Ditemukan 48 data

Urut Berdasarkan
 
Register : 31-05-2016 — Putus : 21-09-2016 — Upload : 04-10-2016
Putusan PN KUPANG Nomor 32/Pid.Sus-TPK/2016/PN.Kpg
Tanggal 21 September 2016 — Drs. RAFAEL ARHAT
7332
  • Pembangunan Landasan Modul PLTS (7.00 X 6.00) 23.563.300,67Zs Pembangunan rumah pembangkit (3.00 x 4.00) 25.548 .397,36Pembangunan pagar kawat berduri sepanjang 53,50 M 24.739.882,33(tiang pipa Gl Medium 2.50 inch)4. Pembangunan PLTS Terpusat 1.148.721.761,255. Pembangunan jaringan tegangan rendah (JTR) 124.960.657,506. Pembangunan sambungan rumah (SR) 100.143.382,507. Pemasangan Instalasi listrik 70 rumah (IR) 66.297.000,008. Biaya pelatihan tenaga teknik untuk perawatan 28.424.000,009.
    Pembangunan pagar kawat berduri sepanjang 53,50 M (tiang 24.739.883,32pipa GI Medium 2.50 inch)4. Pembangunan PLTS Terpusat 1.148.711.825,005. Pembangunan jaringan tegangan rendah (JTR) 124.960. 487,006. Pembangunan sambungan rumah (SR) 100.146.235,007. Pemasangan Instalasi listrik 70 rumah (IR) 66.297.000,008. Biaya pelatihan tenaga teknik untuk perawatan 28.424.000,009.
    Pembangunan pagar kawat berduri sepanjang 53,50 M (tiang 24.739.883,32pipa GI Medium 2.50 inch)4. Pembangunan PLTS Terpusat 1.148.711.825,005. Pembangunan jaringan tegangan rendah (JTR) 124.960. 487,006. Pembangunan sambungan rumah (SR) 100.146.235,00q, Pemasangan Instalasi listrik 70 rumah (IR) 66.297.000,008. Biaya pelatihnan tenaga teknik untuk perawatan 28.424.000,009.
    Pembangunan pagar kawat duri sep. 53,50 m (tiang pipa gi medium 2,50 inc)4. Pembangunan plts terpadu5. Pembangunan jaringan tekanan rendah (jtr)6. Pembangunan sambungan rumah (sr)7. Pemasangan instalasi listrik 80 rumah8. Pelatinan tenaga tehnik untuk perawatan9. Testing rincian dari item pekerjaan dari pembangunan PLTS terpaduNO.
    Pembangunan Landasan Modul PLTS (7.00 X 6.00) 23.563.300,67Pembangunan rumah pembangkit (3.00 x 4.00) 25.548.397,36Pembangunan pagar kawat berduri sepanjang 53,50 M (tiang 24.739.883,32pipa GI Medium 2.50 inch)4. Pembangunan PLTS Terpusat 1.148.711.825,005. Pembangunan jaringan tegangan rendah (JTR) 124.960. 487,006. Pembangunan sambungan rumah (SR) 100.146.235,001s Pemasangan Instalasi listrik 70 rumah (IR) 66.297.000,008. Biaya pelatihan tenaga teknik untuk perawatan 28.424.000,009.
