGAN TERKAIT DENGAN KETENAGAKERJAAN5.
    Bahwa Tergugat juga masih kurang bayar atas Tunjangan Hari Raya (THR)Penggugat pada tahun 2016 yakni sebesar USD 4,000. dan dikarenakanposisi Tergugat sebagai Pemberi Kerja dan telah melakukan PHK sepihaktanpa alasan kepada Penggugat, maka Tergugat wajib untuk mengganti biayapemindahan barang Penggugat untuk kembali ke negaranya di Filipina yaknisebesar USD 15,000..Dengan demikian, total ganti rugi yang wajib dibayarkan oleh Tergugat kepadaPenggugat adalah USD 49,000. (Nilai Ganti Rugi).8.
    Tunjangan tetap sebesar USD 4,000. THR sebesar USD 11,000, Sehingga total ganti rugi yang diterima Penggugat hanya sebesarUSD 37,000. (tiga puluh tujuh ribu Dolar Amerika).4.(i).
    Dengan demikiandalil, dasar dan tuntutan Penggugat dalam angka romawi Ill nomor 6halaman 3 gugatan Penggugat sangat ngawur, tidak jelas dan tidakmemiliki dasar hukum oleh karenanya harus ditolak dan tidak dapatdi terima.Bahwa dalil Penggugat dalam angka romawi I nomor 7 halaman 3gugatan Penggugat yang pada pokoknya menyatakan Tergugatkurang bayar USD 4,000,(empat ribu) dan Tergugat wajibmengganti biaya pemindahan barangbarang Penggugat sebesarRp. 15,000, (lima belas ribu).5(iii).A.
    (empatribu dolar Amerika), dalil tersebut tidak disertai dengan buktibukti yangmenunjukkan adanya kekurangan bayar USD 4,000 (empat ribu dolar Amerika)bukti dimaksud diantaranya adalah berapa besarnya THR yang harus dibayarkandan berapa besarnya THR yang sudah dibayarkan, oleh karena tidak terdapatbukti yang cukup, maka atas permintaan tunjangan hari raya pada tahun 2016sebesar USD 4,000 (empat ribu dolar Amerika) patut untuk dinyatakan ditolak;Menimbang, bahwa selanjutnya berkaitan dengan tuntutan
Register : 18-08-2011 — Putus : 20-10-2011 — Upload : 01-09-2014
Putusan PN TARAKAN Nomor 146/Pid.Sus/2011/PN. Trk
Tanggal 20 Oktober 2011 — HARSONO Bin MALIMPO
497
  • Menetapkan barang bukti berupa papan jenis meranti sebanyak 400 potong dengan ukuran 2 X 20 X 4 M dengan volume 4,000 M3, Papan jenis meranti sebanyak 55 potong dengan ukuran 5 X 7 X 4 m dengan volume 0,7700, 1 (satu) unit Loang boat tanpa nama bermesin Yamaha 40 PK, yang telah dilelang berdasarkan Risalah lelang Nomor 151/2011 tanggal 18 Agustus 2011 sebesar Rp 9.207.000 ( Sembilan juta dua ratus tujuh ribu rupiah) dirampas untu negara;6.
