7829
  • Galian Tanah POER, Pondasi Foot Plat & Sloof Gantung 811.66 m3 18,700.16 15,178,171.87 0.18972 Pek. Galian Tanah Pondasi Batu Kali menerus 202.18 m3 18,700.16 3,780,798.35 0.04303 Pek. Urugan Pasir Bawah Pondasi Plat & sloof 20/40 t=10 cm 48.16 m3 81,361.52 3,918,370.80 0.49004 Pek. Urugan Pasir Bawah Pondasibatu kali t=10cm 7.78 m3 81,361.52 632,992.63 0.00795 Pek. Urugan Tanah Kembali bks Galian 771.45 m3 8,960.08 6,912,261,11 0.08646 Pek.
    Beton Pondasi Plat setempat P1dan P2 70.12 m3 2,164, 720.56 151,790,205.67 1.89714 Pekerjaan POER BetonP1A 43.20 m3 2,164, 720.56 93,515,928.19 1.16885 Pekerjaan Beton Sloof 1 (20/40) 76.16 m3 2,707,837.44 206,288,899.43 2.57756 Pekerjaan Beton Sloof 2 (20/30) 56.37 m3 2,707,837.44 152,640,796.49 1.90777 Pek.
    Galian Tanah POER, Pondasi Foot Plat & Sloof Gantung 811.66 m3 18,700.16 15,178,171.87 0.18972 Pek. Galian Tanah Pondasi Batu Kali menerus 202.18 m3 18,700.16 3,780, 798.35 0.04303 Pek. Urugan Pasir Bawah Pondasi Plat & sloof 20/40 t=10 cm 48.16 m3 81,361.52 3,918,370.80 0.49004 Pek. Urugan Pasir Bawah Pondasibatu kali t=10cm 7.78 m3 81,361.52 632,992.63 0.00795 Pek. Urugan Tanah Kembali bks Galian 771.45 m3 8,960.08 6,912,281.11 0.08646 Pek.
    Beton Pondasi Platsetempat P1dan P2 70.12 m3 2,164,720.56 151,790,205.67 1.89714 Pekerjaan POER Beton P1A 43.20 m3 2,164,720.56 93,515,928.19 1.16885 Pekerjaan Beton Sloof 1 (20/40) 76.16 m3 2,707,837.44 206,288,899.43 2.5775 Putusan Perkara Nomor : 25/Pid.Sus/TPK/2015/PN.Pgp halaman 33 dari 124 6 Pekerjaan Beton Sloof 2 (20/30) 56.37 m3 2,707,837.44 152,640, 796.49 1.90777 Pek.
    Addendum Pertama Nomor 01.A/KPJPAPBD/DPU/2010 tanggal 20 April2010 berkaitan dengan sub pekerjaan struktur dan atap, sub pekerjaanpondasi poer dan sloof, pekerjaan beton Struktur lantai 1 dan 2.g. Addendum Kedua Nomor 01.B/KPJBAPBD/DPU/2010 tanggal 02Oktober 2010.h.
Register : 06-06-2012 — Putus : 11-07-2012 — Upload : 26-09-2012
Putusan PT BENGKULU Nomor 08/Pid.TIPIKOR/2012/Pt.BKL
Tanggal 11 Juli 2012 — TASLIMUDIN BIN TAJUDIN
7021
  • Sloof 15/20 BTN.6.39 6,840 M3 .608.957,63 .685.270,162 Pek. Kolom Struktur 15/15 BTIN.6.41 5,670 M3 .631.864,88 .932.673,843 Pek. Rink Balk 15/20 BTN.6.39 6,840 M3 .608.957,63 .685.270,16SUB JUMLAH 81.303.214,15Ill PEKERJAAN PASANGAN1 Pas. Batu Kosong PPon.6.14 36,480 M3 .167,00 .739.852,162 Pas. Pondasi batu kali 1:4 PPon.6.5 61,560 M3 .790,00 .658.992,403 Pek. Rambat Beton Tumbuk 1:3:5 PB.6.1 11,580 M3 .820,00 .776.335,604 Pas. Batu Bata 1:4 PD.6.11 381,600 M2 .615,00 .381.084,005 Pek.
    Sloof 15/20 BTN.6.39 9,600 M3 .118.082,63 33.593,202 Pek. Kolom Struktur 15/20 BTIN.6.41 11,340 M3 .648.805,43 .717.453,523 Pek. Rink Balk 15/20 BTN.6.45 9,600 M3 .209.074,03 .007.110,64SUB JUMLAH 142.258.157,36Ill PEKERJAAN PASANGAN1 Pas. Batu Kosong (Aanstamping) PPon.6.14 56,000 M3 .167,00 .881.352,002 Pas. Pondasi batu kali 1:4 PPon.6.5 96,000 M3 .090,00 .816.640,003 Pek. Lantai Beton Tumbuk 1:3:5 PB.6.1 42,000 M3 .620,00 .866.040,00bawah lantai4 Pek.
