Ditemukan 774 data

Urut Berdasarkan
 
Register : 01-12-2020 — Putus : 29-03-2021 — Upload : 31-03-2021
Putusan PN BENGKULU Nomor 35/Pid.Sus-TPK/2020/PN Bgl
Tanggal 29 Maret 2021 — Penuntut Umum:
JOHAN SATYA ADHYAKASA
Terdakwa:
RAFHAEL PERMATA PUTRA NAINGGOLAN Bin MARUDIN NAINGGOLAN.Alm
312117
  • 1 Total Panjang 262,6 m m3 13.60 881,200.00 596,500.00 20,096, 720.00 13.60 881,200.00 596,500.00 20,096,720.007 Sloof 2 Total Panjang 227,2 m m3 8.23 881,200.00 596,500.00 12,161,471.00 8.23 881,200.00 596,500.00 12,161,471.008 Sloof 3 Total Panjang 70 m m3 14.18 881,200.00 596,500.00 20,953, 786.00 14.18 881,200.00 596,500.00 20,953,786.00141,652,322.00 141,652,322.00 0.0E.
    1 Total Panjang 262,6 m m2 135.98 77,150.00 28,430.00 14,356, 768.40 135.98 77,150.00 28,430.00 14,356,768.407 Sloof 2 Total Panjang 227,2 m m2 109.75 77,150.00 28,430.00 11,587,405.00 109.75 77,150.00 28,430.00 11,587,405.008 Sloof 3 Total Panjang 70 m m2 218.20 77,150.00 28,430.00 23,037,556.00 218.20 77,150.00 28,430.00 23,037,556.0064,690,671.00 64,690,671.00 0.0H.
    Pembesian1 Pile Cap 1 (Pondasi) kg 111.50 13,965.00 1,334.50 1,705,894.25 111.50 13,965.00 1,334.50 1,705,894.252 Sloof 1 Total Panjang 51 m kg 251.86 13,965.00 1,334.50 3,853,332.07 251.86 13,965.00 1,334.50 3,853,332.073 Sloof 2 Total Panjang 8 m kg 26.88 13,965.00 1,334.50 411,250.56 26.88 13,965.00 1,334.50 411,250.564 Sloof 3 Total Panjang 2 m kg 6.02 13,965.00 1,334.50 92,102.99 6.02 13,965.00 1,334.50 92,102.99Kolom Praktis Sampai5 Kedalaman Pondasi kg 29.92 13,965.00 1,334.50 457,761.04 29.92
    1 Total Panjang 262,6 m m2 135.98 77,150.00 28,430.00 14,356, 768.40 135.98 77,150.00 28,430.00 14,356,768.407 Sloof 2 Total Panjang 227,2 m m2 109.75 77,150.00 28,430.00 11,587,405.00 109.75 77,150.00 28,430.00 11,587,405.008 Sloof 3 Total Panjang 70 m m2 218.20 77,150.00 28,430.00 23,037,556.00 218.20 77,150.00 28,430.00 23,037,556.0064,690,671.00 64,690,671.00 0.0 Putusan Nomor 35/Pid.SusTPK/2020/PN.Bgl Halaman 35 H.
Register : 20-06-2019 — Putus : 12-09-2019 — Upload : 19-09-2019
Putusan PN KENDARI Nomor 15/Pid.Sus-TPK/2019/PN Kdi
Tanggal 12 September 2019 — Penuntut Umum:
BUSTANIL N. ARIFIN, SH
Terdakwa:
MUHAMMAD NASIR
9580
  • Sloof 15 X Volume 20 Camp 1:2:3 Log Ms Ome (0.4) KurangPek. Balok Latey 4 Camp 1:2:3 14.50 M 14.50 0.00 TetapPek. Ringbalk 15 Volume5 X 20 Camp 1:2: 1.55 M3 0.77 (0.8)3 KurangPEKERJAANV. RANGKA ATAPDAN PLAFONDPas. AtapVolume1 Spandek 720.37 M2 572.67 (147.7) Kurang Zincalume 0,4 mm Halaman 15 dari 137 halaman,Putusan No. 15/Pid.SusTPK/2019/PN. Kdi g Pas. Nok Bala 62.49 M' 62.95 05 ValurineRingan TambahPas.
    Sloof 15 X VolumeT2 20Camp1:2:3 6.89 Ms GAL 8.0 ambahPek. Balok Latey Volume3 Camp 1:2:3 102.07 M 89.00 (13.1) KurangPek. Ringbalk 15 Volume4 x 20 Camp 1: 2: 6.39 M3 5.03 (1.4) KurangPEKERJAANXV RANGKA ATAPDAN PLAFONDPas. KudakudaBaja Ringan Volume1 Untuk Atap 605.83 M2 661.67 55.8 iarabaliSpandekPas. Atap volurie2 Spandek 605.83 M2 661.67 55.8: ambahZincalume 0,4 mm3 Pas. Nok Baja 49.50 Mt 59.00 95 VolumeRingan ambahPas.
    Sloof 15x20 (0.bk) Kg/Cm2 130.82 2005. Ring balk 15x20(0.bk) Kg/Cm2 161.82 200 Bahwa terdakwa selau PPK yang telah membayarkan 100% kegiatanPembangunan Peningkatan Puskesmas Non Rawat Inap menjadi Rawat InapPuskesmas Bobolio Kecamatan Wawonii Selatan pada Dinas Kesehatan danSosial Kab.
    Bahwa yang saksi lakukan pengujian adalah pada struktur bangunan antaralain Item Pekerjaan Kolom Utama Teras, Kolom Praktis, Balok Latey, Sloof,Ring Balok. Bahwa pengetesan yang saksi lakukan pada item tersebut diatas saat itusecara keseluruhan sudah mencantumkan pekerjaan beton sesuai yangtertera dalam kontrak atas pekerjaan tersebut .
    Sloof 15 X Volume3 20 Camp 1:2:3 108 Ms D:f2 (04) KurangPek. Balok Latey 4 Camp 1:2:3 14.50 M 14.50 0.00 TetapPek. Ringbalk 15 Volume5 X 20 Camp 1:2: 1.55 M3 0.77 (0.8)3 KurangPEKERJAANV. RANGKA ATAPDAN PLAFONDPas. Atap1 Spandek 720.37 M2 572.67 (147.7) yume: urangZincalume 0,4 mm3 Pas. Nok Bala 62.49 M' 62.95 05 MeiRingan Tambah Halaman 100 dari 137 halaman, Putusan No. 15/Pid.SusTPK/2019/PN. Kdi Pas.
Putus : 11-03-2014 — Upload : 07-07-2014
Putusan PN SIDOARJO Nomor 144/Pid.B/2014/PN.Sda.
Tanggal 11 Maret 2014 — SUPARMAN Als.MAN TUKLUK
191
  • Tjiwi Kimia membangun tempat parkirsepeda motor dengan menggunakan bahan bangunan besi semen dan pasir, dalamkegiatan pembangunan tersebut menyiapkan bahan bahan bangunan berupa besi yangsudah bentuk kolom besi cor, ring besi cor dan sloof besi cor dan semen serta bahanbangunan lainnya disimpan di area proyek tersebut agar mudah dipasang oleh tukang tukangnya.
    Tjiwi Kimiadengan menggunakan bahan bahan berupa semen, pasir, besi besi yangg sudahberbentuk kolom dan sloof serta ring dan batako.Bahwa saksi bekerja di CV. Arila Jaya selaku penjaga malam setiap harinya mulaiPukul 19.00 WIB sampai dengan Pukul 05.00 WIB. Namun jika hari Minggu saksitidak jaga di lokasi proyek tersebut.