    Menyatakan barang bukti berupa :e Papan jenis meranti sebanyak 400 potong dengan ukuran 2 X 2 X4 m3 denganvolume 4,000 M3;e Papan jenis meranti sebanyak 55 potong dengan ukuran 5 X 6 X 4 M3 denganvolume 0,7700;e 1 (satu) unit loang boat tanpa nama bermesin Yamaha 40 PK terhadap barangbukti tersebut tekal dilakukan pelelangan dengan Risalah lelang Nomor151/2011 tanggal 18 Agustus 2011 dengan hasil bersih lelang sebesar Rp9.207.000 sesuai dengan Cek dari Bank BRI No 081301000425307 danterhadap barang
    kayu dibantu oleh ABK bernama Derhan dan jumlahkayu yang diangkut sebanyak 5 M3;Bahwa jenis kayu yang diangkut adalah meanti dengan ukuran 5 X 70 cm panjang 4meter sebanyak kurang lebih 1 m3 dan papan dengan ukuran panjnagn 4 m sebanyakkurang lebih 4 m3;Bahwa benar terdakwa mengankut kayu tersebut mendapat upah sebesar Rp 300.000;Menimbang bahwa dipersidangan Penuntut Umum telah pula memperlihatkan barangbukti berupa:Papan jenis meranti sebanyak 400 potong dengan ukuran 2 X 20 X 4 M denganvolume 4,000
    lamanya penangkapan dan penahanan yang telah dijalani olehterdakwa harus dikurangkan seluruhnya dari pidana yang dijatuhkan ;Menimbang, bahwa oleh karena selama pemeriksaan persidangan terdakwa ditahan diRumah Tahanan Negara Tarakan dan untuk menjamin Pelaksanan Putusan telah berkekuatanHukum tetap nantinya,maka atas diri terdakwa diperintahkan agar tetap berada dalam tahanan;Menimbang bahwa mengenai barang bukti berupaPapan jenis meranti sebanyak 400 potong dengan ukuran 2 X 20 X 4 M denganvolume 4,000
    Menetapkan barang bukti berupa papan jenis meranti sebanyak 400 potong denganukuran 2 X 20 X 4 M dengan volume 4,000 M3, Papan jenis meranti sebanyak 55potong dengan ukuran 5 X 7 X 4 m dengan volume 0,7700, (satu) unit Loang boattanpa nama bermesin Yamaha 40 PK, yang telah dilelang berdasarkan Risalah lelangNomor 151/2011 tanggal 18 Agustus 2011 sebesar Rp 9.207.000 ( Sembilan juta duaratus tujuh ribu rupiah) dirampas untu negara;6.
Putus : 14-08-2014 — Upload : 14-10-2014
Putusan PN KUPANG Nomor 36/Pid.Sus-TPK/2014/PN Kpg
Tanggal 14 Agustus 2014 — - PHILIP BENEDICTUS WADHI, Amd - YOSAFAT SALIM alias ALEONG
8226
  • Yakobus 18,000 18,000 Buah 3,500,00 63.000,00Obenu 6,000 4,000) 2,000) Buah 15,107,50 30.215,00ePaSAngkerePaSEngsel93.215,0011 Antonius Kefi 18,000 18,000 Buah 3,500,00 63,000,00e 6,000 4,000) 2,000) Buah 15.107,50 30,215,00PaSAngkerePaSEngsel93.215,0012 Yohanes 18,000 18,000 Buah 3,500,00 63,000,00TnopoePaSAngker63,000,001.222.139,00Jumlah perkecamatan 6.689.595,6 0 1. Kecamatan Noemutia.
    Urbanus 18,000 18,000 Buah 3,500,00 63.000,00Metan 1,860 1,770 0,090 M2 167,700, 15.093,00 12,000 4,000 8,000) Buah 00 100.000,006,000 4,000) 2,000) Buah 12,500,0 30,215,00Pa 0,400 0,368) 0,032 M3 0 43.852,80S. 15.107,5An 0gk 1,370.40er 0,00e@PaSJelusie@PlatStripePaSEn gsel Pe kIkatanAngin252,160,80Mikhael Mano 18,000 18,000 Buah 3,500,00 63.000,00e 6,000 4,000) 2,000 Buah 15.107,5 30,215,001,860; 1,770 0,090 M2 0 15.093,00Pa 12,000 12,000 Buah 167,700, 150,000,00)S. 00An 12.500,0gk 0erePaSEngselePaS.JelusiePlatStrip258.308,00Sebastian
    18,000 18,000 Buah 3,500,00 63.000,00Mano 6,000 4,000) 2,000 Buah 15.107,5 30.215,00e 0,400 0,368) 0,032) M3 0 43,852,8012,000 4,000; 8,000 Buah 1.370.40 100.000,00Pa 0,00S 12,500,0An 0gkerePaSEngselePekIkatanAngine@Pla Putusan No. 36/PID.SUS/2014/PN.KPG Hal. 217218 strip 237,067,805.
    Elisabeth Rae 18,000 18,000 Buah 3,500,00 63.000,00; 12.000 8,000 4,000 Buah 12,000,0 50,000,000,400 0,336 0,064) M3 0 87.705,60Pa 6,000 4,000) 2,000 Buah 1.370.40 30.215,003 0,00An 15.107,5gk 0er PlatStripPekIkatanAnginPaS.Engsel 230.920,606. (Paulus Manek 18,000 18,000!