    Sloof 15/20M36,84 511,58Beton memakai krikilbulat, sehingga tidakdapat mencapai K225,mutu terpasangsebanding mutuBetontumbuk,Pembesian terpasang110 kg/m3, di RAB114,23 kg/m3 (adakekurangan volumebesi=4,23 kg/m3) Pek. Kolom Struktur15/20M35,67 270,41Beton memakai krikilbulat, sehingga tidakdapat mencapai K225,mutu terpasangsebanding mutuBetontumbuk,Pembesian terpasang110 kg/m3, di RAB192,85 kg/m3 (adakekurangan volumebesi=82,85 kg/m3) Pek.
    Sloof 15/20 M3 6,84 yol 1,33Beton memakai krikil bulat,sehingga tidak dapat mencapaiIK225, mutu terpasangsebanding mutu Betontumbuk,Pembesian terpasang 110 kg/m3, di RAB 114,23 kg/m3 (adakekurangan volume besi=4,23kg/m3)2 Pek. Kolom Struktur M3 5,67 527 0,41Beton memakai krikil bulat,15/20 sehingga tidak dapat mencapaiIK225, mutu terpasangsebanding mutu Betontumbuk,iPembesian terpasang 110 kg/m3, di RAB 192,85 kg/m3 (adakekurangan volume besi=82,85kg/m3)3 Pek.
    Sloof 15/20 M3 9,60 ,60 ,00Beton memakai krikil bulat,sehingga tidak dapt mencapaiIK225, mutu erpasang sebandingdengan mutu beton tumbuk.Pembesian terpasang 110 kg/m3, RAB 144,23 kg/m3 (adamark up Volume besi=34,33 kg/m3)2 Pek. Kolom Struktur M3 11,34 84 2,50Bangunan A,B, beton memakai15/20 Kkrikil bulat, sehingga tidakdapat mencapai K225, mututerpasang sebanding mutulbeton tumbuk.
Register : 27-04-2018 — Putus : 28-05-2018 — Upload : 20-06-2019
Putusan PT BANDA ACEH Nomor 8/PID.SUS/TIPIKOR/2018/PT BNA
Tanggal 28 Mei 2018 — Pembanding/Terbanding/Terdakwa : MUSTAFA LISA Alias AFA Bin ANDRI LISA Diwakili Oleh : SYAHRUL RIZAL SH MH
Terbanding/Pembanding/Penuntut Umum II : WILDANI HAPIT SH
Terbanding/Penuntut Umum I : HELMI ABDUL AZIZ, SH
9435
  • VII.2 4.602.913,00 137.811.215,22x 140 cm2 Sloof 20/25 cm 15,73 M? SUPL. 4.550.030,00 71.571.971,90VIlc3 Balok Latai 13/15 4,58 M* SUPL. 7.088.696,00 32.466.227,68cm VIIk4 Kolom Tepi 5,85 M* SUPL. 5.613.411,00 32.838.454,35VIIf5 Kolom Tengah 10,53 M? SUPL. 5.613.411,00 59.109.217,83VIlg6 Kolom Rata 0,96 M? SUPL. 6.604. 708,00 6.340.519,68Dinding Vilh7 Kolom Teras 30/30 1,44 M2 SUPL. 4,132.979,00 5.951.489, 76cm VIIh8 Kolom Praktis 1,80 M?
    VII.2 4.602.913,00 137.811.215,22140 x 140 cm2 Sloof 20/25 cm 15,73 M? SUPL. VII 4.550.030,00 1.571.971,90Cc3 Balok Latai 4,58 M? SUPL. VII 7.088.696,00 32.466.227,6813/15 cm k4 Kolom Tepi 5,85 M? SUPL. VII 5.613.411,00 32.838.454,35f5 Kolom Tengah 10,53 M? SUPL. VII 5.613.411,00 59.109.217,836 Kolom Rata 0,96 M SUPL VIl 6.604.708,00 6.340.519,68Dinding h7 Kolom Teras 1,44 M SUPL. VII 4,132.979,00 5.951.489, 7630/30 cm h8 Kolom Praktis 1,80 M* SUPL.
    VII 5.946.360,00 28.720.918,80CaRport T = q10cm12 BakPenampunganAirGalian Tanah 24,00 M3 SNI 51.000,00 1.224.000,002835.2008(6.1) Sloof 20/25 0,80 M3 SUPL. VII 4.550.030,00 3.640.024,00cm CcBalok 20/25 0,80 M3 SUPL. VII 4.388.581,00 3.510.864,80cm Kolom Praktis 0,18 M3 SUPL. VII 8.195.595,00 1.475.207,10 Halaman 23 Putusan Nomor 8/PID.SUS/TIPIKOR/2018./PT BNA 15/15 cm hiBeton K250 0,72 M3 SUPL.