Register : 29-04-2014 — Putus : 03-09-2014 — Upload : 30-09-2014
Putusan PN BANDA ACEH Nomor 16/Pid.Sus-TPK/2014/PN Bna
Tanggal 3 September 2014 — Siarrudin, S.T. Bin M. Yakob Mas
8416
  • Pondasi umpak beton bertulang 68,41 29,17 234.150.329,70 99.847.004,40= Pekerjaan Sloof beton 44.63 32,78 152.737.987,50 112.181.559,53 Pek. Kolom Beton bertulang (belakang ) 21,17 15,02 72.458.559,00 51.391.977,41= Pek. Plesteran Bata : 2 408,38 351,37 17.110.912,50 14.722.486,807 Pek.
    Beton Pondasi umpak m3 4,56 3.422.700,00 15.607.512,00= Pekerjaan Cor beton sloof m3 2,55 3.422.700,00 8.727.885,00 pekerjaan tiang beton m3 2,30 3.422.700,00 7.872.210,00= pekerjaan balok beton (30 x 50 ) m3 0,00 3.422.700,00 7 pekerjaan balok beton (50 x 50 ) M3 4,25 3.422.700,00 14.546.475,00 Pekerjaan balok anak ( 20 x 20 ) m3 0,44 3.422.700,00 1.505.988,007 Pek.
    Pondasi umpak beton bertulang 68,41 29,17 234.150.329,70 99.847.004,40 Pekerjaan Sloof beton 44.63 32,78 152.737.987,50 112.181.559,53 Pek. Kolom Beton bertulang (belakang ) 21,17 15,02 72.458.559,00 51.391.977,417 Pek. Plesteran Bata 1 : 2 408,38 351,37 17.110.912,50 14.722.486,80= Pek.
    Beton Pondasi umpak m3 4,56 3.422.700,00 15.607.512,00 Pekerjaan Cor beton sloof m3 2,55 3.422.700,00 8.727.885,00= pekerjaan tiang beton m3 2,30 3.422.700,00 7.872.210,007 pekerjaan balok beton (30 x 50 ) m3 0,00 3.422.700,00 Halaman 31 dari 120 Putusan Nomor 16/Pid.SusTPK/2014./PN.Bna pekerjaan balok beton (50 x 50 ) M3 4,25 3.422.700,00 14.546.475,007 Pekerjaan balok anak ( 20 x 20 ) m3 0,44 3.422.700,00 1.505.988,00 Pek.
    Pondasi umpak beton bertulang 68,41 29,17 234.150.329,70 99.847.004,407 Pekerjaan Sloof beton 44.63 32,78 152.737.987,50 112.181.559,53= Pek. Kolom Beton bertulang (belakang ) 21,17 15,02 72.458.559,00 51.391.977,41 Pek. Plesteran Bata : 2 408,38 351,37 17.110.912,50 14.722.486,80 Pek.
Putus : 01-09-2016 — Upload : 13-03-2018
Putusan MAHKAMAH AGUNG Nomor 2449 K/PID.SUS/2015
Tanggal 1 September 2016 — SURYADI bin M. ALI, dkk
11655 Berkekuatan Hukum Tetap
  • Pekerjaan Sloof (K.225) Uk. 25 x 50 Cm 8,13 M3 Suplemen 3e 4.457.451 ,00 36.216.789,384. Pekerjaan Sloof (K.225) Uk. 20 x 30 Cm 2,19 M3 Suplemen 3c 4.432.376,00 9.706.903,445. Pekerjaan Kolom (K.225) Uk. 30 x 40 Cm 37,22 M3 Suplemen 4.f.3 5.339.239,00 198.747.832,54Pekerjaan Kolom (K.225) Uk. 20 x 30 Cm 2,31 Suplemen 4.f.3 5.339.239,00 12.333.642,096. Pekerjaan Kolom (K.175) Uk. 15 x 20 Cm 1,89 M3 Suplemen 4.d 8.292.621 ,00 15.673.053,697.
    Pekerjaan sloof (K.225) Uk. 25 x 50 Cm;Berdasarkan volume kontrak awal untuk item pekerjaan sloof (K.225)Uk. 25 x 50 Cm adalah sebesar 32,25 M? addendum kontrak dan backup data adalah sebesar 24,13 M%, hal ini mengakibatkan terjadinyapengurangan volume sebesar 8,12 M?
    Pekerjaan Sloof (K.225) Uk. 25 x 50 Cm 8,13 M3 Suplemen 3e 4.457.451,00 36.216.789,384. Pekerjaan Sloof (K.225) Uk. 20 x 30 Cm 2,19 M3 Suplemen 3c 4.432.376,00 9.706.903,445. Pekerjaan Kolom (K.225) Uk. 30 x 40 Cm 37,22 M3 Suplemen 4.f.3 5.339.239,00 198.747.832,54Pekerjaan Kolom (K.225) Uk. 20 x 30 Cm 2,31 Suplemen 4.f.3 5.339.239,00 12.333.642,096. Pekerjaan Kolom (K.175) Uk. 15 x 20 Cm 1,89 M3 Suplemen 4.d 8.292.621,00 15.673.053,697.
    Pekerjaan Beton Bertulang;1.Pekerjaan sloof (K.225) Uk. 25 x 50 Cm;Berdasarkan volume kontrak awal untuk item pekerjaan sloof (K.225)Uk. 25 x 50 Cm adalah sebesar 32,25 M addendum kontrak danback up data adalah sebesar 24,13 M%, hal ini mengakibatkanterjadinya pengurangan volume sebesar 8,12 M dimana sebenarnyavolume awal sebesar 32,25 M sudah benar, sehingga terhadappengurangan tersebut terindikasi adanya rekayasa hitungan untukmemenuhi CCO sehingga pengurangan tersebut tidak dibuktikanterhadap
    Putusan No. 2449/PID.SUS/2015VV VV VV VV VV VV WVVV VV VV WVFoto skriping jalan gang way;Foto galian tanah plat beton;Foto pembesian plat beton;Foto pemasangan rangka kudakuda pos jaga;Foto pembesian dan pemasangan mall sloof kios pendukung 4 unit;Foto pengecoran sloof kios pendukung 4 unit;Foto pemasangan batu bata kios pendukung 4 unit;Foto pemasangan bouwplank kios pendukung 4 unit;Foto galian pondasi kios pendukung 4 unit;Foto pondasi kios pendukung 4 unit;Foto pembesian dan beton teras kios
Putus : 12-11-2014 — Upload : 11-05-2015
Putusan MAHKAMAH AGUNG Nomor 646 K/Pid.Sus/2014
Tanggal 12 Nopember 2014 — YUNITA SARI, S.Pd als YUNI binti ALI AZWAR
2314 Berkekuatan Hukum Tetap
  • Kolom Praktis 13/13 PEK.BETON 6.45 0.43 M3 2.478.785 1.065.877,55Pek Sloof 15/15 PEK.BETON 6.39 0.57M3 2.283.389 1.301.531,73Pek. Rink Balk 13/15 PEK.BETON 6.46 0.57 M3 2.487.835 1.418.065,953.Pas Dinding Batu Bata 1: 4 PEDIN 6.14 60.33 M2 91.350 5.511.145,504 Plesteran tembok+kolom 1:2 PEK.PLES 6.2 125.23 M2 31.800 3.982.314,005.Pek Rabat Keliling Beton Tumbuk 1 :3:5 PEK BETON 6.1 1,79 M3 621.400 1.112.306,006.Pek.
    Kolom Praktis 13/13Pek Sloof 15/15Pek. Rink Balk 13/53.Pas Dinding Batu Bata 1: 44.Plesteran tembok+kolom 1:25.Pek Rabat Keliling Beton Tumbuk 1 :3:56.Pek. Beton Tumbuk 1 :3 : 5 Bawah LantaiPEKERJAANKAYU DAN KACA1.Pek. Kayu Kuda kudadan Gording2.Pek. Kosen Pintu dan Jendela3.Pek. List Plank Papan 3/254.Pas Pintu Ply wood Lapis SengPEKERJAANATAP1.Pek Penutup Atap Seng Gelombang Bjls 282.Pek.