    Buah 3,500,00 63,000,005 0,400/ 0,336 0,064 M 1.370.40 87.705,6012,000 12,000 Buah 0,00; 150.000,00Pa 6,000 4,000 2,000 Buah 12,500,0 30.215,00S 0An 15.107,5gk 0er PekIkatanAnginPlaStripPaEngsel 330.920,60 Hendrikus 18,000 18,000 Buah 3,500,00 63,000,00Obe 6,000 4,000) 2,000 Buah 15.107,5 30.215,00e 0PaSAngkerePaSEngsel93.215,00Nikodemus 18,000 18,000 Buah 3,500,00 63,000,00Boki 12,000 4,000) 8,000 Buah 12,500,0 100,000,00e 0,400 0,336); 0,064) M3 0 87.705,601.370,40Pa 0,00SAngkerePlatStripe@PekIkatanAngin250,705,60Susana
Register : 21-06-2021 — Putus : 21-06-2021 — Upload : 09-08-2021
Putusan PN MALANG Nomor 90/Pid.C/2021/PN Mlg
Tanggal 21 Juni 2021 — Penyidik Atas Kuasa PU:
Yudik Prio Utomo
Terdakwa:
Nur Kholis
172
  • KarcisBerwama Ungu 6 Lembar Karcis Plaza Batu Roda Empat Karis Berwamakundng 208 Lembar Kareis Parkir Plaza Batu Roda Qua Karcisberwama Merah 7 kepala stempel yang antara lain :8) Stempel Porkir Khusus Bus Pariwisata Batu Plaza Rp.20,000,b) Stempel Khusus Bus Parwisata Batu Plaza Rp.25,000,pe Parkir Khusus Bus Pariwisata Batu Plaza Rp.15.000,dg) Stempel Parkir Batu Plaza Ap. 2000,) Stempel Parkir Plaza Batuf Stempel Parkdir Plaza Batu Roda Empat Rp. 5000,9) Stempel Parkir Batu Plaza Roda Empat Rp. 4,000
    KarcisBerwama Ungu 56 Lembar Karcis Plaza Batu Roda Empat KarcisBernwama Kunin 208 Lembar Karcis Parkir Plaza Batu Roda Dua Kartisberwama Merah7 kepata stempel yang antara lain :a) Stempel Parkir Khusus Bus Parhwisata Batu Plaza Ap.20,000,b) Stempel Khusus Bus Pariwisata Batu Plaza Rp.25.000,c) Stempel Parkir Khusus Bus Pariwisata Botu Plaza Rp.15.000,d) Stempel Parkir Batu Plaza Ap. 2000,) Stempel Parkir Plaza Batuf Stempel Parkir Plaza Batu Roda Empat Rp. 5000,g) Stempel Parkir Batu Plaza Roda Empat Rp. 4,000
    kepala stempel yang antara laina) Stempel Parkir Khusus Bus Pariwisata Batu Plaza Rp.20.000,Stempel Khusus Bus Pariwisata Batu Plaza Rp.25.000,ae Parkir Khusus Bus Pariwisata Batu Plaza Rp.13.000,Stempel Parkir Batu Plaza Rp. 2000,) Stempel Parkur Plaza Batuf) Stempel Parkir Plaza Batu Roda Empat Rp, 5000,9g) Stempel Parkir Batu Plaza Roda Empat Rp. 4,000, 2 (Qua) Lembar Kyeitans) berstempel Parkir Khusus BusPariwisata Batu Plaza Rp. 25.000,". 1 (Satu) Bendel Kartis Mobil dengan tariff Rp. 3000,
    Parkir Khusus Bus Pariwisata Batu Plara Rp.000,b) Stempel Khusus Bus Pariwisata Batu Plaza Rp.25.000,Stempel Parkir Khusus Bus Pariwisata Batu Plaza Rp.15.000,Stempel Parkir Batu Plaza Rp, 2000,Stempel Parkir Plaza BatuStempel Parkir Plaza Batu Roda Empat Rp. 5000,Stempel Parkir Batu Plaza Roda Empat Rp. 4,000, 2 (Dua) Lembar Kwitans!