Register : 26-10-2017 — Putus : 17-09-2018 — Upload : 01-11-2018
Putusan PN TONDANO Nomor 263/Pdt.G/2017?PN Tnn
Tanggal 17 September 2018 — MARTHA ROSALI TAMPI lawan YOHAN MONDONG,Dkk
440
  • Menyatakan tanah yang menjadi objek sengketa dalam perkara ini yang terletak di Lingkungan IV Kelurahan Kakaskasen I Kecamatan Tomohon Utara Kota Tomohon dengan ukuran panjang dari panjang dari Barat ke Timur 53,50 m2 (lima puluh tiga koma lima puluh meter persegi) dan lebar dari Selatan ke Utara 6,4 m2 (enam koma empat meter persegi) sehingga luasnya 34,24 m2 (tiga puluh empat koma dua puluh empat meter persegi), dengan batas-batas :- Sebelah Utara dengan Tergugat
Putus : 22-12-2014 — Upload : 02-10-2015
Putusan MAHKAMAH AGUNG Nomor 2067 K/Pdt/2012
Tanggal 22 Desember 2014 — ZAINIR MAN, dk VS AGUS P, dkk
5928 Berkekuatan Hukum Tetap
  • B4 (53,50 m2 x Rp8.202,00) = Rp 438.887 ,006. B5 (112 m? x Rp8.202,00) = Rp 918.624,007. C1 (39 m? x Rp8.202,00) = Rp 319.878,008. C2 (54m? x Rp8.202,00) = Rp 442.908,009. C3 (65 m? x Rp8.202,00) = Rp 533.130,0010.C4 (63m? x Rp8.202,00) = Rp 516.726,0011.C7 (45 m2 x Rp8.202,00) = Rp 369.090,00Jumlah =Rp = 5.427.343,00a. Biaya bangunan menurut realisasi unum (RAB) RencanaAnggaran Realisasi:1. At (51 m2 x Rp2.200.000,00) = Rp 112.200.000,002. B1 (71 m2 x Rp2.200.000,00) =Rp 156.200.000,003.
Register : 13-12-2022 — Putus : 24-01-2023 — Upload : 17-09-2023
Putusan PN SANGATTA Nomor 389/Pid.Sus/2022/PN Sgt
Tanggal 24 Januari 2023 — Penuntut Umum:
TINA MAYASARI, S.H., M.H.
Terdakwa:
SRI MEGAWATI Alias MEGA Binti BAHAR
3429
  • lima puluh juta rupiah) dengan ketentuan apabila denda tersebut tidak dibayar maka akan diganti dengan pidana penjara selama 1 (satu) tahun;
  • Menetapkan masa penangkapan dan penahanan yang telah dijalani oleh Terdakwa dikurangkan seluruhnya dari pidana yang dijatuhkan;
  • Menetapkan Terdakwa tetap ditahan;
  • Menetapkan barang bukti berupa:
  • - 3 (tiga) poket yang diduga Narkotika jenis shabu-shabu seberat 53,50

Register : 26-10-2017 — Putus : 17-09-2018 — Upload : 07-08-2021
Putusan PN TONDANO Nomor 263/Pdt.G/2017/PN Tnn
Tanggal 17 September 2018 — Penggugat:
MARTHA ROSALI TAMPI
Tergugat:
1.YOHAN MONDONG
2.DIANE SUMARAUW
3.WELLY SUMARAUW
4.POLTJE SUMARAUW
5.CONNY SUMARAUW
6.EDWIN SUMARAUW
Turut Tergugat:
KEPALA KANTOR PERTANAHAN KOTA TOMOHON
450
  • Menyatakan tanah yang menjadi objek sengketa dalam perkara ini yang terletak di Lingkungan IV Kelurahan Kakaskasen I Kecamatan Tomohon Utara Kota Tomohon dengan ukuran panjang dari panjang dari Barat ke Timur 53,50 m2 (lima puluh tiga koma lima puluh meter persegi) dan lebar dari Selatan ke Utara 6,4 m2 (enam koma empat meter persegi) sehingga luasnya 34,24 m2 (tiga puluh empat koma dua puluh empat meter persegi), dengan batas-batas :

    • Sebelah Utara dengan
Register : 05-07-2023 — Putus : 23-01-2024 — Upload : 08-05-2024
Putusan PN MEDAN Nomor 535/Pdt.G/2023/PN Mdn
Tanggal 23 Januari 2024 — Penggugat:
MURNIDA
Tergugat:
1.YAYASAN BAHTERA NUH
2.YUSUF PALAN HUTAJULU
157
  • 1.207,25 (seribu dua ratus tujuh koma dua puluh lima) meter persegi yang terletak di Lingkungan XVI, Kelurahan Simpang Selayang, Kecamatan Medan Tuntungan, Kota Medan, Provinsi Sumatera Utara, yang batas-batasnya sebagai berikut:
    • Sebelah Utara berbatas dengan tanah Kontan Br Ginting, sepanjang 29 meter;
    • Sebelah Selatan berbatasan dengan tanah Anthony Tarigan, sepanjang 36 meter/4,6 meter;
    • Sebelah Timur berbatasan dengan tanah Rumah Doa Bahtera Nuh, sepanjang 53,50
Register : 12-07-2010 — Putus : 14-04-2011 — Upload : 05-03-2015
Putusan PN PADANG Nomor 70/Pdt.G/2010/PN Pdg
Tanggal 14 April 2011 — ZAINIR MAN CS melawan AGUS P
7114
  • ., ) = Rp 481.457,5.B4 (53,50 m? x Rp 8.202, ) = Rp 438.887,196. BS (112 m? x Rp 8.202, ) = Rp 918.624,7. Cl (39 m? x Rp 8.202, ) =Rp 319.878,8 .C2 (54m? x Rp 8.202, ) =Rp 442.908,9. C3 ( 65 m? x Rp 8.202, ) =Rp 33.130,10. C4( 63m2 x Rp 8.202 , ) =Rp 516.726,11. C7 (45 m? x Rp 8.202, ) = Rp 369,090.Jumlah =Rp 5.427.343,d. Biaya Bangunan menurut realisasi unum ( RAB ) Rencana Anggaran Realisasi;1. Al (51 m? x Rp 2.200.000, ) =Rp 112.200.000,2. B1 (71 m? x Rp 2.200.000. ) =Rp 156.200.000,3.
