Ditemukan 2835 data

Urut Berdasarkan
 
Register : 18-06-2020 — Putus : 22-09-2020 — Upload : 24-09-2020
Putusan PN KENDARI Nomor 18/Pid.Sus-TPK/2020/PN Kdi
Tanggal 22 September 2020 — Penuntut Umum:
ANDI MUHAMMAD DEDI HIDAYAT, S.H.
Terdakwa:
LA WAWE Bin LA NGGARI
172130
  • 1,00 2,00 2,00 batang Tetap3 inci9 PapanProyek 1,00 1,00 1,00 Is Tetap10 Prasasti 1,00 1,00 1,00 buah Tetaptt ALAT1 Katrol 1,00 1,00 2,00 2,00 buah Tetap2 Tali Timba 12,00 12,00 24,00 24,00 : m Tetap3 Mesin Alcon 1,00 1,00 2,00 2,00 buah Tetap Halaman ke 9 dari 106 halaman, Putusan Perkara Nomor 18/Pid.SusTPK/2020/PN.
    Kdi 7 Coa Mi 0,07 0,82 0,89 0,88 0,01 m3 Bertambahg, Pipa Paralon 1,00 1,00 2,00 2,00 batang Tetap3 inci9 PapanProyek 1,00 1,00 1,00 Is Tetap10 Prasasti 1,00 1,00 1,00 buah TetapIl ALAT1 Katrol 1,00 1,00 2,00 2,00 buah Tetap2 Tali Timba 12,00 12,00 24,00 24,00 m Tetap3 Mesin Alcon 1,00 1,00 2,00 2,00 buah Tetap4 Ember Cor 4,00 4,00 8,00 8,00 buah Tetap5 Sekop 1,00 1,00 2,00 2,00 buah Tetap6 Pacul 1,00 1,00 2,00 2,00 buah Tetap7 pendok 1,00 1,00 2,00 2,00 : buah TetapIi UPAH1 Pekerja 16,93 31,38 48,31
    1,00 2,00 2,00 batang Tetap3 inci9 PapanProyek 1,00 1,00 1,00 Is Tetap10 Prasasti 1,00 1,00 1,00 buah TetapIl ALAT1 Katrol 1,00 1,00 2,00 2,00 buah Tetap2 Tali Timba 12,00 12,00 24,00 24,00 m Tetap3 Mesin Alcon 1,00 1,00 2,00 2,00 buah Tetap4 Ember Cor 4,00 4,00 8,00 8,00 buah Tetap5 Sekop 1,00 1,00 2,00 2,00 buah Tetap6 Pacul 1,00 1,00 2,00 2,00 buah Tetapgf menidels 1,00 1,00 2,00 2,00 : buah TetapPlesterIll UPAH1 Pekerja 16,93 31,38 48,31 114,00 65,69 HOK Berkurang2 Tukang 6,94 12,59 19,53 24,06
    Kdi Balok Kayu2 8/12 Klas I 0,30 0,40 0,69 0,16 0,53 m3 Bertambah3 Paku Campur 5,87 11,72 17,58 2,20 15,38 kg Bertambah4 Semen Portland 13,47 24,67 38,14 23,88 14,26 zak Bertambah5 BatuPecah 12 1,60 2,81 4,41 2,00 2,41 m3 Bertambah(Manual)g PasirPasang/ 1,26 2,34 3,60 5,32 1,72 m3 BerkurangBeton7 Kayullas IT 0,07 0,82 0,89 0,88 0,01 m3 Bertambah(Papan)8 ae Rauailon & 1,00 1,00 2,00 2,00 batang Tetap9 PapanProyek 1,00 1,00 1,00 ls Tetap10 Prasasti 1,00 1,00 1,00 buah TetapIl ALAT1 Katrol 1,00 1,00
    2,00 2,00 buah Tetap2 Tali Timba 12,00 12,00 24,00 24,00 m Tetap3 Mesin Alcon 1,00 1,00 2,00 2,00 buah Tetap4 Ember Cor 4,00 4,00 8,00 8,00 buah Tetap5 Sekop 1,00 1,00 2,00 2,00 buah Tetap6 Pacul 1,00 1,00 2,00 2,00 buah Tetap7 Sendok Plester 1,00 1,00 2,00 2,00 buah TetapIll UPAH1 Pekerja 16,93 31,38 48,31 114,00 65,69 HOK Berkurang2 Tukang 6,94 12,59 19,53 24,06 4,53 HOK Berkurang Menimbang, bahwa terhadap item pekerjaan pengadaan 10 (Sepuluh) buahtenda jadi dan 2 (dua) buah meja hidangan, terdakwa
Putus : 23-04-2013 — Upload : 21-10-2013
Putusan MAHKAMAH AGUNG Nomor 358 K/Pid.Sus/2013
Tanggal 23 April 2013 — RIZAL EFENDI, A.Md bin AMAN JAUHARI
2511 Berkekuatan Hukum Tetap
  • Biaya Dokumentasi 1,00 Ls 100.000,00 150.000,002. Penggandaan Dokumen 1,00 Ls 250.000,00 250.000,003. Biaya P3K 1,00 Ls 450.000,00 450.000,004. Biaya Adm & Kantor 1,00 Ls 4.000.000,00 4.000.000,005. Meja + Kursi Siswa 60,00 Unit 500.000,00 30.000.000,006. Meja + Kursi Guru 2,00 Unit 750.000,00 1.500.000,007. Lemari Kelas 2,00 Bh /1.500.000,00 3.000.000,008. IMB 2,50 % Ls 252.536.587,39 6.313.414,68Jumlah 45.663.414,68 Hal. 6 dari 41 hal. Put.
    Kunci Pintu 1,00 Unit 141.351,76 141.351,763. Pek. Engsel 3 2,00 Bh 11.835,98 23.671 ,964. Pek. Engsel 4 1,00 Bh 15.318,16 15.318,165. Pas. Grendel Jendela 2,00 Unit 10.943,24 21.886,486. Pas. Hak Angin + Hendel Jendela 2,00 Ls 10.943,24 21.886,48Jumlah 713.362,40Vi. PEKERJAAN LISTRIK15 Pek. Instalasi titik lampu 1,00 Ttk 100.000,00 1.000.000,002. Pek. Saklar Tunggal 1,00 Bh 42.000,00 42.000,003. Pek. Lampu SL 18 watt + Fitting 1,00 Unit 42.000,00 42.000,00Jumlah 184.000,00Vil.
    Biaya Dokumentasi 1,00 Ls 100.000,00 150.000,002. Penggandaan Dokumen 1,00 Ls 250.000,00 250.000,003. Biaya P3K 1,00 Ls 450.000,00 450.000,004. Biaya Adm & Kantor 1,00 Ls 4.000.000,00 /4.000.000,005. Meja + Kursi Siswa 60,00 Unit /500.000,00 30.000.000,00 Hal. 17 dari 41 hal. Put. No. 358 K/Pid.Sus/2013 6. Meja + Kursi Guru 2,00 Unit 750.000,00 1.500.000,00Ts Lemari Kelas 2,00 Bh 1.500.000,00 3.000.000,008.
    Kunci Pintu 1,00 Unit 141.351,76 141.351,763. Pek. Engsel 3 2,00 Bh 11.835,98 23.671 ,964. Pek. Engsel 4 1,00 Bh 15.318,16 15.318,165. Pas. Grendel Jendela 2,00 Unit 10.943,24 21.886,486. Pas. Hak Angin + Hendel Jendela 2,00 Ls 10.943,24 21.886,48Jumlah 713.362,40Vi. PEKERJAAN LISTRIK1, Pek. Instalasi titik lampu 1,00 Ttk 100.000,00 1.000.000,002. Pek. Saklar Tunggal 1,00 Bh 42.000,00 42.000,003 Pek. Lampu SL 18 watt + Fitting 1,00 Unit 42.000,00 42.000,00Jumlah 184.000,00Vil. /PEKERJAAN CAT1.
    Meja + Kursi 1,00 Unit 700.000,00 700.000,002. Lembari Obat 1,00 Bh 1.500.000,00 1.500.000,003. Ranjang UKS + Kasur dan Bantal 1,00 Unit 1.700.000,00 1.700.000,00 Hal. 19 dari 41 hal. Put. No. 358 K/Pid.Sus/2013 4.