Putus : 14-08-2014 — Upload : 14-10-2014
Putusan PN KUPANG Nomor 38/Pid.Sus-TPK/2014/PN Kpg
Tanggal 14 Agustus 2014 — - NURDIN HAJI RUSMAN
9126
  • Yakobus Kusi 18,000 18,000 Buah 3.500,00 63.000,00e Pas Angker 6,000 4,000) 2,000) Buah 15.107,50 30.215,00e Pas Engsel93.215,004. lmanuel Abi 0,400) 0,370) 0,030) M3 1.370.400,00 41.112,00e = =6Pek. 18,000 18,000 Buah 3.500,00 63.000,00Penyokong 6,000 4,000) 2,000) Buah 15.107,50 30.215,00e Pek Angkere Pek Engsel134.327,005. Andreas Usboko 18,000 18,000 Buah 3.500,00 63.000,00030,e Pas Angker 6,000 4,000) 2,000) Buah 15.107,50 215,00e Pas Engsel93.215,006.
    David Malafu 18.000 18,000 Buah 3.500,00 63.000,00e Pas Angker 6,000 4,000) 2,000) Buah 15.107,50 30,215,00 e Pas Engsel 93,215,00 60 9. Yulita Mamo 18,000 18,000 Buahe Pas Angker 6,000 4,000) 2,000) Buahe Pas Engsel 12,000 10,000) 2,000) Buahe = Plat Strip118.215,0010. Paulus Berek 18,000 18,000 Buah 3.500,00 63,000,00e Pas Angker 6,000 4,000) 2,000) Buah 15,107,50 30,215,00e Pas Engsel93.215,0011.
    Yak Kusi 18,000 18,000 Buah 3.500,00 63.000,00e Pas 6,000 4,000 2,000 Buah 15.107,50 30.215,00Angkere PasEngsel93.215,004. lmanuel Abi 0,400 0,370 0,030 M3 1.370.400, 41.112,00e =Pek. 18,000 18,000 Buah 00 63.000,00Penyok 6,000 4,000) 2,000 Buah 3.500,00 30.215,0015.107,50 112 onge PekAngkere PekEngsel134.327,005. Andreas Usboko 18,000 18,000) Buah 3.500,00 63.000,00030.e Pas 6,000 4,000) 2,000); Buah 15.107,50 215,00Angkere 6PasEngsel93.215,006.
    David Malafu 18.000 18,000) Buah 3.500,00 63.000,00e Pas 6,000 4,000) 2,000) Buah 15.107,50 30,215,00Angkere 6PasEngsel93,215,009. Yulita Mamo 18,000 18,000) Buahe Pas 6,000 4,000) 2,000 BuahAngker 12,000 10,000) 2,000 Buahe 6PasEngsele =6PlatStrip118.215,0010. Paulus Berek 18,000 18,000) Buah 3.500,00 63,000,00e Pas 6,000 4,000) 2,000); Buah 15,107,50 30,215,00Angkere PasEngsel93.215,0011.
    M3 1.370.400,00 24.667 ,20e Pek 18,000 18,000 Buah 3.500,00 63.000,006,000 4,000) 2,000 Buah 15.107,50 30.215,00 117.882,20 118 7.
Register : 13-08-2018 — Putus : 13-02-2019 — Upload : 22-05-2019
Putusan PN JAKARTA PUSAT Nomor 236/Pdt.Sus-PHI/2018/PN Jkt.Pst
Tanggal 13 Februari 2019 — Penggugat:
EDWIN FADLEN CORPUS
Tergugat:
PT. PANEN LESTARI INTERNUSA
7926
  • Tunjangan tetap sebesar USD 4,000.Halaman 2 dari 34 Putusan Nomor 236/Pdt.SusPHI.G/2018/PN.JKT.PST THR 2017 sebesar USD 11,000.Sehingga total ganti rugi yang diterima oleh Penggugat hanya USD 37,000.
    Bahwa Tergugat juga masih kurang bayar atas Tunjangan Hari Raya (THR)Penggugat pada tahun 2016 yakni sebesar USD 4,000. dan dikarenakanposisi Tergugat sebagai Pemberi Kerja dan telah melakukan PHK sepihaktanpa alasan kepada Penggugat, maka Tergugat wajib untuk mengganti biayapemindahan barang Penggugat untuk kembali ke negaranya di Filipina yaknisebesar USD 15,000..Dengan demikian, total ganti rugi yang wajib dibayarkan oleh Tergugat kepadaPenggugat adalah USD 49,000.