    VII.2 4.602.913,00 137.811.215,22140 x 140 cm2 Sloof 20/25 cm 15,73 M SUPL. VIlc 4.550.030,00 71.571.971,903 Balok Latai 4,58 M? SUPL. VIIk 7.088.696,00 32.466.227 ,6813/15 cm4 Kolom Tepi 5,85 M* SUPL. VIIf 5.613.411,00 32.838.454,355 Kolom Tengah 10,53 M? SUPL. VIIg 5.613.411,00 59.109.217,836 Kolom Rata 0,96 M? SUPL. VIIh 6.604.708,00 6.340.519 ,68Dinding7 Kolom Teras 1,44 M? SUPL. VIIh 4,132.979,00 5.951.489,7630/30 cm8 Kolom Praktis 1,80 M? SUPL.
    VIIq 5.946.360,00 28.720.918,80CaRport T =10 cm12 BakPenampunganAirGalian Tanah 24,00 M3 SNI 51.000,00 1.224.000,002835.2008(6.1) Sloof 20/25 0,80 M3 SUPL. VIlc 4.550.030,00 3.640.024,00cmBalok 20/25 0,80 M3 SUPL. VIIl 4.388.581,00 3.510.864,80cmKolom Praktis 0,18 M3 SUPL. VII 8.195.595,00 1.475.207,1015/15 cm hiBeton K250 0,72 M3 SUPL. VIIq 5.946.360,00 4.281.379,20Penutup 1,00 M3 Taksir 500.000,00 500.000,00 Halaman 40 Putusan Nomor 8/PID.SUS/TIPIKOR/2018.
Putus : 17-04-2012 — Upload : 12-06-2012
Putusan MAHKAMAH AGUNG Nomor 556 K/Pid.Sus/2012
Tanggal 17 April 2012 — ISWANDI alias IWAN bin ISMAIL
2617 Berkekuatan Hukum Tetap
  • Sloof beton 20X70 163.579.911,11 109.608.796,24 53.971.114,87 (168,34 kg)7 Pek. Cor kolom utama 70.536 524,82 58.665.855,60 11.870.669,22 Hanya ada45X45 (195,71 kg) ukuran 40/408 Pek. Cor kolom utama 9.271.450,82 3.127.190,35 6.144.260,47 Hanya adadiameter 40 cm (2116,64 diameter 20Kg) cm9 Pek. Cor kolom utama 9.508.008,41 5.897 824,76 3.610.183,64 Hanya ada25X40 (241, 76 kg) ukuran 25/1510 Pek.
    Sloof beton 20X70 163.579.911,11 109.608.796,24 53.971.114,87 (168,34 kg)7 Pek. Cor kolom utama 70.536.524,82 58.665.855,60 11.870.669,22 Hanya ada45X45 (195,71 kg) ukuran 40/408 Pek. Cor kolom utama 9.271.450,82 3.127.190,35 6.144.260,47 Hanya adadiameter 40 cm (2116,64 diameter 20Kg) cm9 Pek. Cor kolom utama 9.508.008,41 5,897 824,76 3.610.183,64 Hanya ada25X40 (241, 76 kg) ukuran 25/1510 Pek.
    , bahwa kekurangan dalam pelaksanaanpekerjaanpekerjaan sebagaimana tercantum dalam RAB antara lain adalah: PEKERJAAN PONDASI Pekerjaan stick pondasi setempat 1 (195,71 kg) senilaiRp 24.749.657,83 ; Pekerjaan pondasi setempat 2 (186 kg) senilai Rp 10.704.140,63 ; Pekerjaan stick pondasi setempat 2 (211,64 kg) senilaiRp 3.450.692,80 ; Pekerjaan pondasi setempat 3 (168 kg) senilai Ro 5.120.745,00 ; Pekerjaan stick pondasi setempat 3 (241,76 kg) senilaiRp 3.002.528,97 ; PEKERJAAN STRUKTUR Pekerjaan sloof
    menunjukkan bahwayang belum dikerjakan itu hanyalah tiga item saja yaitu PekerjaanKeramik lantai dasar, hal ini belum bisa dikerjakan karena bangunanbelum siap seluruhnya ;Bahwa item kedua yang belum dikerjakan adalah instalasi listrik, hal inibelum bisa dikerjakan karena belum ada tiangtiang untukpemasangan instalasi listrik itu, dan tiang ;Pembersihan akhir juga belum dikerjakan karena pembersihan akhir inihanya dilakukan pada waktu bangunan sudah selesai ;Bahwa selain dari pada itu baik stik pondasi, sloof
Register : 09-07-2015 — Putus : 30-11-2015 — Upload : 29-12-2015
Putusan PN KUPANG Nomor 41/Pid.Sus-TPK/2015/PN.Kpg
Tanggal 30 Nopember 2015 — Benediktus Bahan Kelen, S.T
14595
  • Sloof 30/50; Beton Bertulang K M3 33.65 4,771,659.59 160,542,486.802153. Balok G11 uk. 30/60; Beton M3 13.41 5,213,443.16 69,912,272.82 Bertulang K275 Halaman 20 dari 186 Putusan Nomor 41/Pid.SusTPK/2015/PN.Kpg 4. Balok G12 uk. 30/60; Beton M3 5.96 5,213,443.16 31,080,462.76Bertulang K2755. Balok G13 uk. 30/60; Beton M3 8.26 4,553,961 .88 37,624,833.05Bertulang K2756. Balok G14 uk. 30/60; Beton M3 8.82 4,940,443 .61 43,574,712.60Bertulang K2757.