    Kolom Praktis 13/13 PEK.BETON 6.45 0.43 M3 2.478.785 1.065.877,55Pek Sloof 15/15 PEK.BETON 6.39 0.57M3 2.283.389 1.301.531,73Pek. Rink Balk 13/5 PEK.BETON 6.46 0.57 M3 2.487.835 1.418.065,953.Pas Dinding Batu Bata 1: 4 PEDIN 6.14 60.33 M2 91.350 5.511.145,504 Plesteran tembok+kolom 1:2 PEK.PLES 6.2 125.23 M2 31.800 3.982.314,005.Pek Rabat Keliling Beton Tumbuk 1 :3:5 PEK BETON 6.1 1,79 M3 621.400 1.112.306,006.Pek.
    Kolom Praktis 13/13 0.43 M3 0.43Pek Sloof 15/15 0.57M3 0.57Pek. Rink Balk 13/15 0.57 M3 0.573.Pas Dinding Batu Bata 1: 4 60.33 M2 58.33 2.004.Plesteran tembok+kolom 1:2 125.23 M2 112.70 12.535.Pek Rabat Keliling Beton Tumbuk 1 :3:5 1,79 M3 0.77 1.026.Pek. Beton Tumbuk 1:3 : 5 Bawah Lantai 1,65 M3 1,65MV. PEKERJAANKAYU DAN KACA1.Pek. Kayu Kuda kudadan Gording 0,50 M3 0,502.Pek. Kosen Pintu dan Jendela 0,13 M3 0,133.Pek.
Putus : 16-12-2010 — Upload : 17-05-2013
Putusan MAHKAMAH AGUNG Nomor 1277 K/PID.SUS/2010
Tanggal 16 Desember 2010 — JAINURI, SH.MH.
5831 Berkekuatan Hukum Tetap
  • tetapi yang dikerjakan hanyaseluas 244 M2;b Pembongkaran dan pemasangan sloof pada garasitidak dikerjakan ;c Pemasangan/penyambungan instalasi listrik tidakdikerjakan ;d Pekerjaan instalasi air diajukan pencairannyasebanyak 2 (dua) kali, dan lainlain ;e Bahwa Terdakwa Jainuri, SH.MH. selaku Pejabat Pembuat Komitmensebagaimana tugas dan wewenangnya tetapi tidak dilaksanakan sehinggamenyetujui bahwa pekerjaan Pembangunan Pos dan Garasi PemadamKebakaran Kec.
    Seruyan Hilir Tahun 2007 antara lain :Pekerjaan Pendahuluan :e Bangsal Kerja 15 buah : Rp. 2.625.000,00Pekerjaan Pembongkaran :e Pembongkaran Lantai Dermaga 147,75 M2: Rp. 1.390.615,62e Pembongkaran Sloof & Belagar 3,334 M2?
    ;a Pembongkaran dan pemasangan sloof pada garasi tidak dikerjakan ;b Pemasangan/penyambungan instalasi listrik tidak dikerjakan ;c Pekerjaan instalasi air diajukan pencairannya sebanyak 2 (dua) kali, danlainlain ; Bahwa Terdakwa Jainuri, SH.MH. selaku Pejabat Pembuat Komitmensebagaimana tugas dan wewenangnya tetapi tidak dilaksanakan sehinggamenyetujui bahwa pekerjaan Pembangunan Pos dan Garasi PemadamKebakaran Kec.
    Seruyan Hilir Tahun 2007 antara lain :Pekerjaan Pendahuluan :e Bangsal Kerja 15 buah : Rp. 2.625.000,00Pekerjaan Pembongkaran : Pembongkaran Lantai Dermaga 147,75 M2: Rp. 1.390.615,62e Pembongkaran Sloof & Belagar 3,334 M2?
    Pembongkaran dan pemasangan sloof pada garasi tidak dikerjakan. Sehinggapencairan dana proyek 100% atas pekerjaan tersebut mengakibatkan kerugian keuanganNegara sebesar Rp. 76.715.770, (tujuh puluh enam juta tujuh ratus lima belas ribu tujuhratus tujuh puluh rupiah) dan menguntungkan pemenang tender PT.
Putus : 01-09-2016 — Upload : 13-03-2018
Putusan MAHKAMAH AGUNG Nomor 2405 K/PID.SUS/2015
Tanggal 1 September 2016 — Ir. IRWANSYAH bin MANSYUR, dkk
18093 Berkekuatan Hukum Tetap
  • Pekerjaan Sloof (K.225) Uk. 25 x 50 Cm 8,13 M3 Suplemen 3e 4.457.451 ,00 36.216.789,384. Pekerjaan Sloof (K.225) Uk. 20 x 30 Cm 2,19 M3 Suplemen 3c 4.432.376,00 9.706.903,445. Pekerjaan Kolom (K.225) Uk. 30 x 40 Cm 37,22 M3 Suplemen 4.f.3 5.339.239,00 198.747.832,54Pekerjaan Kolom (K.225) Uk. 20 x 30 Cm 2,31 Suplemen 4.f.3 5.339.239,00 12.333.642,096. Pekerjaan Kolom (K.175) Uk. 15 x 20 Cm 1,89 M3 Suplemen 4.d 8.292.621 ,00 15.673.053,697.
    Pekerjaan sloof (K.225) Uk. 25 x 50 Cm;Berdasarkan volume kontrak awal untuk item pekerjaan sloof(K.225) Uk. 25 x 50 Cm adalah sebesar 32,25 M* AddendumKontrak dan back up data adalah sebesar 24,13 MS, hal inimengakibatkan terjadinya pengurangan volume sebesar 8,12 Mdengan rinci mengenai Rekapitulasi Selisin Perhitungan Volume PekerjaanPembangunan Pasar Pagi Kuala Simpang Kabupaten Aceh Tamiang, yaituHal. 46 dari 280 hal.
    Pekerjaan Sloof (K.225) Uk. 25 x 50 Cm 8,13 M3 Suplemen 3e 4.457.451 ,00 36.216.789,384. Pekerjaan Sloof (K.225) Uk. 20 x 30 Cm 2,19 M3 Suplemen 3c 4.432.376,00 9.706.903,445. Pekerjaan Kolom (K.225) Uk. 30 x 40 Cm 37,22 M3 Suplemen 4.f.3 5.339.239,00 198.747.832,54Pekerjaan Kolom (K.225) Uk. 20 x 30 Cm 2,31 Suplemen 4.f.3 5.339.239,00 12.333.642,096. Pekerjaan Kolom (K.175) Uk. 15 x 20 Cm 1,89 M3 Suplemen 4.d 8.292.621,00 15.673.053,697.