Register : 19-01-2018 — Putus : 19-02-2018 — Upload : 22-08-2019
Putusan PT PADANG Nomor 2/PID.TPK/2018/PT PDG
Tanggal 19 Februari 2018 — Pembanding/Penuntut Umum : VANANDA PUTRA, SH
Terbanding/Terdakwa : WEKY THENY Pgl WIKY
14749
  • Refrigeneration Compressor MYCOM N6WA 1,00 SetJapan2. Cooling Towet Liang Chi LBC 60 1,00 Set3. Horizontal Sheel and Tube Condensor 1,00 Set4. Herring bone Coil Evaporator 1,00 Set5. Liquid Scpratur / Sucdon Trap 1,00 Set6. Accumulator 1,00 Set7. Oil separator 1,00 Set8. Amonia Receiver 1,00 SetS. Corresponding Ammonia Pipes, Pipe Fitting and 1,00 SetValves (stop, expansion, check, float, sapety) forRefrigerant Lines10. Brine Tank 1,00 Set11.
    Insulation for Brine Tank, Suction Trap, 1,00 SetAccumulator and Piping12. Wooden Cover for Brine Tank 1,00 Set13. Brine Agitator 1,00 Set14. Can Filling Device for 10 Ice Cans 1,00 Set15. Tipping Device/Can Dumper 1,00 Set16. Can Grid/Ice Can Frame 1,00 Set17. Overhead Travelling Crane with Hoist & Hoist 1,00 SetJoke Bar18. Pipes/Fitting and Galvanized Valves for Water 1,00 SetLines19. Ice Can Square 50 Kg 200 Set20. Pum and electromotor for Condenser 1,00 Set21.
    Refrigeneration Compressor MYCOM N6WA 1,00 SetJapan2. Cooling Towet Liang Chi LBC 60 1,00 SetBh Horizontal Sheel and Tube Condensor 1,00 Set4. Herring bone Coil Evaporator 1,00 Set5, Liquid Scpratur / Sucdon Trap 1,00 Set6. Accumulator 1,00 Setts Oil separator 1,00 Set8. Amonia Receiver 1,00 Set9. Corresponding Ammonia Pipes, Pipe Fitting and 1,00 SetValves (stop, expansion, check, float, sapety) forRefrigerant Lines10. Brine Tank 1,00 Set11.
    Insulation for Brine Tank, Suction Trap, 1,00 SetAccumulator and Piping12. Wooden Cover for Brine Tank 1,00 Set13. Brine Agitator 1,00 Set14. Can Filling Device for 10 Ice Cans 1,00 Set15. Tipping Device/Can Dumper 1,00 Set16. Can Grid/Ice Can Frame 1,00 Set17. Overhead Travelling Crane with Hoist & Hoist 1,00 Set Halaman 18 dari 52 Putusan Nomor 2/TIPIKOR/2018/PT PDG Joke Bar18. Pipes/Fitting and Galvanized Valves for Water 1,00 SetLines19. Ice Can Square 50 Kg 200 Set20.
    Pum and electromotor for Condenser 1,00 Set21. Pum and electromotor for Filling Tank 1,00 Set22. Electrical Panel 1,00 Set23. Trial Run 1,00 Set24. Generator 144 KVA 1,00 UnitC. BIAYA JASA1. Biaya instalasi 1,00 Lot2. Biaya Transportasi Barang ke Lokasi 1,00 Lot Bahwa sebelum melaksanakan proses lelang kegiatan Pembangunan Pabrik eskapasitas 10 (Sepuluh) ton perhari di Kecamatan Lengayang Kab.
Putus : 27-07-2011 — Upload : 21-10-2013
Putusan MAHKAMAH AGUNG Nomor 1086 K/Pid.Sus/2010
Tanggal 27 Juli 2011 — NURMALIA S.Sos BINTI ARAHAM
3123 Berkekuatan Hukum Tetap
  • No. 1086 K/Pid.Sus/2010 No Volumeesatrale Terpasang KurangDiv.1 UMUM Ls 1,00 1,00te Mobilisasi 1,00Div. Il PEKERJAAN TANAH M3 23.900,70 11.875,003.1(1) galian Tanah Biasa M3 1.478,60 1.099,90 12.025,70a2 i) Timbunan Biasa dari selain 378,70galian sumber bahanDiv. VI IsTRUKTUR M3 84,50 0,0071(6) Beton K.225 Ls 1,00 1,00 84,5079 (1) Pengadaan/Pemancangan 0,00Tiang Kayu M3 1.636,00 697,877.10 (3) Bronjong (Gabions) Ls 1,00 1,00 938,13700 (4) Pengadaan Ijuk untuk 0,00Pekerjaan Bronjong 3.
    UMUM Ls 1,001.2 Mobilisasi 1,00 0,00Div. II /PEKERJAAN TANAH M3 85,503.2 (1) Galian Tanah Biasa 378,00 292,50M3 540,00 (kurang)3.2 (1) Timbunan Biasa dari 1165,10 625,10selain galian sumber (kurang)bahanDiv. VI STRUKTUR M3 420,007.10 (3) Bronjong (Gabions) 650,00 230,00Fel Ay Ls 1,00 (kurang)Kayu pancang dan besi 1,00 0,00untuk perkuatan7.8.
    VI IsTRUKTUR M3 84,50 0,0074 (6) Beton K.225 Ls 1,00 1,00 84,5079 (1) Pengadaan/Pemancangan 0,00Tiang Kayu M3 1.636,00 697,877.10(3) Bronjong (Gabions) Ls 1,00 1,00 938,13FAO (4) Pengadaan Ijuk untuk 0,00Pekerjaan Bronjong 3.
    UMUM 1,0012 Mobilisasi Ls 1,00 1,00 Hal. 45 dari 65 hal. Put. No. 1086 K/Pid.Sus/2010 Div. Ill IPEKERJAAN TANAH 12,003.1(1) Igatian Tanah Biasa M3 110,00 120,00 98,00 (kurang)3.2(1) lTimbunan Biasa dari selainM3 549,30 429,30 (kurang)galian sumber bahanTimbunan Pilihan 3,303.2 (3) M3 12,00 8,70 (kurang)STRUKTURDiv. VII Beton K.225 0,007.1(6) Bronjong (Gabions) M3 84,50 97,50 7,50 (Kurang)7.10 (3) Ls 1,00 75,50 (kurang) 4.
    UMUM Ls 1,00 1,00 0,001.2 MobilisasiDiv. Ill PEKERJAAN TANAH3.2 (1) Galian Tanah Biasa M3 378,00 85,50 292,50 (kurang)625,10 (kurang)3.2 (1)I Timbunan Biasa dari/M3 1165,10 540,00selain galian sumberbahan230,00Div. VII STRUKTUR(kurang)7.10 (3) Bronjong (Gabions) M3 650,00 420,00 0,007.10 (4) Kayu pancang dan besijLs 1,00 1,00untuk perkuatan 8.
Register : 09-07-2015 — Putus : 05-08-2015 — Upload : 02-09-2020
Putusan PT PALU Nomor 39/PID.TPK/2015/PT PAL
Tanggal 5 Agustus 2015 — Pembanding/Jaksa Penuntut : SAMSUL BAHRI SANUSI, SH.
Terbanding/Terdakwa : ABDULLAH BAJDA
5216
  • Grendel Pintu BH 1,00 BH 1,002 Pas. Engsel Pintu PSG 1,00 PSG 1,00rR X Pekerjaan Elektrikal 1 Instalasi Penerangan BH 13,00 BH 13,00Instalasi Saklar dan2 Stopkontak TIK 13,00 TTK 13,003 Pasang MCB BH 2,00 BH 2,00Pasang Lampu SL 5 watt +4 fitting SET 13,00 SET 13,00Pasang Stop Kontak5 Tunggal + duss BH 1,00 BH 1,00Pasang Saklar Tunggal +6 duss BH 1,00 BH 1,00 XI Pekerjaan Peralatan Sanitair 1 Pek. Kloset Jongkok BH 4,00 BH 4,002 Pek.
    Kran Air 3/4" TTK 15,00 TTK 2,00XIl Pekerjaan Instalasi Air Bersih Pasang Pompa Air 200 watt1 + acc SET 1,00 SET 1,002 Pasang Tandon Air 550 Itr BH 1,00 BH 1,003 Pek. Pipa GIP 3/4" M' 15,00 M' 15,004 Pek. Pipa GIP 1" M' 26,99 M' 26,995 Pek. Pipa PVC 3/4" M' 4,00 M' 4,006 Fitting dan Accessories LS 1,00 LS 1,00 XIll Pekerjaan Instalasi Air Kotor 1 Pek. Pipa PVC 2" M' 3,66 M' 3,662 Pek. Pipa PVC 3" M' 76,28 M' 76,283 Fitting dan Accessories LS 1,00 LS 1,00Pek.