    Sloof Praktis uk. 15/20;Beton Bertulang K1757. Balok Ring Praktis uk. 15/20;Beton Bertulang K1758. Meja Beton DudukanWastafel; Beton Bertulang K 50.1213.683.275.841.562.131.860.35 0.009.532.934.220.561.891.800.42 50.124.140.341.631.000.240.060.07 0.00%1.80%0.47%0.61%0.08%0.23%0.22%0.03%Halaman 44 dari 186 Putusan Nomor 41/Pid.SusTPK/2015/PN.Kpg 175 9 Plat Atapt= 10cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.
    Sloof 30/50; Beton Bertulang K M? 33.65 4,771,659.59 160,542,486.802753. Balok G11 uk. 30/60; Beton M3 13.41 5,213,443.16 69,912,272.82Bertulang K2754. Balok G12 uk. 30/60; Beton M3 5.96 5,213,443 .16 31,080,462.76Bertulang K2755. Balok G13 uk. 30/60; Beton M3 8.26 4,553,961.88 37,624,833.05Bertulang K2756. Balok G14 uk. 30/60; Beton M? 8.82 4,940,443 .61 43,574,712.60 Bertulang K275 Halaman 54 dari 186 Putusan Nomor 41/Pid.SusTPK/2015/PN.Kpg 7.
    Sloof Praktis uk.15/20; Beton Bertulang M3 6.92 2,184,785.71 15,112,162.76K1757. Balok Ring Praktis uk.15/20; Beton BertulangK1758. Meja Beton DudukanWastafel; BetonBertulang K1759. Plat atap t=10 cmSUB JUMLAH B2 271,857 ,206.56B6 PEKERJAANSANITAIR Bh 6.00 600,000.00 3,600,000.001. Pasangan Bak Air2. Instalasi Air Kotor M! 39.83 34,000.00 1,354,220.00 PVC 4 M! 26.47 28,000.00 741,160.00 PVC 3 M!
    Sloof Praktis uk. 15/20;Beton Bertulang K1757. Balok Ring Praktis uk. 15/20;Beton Bertulang K1758. Meja Beton DudukanWastafel; Beton Bertulang K1759 Plat Atapt= 10cm m3 50.1213.683.295.841.562.131.860.356.92 0.009.532.934.220.561.891.800.423.39 50.124.140.341.631.000.240.060.073.52 0.00%1.80%0.47%0.61%0.08%0.23%0.22%0.03%0.22% Halaman 78 dari 186 Putusan Nomor 41/Pid.SusTPK/2015/PN.Kpg PEKERJAAN SANITAIR B.61 Pas.
Putus : 05-05-2011 — Upload : 18-10-2011
Putusan PT TANJUNG KARANG Nomor 29/ Pid/ 2011/ PT. TK.
Tanggal 5 Mei 2011 — SAFUAN JAUHARI, S.H., MM bin JAUHARI.
6924
  • Fondasi batu belah adk G32H M3 2.641:52 Sloof beton 12/15 G41 M3 1.983 Kolom beton 20/20 G41 M3 0.484 Kolom praktis J1I/1ll (t = 3,5 G4l M3 0.51M)5 Kolom praktis Il/ll (t =G4l1 M3 0.583,M)6 Ring balk 12/15 G41 M3 1.427 Balok teras 17/17 G41 M3 0.45III Pek.
    Fondasi batu belah G32H M3 3.96adk 1:52 Sloof beton 12/15 G41 M3 2.973 Kolom beton 20/20 G41 M3 0.844 Kolom praktis I1I/11 (t =(G4l M3 0.893,5 M)5 Kolom praktis I1I/11 (t =G4l M3 0.803,M)6 Ring balk 12/15 G41 M3 2.357 Balok teras 17/17 G41 M3 0.69III Pek.
    Fondasi batu belah G32H M3 3.96adk 1:52 Sloof beton 12/15 G41 M3 2.973 Kolom beton 20/20 G41 M3 0.844 Kolom praktis I1I/11l (t =G4l M3 0.893,5 M)5 Kolom praktis I1I/11 (t =(G4l M3 0.803,M)6 Ring balk 12/15 G41 M3 2.357 Balok teras 17/17 G41 M3 0.69III Pek.