    Putusan No. 2405 K/Pid.Sus/2015VV VV VV VV VV VV VV WV WVVV VV VV WVFoto pembesian tutup saluran drainase;Foto pengukuran saluran drainase;Foto pengacian saluran drainase;Foto skriping jalan gang way;Foto galian tanah plat beton;Foto pembesian plat beton;Foto pemasangan rangka kudakuda pos jaga;Foto pembesian dan pemasangan mall sloof kios pendukung 4 unit;Foto pengecoran sloof kios pendukung 4 unit;Foto pemasangan batu bata kios pendukung 4 unit;Foto pemasangan bouwplank kios pendukung 4 unit;Foto
    Putusan No. 2405 K/Pid.Sus/2015Foto galian tanah plat beton;Foto pembesian plat beton;Foto pemasangan rangka kudakuda pos jaga;Foto pembesian dan pemasangan mall sloof kios pendukung 4 unit;Foto pengecoran sloof kios pendukung 4 unit;Foto pemasangan batu bata kios pendukung 4 unit;Foto pemasangan bouwplank kios pendukung 4 unit;Foto galian pondasi kios pendukung 4 unit;Foto pondasi kios pendukung 4 unit;Foto pembesian dan beton teras kios pendukung 4 unit;Foto pemasangan batu bata kios pendukung
Register : 09-07-2015 — Putus : 30-11-2015 — Upload : 29-12-2015
Putusan PN KUPANG Nomor 41/Pid.Sus-TPK/2015/PN.Kpg
Tanggal 30 Nopember 2015 — Benediktus Bahan Kelen, S.T
14897
  • Sloof 30/50; Beton Bertulang K M3 33.65 4,771,659.59 160,542,486.802153. Balok G11 uk. 30/60; Beton M3 13.41 5,213,443.16 69,912,272.82 Bertulang K275 Halaman 20 dari 186 Putusan Nomor 41/Pid.SusTPK/2015/PN.Kpg 4. Balok G12 uk. 30/60; Beton M3 5.96 5,213,443.16 31,080,462.76Bertulang K2755. Balok G13 uk. 30/60; Beton M3 8.26 4,553,961 .88 37,624,833.05Bertulang K2756. Balok G14 uk. 30/60; Beton M3 8.82 4,940,443 .61 43,574,712.60Bertulang K2757.
    Sloof Praktis uk. 15/20;Beton Bertulang K1757. Balok Ring Praktis uk. 15/20;Beton Bertulang K1758. Meja Beton DudukanWastafel; Beton Bertulang K 50.1213.683.275.841.562.131.860.35 0.009.532.934.220.561.891.800.42 50.124.140.341.631.000.240.060.07 0.00%1.80%0.47%0.61%0.08%0.23%0.22%0.03%Halaman 44 dari 186 Putusan Nomor 41/Pid.SusTPK/2015/PN.Kpg 175 9 Plat Atapt= 10cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.
    Sloof 30/50; Beton Bertulang K M? 33.65 4,771,659.59 160,542,486.802753. Balok G11 uk. 30/60; Beton M3 13.41 5,213,443.16 69,912,272.82Bertulang K2754. Balok G12 uk. 30/60; Beton M3 5.96 5,213,443 .16 31,080,462.76Bertulang K2755. Balok G13 uk. 30/60; Beton M3 8.26 4,553,961.88 37,624,833.05Bertulang K2756. Balok G14 uk. 30/60; Beton M? 8.82 4,940,443 .61 43,574,712.60 Bertulang K275 Halaman 54 dari 186 Putusan Nomor 41/Pid.SusTPK/2015/PN.Kpg 7.
    Sloof Praktis uk.15/20; Beton Bertulang M3 6.92 2,184,785.71 15,112,162.76K1757. Balok Ring Praktis uk.15/20; Beton BertulangK1758. Meja Beton DudukanWastafel; BetonBertulang K1759. Plat atap t=10 cmSUB JUMLAH B2 271,857 ,206.56B6 PEKERJAANSANITAIR Bh 6.00 600,000.00 3,600,000.001. Pasangan Bak Air2. Instalasi Air Kotor M! 39.83 34,000.00 1,354,220.00 PVC 4 M! 26.47 28,000.00 741,160.00 PVC 3 M!
    Sloof Praktis uk. 15/20;Beton Bertulang K1757. Balok Ring Praktis uk. 15/20;Beton Bertulang K1758. Meja Beton DudukanWastafel; Beton Bertulang K1759 Plat Atapt= 10cm m3 50.1213.683.295.841.562.131.860.356.92 0.009.532.934.220.561.891.800.423.39 50.124.140.341.631.000.240.060.073.52 0.00%1.80%0.47%0.61%0.08%0.23%0.22%0.03%0.22% Halaman 78 dari 186 Putusan Nomor 41/Pid.SusTPK/2015/PN.Kpg PEKERJAAN SANITAIR B.61 Pas.
Register : 27-04-2018 — Putus : 28-05-2018 — Upload : 20-06-2019
Putusan PT BANDA ACEH Nomor 8/PID.SUS/TIPIKOR/2018/PT BNA
Tanggal 28 Mei 2018 — Pembanding/Terbanding/Terdakwa : MUSTAFA LISA Alias AFA Bin ANDRI LISA Diwakili Oleh : SYAHRUL RIZAL SH MH
Terbanding/Pembanding/Penuntut Umum II : WILDANI HAPIT SH
Terbanding/Penuntut Umum I : HELMI ABDUL AZIZ, SH
9636
  • VII.2 4.602.913,00 137.811.215,22x 140 cm2 Sloof 20/25 cm 15,73 M? SUPL. 4.550.030,00 71.571.971,90VIlc3 Balok Latai 13/15 4,58 M* SUPL. 7.088.696,00 32.466.227,68cm VIIk4 Kolom Tepi 5,85 M* SUPL. 5.613.411,00 32.838.454,35VIIf5 Kolom Tengah 10,53 M? SUPL. 5.613.411,00 59.109.217,83VIlg6 Kolom Rata 0,96 M? SUPL. 6.604. 708,00 6.340.519,68Dinding Vilh7 Kolom Teras 30/30 1,44 M2 SUPL. 4,132.979,00 5.951.489, 76cm VIIh8 Kolom Praktis 1,80 M?
    VII.2 4.602.913,00 137.811.215,22140 x 140 cm2 Sloof 20/25 cm 15,73 M? SUPL. VII 4.550.030,00 1.571.971,90Cc3 Balok Latai 4,58 M? SUPL. VII 7.088.696,00 32.466.227,6813/15 cm k4 Kolom Tepi 5,85 M? SUPL. VII 5.613.411,00 32.838.454,35f5 Kolom Tengah 10,53 M? SUPL. VII 5.613.411,00 59.109.217,836 Kolom Rata 0,96 M SUPL VIl 6.604.708,00 6.340.519,68Dinding h7 Kolom Teras 1,44 M SUPL. VII 4,132.979,00 5.951.489, 7630/30 cm h8 Kolom Praktis 1,80 M* SUPL.
    VII 5.946.360,00 28.720.918,80CaRport T = q10cm12 BakPenampunganAirGalian Tanah 24,00 M3 SNI 51.000,00 1.224.000,002835.2008(6.1) Sloof 20/25 0,80 M3 SUPL. VII 4.550.030,00 3.640.024,00cm CcBalok 20/25 0,80 M3 SUPL. VII 4.388.581,00 3.510.864,80cm Kolom Praktis 0,18 M3 SUPL. VII 8.195.595,00 1.475.207,10 Halaman 23 Putusan Nomor 8/PID.SUS/TIPIKOR/2018./PT BNA 15/15 cm hiBeton K250 0,72 M3 SUPL.
    VII.2 4.602.913,00 137.811.215,22140 x 140 cm2 Sloof 20/25 cm 15,73 M SUPL. VIlc 4.550.030,00 71.571.971,903 Balok Latai 4,58 M? SUPL. VIIk 7.088.696,00 32.466.227 ,6813/15 cm4 Kolom Tepi 5,85 M* SUPL. VIIf 5.613.411,00 32.838.454,355 Kolom Tengah 10,53 M? SUPL. VIIg 5.613.411,00 59.109.217,836 Kolom Rata 0,96 M? SUPL. VIIh 6.604.708,00 6.340.519 ,68Dinding7 Kolom Teras 1,44 M? SUPL. VIIh 4,132.979,00 5.951.489,7630/30 cm8 Kolom Praktis 1,80 M? SUPL.