    (ii) Tunjangan Hari Raya (THR) Pemohon pada tahun 2016 yakni sebesarUSD 4,000. (empat ribu Dolar Amerika Serikat).(iii) Biaya pemindahan barang Penggugat untuk kembali ke negaranya diFilipina yakni sebesar USD 15,000. (lima belas ribu Dolar AmerikaSerikat).3. Menyatakan putusan dalam perkara ini dapat dilaksanakan terlebih dahulumeskipun ada upaya hukum kasasi (u/tvoerbaar bij voorraad);4.
    Tunjangan tetap sebesar USD 4,000. THR sebesar USD 11,000, Sehingga total ganti rugi yang diterima Penggugat hanya sebesarUSD 37,000. (tiga puluh tujuh ribu Dolar Amerika).Bahwa sangat tidak berdasar dan tidak beralasan dalil Penggugat, faktanyadapat Tergugat tegaskan sebagai berikut:Bahwa telah dibicarakan masalah akhir dari surat dalam Bahasa Inggrisperihal "Appointment as Financial Controler (Division 1!)
    (empatribu dolar Amerika), dalil tersebut tidak disertai dengan buktibukti yangmenunjukkan adanya kekurangan bayar USD 4,000 (empat ribu dolar Amerika)bukti dimaksud diantaranya adalah berapa besarnya THR yang harus dibayarkandan berapa besarnya THR yang sudah dibayarkan, oleh karena tidak terdapatbukti yang cukup, maka atas permintaan tunjangan hari raya pada tahun 2016sebesar USD 4,000 (empat ribu dolar Amerika) patut untuk dinyatakan ditolak;Menimbang, bahwa selanjutnya berkaitan dengan tuntutan
Putus : 11-07-2013 — Upload : 20-03-2014
Putusan PT PALEMBANG Nomor 04/TIPIK0R/2013/PT.PLG
Tanggal 11 Juli 2013 — BAHARUDDIN PASIN BIN PASIN RAHMAN
7926
  • 728.317,50 5.098.222,50 Bend All Flange 45 dia. 4,000 buah 909.549,00 3.638.196,00250 mm Loose Flange dia. 250 mm 6,000 buah 289.455,50 1.736.733,00Pipa Penguras Tee All Flange dia. 250 1,000 buah 767.495,50 767.495,50mmx75 mm Gate Valve dai. 75 mm 1,000 buah 789.250,50 789.250,50 Flange Socket PVC dia. 90 2,000 buah 161.975,50 323.950,00mm Bend PVC 90 dia. 90mm/2,000 buah 72.751,00 145.502,00 Pipa PVC dia. 90 mm 3,000 m!
    728.317,50 5.826.540,00 Bend All Flange 45 dia. 4,000 buah 909.549,00 3.638.196,00250 mm Loose Flange dia. 250 mm 6,000 buah 289.455,50 1.736.733,00Pipa Penguras Tee All Flange dia. 250 1,000 buah 767.495,50 767.495,50mmx75 mm Gate Valve dai. 75 mm 1,000 buah 789.250,50 789.250,50 Flange Socket PVC dia. 90 2,000 buah 161.975,50 323.950,00mm Bend PVC 90 dia. 90mm /2,000 buah 72.751,00 145.502,00 Pipa PVC dia. 90 mm 3,000 m!
    728.317,50 5.826.540,00 Bend All Flange 45 dia. 4,000 buah 909.549,00 3.638.196,00250 mm Loose Flange dia. 250 mm 6,000 buah 289.455,50 1.736.733,00 Pipa Penguras Tee All Flange dia. 250 1,000 buah 767.495,50 767.495,50mmx75 mm Gate Valve dai. 75 mm 1,000 buah 789.250,50 789.250,50 Flange Socket PVC dia. 90 2,000 buah 161.975,50 323.950,00mm Bend PVC 90 dia. 90mm 2,000 buah 72.751,00 145.502,00 Pipa PVC dia. 90 mm 3,000 m!