    Fondasi batu belah adk G32H M3 2.641:52 Sloof beton 12/15 G41 M3 1.983 Kolom beton 20/20 G41 M3 0.484 Kolom praktis JI1I/1l (t = 3,5 G4l M3 0.51M)5 Kolom praktis Il/ll (t =G4l1 M3 0.583,M)6 Ring balk 12/15 G41 M3 1.427 Balok teras 17/17 G41 M3 0.45III Pek.
    Fondasi. batu belah (G32H M3 3.96adk 1:52 Sloof beton 12/15 G41 M3 2.973 Kolom beton 20/20 G41 M3 0.844 Kolom praktis I1I/I11 (t =(G4l M3 0.893,5 M)5 Kolom praktis II/I11 (t =(G4l M3 0.803,M)6 Ring balk 12/15 G41 M3 2.357 Balok teras 17/17 G41 M3 0.69III Pek.
Register : 29-04-2014 — Putus : 03-09-2014 — Upload : 30-09-2014
Putusan PN BANDA ACEH Nomor 15/Pid.Sus-TPK/2014/PN Bna
Tanggal 3 September 2014 — Sayuti, S.H. Bin Muhammad Daud
7420
  • Sloof beton m3 22,50 3.796.700,00 85.425.750,00 Pek. Cor Beton Kolom Tribun (40 x 40 ) m3 3.796.700,00 Pek. Cor Beton Kolom Tribun (30 x 30 ) m3 3.796.700,00 7 Pek. Cor Beton Kolom Tribun (50 x50 ) m3 23,10 3.796.700,00 87.703.770,00 Pek. Cor Balok atas (30 x 40 ) m3 3.796.700,00 Pek. Cor Balok atas (30 x 50 ) m3 20,57 3.796.700,00 78.079.135,50 Pek. Cor Flat lantai m3 34,51 3.796.700,00 131.024.117,007 Pek. Cor Tempat Duduk m3 78,40 3.796.700,00 297.66 1.280,00 Pek.
    Sloof beton m3 16,56 3.796.700,00 62.873.352,00 Pek. Cor Beton Kolom Tribun (40 x 40 ) m3 3.796.700,00 Pek. Cor Beton Kolom Tribun (30 x 30 ) m3 3.796.700,00 Pek. Cor Beton Kolom Tribun (50 x 50 ) m3 16,80 3.796.700,00 63.784.560,00 Pek. Cor Balok atas (30 x 40 ) m3 3.796.700,00 Pek. Cor Balok atas (30 x 50 ) m3 14,82 3.796.700,00 56.267.094,007 Pek. Cor Flat lantai m3 24,65 3.796.700,00 93.588.655,00 Pek. Cor Tempat Duduk m3 56,00 3.796.700,00 212.615.200,00= Pek.
    Pondasi umpak beton bertulang 68,41 29,17 234.150.329,70 99.847.004,40= Pekerjaan Sloof beton 44.63 32,78 152.737.987,50 112.181.559,53= Pek. Kolom Beton bertulang (belakang ) 21,17 15,02 72.458.559,00 51.391.977,417 Pek. Plesteran Bata 1 : 2 408,38 351,37 17.110.912,50 14.722.486,80= Pek.
    Pondasi umpak beton bertulang 68,41 29,17 234.150.329,70 99.847.004,40= Pekerjaan Sloof beton 44.63 32,78 152.737.987,50 112.181.559,53 Pek. Kolom Beton bertulang (belakang ) 21,17 15,02 72.458.559,00 51.391.977,41= Pek. Plesteran Bata : 2 408,38 351,37 17.110.912,50 14.722.486,807 Pek.
    Pondasi umpak beton bertulang 68,41 29,17 234.150.329,70 99.847.004,40 Pekerjaan Sloof beton 44.63 32,78 152.737.987,50 112.181.559,53= Pek. Kolom Beton bertulang (belakang ) 21,17 15,02 72.458.559,00 51.391.977,417 Pek. Plesteran Bata 1 : 2 408,38 351,37 17.110.912,50 14.722.486,80= Pek.
Register : 19-06-2014 — Putus : 16-04-2015 — Upload : 24-06-2015
Putusan PN BANDA ACEH Nomor 24/Pid.Sus-TPK/2014/PN Bna
Tanggal 16 April 2015 — 1.Ir. IRWANSYAH Bin MANSYUR 2.Drs. DJAKFAR Bin M.YUSUF
10322
  • Pekerjaan Sloof (K.225) Uk. 25 x 50 Cm 8,13 M3 Suplemen 3e 4.457.451,00 36.216.789,384. Pekerjaan Sloof (K.225) Uk. 20 x 30 Cm 2,19 M3 Suplemen 3c 4.432.376,00 9.706.903,445. Pekerjaan Kolom (K.225) Uk. 30 x 40 Cm 37,22 M3 Suplemen 4.f.3 5.339.239,00 198.747.832,54Pekerjaan Kolom (K.225) Uk. 20 x 30 Cm 2,31 Suplemen 4.f.3 5.339.239,00 12.333.642,096. Pekerjaan Kolom (K.175) Uk. 15 x 20 Cm 1,89 M3 Suplemen 4.d 8.292.621,00 15.673.053,697.