    VIIq 5.946.360,00 28.720.918,80CaRport T =10 cm12 BakPenampunganAirGalian Tanah 24,00 M3 SNI 51.000,00 1.224.000,002835.2008(6.1) Sloof 20/25 0,80 M3 SUPL. VIlc 4.550.030,00 3.640.024,00cmBalok 20/25 0,80 M3 SUPL. VIIl 4.388.581,00 3.510.864,80cmKolom Praktis 0,18 M3 SUPL. VII 8.195.595,00 1.475.207,1015/15 cm hiBeton K250 0,72 M3 SUPL. VIIq 5.946.360,00 4.281.379,20Penutup 1,00 M3 Taksir 500.000,00 500.000,00 Halaman 40 Putusan Nomor 8/PID.SUS/TIPIKOR/2018.
Putus : 05-05-2011 — Upload : 18-10-2011
Putusan PT TANJUNG KARANG Nomor 29/ Pid/ 2011/ PT. TK.
Tanggal 5 Mei 2011 — SAFUAN JAUHARI, S.H., MM bin JAUHARI.
7025
  • Fondasi batu belah adk G32H M3 2.641:52 Sloof beton 12/15 G41 M3 1.983 Kolom beton 20/20 G41 M3 0.484 Kolom praktis J1I/1ll (t = 3,5 G4l M3 0.51M)5 Kolom praktis Il/ll (t =G4l1 M3 0.583,M)6 Ring balk 12/15 G41 M3 1.427 Balok teras 17/17 G41 M3 0.45III Pek.
    Fondasi batu belah G32H M3 3.96adk 1:52 Sloof beton 12/15 G41 M3 2.973 Kolom beton 20/20 G41 M3 0.844 Kolom praktis I1I/11 (t =(G4l M3 0.893,5 M)5 Kolom praktis I1I/11 (t =G4l M3 0.803,M)6 Ring balk 12/15 G41 M3 2.357 Balok teras 17/17 G41 M3 0.69III Pek.
    Fondasi batu belah G32H M3 3.96adk 1:52 Sloof beton 12/15 G41 M3 2.973 Kolom beton 20/20 G41 M3 0.844 Kolom praktis I1I/11l (t =G4l M3 0.893,5 M)5 Kolom praktis I1I/11 (t =(G4l M3 0.803,M)6 Ring balk 12/15 G41 M3 2.357 Balok teras 17/17 G41 M3 0.69III Pek.
    Fondasi batu belah adk G32H M3 2.641:52 Sloof beton 12/15 G41 M3 1.983 Kolom beton 20/20 G41 M3 0.484 Kolom praktis JI1I/1l (t = 3,5 G4l M3 0.51M)5 Kolom praktis Il/ll (t =G4l1 M3 0.583,M)6 Ring balk 12/15 G41 M3 1.427 Balok teras 17/17 G41 M3 0.45III Pek.
    Fondasi. batu belah (G32H M3 3.96adk 1:52 Sloof beton 12/15 G41 M3 2.973 Kolom beton 20/20 G41 M3 0.844 Kolom praktis I1I/I11 (t =(G4l M3 0.893,5 M)5 Kolom praktis II/I11 (t =(G4l M3 0.803,M)6 Ring balk 12/15 G41 M3 2.357 Balok teras 17/17 G41 M3 0.69III Pek.
Register : 17-02-2016 — Putus : 01-03-2016 — Upload : 22-08-2019
Putusan PT PADANG Nomor 1/PID.TPK/2016/PT PDG
Tanggal 1 Maret 2016 — Pembanding/Terbanding/Jaksa Penuntut : RAHMADANI, SH.MH
Terbanding/Pembanding/Terdakwa : Ir. MARA HUSNI Pgl. DATUAK
Terbanding/Terdakwa : KHUSLAINI, SE
8638
  • Bangunan Rumah JagaoO Pekerjaan Bongkaran meliputi bongkar dinding lama, dananyasebesar Rp. 1.500.000, (Satu juta lima ratus ribu rupiah).Halaman 7 dari 109 hal.Put.No.1/TIPIKOR/2016/PT:PDGPekerjaan Fondasi meliputi pasang bouplank dengan volume12,00M1, galian pondasi dengan volume 8,00 M3, Aan stampang denganvolume 2,00 M3, pasang pondasi batu kali dengan volume 3,75 M3,pasang sloof 15/20 dengan volume 0,38 M3, timbunan rabat denganvolume 3,13 M3, urugan pasir bawah lantai dengan volume 4,05 M3dan
    (dua juta dua ratusSembilan puluh satu ribu dua ratus empat puluh lima rupiah).Pekerjaan Pondasi meliputi galian pondasi dengan volume 16,96M3, urugan kembali dengan volume 4,24 M3, pasang aan stampingbatu kali dengan volume 4,24 M3, pasang pondasi batu kali denganvolume 11,93 M3, pasang sloof 15/20 dengan volume 0,80 M3,dengan total dananya sebesar Rp. 11.328.592,38, (Sebelas jut tigaratus dua puluh delapan ribu lima ratus Sembilan puluh dua rupiahtiga puluh delapan sen).Pekerjaan Beton /Dinding
    (dua juta dua rattus Sembilanpuluh satu ribu dua ratus empat puluh lima rupiah).oO Pekerjaan Pondasi meliputi galian pondasi dengan volume 16,96 M3menjadi 28,48 M3, urugan kembali dengan volume 4,24 M3 menjadi7,12 M3, pasang aan stamping batu kali dengan volume 4,24 M3menjadi 7,12 M3, pasang pondasi batu kali dengan volume 11,93 M3menjadi 10,01 M3, pasang sloof 15/20 dengan volume 0,795 M3menjadi 1,34 M3, dengan total dananya sebesar Rp. 11.328.592,38,(sebelas jut tiga ratus dua puluh delapan ribu
    Pekerjaan Pondasi meliputi galian pondasi Volume Rencana 9,17M3 sedang kan yang terpasang 8,93 M3, Aanstampang VolumeRencana 2,29 M3 sedang kan yang terpasang 2,23 M3, pasangpondasi batu kali Volume Rencana 4,30 M3 sedang kan yangterpasang 4,19 M3, pasang sloof 15/20 Volume Rencana 0,57 M3sedang kan yang terpasang 0,56 M3.Halaman 32 dari 109 hal.Put.No.1/TIPIKOR/2016/PT:PDGb.
    Pekerjaan Pondasi meliputi galian pondasi Volume Rencana 9,17M3 sedang kan yang terpasang 8,93 M3, Aanstampang VolumeRencana 2,29 M3 sedang kan yang terpasang 2,23 M3, pasangpondasi batu kali Volume Rencana 4,30 M3 sedang kan yangterpasang 4,19 M3, pasang sloof 15/20 Volume Rencana 0,57 M3sedang kan yang terpasang 0,56 M3.b.
Register : 19-06-2014 — Putus : 16-04-2015 — Upload : 24-06-2015
Putusan PN BANDA ACEH Nomor 24/Pid.Sus-TPK/2014/PN Bna
Tanggal 16 April 2015 — 1.Ir. IRWANSYAH Bin MANSYUR 2.Drs. DJAKFAR Bin M.YUSUF
10522
  • Pekerjaan Sloof (K.225) Uk. 25 x 50 Cm 8,13 M3 Suplemen 3e 4.457.451,00 36.216.789,384. Pekerjaan Sloof (K.225) Uk. 20 x 30 Cm 2,19 M3 Suplemen 3c 4.432.376,00 9.706.903,445. Pekerjaan Kolom (K.225) Uk. 30 x 40 Cm 37,22 M3 Suplemen 4.f.3 5.339.239,00 198.747.832,54Pekerjaan Kolom (K.225) Uk. 20 x 30 Cm 2,31 Suplemen 4.f.3 5.339.239,00 12.333.642,096. Pekerjaan Kolom (K.175) Uk. 15 x 20 Cm 1,89 M3 Suplemen 4.d 8.292.621,00 15.673.053,697.