    446.063,00 4.460.630,00 Bend All Flange 45 dia. 4,000 buah 404.244,00 1.616.976,00150 mm Loose Flange dia. 150 mm 6,000 buah 236.322,00 1.417.932,00Pipa Penguras Tee All Flange dia. 150 1,000 buah 363.251,50 363.251,50mmx75 mm Gate Valve dai. 75 mm 1,000 buah 789.250,50 789.250,50 Flange Socket PVC dia.90 2,000 buah 161.975,00 323.950,00mm Bend PVC 90 dia.90 mm 2,000 buah 72.751,00 145.502,00 Pipa PVC dia. 90 mm 3,000 m!
    446.063,00 3.122.441,00 Bend All Flange 45 dia. 150 4,000 buah 404.244,00 1.616.976,00mm Loose Flange dia. 150 mm 6,000 buah 236.322,00 1.417.932,00Pipa Penguras Tee All Flange dia. 150 1,000 buah 363.251,50 363.251,50mmx75 mm Gate Valve dai. 75 mm 1,000 buah 789.250,50 789.250,50 Flange Socket PVC dia. 90 2,000 buah 161.975,00 323.950,00mm Bend PVC 90 dia.90 mm 2,000 buah 72.751,00 145.502,00 Pipa PVC dia. 90 mm 3,000 m!
Upload : 04-04-2019
Putusan PT MAKASSAR Nomor 4/PID.SUS.TPK/2019/PT.Mks
LANDA GASSA, S.T BIN LA GASSA
10089
  • Angker Besi Plat Strip Bh 4,000 0,000 () 4,00Shelter Tidak Permanen 5Volume SelisihNo Uraian Pekerjaan Sat Vol RealKontrak Volume1 Pek. Galian Tanah M3 0,157 0,000 () 0,162 Pek. Pondasi setempat (cor beton) M3 0,080 0,000 () 0,083 Pek. Rangka Atas atap 4/6 M3 0,080 0,076 () 0,044 Pek. Angker Besi Plat Strip Bh 4,000 0,000 () 4,00Shelter Tidak Permanen 6Volume SelisihNo Uraian Pekerjaan Sat Vol RealKontrak Volume1 Pek. Galian Tanah M3 0,157 0,000 () 0,162 Pek.
    Angker Besi Plat Strip Bh 4,000 0,000 () 4,00Shelter Tidak Permanen 9No Uraian Pekerjaan Sat Volume Vol Real SelisinKontrak Volume1 Pek. Galian Tanah M3 0,157 0,000 () 0,161 Pek. Pondasi setempat (cor beton) M3 0,080 0,000 () 0,082 Pek. Angker Besi Plat Strip Bh 4,000 0,000 () 4,00Shelter Tidak Permanen 10No Uraian Pekerjaan Sat Volume Vol Real SellsinKontrak Volume1 Pek. Galian Tanah M3 0,157 0,000 () 0,162 Pek. Pondasi setempat (cor beton) M3 0,080 0,000 () 0,083 Pek.
    Angker Besi Plat Strip Bh 4,000 0,000 () 4,00Shelter Tidak Permanen 6Volume SelisihNo Uraian Pekerjaan Sat Vol RealKontrak Volume1 Pek. Galian Tanah M3 0,157 0,000 () 0,162 Pek. Pondasi setempat (cor beton) M3 0,080 0,000 () 0,083 Pek. Rangka Atas atap 4/6 M3 0,080 0,065 () 0,024 Pek. Angker Besi Plat Strip Bh 4,000 0,000 () 4,00Shelter Tidak Permanen 7Volume SelisihNo Uraian Pekerjaan Sat Vol RealKontrak Volume1 Pek. Galian Tanah M3 0,157 0,000 () 0,162 Pek.
    Angker Besi Plat Strip Bh 4,000 0,000 () 4,00Shelter Tidak Permanen 8Volume SelisihNo Uraian Pekerjaan Sat Vol RealKontrak Volume1 Pek. Galian Tanah M3 0,157 0,000 () 0,162 Pek. Pondasi setempat (cor beton) M3 0,080 0,000 () 0,083 Pek. Rangka Atas atap 4/6 M3 0,080 0,089 (+) 0,014 Pek. Angker Besi Plat Strip Bh 4,000 0,000 () 4,00Shelter Tidak Permanen 9Volume SelisihNo Uraian Pekerjaan Sat Vol RealKontrak Volume1 Pek. Galian Tanah M3 0,157 0,000 () 0,162 Pek.