    Septictank dan4 Peresapan UNIT 1,00 UNIT 1,00 XIV Pekerjaan LainlainHalaman 9 dari 33 halamanPutusan Perkara Nomor 39/Pid.SusTPK/2015/PT PAL1 Pek. Pintu WC Plastik BH 4,00 BH 4,002 Pek.
    Grendel Pintu BH 1,00 BH 1,002 Pas. Engsel Pintu PSG 1,00 PSG 1,00X Pekerjaan Elektrikal1 Instalasi Penerangan BH 13,00 BH 13,00Instalasi Saklar dan2 Stopkontak TIK 13,00 TIK 13,003 Pasang MCB BH 2,00 BH 2,00Pasang Lampu SL 5 watt +4 fitting SET 13,00 SET 13,00Pasang Stop Kontak5 Tunggal + duss BH 1,00 BH 1,00Pasang Saklar Tunggal +6 duss BH 1,00 BH 1,00x1 Pekerjaan Peralatan Sanitair1 Pek.
    Kran Air 3/4" TTK 15,00 TTK 2,00xIl Pekerjaan Instalasi Air BersihPasang Pompa Air 200 watt1 + acc SET 1,00 SET 1,002 Pasang Tandon Air 550 Itr BH 1,00 BH 1,003 Pek. Pipa GIP 3/4" M' 15,00 M' 15,004 Pek. Pipa GIP 1" M' 26,99 M' 26,995 Pek. Pipa PVC 3/4" M' 4,00 M' 4,006 Fitting dan Accessories LS 1,00 LS 1,00XIII Pekerjaan Instalasi Air Kotor1 Pek. Pipa PVC 2" M' 3,66 M' 3,662 Pek. Pipa PVC 3" M' 76,28 M' 76,283 Fitting dan Accessories LS 1,00 LS 1,00Pek.
Register : 21-06-2016 — Putus : 07-10-2016 — Upload : 21-02-2017
Putusan PN PALU Nomor 32/Pid.Sus-TPK/2016/PN Pal
Tanggal 7 Oktober 2016 — JIBRAN HAMADI, SE
9217
  • Direksi Keet 1,00 M 950.000,00 900.000,003. Papan Proyek 1,00 Bh 336.539,00 335.742,004. Pengukuran Lokasi 1,00 Ls 700.000,00 745.500,00/ UizetIl PEKERJAAN NORMALISAS!1. Galian Tanah 7.502,30 Ms 23.321,68 174.966.250,58dengan alat beratlll PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003: Penggambaran 1,00 Set 286.000,00 286.000,00Asbuilt Drawing4. Pencetakan Asbuilt 1,00 Set 189.200,00 189.200,00Drawing5.
    Direksi Keet 1,00 M 950.000,00 950.000,003. Papan Proyek 1,00 Bh 336.132,50 336.132,504. Pengukuran Lokasi / 1,00 Ls 719.000,00 719.000,00Uizetll PEKERJAAN NORMALISASI!1. Galian Tanah dengan 7.502,30 M3 23.323,31 174.966.250,58alat beratlll PEKERJAAN LAINLAINDemobilisasi 1,00 Ls 897.000,00 897.000,00Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt 1,00 Set 286.000,00 286.000,00Drawing4. Pencetakan Asbuilt 1,00 Set 189.695,00 189.695,00Drawing5.
    Direksi Keet 1,00 M 985.000,00 985.000,003. Papan Proyek 1,00 Bh 337.440, 40 337.440,404. Pengukuran Lokasi / 1,00 Ls 725.000,00 725.000,00Uizetll PEKERJAAN NORMALISAS!1. Galian Tanah 7.502,30 Ms 23.321,03 174.961.369,80dengan alat beratill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 897.000,00 897.000,00Dokumentasi 1,00 Set 133.650,00 133.650,00Penggambaran 1,00 Set 261.250,00 261.250,00Asbuilt Drawing4. Pencetakan Asbuilt 1,00 Set 187.550,00 187.550,00Drawing5.
    Direksi Keet 1,00) M 950.000,00 950.000,003. Papan Proyek 1,00 Bh 336.132,50 336.132,504. Pengukuran Lokasii / 1,00 Ls 719.000,00 719.000,00Uizetll PEKERJAAN NORMALISAS!1. Galian Tanah dengan 7.502,30 MS 23.323,31 174.966.250,58alat beratlll PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 897.000,00 897.000,00Dokumentasi 1,00 Set 133.650,00 133.650,00Penggambaran Asbuilt 1,00 Set 286.000,00 286.000,00Drawing4. Pencetakan Asbuilt 1,00 Set 189.695,00 189.695,00Drawing5.
    Direksi Keet 1,00 M 985.000,00 985.000,003. Papan Proyek 1,00 Bh 337.440, 40 337.440,404. Pengukuran Lokasi / 1,00 Ls 725.000,00 725.000,00Uizetll PEKERJAAN NORMALISASI!1. Galian Tanah 7.502,30 Ms 23.321,03 174.961.369,80dengan alat beratlll PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 897.000,00 897.000,00Dokumentasi 1,00 Set 133.650,00 133.650,00Penggambaran 1,00 Set 261.250,00 261.250,00Asbuilt Drawing4. Pencetakan Asbuilt 1,00 Set 187.550,00 187.550,00Drawing5.
Register : 05-06-2018 — Putus : 29-08-2018 — Upload : 02-08-2021
Putusan PN LHOK SUKON Nomor 149/Pid.Sus/2018/PN LSK
Tanggal 29 Agustus 2018 — Penuntut Umum:
MUHAMMAD HERIANSYAH, SH
Terdakwa:
AFIFUDDIN Bin ISMAIL
318
  • Ketiga Penuntut Umum;
  • Menjatuhkan pidana kepada Terdakwa oleh karena itu dengan pidana penjara selama 1 (satu) tahun 6 (enam) bulan;
  • Menetapkan masa penangkapan dan penahanan yang telah dijalani Terdakwa dikurangkan seluruhnya dari pidana yang dijatuhkan;
  • Menetapkan Terdakwa tetap ditahan;
  • Menetapkan barang bukti berupa:
    • 8 (delapan) paket kecil atau 8 (delapan) bungkus kecil plastik bening diduga berisi Narkotika Jenis Sabu seberat 1,00
      Menyatakan barang bukti berupa :8 (delapan) paket kecil atau 8 (delapan) bungkus kecil plastik beningdiduga berisi Narkotika Jenis Sabu seberat 1,00 (Satu koma nol nol)Gram/bruto. 1 (Satu) kotak kaleng rokok merk dji Sam soe. 1 (satu) unit hp merk nokia warna hitam. Uang tunai sebesar Rp 120.000, (Seratus dua puluh ribu rupiah)Dipergunakan dalam berkas perkara Zulkarnaini Bin Iskandar 1 (satu) unit hp merk nokia warna abuabu.Dirampas untuk dimusnahkan4.
      Bahwa berdasarkan hasil penimbangan PT.POS Indonesia CabangLhoksukon Nomor : 19/KPC/LSK/2018 tanggal 15 Februari 2018, hasilpenimbangan barang bukti atas nama terdakwa Kamaruddin Bin Hasanberupa 8(delapan) paket kecil narkotika jenis sabu yang dikemas dalamplastik bening dengan berat keseluruhan 1,00 (satu koma nol nol) gram. Bahwa berdasarkan Berita Acara Analisis Laboratorium Barang BuktiNarkotika No.
      Bahwa berdasarkan hasil penimbangan PT.POS Indonesia CabangLhoksukon Nomor : 19/KPC/LSK/2018 tanggal 15 Februari 2018, hasilpenimbangan barang bukti atas nama terdakwa Kamaruddin Bin Hasanberupa 8 (delapan) paket kecil narkotika jenis sabu yang dikemas dalamplastik bening dengan berat keseluruhan 1,00 (satu koma nol nol) gram. Bahwa berdasarkan Berita Acara Analisis Laboratorium Barang BuktiNarkotika No.
      Menetapkan terdakwa tetap ditahan ;Menetapakan barang bukti berupa : 8 (delapan) paket kecil atau 8 (delapan) bungkus kecil plastik beningdiduga berisi Narkotika Jenis Sabu seberat 1,00 (Satu koma nol nol)Gram/bruto. 1 (satu) kotak kaleng rokok merk dji Sam soe. 1 (satu) unit hp merk nokia warna hitam.