    Pekerjaan Beton Bertulang1 Pekerjaan Sloof (K.225) Uk. 25 x 50 CmBerdasarkan Volume Kontrak Awal untuk item Pekerjaan Sloof (K.225)Uk. 25 x 50 Cm adalah sebesar 32,25 M? Addendum Kontrak dan BackUp Data adalah sebesar 24,13 M3, hal ini mengakibatkan terjadinyapengurangan volume sebesar 8,12 M?
    Pekerjaan Sloof (K.225) Uk. 25 x 50 Cm 8,13 M3 Suplemen 3e 4.457.451,00 36.216.789,384. Pekerjaan Sloof (K.225) Uk. 20 x 30 Cm 2,19 M3 Suplemen 3c 4.432.376,00 9.706.903,445. Pekerjaan Kolom (K.225) Uk. 30 x 40 Cm 37,22 M3 Suplemen 4.f.3 /5.339.239,00 198.747.832,54Pekerjaan Kolom (K.225) Uk. 20 x 30 Cm 2,31 Suplemen 4.f.3 5.339.239,00 12.333.642,096. Pekerjaan Kolom (K.175) Uk. 15 x 20 Cm 1,89 M3 Suplemen 4.d 8.292.621,00 15.673.053,697. Pekerjaan Balok Lantai (K.225) Uk. 25x50 Cm 44,27.
    Pekerjaan Beton Bertulang1 Pekerjaan Sloof (K.225) Uk. 25 x 50 CmBerdasarkan Volume Kontrak Awal untuk item Pekerjaan Sloof (K.225)Uk. 25 x 50 Cm adalah sebesar 32,25 M* Addendum Kontrak dan BackUp Data adalah sebesar 24,13 M3, hal ini mengakibatkan terjadinyapengurangan volume sebesar 8,12 M? dimana sebenarnya volume awalsebesar 32,25 M?
    pasar basah;Foto pengecoran sloof pasar basah;Foto pengecoran kolom pasar los bertingkat;Foto pemasangan batu bata pasar los bertingkat;Hal. 231 dari 283 Hal.
Register : 09-07-2015 — Putus : 30-11-2015 — Upload : 04-02-2016
Putusan PN KUPANG Nomor 38/PIDSUS.TPK/2015/PN.KPG
Tanggal 30 Nopember 2015 — ALFONSIUS AFO NDAY
10257
  • Sloof Praktis uk. 15/20; Beton Me 2.13 4,116,106.34 8,767,306.50Bertulang K1757. Balok Ring Praktis uk. 15/20; Me 1.86 4,116,106.34 7,675,097.69Beton Bertulang K1758. Meja Beton Dudukan Me 0.35 2,184,785.71 772,758.71Wastafel; Beton Bertulang K175 Me 6.92 2,184,785.71 15,112,162.769. Plat Atap t=10 cmSUB JUMLAH B2 271,857,206.56B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002.
    Sloof Praktis uk. 15/20; Me 0.35 2,184,785.71 772,758.71Beton Bertulang K1757. Balok Ring Praktis uk. Me 6.92 2,184,785.71 15,112,162.7615/20; Beton Bertulang K1758. Meja Beton DudukanWastafel; Beton BertulangK1759. Plat atap t=10 cmSUB JUMLAH B2 279,960,085.62B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002. Instalasi Air Kotor PVC 4 M' 39.83 34,000.00 1,354,220.00 PVC 3 M!
    Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K175 Putusan No. 38/PIDSUS.TPK/2015/PN.KPG33 7. Balok Ring Praktis uk. 15/20; m3 1.86 1.80 0.06 0.22%Beton Bertulang K1758. Meja Beton Dudukan Wastafel:; m3 0.35 0.42 0.07 0.03%Beton Bertulang K1759 Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.
    Sloof 30/50;Beton BertulangK2753. Balok G11 uk.30/60; BetonBertulang K2754. Balok G12 uk.30/60; BetonBertulang K2755. Balok G13 uk.30/60; BetonBertulang K2756. Balok G14 uk.30/60; BetonBertulang K2757. Balok G15 uk.35/70; BetonBertulang K2758. Balok B1 uk.25/40; BetonBertulang K2759. Balok B2 uk.20/35; BetonBertulang K27510. Balok B3 uk.20/50; BetonBertulang K27511.
    Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K1757. Balok Ring Praktis uk. 15/20; m3 1.86 1.80 0.06 0.22%Beton Bertulang K1758. Meja Beton Dudukan Wastafel:; m3 0.35 0.42 0.07 0.038%Beton Bertulang K1759 Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22%B.6 PEKERJAAN SANITAIR1 Pas.
Putus : 23-04-2015 — Upload : 20-08-2015
Putusan PT KUPANG Nomor 14/Pid.Sus-TPK/2015/PT.KPG
Tanggal 23 April 2015 — SUSILO HADI, S.Pd
4624
  • Beton bertulang camp. 1PC:2Psr:3Krl Cor Beton Sloof 15/20 K 175 2,018 2,348 m3 Cor Beton Kolom Praktis 15/15K 175 0,878 0,638 m3 Cor Beton Ringbalk 15/20K 175 2,018 2,348 m3Pek. Pasangan Tembok Batu Potong 1 pc :57 psr 10,907 9,038 m38 Pek. Plesteran Dinding Tembok 1pc : 5 psr 210,000 164,325 m29 Pek. Acian 210,000 164,325 m210 Pek. Pengecetan Dinding Tembok 210,000 164,325 m2PEK. SALURAN DRAINASE TIPE 150C. TRAPESIUM1 Pek. Galian tanah 691,200 475,093 m32 Pek. Urugan Pasir 18,000 m33 Pek.
    MigB PEKERJAAN PAGAR TEMBOKDEPAN= 78,25 DARI 70 M' Pekerjaan Persiapan1 Pembersihan Lokasi 1.000 Ls2 Pengadaan Air Kerja 1.000 Ls Pekerjaan Galian dan Timbunaan1 Pekerjaan Galian Tanah 25.200 10.89 M32 Pekerjaan Urugan Pasir Bawah Pondasi 2.100 2.24 M33 Pekerjaan Urugan Tanah Galian 12.600 7.61 M3lll Pekerjaan Pasangan dan Plesteran1 Pasangan Aanstanpeng Batu Karang 8.400 M3Pekerjaan Pasangan Pondasi Batu2 Karang 1pC : 6Psr 22.050 16.04 M33 Pekerjaan Beton Bertulang Camp.1Pc:2Psr:3Krl Cor Beton Sloof
    Beton bertulang camp.6 1PC:2Psr:3Krl Cor Beton Sloof 15/20 K 175 2,018 2,348 m3 Cor Beton Kolom Praktis 15/15K 175 0,878 0,638 m3 Cor Beton Ringbalk 15/20K 175 2,018 2,348 m3Pek. Pasangan Tembok Batu Potong 17 pc: 5 psr 10,907 9,038 m3Pek. Plesteran Dinding Tembok 1pc : 58 psr 210,000 164,325 m29 Pek. Acian 210,000 164,325 m210 Pek. Pengecetan Dinding Tembok 210,000 164,325 m2 C. PEK. SALURAN........30 PEK. SALURAN DRAINASE TIPE 150C. TRAPESIUM1 Pek. Galian tanah 691,200 475,093 m32 Pek.