    Pekerjaan Beton Bertulang1 Pekerjaan Sloof (K.225) Uk. 25 x 50 CmBerdasarkan Volume Kontrak Awal untuk item Pekerjaan Sloof (K.225)Uk. 25 x 50 Cm adalah sebesar 32,25 M? Addendum Kontrak dan BackUp Data adalah sebesar 24,13 M3, hal ini mengakibatkan terjadinyapengurangan volume sebesar 8,12 M?
    Pekerjaan Sloof (K.225) Uk. 25 x 50 Cm 8,13 M3 Suplemen 3e 4.457.451,00 36.216.789,384. Pekerjaan Sloof (K.225) Uk. 20 x 30 Cm 2,19 M3 Suplemen 3c 4.432.376,00 9.706.903,445. Pekerjaan Kolom (K.225) Uk. 30 x 40 Cm 37,22 M3 Suplemen 4.f.3 /5.339.239,00 198.747.832,54Pekerjaan Kolom (K.225) Uk. 20 x 30 Cm 2,31 Suplemen 4.f.3 5.339.239,00 12.333.642,096. Pekerjaan Kolom (K.175) Uk. 15 x 20 Cm 1,89 M3 Suplemen 4.d 8.292.621,00 15.673.053,697. Pekerjaan Balok Lantai (K.225) Uk. 25x50 Cm 44,27.
    Pekerjaan Beton Bertulang1 Pekerjaan Sloof (K.225) Uk. 25 x 50 CmBerdasarkan Volume Kontrak Awal untuk item Pekerjaan Sloof (K.225)Uk. 25 x 50 Cm adalah sebesar 32,25 M* Addendum Kontrak dan BackUp Data adalah sebesar 24,13 M3, hal ini mengakibatkan terjadinyapengurangan volume sebesar 8,12 M? dimana sebenarnya volume awalsebesar 32,25 M?
    pasar basah;Foto pengecoran sloof pasar basah;Foto pengecoran kolom pasar los bertingkat;Foto pemasangan batu bata pasar los bertingkat;Hal. 231 dari 283 Hal.
Putus : 24-07-2012 — Upload : 12-07-2013
Putusan MAHKAMAH AGUNG Nomor 710 K/PID.SUS/2012
Tanggal 24 Juli 2012 — JONIARTO Bin M. YATTA
3219 Berkekuatan Hukum Tetap
  • STRUKTUR PLEA2 Sloof 15/20 82.1 m2 K62 18 a FF oO NViN 2a AF ODVilof Oo NVillKolom struktur 20/20Kolom praktis 11/11Ring balok 15/20PEKERJAAN DINDINGPas.
    Sloof 15/20 1,02 ms AnI.B.9a 6.582.055,95 7.108.620,432. Kolom struktur 20/20 1,08 m! B.6.45 61.031 415.010,80 pemb3. Kolom praktis 11/11 6,80 m? Anl.B.9 5.729.330,37 5.843.916,98) ersia4. Ring balok 15/20 1,02 17.598.736,89 nsloof10.pembersiankolomstruktur 410dan 48.pembersianRingBalok10Iv PEKERJAAN DINDING 82,1 m2 D.6.11 71.080,00 5.835.668,001. Pas. Batu bata 1:4 (3,40) 164,20 m2 Pt.6.4 23.900,00 3.924.380,002. Plesteran 1:4 (6,80) 0,25 i K.6.2 4.344.900,00 1.086.225,003.
    Sloof 15/202. Kolom struktur 20/20 1,02 m 33. Kolom praktis 11/11 1,08 m34. Ring balok 15/20 6,80 m31,02 m>IV PEKERJAAN DINDING1. Pas. Batu bata1 :42. Plesteran 1: 43. Kayu kusen pintu dan jendela 82,1 m44. Daun pintu panel (2 unit) 164,20 m4 Hal. 35 dari 43 hal. Put.
    STRUKTUR ms Anl.B.4 4.148.224 ,20 4.231.188,68) As Sloof 15/20 1,02 m3 Anl.B.9a 6.582.055,95 7.108.620,432. Kolom struktur 20/20 1,08 m1 B.6.45 61.031 415.010,80 pemb3. Kolom praktis 11/11 6,80 a Anl.B.9 5.729.330,37 5.843.916,98 ersia4. Ring balok 15/20 1,02 17.598.736,89 isloof10pembersiankolomstruktur 410dan 48pembersianRingBalok10IV PEKERJAAN DINDING 82,1 m? D.6.11 71.080,00 5.835.668,00)1. Pas. Batu bata 1:4 (3,40) 164,20 Pte.4 23.900,00 3.924.380,00 62 m22.
