Register : 09-07-2019 — Putus : 18-09-2019 — Upload : 20-09-2019
Putusan PN BENGKULU Nomor 37/Pid.Sus-TPK/2019/PN Bgl
Tanggal 18 September 2019 — Penuntut Umum:
RENOL WENDI SH
Terdakwa:
Amran Firozi Bin Abd. Rahman
9950
  • 5.346.000 27,00 150.000 a030.000 1.296.000pasir 4.752.000 24,00 150.000 3.600.000 1.152.000. 2.400.0001 0011 2/KWTT/12.05/2 korai 3.696.000 16,00 150.000 1.296.000P16 tgl: SOM 1/2006 sirtu 1.815.000 11,00 150.000 #2690000 165.000pasir urug 880.000 5,00 150.000 750.000 130.000semen 11.040.000 160,00 65.000 clad 640.0003 (00115/KWT/12.05/20 .6 tg. 22/11/2016 besi8mm 4.200.000 84,00 45.000 3.780.000 420000besi 10 mm 616.000 8,00 75.000 600.000 16.000kawat baton 105.000 7,00 15.000 105.000 0Semen 3.726.000 54,00
    Rp) Vol Harga JumlahSatuan (Rpi (RP)batu 5.346.000 27,00 150.000 *9:909 4 596.000pasir 4.752.000 24,00 150.000 3.600.000 4 152.000, 2.400.000 pouzikwrti2.0512 korai 3.696.000 16,00 150.000 1.296.000Pub gl: SOL ZOLG sirtu 1.815.000 11,00 150.000 1.650.000 165.000pasir urug 880.000 5,00 150.000 750.000 130.000semen 11.040.000 160,00 65.000 a 640.000besi 8mm 4.200.000 84,00 45.000 3.780.000 420 000besi 10 mm 616.000 8,00 75.000 600.000 16.000kawat baton 105.000 7,00 15.000 105.000 0Semen 3.726.000 54,00
Register : 29-07-2019 — Putus : 02-12-2019 — Upload : 18-12-2019
Putusan PN PALEMBANG Nomor 18/Pid.Sus-TPK/2019/PN Plg
Tanggal 2 Desember 2019 — Penuntut Umum:
HERY FADLULLAH, SH
Terdakwa:
AHMAT THOHA, SE. Bin ABIDIN
211152
  • Tambahan Tanah Timbunan 54,00 Me 907.298,00 48.994.092,00Pek. Cerucuk Gelam. @ 12 cm 28,80 M? 72.501,00 2.088.028,80Sub Jumlah 291.584.928,22IV PEKERJAAN LAPISAN ATAP, RANGKA DAN ATAPPek. Lapisan Penutup (Aluminium Composit) 132,80 733.825,00 97.451.960,00Pek. Pasangan Atap Keramic Berglazur 12,25 M? 160.184,64 1.962.261,84Pek.
    Tambahan Tanah Timbunan 54,00 Me 907.298,00 48.994.092,00Pek. Cerucuk Gelam. @ 12 cm 28,80 M? 72.501,00 2.088.028,80Sub Jumlah 291.584.928,22IV PEKERJAAN LAPISAN ATAP, RANGKA DAN ATAPPek. Lapisan Penutup (Aluminium Composit) 132,80 c 733.825,00 97.451.960,00Pek. Pasangan Atap Keramic Berglazur 12,25 M?