Register : 08-08-2017 — Putus : 14-09-2017 — Upload : 27-12-2019
Putusan PA JAKARTA SELATAN Nomor 335/Pdt.P/2017/PA.JS
Tanggal 14 September 2017 — Pemohon melawan Termohon
275
  • lineTypesv0fspsn lineWidth sv 0spsn lineDashing sv 0spsnfArrowheadsOKsv 1spsn fLinesv 1spsn lidRegroupsv0spsn dhgt sv 251660288 spsn fLayoutInCell sv 1spsn fLayoutInCell sv 1shp*shpinstshplid1042spsn relLeft sv 905spsn relTop sv455spsn relRight sv 1035spsn relBottom sv 533spsnfRelFlipH sv 0spsn fRelFlipV sv 0spsn shapeTypesv 0spsn geoRightsv 130spsn geoBottomsv 78spsn shapePath sv 4spsn pVerticies sv 8;18;(130,0);(115,4);(98,10);(82,17);(65,25);(50,33);(37,42);(27,47);(20,52):(18,53);(0,78);(25,64);(53,50
Register : 16-11-2023 — Putus : 15-12-2023 — Upload : 15-12-2023
Putusan PTA MEDAN Nomor 112/Pdt.G/2023/PTA.Mdn
Tanggal 15 Desember 2023 — Identitas Pihak Tidak Dipublikasi
1140
  • 2;, yang terletak di Kelurahan Hutabulu Mejan, Kecamatan Balige, Kabupaten Toba Samosir, Propinsi Sumatera Utara, dengan ukuran dan batas-batas sebagai berikut:
    • Sebelah Barat, dengan ukuran 53,92 meter, berbatasan dengan tanah Pangihutan Hutagaol;
    • Sebelah Timur, dengan ukuran 53,92 meter, berbatasan dengan tanah Herri Hutagaol dan Bundar;
    • Sebelah Utara, dengan ukuran 53,50 meter, berbatasan dengan tanah Rudi Hutagaol;
    • Sebelah Selatan, dengan ukuran
      53,50 meter, berbatasan dengan tanah Mukri Freddy Simamora.