    STRUKTUR M3 4.148.224,20 1,02 4.148.224,20 1,02 3.676.419,01 4, Sloof 15/20 M3 6.582.055,95 1,08 6.582.055,95 1,08 5.799.858,43 554.769,67 Pembesian2. Kolom struktur 20/20 M3 61.031 6,80 61.031 6,80 415.010,80 1.308.762,00 tidak sesuai3, Kolom praktis 11/11 M 5,729.330,37 1,02 5,729.330,37 1,02 5.843.916,98 ukuran4, Ring balok 15/20 17.598.736,89 15.297.313,89 437.891 ,332.301.423,00IV PEKERJAAN DINDING M3 5.835.668,00 85,50 (3,40)1. Pas.
Putus : 12-11-2014 — Upload : 11-05-2015
Putusan MAHKAMAH AGUNG Nomor 646 K/Pid.Sus/2014
Tanggal 12 Nopember 2014 — YUNITA SARI, S.Pd als YUNI binti ALI AZWAR
2012 Berkekuatan Hukum Tetap
  • Kolom Praktis 13/13 PEK.BETON 6.45 0.43 M3 2.478.785 1.065.877,55Pek Sloof 15/15 PEK.BETON 6.39 0.57M3 2.283.389 1.301.531,73Pek. Rink Balk 13/15 PEK.BETON 6.46 0.57 M3 2.487.835 1.418.065,953.Pas Dinding Batu Bata 1: 4 PEDIN 6.14 60.33 M2 91.350 5.511.145,504 Plesteran tembok+kolom 1:2 PEK.PLES 6.2 125.23 M2 31.800 3.982.314,005.Pek Rabat Keliling Beton Tumbuk 1 :3:5 PEK BETON 6.1 1,79 M3 621.400 1.112.306,006.Pek.
    Kolom Praktis 13/13Pek Sloof 15/15Pek. Rink Balk 13/53.Pas Dinding Batu Bata 1: 44.Plesteran tembok+kolom 1:25.Pek Rabat Keliling Beton Tumbuk 1 :3:56.Pek. Beton Tumbuk 1 :3 : 5 Bawah LantaiPEKERJAANKAYU DAN KACA1.Pek. Kayu Kuda kudadan Gording2.Pek. Kosen Pintu dan Jendela3.Pek. List Plank Papan 3/254.Pas Pintu Ply wood Lapis SengPEKERJAANATAP1.Pek Penutup Atap Seng Gelombang Bjls 282.Pek.
    Kolom Praktis 13/13 PEK.BETON 6.45 0.43 M3 2.478.785 1.065.877,55Pek Sloof 15/15 PEK.BETON 6.39 0.57M3 2.283.389 1.301.531,73Pek. Rink Balk 13/5 PEK.BETON 6.46 0.57 M3 2.487.835 1.418.065,953.Pas Dinding Batu Bata 1: 4 PEDIN 6.14 60.33 M2 91.350 5.511.145,504 Plesteran tembok+kolom 1:2 PEK.PLES 6.2 125.23 M2 31.800 3.982.314,005.Pek Rabat Keliling Beton Tumbuk 1 :3:5 PEK BETON 6.1 1,79 M3 621.400 1.112.306,006.Pek.
    Kolom Praktis 13/13 0.43 M3 0.43Pek Sloof 15/15 0.57M3 0.57Pek. Rink Balk 13/15 0.57 M3 0.573.Pas Dinding Batu Bata 1: 4 60.33 M2 58.33 2.004.Plesteran tembok+kolom 1:2 125.23 M2 112.70 12.535.Pek Rabat Keliling Beton Tumbuk 1 :3:5 1,79 M3 0.77 1.026.Pek. Beton Tumbuk 1:3 : 5 Bawah Lantai 1,65 M3 1,65MV. PEKERJAANKAYU DAN KACA1.Pek. Kayu Kuda kudadan Gording 0,50 M3 0,502.Pek. Kosen Pintu dan Jendela 0,13 M3 0,133.Pek.
Register : 20-06-2019 — Putus : 12-09-2019 — Upload : 19-09-2019
Putusan PN KENDARI Nomor 15/Pid.Sus-TPK/2019/PN Kdi
Tanggal 12 September 2019 — Penuntut Umum:
BUSTANIL N. ARIFIN, SH
Terdakwa:
MUHAMMAD NASIR
9176
  • Sloof 15 X Volume 20 Camp 1:2:3 Log Ms Ome (0.4) KurangPek. Balok Latey 4 Camp 1:2:3 14.50 M 14.50 0.00 TetapPek. Ringbalk 15 Volume5 X 20 Camp 1:2: 1.55 M3 0.77 (0.8)3 KurangPEKERJAANV. RANGKA ATAPDAN PLAFONDPas. AtapVolume1 Spandek 720.37 M2 572.67 (147.7) Kurang Zincalume 0,4 mm Halaman 15 dari 137 halaman,Putusan No. 15/Pid.SusTPK/2019/PN. Kdi g Pas. Nok Bala 62.49 M' 62.95 05 ValurineRingan TambahPas.