    Angker Besi Plat Strip Bh 4,000 0,000 () 4,00Shelter Tidak Permanen 12Volume SelisihNo Uraian Pekerjaan Sat Vol RealKontrak Volume1 Pek. Galian Tanah M3 0,157 0,000 () 0,162 Pek. Pondasi setempat (cor beton) M3 0,080 0,000 () 0,084 Pek. Rangka Atas atap 4/6 M3 0,080 0,070 () 0,015 Pek. Angker Besi Plat Strip Bh 4,000 0,000 () 4,004. Paket Pembuatan Sarana Pintu Masuk/Gerbang utama (1 unit) :Volume SelisihNo Uraian Pekerjaan Sat Vol RealKontrak Volume1 Pek.
Register : 05-04-2012 — Putus : 30-01-2013 — Upload : 14-07-2013
Putusan PENGADILAN PAJAK Nomor PUT.43018/PP/M.VII/19/2013
Tanggal 30 Januari 2013 — Pemohon Banding dan Terbanding
12340
  • dikenakan tambah bayar sebesarRp.27.694.000,00;: bahwa dengan diterbitkannya SPTNP tersebut, Pemohon Banding merasa keberatandengan alasan Harga yang Pemohon Banding beritahukan di PIB adalah hargayang sebenarnya yang tercantum dalam invoice;: bahwa berdasarkan pemeriksaan Majelis atas berkas banding, diperoleh petunjukPemohon Banding sesuai dengan Pemberitahuan Impor Barang (PIB) Nomor:456440, tanggal 02 Desember 2011, melakukan importasi barang SuplemenMakanan, 2,136 Pcs Noodle Maker/Atlas dan 4,000
    ,Ltd yang beralamat di No.100Zhennan West Road Xixiashu, Changzhou, Jiangsu, China, berupa 2,136 PcsNoodle Maker/Atlas dan 4,000 Pcs Noodle Maker/Pasta Concerto, asal negaraChina; total harga FOB USD 15,985.44 Term of Payment : By TT before shipment;bahwa berdasarkan pemeriksaan Majelis atas Sales Contract nomor: SL2664tanggal 12 Oktober 2011 diketahui bahwa Pemohon Banding sepakat membelibarang kepada Changzhou Shule Kitchen Utensils Co.
    ,Ltd yang beralamat di No.100Zhennan West Road Xixiashu, Changzhou, Jiangsu, China, berupa 2,136 PcsNoodle Maker/Atlas dan 4,000 Pcs Noodle Maker/Pasta Concerto, asal negaraChina; dengan perincian nilai barang sebesar USD 15,985.44 dan freight costsebesar USD 800.00 sehingga total nilai sebesar CNF USD 16,785.44;bahwa berdasarkan pemeriksaan Majelis atas Commercial Invoice nomor: SL2664tanggal 09 November 2011 diketahui bahwa Pemohon Banding membeli barangkepada Changzhou Shule Kitchen Utensils Co
    ,Ltd yang beralamat di No.100Zhennan West Road Xixiashu, Changzhou, Jiangsu, China, berupa barang 2,136Pcs Noodle Maker/Atlas dan 4,000 Pcs Noodle Maker/Pasta Concerto, asal negaraChina; total harga FOB USD 15,985.44 dan freight cost sebesar USD 800.00sehingga total nilai sebesar CFR USD 16.785.44 Term of Delivery and Payment T/T;bahwa berdasarkan pemeriksaan Majelis atas Packing List dari Invoice nomor:SL2664 tanggal 09 November 2011 diketahui bahwa Pemohon Banding membelibarang kepada Changzhou
    ,Ltd yang beralamat di No.100Zhennan West Road Xixiashu, Changzhou, Jiangsu, China, berupa barang 2,136Pcs Noodle Maker/Atlas dan 4,000 Pcs Noodle Maker/Pasta Concerto, asal negaraChina, Qty: 2,136Pcs Noodle Maker/Atlas dan 4,000Pcs Noodle Maker/PastaConcerto, Nwt : 16,230Kgs, Gwt : 17,086Kgs;bahwa berdasarkan pemeriksaan Majelis atas Bill of Lading nomor: SHSM18338300tanggal 20 November 2011, diketahui diterbitkan oleh Hanjing Shipping, denganShipper : Changzhou Shule Kitchen Utensils Co.