Ditemukan 42 data

Urut Berdasarkan
 
Putus : 20-02-2018 — Upload : 19-09-2018
Putusan PN SAMARINDA Nomor 49/Pid.Sus-TPK/2017/PN.Smr
Tanggal 20 Februari 2018 —
8923
  • reservoir ND 300 mm buah 4.00 2,607,070.00 10,428,280.00 4.00 2,607,070.00 0.00 10,428,280.00Inlet pompa backwash ND 300Kam buah 1.00 2,607,070.00 2,607,070.00 1.00 2,607,070.00 0.00 2,607,070.00Outlet pompa backwash ND 250mm buah 1.00 2,035,930.00 2,035,930.00 1.00 2,035,930.00 0.00 2,035,930.00Outlet blower ND 100 mm buah 1.00 838,680.00 838,680.00 1.00 838,680.00 0.00 838,680.00Tutup manhole dari plat baja t=34.3 mm dengan rangka besi siku unit 4.00 2,375,090.00 2.00 2,375,090.00 4,750,180.00 4,750
    ND 300 mm buah 4.00 2,607,070.00 10,428, 280.00 4.00 2,607,070.00 0.00 10,428, 280.00Inlet pompa backwash ND300 rm buah 1.00 2,607,070.00 2,607,070.00 1.00 2,607,070.00 0.00 2,607,070.00Outlet pompa backwash ND250 mm buah 1.00 2,035,930.00 2,035,930.00 1.00 2,035,930.00 0.00 2,035,930.00Outlet blower ND 100 mm buah 1.00 838,680.00 838,680.00 1.00 838,680.00 0.00 838,680.00Tutup manhole dari plat baja4.3 t=3 mm dengan rangka besi unit 4.00 2,375,090.00 9.500.360.00 2.00 2,375,090.00 4,750,180.00 4,750
Register : 23-07-2018 — Putus : 16-05-2019 — Upload : 08-07-2019
Putusan PN MANADO Nomor 25/Pid.Sus-TPK/2018/PN Mnd
Tanggal 16 Mei 2019 — - HANDRIE MARTHEN JOHNSON KOMALING, S.H.
10325
  • dari 357 halaman Putusan Nomor 25/Pid.SusTPK/2018/PN.Mnd No Uraian Sa Negoisasi Pemeriksaan Politeknik SelisihPekerj t Negeri Bandungaan Vol Harga Jumlah Vol Harga Jumlah Vol Harga Jumum satuan Harga um satuan Harga um satua lahe (Rp) (Rp) e (Rp) (Rp) e n Har(Rp) ga(Rp)1 2 3 4 5 6 7 8 9 10 11 12A PekerjaanPersiapan1 Mobilis Ls 1.0 10,000,0 10,000,0 1.0 10,000,0 10,000,0 10,00 asi dan 0 00.00 00.00 0 00.00 00.00 0,000demobi .00lisasiperalatan2 Pembu Ls 1.0 4,750,00 4,750,00 1.0 4,750,00 4,750,00 4,750