    M3B PEKERJAAN PAGAR TEMBOKDEPAN= 78,25 DARI 70 M' Pekerjaan Persiapan1 Pembersihan Lokasi 1.000 Ls2 Pengadaan Air Kerja 1.000 Ls Pekerjaan Galian dan Timbunaan1 Pekerjaan Galian Tanah 25.200 10.89 M32 Pekerjaan Urugan Pasir Bawah Pondasi 2.100 2.24 M33 Pekerjaan Urugan Tanah Galian 12.600 7.61 M3lll Pekerjaan Pasangan dan Plesteran1 Pasangan Aanstanpeng Batu Karang 8.400 M3Pekerjaan Pasangan Pondasi Batu2 Karang 1pC : 6Psr 22.050 16.04 M33 Pekerjaan Beton Bertulang Camp.1Pc:2Psr:3Krl Cor Beton Sloof
Putus : 16-06-2014 — Upload : 27-01-2017
Putusan PT BANDA ACEH Nomor 10/PID-TIPIKOR/2014/PT-BNA
Tanggal 16 Juni 2014 — I. Saleh Kadri, SE, M.Si Bin H. Sakum II. H. Mik’un Sijabat, S.Pd Bin Alm H. Angkat Sijabat
6035
  • TanahLokasi di LuarBangunan Seteballm (Teras Depan,Belakang, Kiri danKanan SesuaiGambar)86.23668,950.005,945,972.200.47 Urugan PasirDibawah Lantai56.138134,950.007,575,836.600.60 Urugan TanahBawah Lantai957.96268,950.0066,051,497.145.22 85,045 7718.93 6.7 IllPEKERJAANBETONBERTULANG Beton Cor 1 : 3:5T=5cm (Lt.Kerja di BawahSloof Gantung)3.689527,382.001,945,644.040.15 Beton Cor 1:3 ::5T=5cm (Lt.Kerja di BawahKeramik)28.069527,382.0014,803,111.721.17 Pondasi Tapak11.523,259, 131.0031,049,189.12297 Sloof
    20/30(Diatas BatuGunung) 7.725 3,875,776.0029,940,369.60 2.36 Hal 7 dari Hal 36 Putusan No.10/Pid.Tipikor/2014/PT.BNA Sloof 20/305 (Gantung) 15.327 M 4,186,926.00 64,173,014.80 5.076 Kaki Kolom 25/25 6.300 M 5,245,475.00 33,046,492.50 2.61Kolom 30/307 (Tiang Teras) 0.828 M* 5,245,475.00 4,343,253.30 0.34Kolom Praktis8 (13/13) 7.137 M?
    Urugan TanahLokasi di LuarBangunan Setebal1m (Teras Depan,Belakang, Kiri danKanan SesuaiGambar)86.23668,950.005,945,972.200.47 Urugan PasirDibawah Lantai56.138134,950.007,575,836.600.60 Urugan TanahBawah Lantai957.962 68,950.0066,051,497.14 522 85,045 978.93 6.7 IiPEKERJAANBETONBERTULANG Beton Cor 1 : 3:5T=5cm (Lt.Kerja di BawahSloof Gantung)3.689527,382.001,945,644.040.15 Beton Cor 1: 3:5T=5cm (Lt.Kerja di BawahKeramik)28.069527,382.0014,803,111.721.17 Pondasi Tapak11.523,259,131.0037,545,189.12207 Sloof
    20/30(Diatas BatuGunung)Td2o3,875,776.0029,940,369.602.36 Sloof 20/30(Gantung)15.3274,186,926.0064,173,014.805.07 Kaki Kolom 25/256.3005,245,475.0033,046,492.502.61 Kolom 30/30(Tiang Teras) 0.828 5,245,475.00 4,343,253.30 0.34 Hal 17 dari Hal 36 Putusan No.10/Pid.Tipikor/2014/PT.BNA Kolom Praktis8 (13/13) 7.137 Me 6,864,336.00 48,990,766.03 3.87Balok Daag9 (13/35) 9.293 M* 6,093,786.00 56,629,553.30 4.47Plat Daak + Plat10 Sun Wearing 16.020 M 3,975,318.00 63,684,594.36 5.0311 Balok Latal 13/18 3.734
Putus : 28-04-2017 — Upload : 30-10-2017
Putusan MAHKAMAH AGUNG Nomor 12 K/PID.SUS/2016
Tanggal 28 April 2017 — Drs. SUDARLIM THIRAYO, MM.;
179130 Berkekuatan Hukum Tetap
  • ., setelah mendengar laporan saksi IHSAN dan saksiAMINULLAH ALI mengeluarkan Surat Nomor: 800.1044.a/DikporaBangkep/2013 perihal undangan pembahasan atas penyimpanganselanjutnya ditindaklanjuti kembali dengan mengeluarkan Surat Nomor:900.1061/DikporaBangkep/2013 tanggal 18 Oktober 2013 dengan perihalpenyimpangan pekerjaan rehabilitasi SMAN 1 Tinangkung khusus untukpenyimpangan jumlah dan jenis/ukuran besi, kKedalaman pondasi poor plat,dan pekerjaan besi pada sloof dan kolom utama, dimana Terdakwa
    Ukuran penampang beberapa elemen struktur (sloof, kolom, balok danpelat lantai) kurang dari yang disyaratkan atau tidak sesuai denganspesifikasi/gambar rencana. Hal tersebut berakibat berkurangnyakuantitas terlaksana dari beberapa item pekerjaan: sloof, kolom, balokdan pelat lantai;3.
    SudarlimThirayo, MM., setelah mendengar laporan saksi IHSAN dan saksiAMINULLAH ALI mengeluarkan Surat Nomor: 800.1044.a/DikporaBangkep/2013 perihal undangan pembahasan atas penyimpanganselanjutnya ditindaklanjuti kembali dengan mengeluarkan Surat Nomor:900.1061/DikporaBangkep/2013 tanggal 18 Oktober 2013 dengan perihalpenyimpangan pekerjaan rehabilitasi SMAN 1 Tinangkung khusus untukpenyimpangan jumlah dan jenis/ukuran besi, kKedalaman pondasi poor plat,dan pekerjaan besi pada sloof dan kolom utama
    Hal tersebutberakibat berkurangnya kuantitas terlaksana dari beberapa itempekerjaan terkait elemen struktur dimaksud;2) Ukuran penampang beberapa elemen struktur (sloof, kolom, balokdan pelat lantai) kurang dari yang disyaratkan atau tidak sesuaiHal. 27 dari 54 hal. Put. No. 12 K/PID.SUS/2016dengan spesifikasi/gambar rencana.
    MOHHAT padapemasangan besi dan sloof sebagaimana dilaporkan oleh KonsultanPengawas, dan Terdakwa telah menegur CV.
Register : 07-03-2013 — Putus : 03-07-2013 — Upload : 24-06-2014
Putusan PN MAMUJU Nomor 05/Pid. Sus/TPK/2013/PN.MU
Tanggal 3 Juli 2013 — PAULINA RARA,B.Amd.Pd
7831
  • Pondasi Batu Belah 1:4 C.11 4.10) m3 2,899,246.95 11,886,912.513 Beton Sloof 1:2:3 (S1 20/25)4 Beton Sloof 1:2:3 (SI 15/20) C.10 1.05) 43 2,99 1,232.24 3,140,793.855 Beton Kolom 1:2:3 (K1 20/25)6 Beton Kolom Selasar 1:2:3 (Kl C.12 3.55 3 3,669,219.45 13,025,729 .0615/15)7 Betom Kolom Praktis !
    869,774.091 Beton Sloof 1:2:3 (S1 20/25) C.16 0.07) m3 2,899,246.95 392,089.062 Betom Kolom Praktis !:2:3 (Kp13:13) C.3 12.00 3 3,236,232.08 1,156,812.193. Pas. Dinding Bata 1:54 Plesteran Dinding 1:5 C5 24.00 m2 96,401.02 888,054.115 Pekerjaan AcianC.9 37,002.2515,957.90Ill. PEKERJAAN PENGECATAN 11 12.00 12,830.56 153,966.721 Pek. Plamur Dinding 13 24.00 m2 8,835.24 212,045.762 Pek. Cat TembokTotal 366,012.48GRAND 5,105,659.87TOTALBC.