Register : 16-09-2016 — Putus : 03-01-2017 — Upload : 19-12-2019
Putusan PA JAKARTA SELATAN Nomor 0359/Pdt.P/2016/PA.JS
Tanggal 3 Januari 2017 — Pemohon melawan Termohon
181
  • lineTypesv0fspsn lineWidth sv 0spsn lineDashing sv 0spsnfArrowheadsOKsv 1spsn fLinesv 1spsn lidRegroupsv0spsn dhgt sv 251660288 spsn fLayoutInCell sv 1spsn fLayoutInCell sv 1shp*shpinstshplid1042spsn relLeft sv 905spsn relTop sv455spsn relRight sv 1035spsn relBottom sv 533spsnfRelFlipH sv 0spsn fRelFlipV sv 0spsn shapeTypesv 0spsn geoRightsv 130spsn geoBottomsv 78spsn shapePath sv 4spsn pVerticies sv 8;18;(130,0);(115,4);(98,10);(82,17);(65,25);(50,33);(37,42);(27,47);(20,52):(18,53);(0,78);(25,64);(53,50
Register : 08-11-2016 — Putus : 30-11-2016 — Upload : 18-12-2019
Putusan PA JAKARTA SELATAN Nomor 443/Pdt.P/2016/PA.JS
Tanggal 30 Nopember 2016 — Pemohon melawan Termohon
313
  • lineTypesv0fspsn lineWidth sv 0spsn lineDashing sv 0spsnfArrowheadsOKsv 1spsn fLinesv 1spsn lidRegroupsv0spsn dhgt sv 251660288 spsn fLayoutInCell sv 1spsn fLayoutInCell sv 1shp*shpinstshplid1042spsn relLeft sv 905spsn relTop sv455spsn relRight sv 1035spsn relBottom sv 533spsnfRelFlipH sv 0spsn fRelFlipV sv 0spsn shapeTypesv 0spsn geoRightsv 130spsn geoBottomsv 78spsn shapePath sv 4spsn pVerticies sv 8;18;(130,0);(115,4);(98,10);(82,17);(65,25);(50,33);(37,42);(27,47);(20,52):(18,53);(0,78);(25,64);(53,50
Register : 11-04-2016 — Putus : 26-05-2016 — Upload : 18-12-2019
Putusan PA JAKARTA SELATAN Nomor 0149/Pdt.P/2016/PA.JS
Tanggal 26 Mei 2016 — Pemohon melawan Termohon
210
  • lineTypesv0fspsn lineWidth sv 0spsn lineDashing sv 0spsnfArrowheadsOKsv 1spsn fLinesv 1spsn lidRegroupsv0spsn dhgt sv 251660288 spsn fLayoutInCell sv 1spsn fLayoutInCell sv 1shp*shpinstshplid1042spsn relLeft sv 905spsn relTop sv455spsn relRight sv 1035spsn relBottom sv 533spsnfRelFlipH sv 0spsn fRelFlipV sv 0spsn shapeTypesv 0spsn geoRightsv 130spsn geoBottomsv 78spsn shapePath sv 4spsn pVerticies sv 8;18;(130,0);(115,4);(98,10);(82,17);(65,25);(50,33);(37,42);(27,47);(20,52):(18,53);(0,78);(25,64);(53,50
Register : 15-07-2016 — Putus : 15-08-2016 — Upload : 19-12-2019
Putusan PA JAKARTA SELATAN Nomor 0262/Pdt.P/2016/PA.JS
Tanggal 15 Agustus 2016 — Pemohon melawan Termohon
230
  • lineTypesv0spsn lineWidth sv 0spsn lineDashing sv 0spsnfArrowheadsOKsv 1spsn fLinesv 1spsn lidRegroupsv0spsn dhgt sv 251660288spsn fLayoutInCell sv 1spsn fLayoutInCell sv 1shp*shpinstshplid1042spsn relLeft sv 905spsn relTopsv455spsn relRightsv 1035spsn relBottom sv 533spsnfRelFlipH sv 0spsn fRelFlipVsv 0spsn shapeTypesv 0spsn geoRightsv 130spsn geoBottomsv 78spsn shapePathsv 4spsn pVerticies sv 8;18;(130,0);(115,4);(98,10);(82,17);(65,25);(50,33);(37,42);(27,47);(20,52):(18,53);(0,78);(25,64);(53,50
Register : 12-05-2017 — Putus : 15-06-2017 — Upload : 27-12-2019
Putusan PA JAKARTA SELATAN Nomor 209/Pdt.P/2017/PA.JS
Tanggal 15 Juni 2017 — Pemohon melawan Termohon
270
  • lineTypesv0fspsn lineWidth sv 0spsn lineDashing sv 0spsnfArrowheadsOKsv 1spsn fLinesv 1spsn lidRegroupsv0spsn dhgt sv 251660288 spsn fLayoutInCell sv 1spsn fLayoutInCell sv 1shp*shpinstshplid1042spsn relLeft sv 905spsn relTop sv455spsn relRight sv 1035spsn relBottom sv 533spsnfRelFlipH sv 0spsn fRelFlipV sv 0spsn shapeTypesv 0spsn geoRightsv 130spsn geoBottomsv 78spsn shapePath sv 4spsn pVerticies sv 8;18;(130,0);(115,4);(98,10);(82,17);(65,25);(50,33);(37,42);(27,47);(20,52):(18,53);(0,78);(25,64);(53,50