Putus : 20-10-2015 — Upload : 04-11-2015
Putusan PN SURABAYA Nomor 1951/Pid.Sus/2015/PN.Sby
Tanggal 20 Oktober 2015 — AGUS SUPRIYANTO ALS AKIL BIN MUJIONO
122
  • Sidoarjo, sedangkanbarang bukti berupa 1 (satu) bungkus plastik klip berisikan narkotika jenis shabudengan berat 1,00 (satu koma nol nol) gram beserta bungkusnya adalah barangbukti hasil UCB yang dilakukan petugas pada hari Senin tanggal 11 Mei 2015 ;e Bahwa menurut pengakuan terdakwa barang bukti 3 (tiga) bungkus plastik klipberisikan Narkotika jenis shabu dengan berat 2,05 (dua koma nol lima) grambeserta bungkusnya atau berat bersih 1,58 (satu koma lima puluh delapan) gramtersebut didapat dari
    Sidoarjo, karena kedapatan menguasai Narkotika jenisshabu ;Bahwa pada saat melakukan penggeledahan terhadap terdakwa ditemukan barangbukti berupa 2 (dua) bungkus plastik klip berisikan narkotika jenis shabu denganberat 1,05 (satu koma nol lima) gram beserta bungkusnya, uang sebesar Rp.200.000, (dua ratus ribu rupiah), 1 (satu) buah HP merk Samsung warna hitamnomor simcard 087702896481 dan 1 (satu) bungkus plastik klip berisikan narkotikajenis shabu dengan berat 1,00 (satu koma nol nol) gram beserta
    Sidoarjo, sedangkanbarang bukti berupa 1 (satu) bungkus plastik klip berisikan narkotika jenis shabudengan berat 1,00 (satu koma nol nol) gram beserta bungkusnya adalah barangbukti hasil UCB yang dilakukan petugas pada hari Senin tanggal 11 Mei 2015 ;Bahwa menurut pengakuan terdakwa barang bukti 3 (tiga) bungkus plastik klipberisikan Narkotika jenis shabu dengan berat 2,05 (dua koma nol lima) grambeserta bungkusnya atau berat bersih 1,58 (satu koma lima puluh delapan) gramtersebut didapat dari AMAL
    Sidoarjo danmendapatkan (satu) bungkus plastik klip berisikan narkotika jenis shabu denganberat 1,00 gram beserta bungkus. Kemudian pada hari Selasa tanggal 12 Mei 2015Halaman 9 dari 15 Putusan No. 1951/Pid.Sus/2015/PN.Sby.sekitar pukul 15.30 WIB, terdakwa menyerahkan uang sebesar Rp. 1.500.000,kepada AMAL MARUF di jalan Perumahan Bumi Mentari Sejahtera Kel.Pecabean Kec. Candi Kab.
    Sidoarjo danmendapatkan (satu) bungkus plastik klip berisikan narkotika jenis shabu denganberat 1,00 gram beserta bungkus. Kemudian pada hari Selasa tanggal 12 Mei 2015sekitar pukul 15.30 WIB, terdakwa menyerahkan uang sebesar Rp. 1.500.000,kepada AMAL MARUF di jalan Perumahan Bumi Mentari Sejahtera Kel.Pecabean Kec. Candi Kab.
Putus : 16-10-2017 — Upload : 25-10-2017
Putusan PN SIDOARJO Nomor 877 /Pid.Sus/ 2017/PN Sda
Tanggal 16 Oktober 2017 — SUPRAPTO Als PAKTO Bin MUHAMAD DA’IMAN
81
  • Menyatakan barang bukti berupa :e 1 (satu) bungkus plastik klip berisikan serbuk kristal warna putih didugakuat Narkotika Golongan (Jenis sabu) dengan berat + 1,00 (satu) gramsetelah ditimbang beserta bungkusnya;e 1 (satu) Pak Plastik klip kecil;e 1 (satu) buah Timbangan electrik;e 1buah HP Merk SAMSUNG warna hitam, SIM Card No. (081553849646).Dirampas untuk dimusnahkan.e Uang Tunai sejumlah Rp 1.200.000, (satu juta dua ratos ribu rupiah);(Dirampas Untuk negara)Menetapkan agar terdakwa dibebani membayar
    Permana Putra bersamadengan anggota team lainnya yaitu Anggota Polres Kota Sidoarjomelakukan penyelidikan terhadap terdakwa, selanjutnya pada waktu dantempat sebagaimana tersebut diatas para saksi melakukan penangkapanterhadap terdakwa yang pada saat itu sedang dudukduduk didipandiruang dapur dan selanjutnya para saksi melakukan penggeledahanterhadap terdakwa dan ditemukan barang bukti berupa 1 bungkus plastikklip berisikan serouk Kristal warna putin yang diduga narkotika jenis sabudengan berat + 1,00
    Taman, Kab.Sidoarjo.Bahwa terdakwa ditangkap karena penyalahgunaan narkotika dan saksiberhasil menemukan barang bukti berupa 1 (satu) bungkus plastik klipberisikan serbuk kristal warna putin diduga kuat Narkotika Golongan (Jenis sabu) dengan berat + 1,00 (satu) gram setelah ditimbang besertabungkusnya, 1 (satu) Pak Plastik klip kecil, 1 (satu) buah Timbanganelectric, Uang Tunai sejumlah Rp 1.200.000, (satu juta dua ratos riburupiah), dan 1 (satu) buah Handphone Merk SAMSUNG warna hitam,SIM Card No
    Sidoarjo sedangkandari saudara MOH YASIN Bin SADEN tidak ditemukan apaapa, lalusaudara SUPRAPTO Alias PAKTO Bin MUHAMAD DAIMAN (alm)dilakukan Interogasi bahwa Narkotika jenis sabu tersebut memperoleh 1(satu) bungkus plastik klip berisikan serbuk kristal warna putin didugakuat Narkotika Golongan (Jenis sabu) dengan berat + 1,00 (satu) gramsetelah ditimbang beserta bungkusnya tersebut dari saudara BENDOL.Terhadap keterangan saksi, Terdakwa membenarkan;2.
    Taman, Kab.Sidoarjo.Bahwa terdakwa ditangkap karena penyalahgunaan narkotika dan saksiberhasil menemukan barang bukti berupa 1 (satu) lbungkus plastik klipberisikan serbuk kristal warna putin diduga kuat Narkotika Golongan (Jenis sabu) dengan berat + 1,00 (satu) gram setelah ditimbang besertabungkusnya, 1 (satu) Pak Plastik klip kecil, 1 (satu) buah Timbanganelectric, Uang Tunai sejumlah Rp 1.200.000, (satu juta dua ratos riburupiah), dan 1 (satu) buah Handphone Merk SAMSUNG warna hitam,SIM Card
Putus : 29-03-2017 — Upload : 31-05-2017
Putusan MAHKAMAH AGUNG Nomor 2016 K/PID.SUS/2016
Tanggal 29 Maret 2017 — WAHYUDIN M. GAGARAMUSU, S.Sos. alias BUDO
9958 Berkekuatan Hukum Tetap
  • Flanged Socket @ 4 1,00 bh 163.125,00 163.125,003. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee PVC @ 4 x 3 2,00 bh 177.500,00 355.000,005. All Socket Tee PVC @ 4 x @ 4 1,00 bh 185.000,00 185.000,006. All Socket Tee PVC @ 3 x @ 3 2,00 bh 148.000,00 296.000,007. All Socket Tee PVC @ 2 2,00 Bh 85.000,00 170.000,008. Gate Valve @ 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC @ 3 2,00 Bh 38.062,50 76.125,0010. Dop PVC @ 2 2,00 bh 32.625,00 65.250,0011.
    ACCESSIRIES PENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh 375.000,00 375.000,00Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block Beton 1,00 PktGalian Tanah Biasa 3,00 MS 24.990 ,00 74.970,00Urugan Tanah 1,00 MS 11.980,00 11.980,00
    Pembuatan Intake 1,00 UnitPembersihan 1,00 Ls 200.000,00 200.000,00okasiGalian tanah 2,71 Me 39.010,75 105.719.13kerasPlesteran 16,50 M? 57.939,67 956.004,50Acian 16,50 M?
    .362,5 125.318,13Bertulang 3Plesteran 3,40 M2 57.939,67 196.994 ,87Bekesting 3,40 M2 181.863.25 545.589.75PEK.ACCESSIRIESPENGURASsAll Flanged 1,00 Bh 1.495.312,5 1.495.312,50Gate Valve 0@ 4All Flanged 1,00 Bh 525.000,00 525.000,00tee PVC @4Flanged 1,00 Bh 163.125,00 163.125,00Socket PVCO 4Flanged 1,00 Bh 163.125,00 163.125,00Sigot PVC@ 4All Flanged 1,00 Bh 375.000,00 375.000,00Bend PVCO 4Paking 5,00 Bh 17.500,00 87.500,00Karet 4 Mur Baut 40,00 Bh 8.775,00 351.000,005/8 34.302.394,06Pembuatan Block
    Beton 1,00 Pkt Galian 3,00 Ms 24.990,00 74.970,00 Hal. 20 dari 71 hal.