Register : 10-11-2011 — Putus : 07-08-2012 — Upload : 14-04-2014
Putusan PN JAKARTA SELATAN Nomor 593/Pdt.G/2011/PN.JKT Sel
Tanggal 7 Agustus 2012 —
9862
  • 167.286.021.917,81Desember 27,68 % 2% 29,68% 31 155.000.000.000 3.907.189.041,10 171.193.210.958,901998 Januari 2839 % 2% 30,39% 31 155.000.000.000 4.000.656.164,38 175.193.867.123,29Februari 31,39 % 2% 33,39% 28 155.000.000.000 3.970.208.219,18 179.164.075.342,47Maret 4633 % 2% 48,33% 31 155.000.000.000 6.362.346.575,34 185.526.421.917,81April 52,33 % 2% 54,33% 30 155.000.000.000 6.921.493.150,68 192.447.915.068,49Mei 57,79 % 2% 59,79% 31 155.000.000.000 7.870.984.931,51 200.318.900.000,00Juni 54,00
Register : 03-10-2018 — Putus : 02-07-2019 — Upload : 11-12-2019
Putusan PN JAKARTA PUSAT Nomor 549/Pdt.G/2018/PN Jkt.Pst
Tanggal 2 Juli 2019 — Penggugat:
1.Nyonya Ipit Patimah
2.Tuan Muslim
3.Tuan Ishak
4.Nyonya Neneng Nuriah
5.Tuan Muhammad Imam Nurjaeni
6.Nyonya Nuraini
7.Nyonya Nurhasanah
8.Nyonya Nurhayati
Tergugat:
1.PT DUTA PERTIWI TBK
2.Kantor Pertanahan Kota Admistratif Jakarta Pusat
226671
  • Pst 14 11 54,00 18/05/20 GG. SUBUR Vill A 23 RT.008/11 1437 1683 BOYORATI 0 10 RW.00614 TL 19.94 15/09/19 JL. SUBUR IX/23RT.002/12 1432 1293 LIM MELINA 0 98 RW.O1114) TL 25.00 06/11/19 GG. SUBUR X/ 18 RT.002/13 1433 1291 BUNTIN TJE 0 97 RW.01114 TL 284.9 06/09/19 JL. SUBUR BARU/ 12 RT.002/14 1434 88 ANTHONY LAM 60. 95 RW.011T4 TI y39g HASAN KASIM 27.50 20/04/20 GG. SUBUR IX/ 12 RT.002/15 1435 TUTIYANI 0 00 RW.01114) TL 20.00 10/07/19te tag 30 EMED SUHARDI O GG SUBUR X RT.002 / RW.01114 Tl
Putus : 27-03-2012 — Upload : 15-05-2012
Putusan PN BANGKO Nomor 60/Pid.B/2011/PN-BK
Tanggal 27 Maret 2012 — Ridwan Bin Abdul Muin
9723
  • Devisi 8 Pengembalian kondisi dan pekerjaan minorPatok Pengarah : 20,00 BhCat Tembok : 76,65 M2Cat Minyak : 54,00 M2Waktu penyelesaian pekerjaan dihitung sejak tanggal 06 Mei 2008 sampaidengan 01 Nopember 2008 adalah 180 hari (seratus delapan puluh) harikalender dan masa pemeliharaan 180 (seratus delapan puluh) hari kalender.Pihak kedua wajib melaksanakan, menyelesaikan dan memperbaikipekerjaan secara cermat, akurat dan penuh tanggungjawab dengan63menyediakan tenaga kerja, bahanbahan, peralatan,
Register : 04-04-2019 — Putus : 23-07-2019 — Upload : 25-07-2019
Putusan PN KENDARI Nomor 7/Pid.Sus-TPK/2019/PN Kdi
Tanggal 23 Juli 2019 — Penuntut Umum:
BUSTANIL N. ARIFIN, SH
Terdakwa:
SYAWAL TOMBILI
6042
  • Kolom M 5.047. 3.028.Teras (K1) : 0,60 005,00 203,00Pek Ringbalk84. 4.572.4 10 x 15 pc: M'54,00 670,00 180,002psr : 3krlPek RabatBeton DalamM 545. 1.346.5 1Pc : 3Psr :3 2,47 831,75 021,095Krl, tbl = 6cmIl.3.PEKERJAAN DINDING DAN PLESTERANPek = DindingTembok 1/2 M 59. 7.443.1 125,3Bata 1Pc : 2 4 388,00 691,925PsrPek PlesteranM 9. 2.471.2 Tembok, 1Pc : 250,62 859,20 504,265Psr 8ll.4.PEKERJAAN LANTAIPas TegelA Keramik M 105. 4.339.Lantai Uk. 40 e 41,17 395,00 112,15x 40Pas.