Register : 13-09-2016 — Putus : 25-10-2016 — Upload : 19-12-2019
Putusan PA JAKARTA SELATAN Nomor 0349/Pdt.P/2016/PA.JS
Tanggal 25 Oktober 2016 — Pemohon melawan Termohon
288
  • lineTypesv0fspsn lineWidth sv 0spsn lineDashing sv 0spsnfArrowheadsOKsv 1spsn fLinesv 1spsn lidRegroupsv0spsn dhgt sv 251660288 spsn fLayoutInCell sv 1spsn fLayoutInCell sv 1shp*shpinstshplid1042spsn relLeft sv 905spsn relTop sv455spsn relRight sv 1035spsn relBottom sv 533spsnfRelFlipH sv 0spsn fRelFlipV sv 0spsn shapeTypesv 0spsn geoRightsv 130spsn geoBottomsv 78spsn shapePath sv 4spsn pVerticies sv 8;18;(130,0);(115,4);(98,10);(82,17);(65,25);(50,33);(37,42);(27,47);(20,52):(18,53);(0,78);(25,64);(53,50
Register : 21-12-2016 — Putus : 02-02-2017 — Upload : 19-12-2019
Putusan PA JAKARTA SELATAN Nomor 514/Pdt.P/2016/PA.JS
Tanggal 2 Februari 2017 — Pemohon melawan Termohon
231
  • lineTypesv0spsn lineWidth sv 0spsn lineDashing sv 0spsnfArrowheadsOKsv 1spsn fLinesv 1spsn lidRegroupsv0spsn dhgt sv 251660288spsn fLayoutInCell sv 1spsn fLayoutInCell sv 1shp*shpinstshplid1042spsn relLeft sv 905spsn relTopsv455spsn relRightsv 1035spsn relBottom sv 533spsnfRelFlipH sv 0spsn fRelFlipVsv 0spsn shapeTypesv 0spsn geoRightsv 130spsn geoBottomsv 78spsn shapePathsv 4spsn pVerticies sv 8;18;(130,0);(115,4);(98,10);(82,17);(65,25);(50,33);(37,42);(27,47);(20,52):(18,53);(0,78);(25,64);(53,50
Register : 11-03-2016 — Putus : 18-04-2016 — Upload : 18-12-2019
Putusan PA JAKARTA SELATAN Nomor 0108/Pdt.P/2016/PA.JS
Tanggal 18 April 2016 — Pemohon melawan Termohon
2711
  • lineTypesv0fspsn lineWidth sv 0spsn lineDashing sv 0spsnfArrowheadsOKsv 1spsn fLinesv 1spsn lidRegroupsv0spsn dhgt sv 251660288 spsn fLayoutInCell sv 1spsn fLayoutInCell sv 1shp*shpinstshplid1042spsn relLeft sv 905spsn relTop sv455spsn relRight sv 1035spsn relBottom sv 533spsnfRelFlipH sv 0spsn fRelFlipV sv 0spsn shapeTypesv 0spsn geoRightsv 130spsn geoBottomsv 78spsn shapePath sv 4spsn pVerticies sv 8;18;(130,0);(115,4);(98,10);(82,17);(65,25);(50,33);(37,42);(27,47);(20,52):(18,53);(0,78);(25,64);(53,50
Register : 07-11-2016 — Putus : 06-12-2016 — Upload : 19-12-2019
Putusan PA JAKARTA SELATAN Nomor 439/Pdt.P/2016/PA.JS
Tanggal 6 Desember 2016 — Pemohon melawan Termohon
270
  • lineTypesv0fspsn lineWidth sv 0spsn lineDashing sv 0spsnfArrowheadsOKsv 1spsn fLinesv 1spsn lidRegroupsv0spsn dhgt sv 251660288 spsn fLayoutInCell sv 1spsn fLayoutInCell sv 1shp*shpinstshplid1042spsn relLeft sv 905spsn relTop sv455spsn relRight sv 1035spsn relBottom sv 533spsnfRelFlipH sv 0spsn fRelFlipV sv 0spsn shapeTypesv 0spsn geoRightsv 130spsn geoBottomsv 78spsn shapePath sv 4spsn pVerticies sv 8;18;(130,0);(115,4);(98,10);(82,17);(65,25);(50,33);(37,42);(27,47);(20,52):(18,53);(0,78);(25,64);(53,50
Putus : 20-11-2015 — Upload : 29-08-2017
Putusan PN GORONTALO Nomor 18/Pid.Sus-TPK/2015/PN Gto
Tanggal 20 Nopember 2015 — - SAFWAN DJAMIL, S.Pd
18052
  • Bulan ke 4 periode 22 Agustus 2014 s/d 18 September 2014 rencanafisik 53,50%, realisasi lapangan 45,13%, sehingga deviasi sebesar 8,37%.5. Bulan ke 5 periode 19 September s/d 16 Oktober 2014 rencanafisik76,16%, realisasi lapangan 66,8%, sehingga deviasi sebesar 9,36%;6. Bulan ke 6 periode 17 Oktober 2014 s/d 13 November 2014 rencanafisik 94,06%, realisasi lapangan 90,86%, sehingga deviasi sebesar 3,2%;7.