Register : 16-10-2015 — Putus : 25-01-2016 — Upload : 28-07-2016
Putusan PN PALU Nomor 55/Pid.Sus-TPK/2015/PN Pal
Tanggal 25 Januari 2016 — JONI B. RAMLI, ST
9535
  • Flanged Socket @ 1,00 bh 163.125,00 163.125,0043. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee 2,00 bh 177.500,00 355.000,00PVC @ 4 x @35. All Socket Tee 1,00 bh = 185.000,00 185.000,00PVC 4 x O46. All Socket Tee 2,00 bh = 148.000,00 296.000,00PVC @ 3 x @37. All Socket Tee = 2,00 Bh 85.000,00 170.000,00PVC 28. Gate Valve @ 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC @ 3 2,00 Bh 38.062,50 76.125,0010. Dop PVC @ 2 2,00 bh = 32.625,00 65.250,0011.
    /181.863.25 545.589.75PEK.ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh 1.495.312,50 1.495.312,50Valve 4All Flanged tee 1,00 Bh 525.000,00 525.000,00PVC @ 4Flanged Socket 1,00 Bh 163.125,00 163.125,00PVC @ 4Flanged Sigot PVC 1,00 Bh 163.125,00 163.125,004All Flanged Bend /1,00 Bh 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,065Pembuatan Block 1,00 Pkt.
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh = 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh 1.495.312,50 1.495.312,50Valve @ 4All Flanged tee PVC /1,00 Bh 525.000,00 525.000,00O4Flanged Socket PVC 1,00 Bh 163.125,00 163.125,00O4Flanged Sigot PVC @ 1,00 Bh 163.125,00 163.125,00AAll Flanged Bend 1,00 Bh = 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,065.
    ACCESSIRIES PENGURASAll Flanged Gate Valve 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC 4 1,00 Bh 375.000,00 375.000,00Paking Karet 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block Beton 1,00 PktGalian Tanah Biasa 3,00 MSs 24.990,00 74.970,00Urugan Tanah 1,00 Ms 11.980,00 11.980,00Beton
Register : 21-06-2016 — Putus : 07-10-2016 — Upload : 16-02-2017
Putusan PN PALU Nomor 33/Pid.Sus-TPK/2016/PN Pal
Tanggal 7 Oktober 2016 —
577
  • Direksi Keet 1,00 M 904.000,00 904.000,003. Papan Proyek 1,00 Bh 335.610,00 335.610,004. Pengukuran Lokasi/ Uizet 1,00 Ls 730.000,00 730.000,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 M 23.321 ,03 174.961.369,80lll PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 135.850,00 135.850,003.
    Direksi Keet 1,00 M 950.000,00 900.000,003. Papan Proyek 1,00 Bh 336.539,00 335.742,004. Pengukuran Lokasi/ Uizet 1,00 Ls 700.000,00 745.500,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 M 23.321 ,68 174,966.250,58Ill PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003.
    Direksi Keet 1,00 M 950.000,00 950.000,003. Papan Proyek 1,00 Bh 336.132,50 336.132,504. Pengukuran Lokasi/ Uizet 1,00 Ls 719.000,00 719.000,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 MP 23.323,31 174,966.250,58Ill PEKERJAAN LAINLAIN1 Demobilis asi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003.
    Direksi Keet 1,00 M 985.000,00 985.000,003. Papan Proyek 1,00 Bh 337.440,40 337.440,404. Pengukuran Lokasi/ Uizet 1,00 Ls 725.000,00 725.000,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 M 23.321 ,03 174.961.369,80lll PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003.
    Direksi Keet 1,00 M 950.000,00 900.000,003. Papan Proyek 1,00 Bh 336.539,00 335.742,004. Pengukuran Lokasi/ Uizet 1,00 Ls 700.000,00 745.500,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 M 23.321 ,68 174.966.250,58lll PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003: Penggambaran Asbuilt Draw ing 1,00 Set 286.000,00 286.000,004. Pencetakan Asbuilt Draw ing 1,00 Set 189.200,00 189.200,005.
Register : 30-01-2018 — Putus : 07-05-2018 — Upload : 03-07-2019
Putusan PN AMBON Nomor 1/Pid.Sus-TPK/2018/PN Amb
Tanggal 7 Mei 2018 — Penuntut Umum:
1.M. RUSLAN MARASABESSY, SH
2.ENDANG ANAKODA, SH
3.TONNY ROMY LESNUSSA, SH
4.JULIVIA SELANNO, SH
5.DOUGLAS JHON FITER SH
6.RASYID WIRAPUTRA, SH
Terdakwa:
M. TAHIR KALLEAN, SP
9473
  • Bak air lapis keramik Bh 1,00 28,625,00 0,004. Stop kran Bh 1,00 270,000,00 270,000,005. Kloset jongkok Bh 1,00 65,000,00 65,000,006. Floor drain Bh 1,00 24,000,00 24,000,00ts Doop bak air Is 1,00 2,200,000,00 2.200,000,008. Septink tank 3,508,795, 40IV. UPAH KERJA1. Upah Tenaga Kerja Is 1,00 500,000,00 500,000.00500,000,00Jumlah 1 unit 9.394.081,07Jumlah Total 18 unit x 9,394,081,07 169,093,459,30 MCK 1 Unit di Dusun Maar :No.
    Daun pintu tripleks lapis m3 1,00 25,000,00 25,000,0015. seng licin m2 1,00 220,000,00 220,000,00Pasang engsel pintu 4 4,883,248,1116. Grendel tanam pintu bhLf: Pekerjaan pengecatan bh18 IsHII. PEKERJAAN SANITAIR1. Pasang pipa air kotor @ 4+ M 2,00 97, 397,70 194, 795,40perlegkapan2. Bak air lapis keramik Bh 1,00 755, 000,00 755,000,003. Stop kran Bh 1,00 28,625,00 28,625,004. Kloset jongkok Bh 1,00 270,000,00 270,000,005. Floor drain Bh 1,00 65,000,00 65,000,006.
    Grendel tanam pintu Is 1,00 25,000,00 25,000,00Pekerjaan pengecatan 1,00 220,000,00 220,000.004,883,248,11lll. PEKERJAAN SANITAIR1. Pasang pipa air kotor @ 4 + M 2,00 97, 397,70 194, 795,40perlegkapan2. Instalasi air bersih Is 280, 000,00 3. Bak air lapis keramik Bh 0,00 755,000,00 755,000,004. Stop kran Bh 1,00 28,625,00 0,005, Kloset jongkok Bh 1,00 270,000,00 270,000,006. Floor drain Bh 1,00 65,000,00 65,000,007. Doop bak air Bh 1,00 24,000,00 24,000,008.
    Grendel tanam pintu 1,00 25,000,00 25,000,0018 Pekerjaan pengecatan 1,00 220,000,00 220,000.004,883,248,11lll. PEKERJAAN SANITAIR1. Pasang pipa air kotor @ 4 + M 2,00 97,397,70 194, 795,40perlegkapan2. Bak air lapis keramik Bh 1,00 755,000,00 755,000,003. Stop kran Bh 1,00 28,625,00 28,625,004. Kloset jongkok Bh 1,00 270,000,00 270,000,005: Floor drain Bh 1,00 65,000,00 65,000,006. Doop bak air Bh 1,00 24,000,00 24,000,007. Septink tank Ls 1,00 2, 200,000,00 2, 200,000.003,508,795,40IV.
    Grendel tanam pintu bh 1,00 25,000,00 25,000,0021. Pekerjaan pengecatan Is 1,00 220,000,00 220,000,004,190,075,37lll. PEKERJAAN SANITAIR1. Pasang pipa air kotor @ 4 + M 2,00 97,397,70 194, 795,40perlegkapan.2. Instalasi Air Bersih Is 280,000,00 3. Bak air lapis keramik Bh 1,00 755,000,00 755,000,004. Stop kran Bh 1,00 28,625,00 28,625,005, Kloset jongkok Bh 1,00 270,000,00 270,000,006. Floor drain Bh 65, 000,00 7.