Register : 25-03-2015 — Putus : 10-08-2015 — Upload : 15-01-2016
Putusan PN KUPANG Nomor 20/Pid.Sus-TPK/2015/PN.Kpg
Tanggal 10 Agustus 2015 — ZAKARIAS HERIANDO SIKU, ST Alias HERI SIKU
7932
  • 127.050,0 tunggal 0Kotak Unit 1,00 30,00 30,00 355.000,0 10.650.00 sekring 0 0,00Arde M 6,00 180,00 120,00 60,00 90.000,00 10.800.00 5.400.000,0,00 00Stop Titk 1,00 30,00 30,00 4.840,00 145.200,0 kontak 0Jumlah VI 46.359.45 17.400.000,00 0,00Vil PEKERJAANPENGECATANMengecat M2 205,00 6.150,00 /4.129,04 2.020,96 16.560,33 68.378.24 33.467.75tembok 4,34 4,41danplafonddenganMatexMengecat M2 20,10 603,00 130,68 472,32 29.343,62 3.834.623, 13.859.57listplank, 61 6,24jelusidengancat EmcoMengecat M2 1,80 54,00
Putus : 16-02-2016 — Upload : 22-11-2016
Putusan PN SEMARANG Nomor 138/Pid.Sus-TPK /2015/PN Smg
Tanggal 16 Februari 2016 — SINARMAN Amd Bin SUWANDI (TERDAKWA)
7124
  • juga melakukan Pemeriksaan Fisik yang dilakukan padatanggal 17 April 2014, sehingga menurut UndangUndang BPKmerupakan lembaga yang berwenang secara akuntabilitas.Menimbang, bahwa atas pemeriksaan fisik tersebut dilaksanakanpada bulan April 2014 (penyerahan pekerjaan Desember 2013, sehinggahasil pemeriksaan fisiknya lebih akurat dibandingkan pemeriksaan yangdilakukan ahli dari UNNES yaitu 4 Maret 2015/2 tahun setelah serahterima pekerjaan.Menimbang, bahwa atas kekurangan volume hasil temuansebesar 54,00
Register : 19-02-2019 — Putus : 08-07-2019 — Upload : 14-11-2019
Putusan PN JAMBI Nomor 12/Pid.Sus-TPK/2019/PN Jmb
Tanggal 8 Juli 2019 — Penuntut Umum:
AHMAD FAUZAN, SH
Terdakwa:
RIDWAN Bin JIDIN
16452
  • Engsel pintu Bh 54,00 48,00 (6,00)3 Pas. Grendel pintu Bh 16,00 0,00 (16,00)4 Pas. Engsel jendela Bh 80,00 88.00 8,005 Pas. Grendel jendela Bh 40,00 44,00 4,006 Pas. Kait angin Bh 80,00 88,00 8,007 Pas. Tangan jendela Bh 40,00 44,00 4,00Vil. PEK. RANGKAATAP DAN ATAP GENTENG METAL1 Pek. Konstruksi rangka atap baja M2 320,31 372 51,69ringan + atap genteng metal2 Pek. Papan singap M2 9,45 45 (4,95)3 Pek. Papan list plank M 89,50 92 2,504 Pek.
Register : 01-02-2021 — Putus : 24-02-2021 — Upload : 26-02-2021
Putusan PT JAKARTA Nomor 4/PID.TPK/2021/PT DKI
Tanggal 24 Februari 2021 — Pembanding/Penuntut Umum : Rachdityo Pandu, W, SH
Terbanding/Terdakwa : Heru Hidayat
16951528
  • 15.873.322.000,0021.301.731.8 3.177.8224 POLA 12.129.100 75,00 4.200,00 18.123.907.675,00623.745.0 666.33 42.585.000,025 PTBA 250.500 00,00 0.000,00 0898.193.5 798.7526 RALS 750.000 80,00 0.000,00 99.443.580,008.866.345.3 1.420.0127 SMRU 28.400.300 10,19 5.000,00 7.446.330.310,1916.281.627.3 2.167.5028 SUGI 43.350.100 62,27 5.000,00 14.114.122.362,271.842.931.4 1.834.9629 TINS 2.224.200 30,00 5.000,00 7.966.430,0019.640.565.5 18.533.9430 TLKM 4.668.500 18,39 5.000,00 1.106.620.518,391.744.844.9 1.724.1531 UNTR 80.100 54,00
Register : 01-02-2021 — Putus : 24-02-2021 — Upload : 26-02-2021
Putusan PT JAKARTA Nomor 4/PID.TPK/2021/PT DKI
Tanggal 24 Februari 2021 — Pembanding/Penuntut Umum : Rachdityo Pandu, W, SH
Terbanding/Terdakwa : Heru Hidayat
18202671
  • 15.873.322.000,0021.301.731.8 3.177.8224 POLA 12.129.100 75,00 4.200,00 18.123.907.675,00623.745.0 666.33 42.585.000,025 PTBA 250.500 00,00 0.000,00 0898.193.5 798.7526 RALS 750.000 80,00 0.000,00 99.443.580,008.866.345.3 1.420.0127 SMRU 28.400.300 10,19 5.000,00 7.446.330.310,1916.281.627.3 2.167.5028 SUGI 43.350.100 62,27 5.000,00 14.114.122.362,271.842.931.4 1.834.9629 TINS 2.224.200 30,00 5.000,00 7.966.430,0019.640.565.5 18.533.9430 TLKM 4.668.500 18,39 5.000,00 1.106.620.518,391.744.844.9 1.724.1531 UNTR 80.100 54,00