    Bulan ke 4 periode 22 Agustus 2014 s/d 18 September 2014rencana fisik 53,50%, realisasi lapangan 45,13%, sehinggan deviasisebesar Bahwa proses pengawasan tetap dilkukan walaupun tidakada Adendum terhadap kontrak saksi. Dan laporan hasil pelaksanaanpekerjaan tetap dilaporkan kepada PPK samapai dengan tanggal 15Desember 2014.;5. Bulan ke 5 periode 19 September s/d 16 Oktober 2014 rencana fisik76,16%, realisasi lapangan 66,8%, sehinggan deviasi sebesar 9,36%;6.
    pada proyek tersebut sebagai berikut :1.Bulan pertama periode 30 Mei 2014 s/d 26 Juni 2014 rencana fisik4,97%, realisasi lapangan 4,18%, sehinggan deviasi sebesar 0,79%;Bulan ke 2 periode 27 Juni 2014 s/d 24 Juli 2014 rencanafisik15,14%, realisasi lapangan 12,42%, sehinggan deviasi sebesar 2,72%;Bulan ke 3 periode 25 Juli 2014 s/d 21 Agustus 2014 rencana fisik32,35%, realisasi lapangan 28,79%, sehinggan deviasi sebesar 3,56%;Bulan ke 4 periode 22 Agustus 2014 s/d 18 September 2014rencana fisik 53,50%
Putus : 13-12-2007 — Upload : 03-04-2008
Putusan MAHKAMAH AGUNG Nomor 424PK/PDT/2007
Tanggal 13 Desember 2007 — PEMERINTAH PROPINSI KALIMANTAN TIMUR ; PT. KALTIM PRIMA COAL ; RIO TINTO plc ; BP pIc ; PACIFIC RESOURCES INVESTMENTS LIMITED ; SANGATTA HOLDINGS LIMITED ; BP INTERNATIONAL LIMITED ; KALIMANTAN COAL LIMITED ; PT. BUMI RESOURCES TBK ; H. MAHYUDIN, ST, MM ; PURNOMO YUSGIANTORO ; DJOKO DARMONO ; SIMON F. SEMBIRING ; DOROJATUN KUNTJOROJAKTI ; ABURIZAL BAKRIE
212226 Berkekuatan Hukum Tetap
  • telah atau diperkirakan dibagikan Tergugat danseharusnya dibagi "Kepada dan diterima oleh para Penggugat,khususnya Penggugat Il, berdasarkan data Direktorat Batubara,Direktorat Jenderal Geologi dan Sumber Daya Mineral, yangditabulasikan di bawah ini :LABA BERSIH KPC (in casu TERGUGAT 1) SETELAH PAJAK(dalam US$ juta)TAHUN LABA BERSIH DIVIDEN YANG SEHARUSNYA DIBAGI1995 139,30 0 % (US$ 0)1996 155,40 15 % (US$ 23,31)1997 127,20 23 % (US$ 29,26)1998 131,30 30 % (US$ 39,39)1999 77,50 37 % (US$ 28,68)2000 53,50