Upload : 18-04-2011
Putusan MAHKAMAH AGUNG Nomor 1622 K/PID.SUS/2010
Jaksa Penuntut Umum pada Kejari; Ir. Kuswari Marzuk
3629 Berkekuatan Hukum Tetap
  • Pembongkaran/ 1,00 Ls 1.200.000,00 1.200.000,00pembersihan2. Penyediaan/sewa gucang bahan 1,00 Unit 1.450.000,00 1.450.000,003. Biayaadministrasi/ dokumentasi4. Pembuatan papan nama 1,00 pkt 1.959.500,00 1.959.500,00kegiatan1,00 Bh 300.000,00 300.000,00Sub. Jumlah 4.909.500,00Il Pekerjaan rehab rumah jaga1. Pek. Lysplankpapan 8,50 MP 36.915, 313.777,502. Pek. Plapond plywood 30.00 M? 120.031 ,50 3.600.945,003. Pek.pintupanel 6,08 MP 317.450,00 1.930.096,004.
    Instalasi/intalatir listrik 1,00 Ls 15.000.000,00 15.000.000,002. Pek. Perbaikan valves pipa3. Pek.Penggantian pipa 4 yang 1,00 Ls 12.775.000,00 12.775.000,00bocor: Perkallkarypempa tniakelsamur 150,00 Me 167.968,00 25.195.200,005. Perbaikan pompa distribusi6. Perbaikan pompa panel listrik 1,00 Ls 18.400.000,00 18.400.000,007, Penggantlankabollisttic 1,00 Ls 15.250.000,00 15.250.000,00a, mite langki bake 1,00 Ls 22.425.000,00 22.425.000,009.
    Pembongkaran/ 1,00 Ls 1.200.000,00 1.200.000,00pembersihan2. Paniyadisartisewa Gudang babar 1,00 Unit 1.450.000,00 1.450.000,00Biaya administrasi/dokumentasiPembualampapan namakegiaian 1,00 pkt 1.959.500,00 1.959.500,001,00 Bh 300.000,00 300.000,00Sub. Jumlah 4.909.500,00Il Pekerjaan rehab rumah jaga1. Pek. Lysplank papan 8,50 M2 36.915, 313.777,502. Pek. Plapond plywood 30.00 M2 120.031 ,50 3.600.945,003. Pek.pintu panel 6,08 M2 317.450,00 1.930.096,004.
    Instalasi/intalatir listrik 1,00 Ls 15.000.000,00 15.000.000,002. Pek. Perbaikan valves pipa 1,00Ls 12.775.000,00 12.775.000,003. Pek. Penggantian pipa 4 yangbocor 150,00 M2 167.968,00 25.195.200,004. Perbalkarrporpainakeisitnut 1,00Ls 18.400.000,00 18.400.000,00 hal.12 dari 28 hal. Put. No.1622 K/PID.SUS/2010 >,~ 5. Perbaikan pompa distribusi6. Perbaikanpompa panel listrik 1,00 Ls 15.250.000,00 15.250.000,007. Penggantian kabel listrik 1,00 Ls 22.425.000,00 22.425.000,008. Pek.
    Pembersihan tangki bak & 1,00 Ls 9.500.000,00 9.500.000,00rumputpagar 1,00Ls 8.500.000,00 8.500.000,009. Pengecatan pipa/menara air, besibaja, besi pagar255,20 M2 32.833.00 8.378.981 ,60Sub. Jumlah 135.424.181 60Vi Pekerjaan R. Panel/sumur bor1. Pek. Cor lantai 1:3:5 2,50 MS 729.660,00 1.824.150,002. Pek. Besi L 0,40x0,40x 0,03 1,00 Ls 450.000,00 450.000,003. Pek. Kawat harmonica gas 50,00 M2 58.584,50 2.914.225,004. Pek. Pintu kawat harmonica 1,00 Bh 295.500,00 295.500,00Sub.
Register : 27-04-2018 — Putus : 28-05-2018 — Upload : 20-06-2019
Putusan PT BANDA ACEH Nomor 8/PID.SUS/TIPIKOR/2018/PT BNA
Tanggal 28 Mei 2018 — Pembanding/Terbanding/Terdakwa : MUSTAFA LISA Alias AFA Bin ANDRI LISA Diwakili Oleh : SYAHRUL RIZAL SH MH
Terbanding/Pembanding/Penuntut Umum II : WILDANI HAPIT SH
Terbanding/Penuntut Umum I : HELMI ABDUL AZIZ, SH
8932
  • /PT BNA 2 Pemasangan 1,00 Ls Taksir 2.000.000,00 2.000.000,00Bouwplank3 Penyiapan Lahan 80.00 M? Taksir 100.000,00 8.000.000,004 Barak Kerja 1,00 Ls Taksir 7.000.000,00 7.000.000,005 Pengurursan IMB 1,00 Ls Taksir 10.000.000,00 10.000.000,00Bangunan danNama BPN6 Papan Nama 1,00 Ls Taksir 750.000,00 750.000,00ProyekSub Total 29,750,000.00Il. PEKERJAAN TANAH & PASANGAN PONDASI1 Galian Tanah 681,38 SNI 51.000,00 34.750.380,00Pondasi Menerus M?
    /PT BNA Pc, Tebal 15 mm M2 6837.200(Dinding) 8 (6.4)3 Relif Bulat Timbul 1,00 LS Taksir 500.000,00 500.000,004 Pengecatan 3.24 PT T38 21.852,00 70.800,48Dinding M2 2000C(1.11.3)5 Batu Candi 1,00 Ls Taksir 7.000.000,00 7.000.000,006 Cetakan Huruf 1,00 Ls Taksir 4.985.000,00 4.985.000,00Tumbul7 Sloof 15x20 Cm 0,06 SUPL.VII 4.649.489,00 278.969,34M3 b18 Kolom Praktis 0,04 SUPL.VII 8.195.595,00 327.823,8015x15 Cm M3 hiSUB TOTAL 13.438.004,96XIV PEKERJAANLAINLAIN1 Pekerjaan Relif 1,00 Ls Taksir 10.000.000,00
    10.000.000,002 Pemasangan 1,00 Ls Taksir 8.500.000,00 8.500.000,00Alugubon3 Pengadaan Meja 1,00 Taksir 15.000.000,00 15.000.000,00Loket Unit(Tempahan)4 Kolom Partisi 12,00 Taksir 900.000,00 10.800.000,00Loket bh5 Dinding Partisi 27,20 Taksir 500.000,00 13.600.000,00Gipsum M26 Logo dan Tulisan 1,00 Ls Taksir 6.500.000,00 6.500.000,00Pada Loket7 Saluran Keliling 1,00 Ls Taksir 14.500.000,00 14.500.000,00Bangunan8 Pemasangan 60,00 Taksir 275.000,00 16.500.000,00Greal Penutup MSaluran9 Pembersihan 1,00
    Ls Taksir 2.000.000,00 2.000.000,00Lahan2 Pemasangan 1,00 Ls Taksir 2.000.000,00 2.000.000,00Bouwplank3 Penyiapan 80.00 Me Taksir 100.000,00 8.000.000,00Lahan4 Barak Kerja 1,00 Ls Taksir 7.000.000,00 7.000.000,005 Pengurursan 1,00 Ls Taksir 10.000.000,00 10.000.000,00IMB Bangunandan NamaBPN6 Papan Nama 1,00 Ls Taksir 750.000,00 750.000,00ProyekSub Total 29,750,000.00Il.
    /PT BNA 3 Relif Bulat 1,00 LS Taksir 500.000,00 500.000,00Timbul4 Pengecatan 3.24 M2 PT T38 21.852,00 70.800,48Dinding 2000C(1.11.3)5 Batu Candi 1,00 Ls Taksir 7.000.000,00 7.000.000,006 Cetakan Huruf 1,00 Ls Taksir 4.985.000,00 4.985.000,00Tumbul7 Sloof 15x20 0,06 M3 SUPL.VIIb 4.649.489,00 218.969 ,34Cm 18 Kolom Praktis 0,04 M3 SUPL.VIIh 8.195.595,00 327.823,8015x15 Cm 1SUB TOTAL 13.438.004,96XIV PEKERJAANLAINLAIN1 Pekerjaan 1,00 Ls Taksir 10.000.000,00 10.000.000,00Relif2 Pemasangan 1,00 Ls Taksir
Register : 19-01-2018 — Putus : 19-02-2018 — Upload : 22-08-2019
Putusan PT PADANG Nomor 1/PID.TPK/2018/PT PDG
Tanggal 19 Februari 2018 — Pembanding/Terbanding/Terdakwa : Hernowo Anung Wibowo,A.Md Diwakili Oleh : MEVRIZAL, S.H.,M.H. Dkk.
