Ditemukan 3 data
210 — 125
22 04/23/13 MITRAMANDALA PENERIMAAN PENJUALAN 25,000,000 57.23 04/29/13 MITRAMANDALA PENERIMAAN PENJUALAN 12,000,000 24 05/02/13 MITRAMANDALA PENERIMAAN PENJUALAN 39,000,000 IGRAND25 05/13/13 MITRAMANDALA PENERIMAAN PENJUALAN 16,000,000 26 06/14/13 MITRAMANDALA PENERIMAAN PENJUALAN 590,000,00027 06/18/13 MITRAMANDALA PENERIMAAN PENJUALAN 388,000,000 Dan di28 07/05/13 MITRAMANDALA PENERIMAAN PENJUALAN 147,000,000 pada29 07/09/13 MITRAMANDALA PENERIMAAN PENJUALAN 23,000,000 p eneri30 07/10/13 MITRAMANDALA
147 — 539
Waybill 1463288341 tanggal 12022013 ke Canada;57.23. Waybill 1463288400 tanggal 13022013 ke United States of America;57.24. Waybill 1463288411 tanggal 13022013 ke Australia;57.25. Waybill 1463288481 tanggal 16022013 ke United States of America;57.26. Waybill 1463288514 tanggal 18022013 ke United States of America;57.27. Waybill 1463288526 tanggal 18022013 ke Norway;57.28. Waybill 1463288536 tanggal 18022013 ke Spain;57.29.
108 — 22
BAB IV : BENTUK DOKUMEN PENAWARAN57.23. BAB V : SYARAT SYARAT UMUM KONTRAK (SSUK)57.24. BAB VI : SYARAT SYRAT KHUSUS KONTRAK (SSKK)57.25. BAB VII : SPESIFIKASI TEKNIS57.26. BAB VIII : DAFTAR KUANTITAS DAN HARGA57.27. BAB IX : BENTUK DOKUMEN KONTRAK58. 1 (satu) Bendel Asli dokumen pengadaan tanggal 01 Nopember 2010 yang dibuat dan ditandatangani oleh An. Sekretaris Daerah Kota Salatiga, Asisten Ekbang Dan Kesra, U.B Kepala Bagian Adm. Pembangunan, Ir.