    Pondasi Batu Belah 1:4 C.11 4.10 m3 2,899,246.95 11,886,912.51B.Beton Sloof 1:2:3 (S1 20/25) 4.Beton Sloof 1:2:3 (S1 15/20) C.10 1.05 3 2,991,232.24 3,140,793.855.Beton Kolom 1:2:3 (K1 20/25)6.Beton Kolom Selasar 1:2:3 (KI C.12 3.55 3 3,669,219.45 13,025,729.0615/15)7.Betom Kolom Praktis !
    869,774.09DINDINGC.16 0.07) m3 2,899,246.95 392,089.061.Beton Sloof 1:2:3 (S1 20/25)2.Betom Kolom Praktis !:2:3 (Kp C.3 12.00 m3 3,236,232.08 1,156,812.1913:13)3.Pas. Dinding Bata 1:5 C5 24.00) m2 96,401.02 888,054.114.Plesteran Dinding 1:55.Pekerjaan Acian C9 37,002.2515,957.90Il. PEKERJAAN PENGECATAN Ll 12.00 12,830.56 153,966.72)1.Pek. Plamur Dinding 13 24.00 m? 8,835.24 212,045.76)2.Pek. Cat TembokII. Total 366,012.48GRAND TOTAL B 5,105,659.87C.
    PEKERJAAN BETON DAN C.10 0.30) m3 869,774.09DINDINGC.16 0.07 m3 2,899,246.95 392,089.06)1.Beton Sloof 1:2:3 (S1 20/25)2.Betom Kolom Praktis !:2:3 (Kp C3 12.00) m3 3,236,232.08 1,156,812.1913:13)3.Pas. Dinding Bata 1:5 C.5 24.00) 42 96,401.02 888,054.114.Plesteran Dinding 1:55.Pekerjaan Acian C9 37,002.2515,957.90Il. PEKERJAAN PENGECATAN Ll 12.00 12,830.56 153,966.72)1.Pek. Plamur Dinding 13 24.00) m2 8,835.24 212,045.762.Pek.
Register : 29-04-2014 — Putus : 03-09-2014 — Upload : 30-09-2014
Putusan PN BANDA ACEH Nomor 15/Pid.Sus-TPK/2014/PN Bna
Tanggal 3 September 2014 — Sayuti, S.H. Bin Muhammad Daud
7420
  • Sloof beton m3 22,50 3.796.700,00 85.425.750,00 Pek. Cor Beton Kolom Tribun (40 x 40 ) m3 3.796.700,00 Pek. Cor Beton Kolom Tribun (30 x 30 ) m3 3.796.700,00 7 Pek. Cor Beton Kolom Tribun (50 x50 ) m3 23,10 3.796.700,00 87.703.770,00 Pek. Cor Balok atas (30 x 40 ) m3 3.796.700,00 Pek. Cor Balok atas (30 x 50 ) m3 20,57 3.796.700,00 78.079.135,50 Pek. Cor Flat lantai m3 34,51 3.796.700,00 131.024.117,007 Pek. Cor Tempat Duduk m3 78,40 3.796.700,00 297.66 1.280,00 Pek.
    Sloof beton m3 16,56 3.796.700,00 62.873.352,00 Pek. Cor Beton Kolom Tribun (40 x 40 ) m3 3.796.700,00 Pek. Cor Beton Kolom Tribun (30 x 30 ) m3 3.796.700,00 Pek. Cor Beton Kolom Tribun (50 x 50 ) m3 16,80 3.796.700,00 63.784.560,00 Pek. Cor Balok atas (30 x 40 ) m3 3.796.700,00 Pek. Cor Balok atas (30 x 50 ) m3 14,82 3.796.700,00 56.267.094,007 Pek. Cor Flat lantai m3 24,65 3.796.700,00 93.588.655,00 Pek. Cor Tempat Duduk m3 56,00 3.796.700,00 212.615.200,00= Pek.
    Pondasi umpak beton bertulang 68,41 29,17 234.150.329,70 99.847.004,40= Pekerjaan Sloof beton 44.63 32,78 152.737.987,50 112.181.559,53= Pek. Kolom Beton bertulang (belakang ) 21,17 15,02 72.458.559,00 51.391.977,417 Pek. Plesteran Bata 1 : 2 408,38 351,37 17.110.912,50 14.722.486,80= Pek.
    Pondasi umpak beton bertulang 68,41 29,17 234.150.329,70 99.847.004,40= Pekerjaan Sloof beton 44.63 32,78 152.737.987,50 112.181.559,53 Pek. Kolom Beton bertulang (belakang ) 21,17 15,02 72.458.559,00 51.391.977,41= Pek. Plesteran Bata : 2 408,38 351,37 17.110.912,50 14.722.486,807 Pek.
    Pondasi umpak beton bertulang 68,41 29,17 234.150.329,70 99.847.004,40 Pekerjaan Sloof beton 44.63 32,78 152.737.987,50 112.181.559,53= Pek. Kolom Beton bertulang (belakang ) 21,17 15,02 72.458.559,00 51.391.977,417 Pek. Plesteran Bata 1 : 2 408,38 351,37 17.110.912,50 14.722.486,80= Pek.
Register : 09-07-2015 — Putus : 30-11-2015 — Upload : 04-02-2016
Putusan PN KUPANG Nomor 37/PIDSUS.TPK/2015/PN.KPG
Tanggal 30 Nopember 2015 — DANIEL EMANUEL DHAE
10457
  • Sloof Praktis uk. Me 0.35 2,184,785.71 772,758.7115/20; BetonBertulang K175 Vi 6.92 2,184,785.71 15,112,162.767. Balok Ring Praktis uk.15/20; BetonBertulang K1758. Meja Beton DudukanWastafel; BetonBertulang K1759. Plat atap t=10 cmSUB JUMLAH B2 271,857,206.56B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002. Instalasi Air Kotor PVC 4 M! 39.83 34,000.00 1,354,220.00 PVC 3 M!
    Sloof Praktis uk.15/20; Beton Me 6.92 2,184,785.71 15,112,162.76Bertulang K1757. Balok Ring Praktis uk.15/20; BetonBertulang K1758. Meja Beton Dudukan Wastafel; Beton Putusan No. 37/PIDSUS.TPK/2015/PN.KPG 25 Bertulang K1759. Plat atapt=10 cmSUB JUMLAH B2 279,960,085.62B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002.
    Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K1757. Balok Ring Praktis uk. 15/20; Beton m3 1.86 1.80 0.06 0.22%Bertulang K1758. Meja Beton Dudukan Wastafel; m3 0.35 0.42 0.07 0.03%Beton Bertulang K1759 Plat Atap t= 10cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.
    Sloof Praktis uk. 15/20; Vi 0.35 2,184,785.71 772,758.71Beton Bertulang K1757. Balok Ring Praktis uk. Me 6.92 2,184,785.71 15,112,162.7615/20; Beton BertulangK1758. Meja Beton DudukanWastafel; BetonBertulang K1759. Plat atap t=10 cmSUB JUMLAH B2 279,960,085.62B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002. Instalasi Air Kotor PVC 4 M!
    Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K1757. Balok Ring Praktis uk. 15/20; m3 1.86 1.80 0.06 0.22%Beton Bertulang K1758. Meja Beton Dudukan Wastafel; m3 0.35 0.42 0.07 0.03%Beton Bertulang K1759 Plat Atap t= 10cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.