Terbanding/Pembanding/Penuntut Umum : VANANDA PUTRA, SH
16760
  • Refrigeneration Compressor MYCOM N6WA 1,00 SetJapan2 Cooling Towet Liang Chi LBC 60 1,00 Set3. Horizontal Sheel and Tube Condensor 1,00 Set4. Herring bone Coil Evaporator 1,00 Set5, Liquid Scpratur / Sucdon Trap 1,00 Set6. Accumulator 1,00 Set7. Oil separator 1,00 Set8. Amonia Receiver 1,00 Set9. Corresponding Ammonia Pipes, Pipe Fitting and 1,00 SetValves(stop, expansion, check, float, sapety) forRefrigerant Lines10. Brine Tank 1,00 Set11.
    Insulation for Brine Tank, Suction Trap, 1,00 SetAccumulator and Piping12. Wooden Cover for Brine Tank 1,00 Set13. Brine Agitator 1,00 Set14. Can Filling Device for 10 Ice Cans 1,00 Set15. Tipping Device/Can Dumper 1,00 Set Hal7 dari 51 Putusan Nomorl1/TIPIKOR/2018/PT Pdg 16. Can Grid/Ice Can Frame 1,00 Set17. Overhead Travelling Crane with Hoist & Hoist 1,00 SetJoke Bar18. Pipes/Fitting and Galvanized Valves for Water 1,00 SetLines19. Ice Can Square 50 Kg 200 Set20.
    Pum and electromotor for Condenser 1,00 Set21. Pum and electromotor for Filling Tank 1,00 Set22. Electrical Panel 1,00 Set23. Trial Run 1,00 Set24. Generator 144 KVA 1,00 UnitC. BIAYA JASA1. Biaya instalasi 1,00 Lot2. Biaya Transportasi Barang ke Lokasi 1,00 Lot Bahwa sebelum melaksanakan proses lelang kegiatan Pembangunan Pabrik eskapasitas 10 (Sepuluh) ton perhari di Kecamatan Lengayang Kab.
    Refrigeneration Compressor MYCOM N6WA 1,00 SetJapan2. Cooling Towet Liang Chi LBC 60 1,00 Set3. Horizontal Sheel and Tube Condensor 1,00 Set4. Herring bone Coil Evaporator 1,00 Set5; Liquid Scpratur / Sucdon Trap 1,00 Set6. Accumulator 1,00 Set7. Oil separator 1,00 Set8. Amonia Receiver 1,00 SetQ. Corresponding Ammonia Pipes, Pipe Fitting 1,00 Setand Valves(stop, expansion, check, float, sapety) forRefrigerant Lines10. Brine Tank 1,00 Set11.
    Pum and electromotor for Condenser 1,00 Set21. Pum and electromotor for Filling Tank 1,00 Set22. Electrical Panel 1,00 Set23. Trial Run 1,00 Set24. Generator 144 KVA 1,00 UnitC BIAYA JASA1 Biaya instalasi 1,00 Lot2 Biaya Transportasi Barang ke Lokasi 1,00 Lot Bahwa sebelum melaksanakan proses lelang kegiatan Pembangunan Pabrik eskapasitas 10 (Sepuluh) ton perhari di Kecamatan Lengayang Kab.
Register : 07-08-2018 — Putus : 28-08-2018 — Upload : 10-08-2021
Putusan PN SAMARINDA Nomor 773/Pid.Sus/2018/PN Smr
Tanggal 28 Agustus 2018 — Penuntut Umum:
AGUS PURWANTORO, SH
Terdakwa:
RUDINI Als ABANG Bin LA RIAU
294
  • Imei:356807075593606 yang ditemukan dikantong celana depan sebelahkanan, 1 (Satu) poket narkotika jenis shabushabu seberat 1,00 (satukoma nol) Gram Brutto atau 0,70 (nol koma tujuh puluh) gram nettoyang ditemukan ditanah yang sebelumnya dibuang oleh terdakwa, 1(satu) bungkus rokok Surya Gudang Garam, 1 (Satu) unit sepeda motormerek YAMAHA JUPITER warna merah KT 6323 IQ, Atas kejadiantersebut terdakwa dan barang bukti dibawa ke Polresta Samarinda gunaproses hukum lebih lanjut;Halaman 3 dari 20 Putusan
    Imei:356807075593606 yang ditemukan dikantong celana depan sebelahkanan, 1 (Satu) poket narkotika jenis shabushabu seberat 1,00 (satukoma nol) Gram Brutto atau 0,70 (nol koma tujuh puluh) gram nettoyang ditemukan ditanah yang sebelumnya dibuang oleh terdakwa, 1(satu) bungkus rokok Surya Gudang Garam, 1 (Satu) unit sepeda motormerek YAMAHA JUPITER warna merah KT 6323 IQ, Atas kejadiantersebut terdakwa dan barang bukti dibawa ke Polresta Samarinda gunaproses hukum lebih lanjut;Bahwa berdasarkan Berita
    Imei: 356807075593606yang ditemukan dikantong celana depan sebelah kanan, 1 (satu) poketnarkotika jenis shabushabu seberat 1,00 (satu koma nol) Gram Brutto atauHalaman 6 dari 20 Putusan Nomor 773/Pid.Sus/2018/PN Smr (Narkotika)benar;0,70 (nol koma tujuh puluh) gram netto yang ditemukan ditanah yangsebelumnya dibuang oleh terdakwa, 1 (satu) bungkus rokok Surya GudangGaram, 1 (satu) unit sepeda motor merek YAMAHA JUPITER warna merahKT 6323 IQ, atas kejadian tersebut Terdakwa dan barang bukti dibawa
    gram brutto yang Terdakwa ketahul bernama Amatdan Terdakwapun tidak langsung menyetujuinya, kemudian Terdakwalangsung menghubungi Saudara Taufik (DPO) untuk memesan narkotikajenis sabusabu seberat 1,00 gram brutto dan Saudara Taufikpunmenyanggupinya dan Terdakwa kembali menghubungi Amat danmenyanggupi permintaannya lalu sekitar pukul 00.10 Wita Terdakwabertemu dengan Saudara Taufik di depan SCP (Samarinda Central Plaza)untuk melakukan transaksi dengan Saudara Taufik (DPO) setelah Terdakwabertemu
    motor Terdakwa diparkiran Guest House dan menaruh 1 (Satu)bungkus rokok gudang garam yang berisikan 1 (Satu) poket narkotika jenissabusabu seberat 1,00 gram brutto di lantai parkiran, kKemudian Terdakwamenunggu Saudara Amat, setelah menunggu sekitar 15 menit kurang lebih3 (tiga) orang yang tidak Terdakwa kenal datang menghampiri TerdakwaHalaman 9 dari 20 Putusan Nomor 773/Pid.Sus/2018/PN Smr (Narkotika)dan langsung melakukan penggeledahan badan dan pakaian dari hasilpenggeledahan ditemukan barang
Putus : 10-10-2017 — Upload : 28-05-2019
Putusan MAHKAMAH AGUNG Nomor 1931 K/PID.SUS/2016
Tanggal 10 Oktober 2017 — SAMUEL ANGKY
7044 Berkekuatan Hukum Tetap
  • PEKERJAAN PERSIAPAN/UMUMPenyediaan air kerja Ls 1,00 2.000.000,00 2.000.000,002. Pembuatan papan nama proyek Ls 1,00 500.000,00 500.000,003. Administrasi, dokumentasi dan Ls 1,00 4.678.500,00 4.678.000,00pelaporan 7.178.500,00IL.
    Pengadaan tanki penampungkapasitas 1.000 liter Bh 1,00 2.500.000,00 2.500.000,002. Pembuatan dudukan tankipenampung Bh 1,00 3.000.000,00) 3.000.000,00)3.
    PEKERJAAN PERSIAPAN/ UMUM1.Penyediaan air kerja Ls 1,00 2.000.000,00 2.000.000,002.Pembuatan papan nama proyek Ls 1,00 500.000,00 500.000,003.Administrasi, dokumentasi dan Ls 1,00 4.678.500,00 4.678.000,00pelaporan 7.178.500,00IL.
Putus : 26-03-2014 — Upload : 08-09-2014
Putusan MAHKAMAH AGUNG Nomor 241 K/Pid.Sus/2014
Tanggal 26 Maret 2014 — Ir. SUNAR WIBOWO, M.Sc
7336 Berkekuatan Hukum Tetap
  • dan dinding 1,00 lot Rp.1.350.000 Rp.1.350.000Perlengkapan akomodasi 1,00 lot Rp.335.000 Rp.335.000Perlengkapan kamar mandi 1,00 set Rp.110.000 Rp.110.000Meja dan kursi juru mudi 1,00 set Rp.645.000 Rp.645.000Rak /lemari dapur 1,00 set Rp.450.000 Rp.450.000Peralatan dapur/makan (lengkap) 1,00 set Rp.335.000 Rp.335.000Peralatan kamar mesin 1,00 set Rp.340.000 Rp.340.000Total biaya akomodasiRp.10.265.000Sistem kemudiSistem rantai (lengkap) 1,00 unit Rp.6.500.000 Rp.6.500.000Rudder angle indicator
    1,00 unit Rp.4.500.000 Rp.4.500.000Konstruksi dan kemudi+ poros 1,00 unit Rp.9.500.000 Rp.9.500.000(lengkap)Total biaya sistem KemudiRp.20.500.000Peralatan listrik dan peneranganLampu navigasi 1,00 set Rp.235.000 Rp.235.000Distribution boxes 220V 380 V 1,00 set Rp.365.000 Rp.365.000ACDistribution boxes 24 V DC 1,00 set Rp.125.000 Rp.125.000Acc 120 AH12 V 2,00 Rp.2.400.000 Rp.2.400.000buahBaterry swich 1,00 Rp.135.000 Rp.135.000buahHorn 1,00 Rp.245.000 Rp.245.000buahShore cornection 1,00 Rp. 1.500.000
    Peralatan Navigasi danKeselamatanKompas magnit 6marine use 1,00 set Rp.3.465.000 Rp.3.465.000Peta laut dan perlengkapannya 1,00 set Rp.2.875.000 Rp.2.875.000Bola tanda labuh 1,00 set Rp.1.350.000 Rp.1.350.000Radio komunikasi dan instalasi 1,00 unti Rp.14.000.000 Rp.14.000.000GPS + fishfinder 1,00 unit Rp.22.400.000 = Rp.22.400.000Bendera Nasional 1,00 Rp. 140.000 Rp.140.000buahTeropong binacular (7 x 50 mm) 1,00 Rp.2.470.000 Rp.2.470.000buahTotal biaya peralatan Navigasi dan KomunikasiRp.46.700.0009
    PERALATAN LISTRIKDAN PENERANGANLampu navigasi 42 V DC 1,00 set Rp.235.000 Rp. 235.000Distribution boxes 220 V380 V 1,00 set Rp.365.000 Rp. 365.000ACDistribution boxes 24 V DC 1,00 set Rp.125.000 Rp. 125.000Acc 120 AH12 V 2,00 buahRp.2.400.000 Rp. 4.800.000Baterry swich 1,00 buah/Rp. 135.000 Rp. 135.000Horn 1,00 buah/Rp. 245.000 Rp. 245.000Shore cornection 1,00 buahRp.1.500.000 Rp. 1.500.000Lampu penerangan 1,00 set Rp.1.500.000 Rp. 1.500.000Lampu sorot (search light) 1,00 set Rp.2.450.000 Rp. 2.450.000Blower
    PERALATAN NAVIGASIDAN KESELAMATANKompas magnit 6 marine use 1,00 set Rp. 3.465.000 Rp. 3.465.000Peta laut dan perlengkapannya 1,00 set Rp. 2.875.000 = Rp. 2.875.000Bola tanda labuh 1,00 set Rp. 1.350.000 Rp. 1.350.000Radio komunikasi dan instalasi 1,00 unit Rp.14.000.000 Rp. 14.000.000GPS + fishfinder 1,00 unit Rp.22.400.000 Rp. 22.400.000Bendera nasional 1,00 buah Rp. 140.000 Rp. 140.000Teropong binacular(7 x50 mm) 1,00 buah Rp. 2.470.000 Rp. 2.470.000Total Biaya Peralatan Navigasi dan KomunikasiRp
Register : 20-10-2015 — Putus : 11-11-2015 — Upload : 30-07-2020
Putusan PT BANJARMASIN Nomor 26/PID.SUS-TPK/2015/PT BJM
Tanggal 11 Nopember 2015 — Pembanding/Terbanding/Terdakwa : H.HAMSANI Als H.SANI Bin HAMNI Alm
Terbanding/Pembanding/Penuntut Umum : DIMAS ADJI W. SH
10742
  • Lemar Buku 1,00 Bh Rp penne, Rp 720,000,00Xvi TK KARYA BUDI1 Meja Kursi Siswa 30,00 Pcs Rp acne, Rp 7,200,000,002 Meja Kursi Guru 1,00 Pcs Rp Spon Rp 600,000,003 Lemari Buku 1,00 Bh Rp gg one, Rp 720,000,00XVIII TKLB MABUUN1 Meja Kursi Siswa 30,00 Pcs Rp sAnne, Rp 7,200,000,002 Meja Kursi Guru 1,00 Pcs Rp 600,000, Rp 600,000,00003 Lemari Buku 1,00 Bh Rp 720,000, Rp 720,000,0000XIV TK KARTIKA MURNI KUALA1 PERAK 30,00 Pcs Rp oO non, Rp 7,200,000,00Meja Kursi Siswa 600,000,2 1,00 Pcs Rp 00 Rp 600,000,00Meja
    Kursi Guru 720,000,3 1,00 Bh Rp 00 Rp 720,000,00Lemari Buku240,000,see TK RUMAH LEBAH MABUUN 30,00 Pcs Rp 00 Rp 7,200,000,00Meja Kursi Siswa 600,000,1 1,00 Pcs Rp 00 RP 600,000,00Meja Kursi Guru 720,000,2 1,00 Bh Rp 00 Rp 720,000,003 Lemari BukuTK DESA UWEI 240,000,XxXI 30,00 Pcs Rp 00 Rp 7,200,000,00Meja Kursi Siswa1 1,00 PCS Rp 600,000,00 Rp 600,000,00Meja Kursi Guru 720,000,2 1,00 Bh Rp 00 Rp 720,000,00Lemari Buku 3 TK SDN 2 PEMBATAANXXII Meja Kursi Siswa 240,000,50,00 Pcs Rp 00 Rp 12,000,000,001
    Pcs Rp Se Rp 600,000,003 Lemari Buku 1,00 Bh Rp 720,000, Rp 720,000,00xvil TK KARYA BUDI 30,00 Pcs Rp 240,000, Rp 7,200,000,00ee 001 Meja Kursi Siswa2 Meja Kursi Guru 1,00 Pcs Rp 600,000, Rp 600,000,003 Lemari Buku 1,00 Bh Rp 720,000, Rp 720,000,00xvii TKLB M ABU UN 30,00 Pcs Rp 240,000, Rp 7,200,000,001 Meja Kursi Siswa2 Meja Kursi Guru 1,00 Pcs Rp 600,000, Rp 600,000,003 Lemari Buku 1,00 Bh Rp 720,000, Rp 720,000,0000XIV TK KARTIKA MURNI KUALA 30,00 Pcs Rp 240,000, Rp 7,200,000,001 PERAK 002 Meja
    Kursi Siswa 1,00 Pcs Re 600,000, Rp 600,000,003 Meja Kursi Guru 1,00 Bh RP 720,000, Rp 720,000,00Xx Lemari Buku 30,00 Pcs Re 240,000, Rp 7,200,000,00TK RUMAH LEBAH MABUUN1 Meja Kursi Siswa 1,00 Pcs Re 600,000, Rp 600,000,002 Meja Kursi Guru 1,00 Bh RP 720,000, Rp 720,000,003 30,00 Pcs Rp 240,000, Rp 7,200,000,00Lemari Buku TK DESA UWEI 00Xx!
    1 Meja Kursi Siswa 1,00 Pcs Rp 600,000, Rp 600,000,00002 Meja Kursi Guru 1,00 Bh Rp 720,000, Rp 720,000,00003 Lemari Buku 50,00 Pcs Re 240,000, Rp 12,000,000,00xxl TK SDN 2 PEMBATAANMeja Kursi Siswa 600,000,1 2,00 Pcs Rp 00 Rp 1,200,000,00Meja Kursi Guru 720,000,2 1,00 Bh Rp 00 Rp 720,000,00Lemari Buku3 SDN MASUKAU LUAR 240,000,XXIII 20,00 Pcs Rp 00 Rp 4,800,000,00Meja Kursi Siswa 600,000,1 2,00 Pcs Rp 00 Rp 600,000,00Meja Kursi Guru 720,000,2 1,00 Bh Rp 00 Rp 720,000,003 Lemari BukuJumiah RP 318,240,000,00