    Sloof 15 X VolumeT2 20Camp1:2:3 6.89 Ms GAL 8.0 ambahPek. Balok Latey Volume3 Camp 1:2:3 102.07 M 89.00 (13.1) KurangPek. Ringbalk 15 Volume4 x 20 Camp 1: 2: 6.39 M3 5.03 (1.4) KurangPEKERJAANXV RANGKA ATAPDAN PLAFONDPas. KudakudaBaja Ringan Volume1 Untuk Atap 605.83 M2 661.67 55.8 iarabaliSpandekPas. Atap volurie2 Spandek 605.83 M2 661.67 55.8: ambahZincalume 0,4 mm3 Pas. Nok Baja 49.50 Mt 59.00 95 VolumeRingan ambahPas.
    Sloof 15x20 (0.bk) Kg/Cm2 130.82 2005. Ring balk 15x20(0.bk) Kg/Cm2 161.82 200 Bahwa terdakwa selau PPK yang telah membayarkan 100% kegiatanPembangunan Peningkatan Puskesmas Non Rawat Inap menjadi Rawat InapPuskesmas Bobolio Kecamatan Wawonii Selatan pada Dinas Kesehatan danSosial Kab.
    Bahwa yang saksi lakukan pengujian adalah pada struktur bangunan antaralain Item Pekerjaan Kolom Utama Teras, Kolom Praktis, Balok Latey, Sloof,Ring Balok. Bahwa pengetesan yang saksi lakukan pada item tersebut diatas saat itusecara keseluruhan sudah mencantumkan pekerjaan beton sesuai yangtertera dalam kontrak atas pekerjaan tersebut .
    Sloof 15 X Volume3 20 Camp 1:2:3 108 Ms D:f2 (04) KurangPek. Balok Latey 4 Camp 1:2:3 14.50 M 14.50 0.00 TetapPek. Ringbalk 15 Volume5 X 20 Camp 1:2: 1.55 M3 0.77 (0.8)3 KurangPEKERJAANV. RANGKA ATAPDAN PLAFONDPas. Atap1 Spandek 720.37 M2 572.67 (147.7) yume: urangZincalume 0,4 mm3 Pas. Nok Bala 62.49 M' 62.95 05 MeiRingan Tambah Halaman 100 dari 137 halaman, Putusan No. 15/Pid.SusTPK/2019/PN. Kdi Pas.
Putus : 28-09-2015 — Upload : 14-03-2016
Putusan PN SUNGAI PENUH Nomor 4/Pdt.G/2015/PN Spn
Tanggal 28 September 2015 —
549
  • Pekerjaan Pondasi, Sloof dan Besi Tiang satu buahruko, dengan biaya yang sudah penggugat keluarkansebesar Rp. 48.760.000 (empat puluh delapan juta tujuhratus enam puluh ribu rupiah).Halaman 3 dari 39 Putusan Nomor 4/Pat.G/20 15/PN.Spn2. Biaya pondasi cerucuk kayu dan sloof satu unit rumahsebesar Rp. 34.810.000 (tiga puluh empat juta delapanratus sepuluh ribu rupiah). Atas nama ADE MIGONASYAHRIL dan ALPAHDI.3.
    Pekerjaan Pondasi, Sloof dan Besi Tiang satu buah ruko, dengan biayayang sudah penggugat keluarkan sebesar Rp. 48.760.000 (empat puluhdelapan juta tujuh ratus enam puluh ribu rupiah);2. Biaya pondasi cerucuk kayu dan sloof satu unit rumah sebesar Rp.34.810.000 (tiga puluh empat juta delapan ratus sepuluh ribu rupiah).Atas nama ADE MIGONA SYAHRIL dan ALPAHDI;3. Biaya timbunan tanah ruko 900 m?
Putus : 09-03-2011 — Upload : 18-10-2011
Putusan PT BANGKA BELITUNG Nomor 9/PID/2011/PT BABEL
Tanggal 9 Maret 2011 — Ir. YENI FETRA Bin SYAFRI
12850
  • PEKERJAAN STRUKTURII PEKERJAAN PONDASI, SLOOF & ROLAGBATAPek.Pondasi P4 Batu kali Untuk 20,20 m3 532.740,00 10.761.348,004. Saluran 4,23 m3 195.037,54 825.008,7910 Pek.Lantai Beton Tbl 5 cm adukan1:3:5 u.bawah saluranSub Total 11.586.356,79C. PEKERJAAN ARSITEKTURI. PEKERJAAN DINDING / PLESTERAN5. Pek.Keramik Dinding, Lantai dan 0,75 m2 4.186.446,23 3.139.834,67R.Mushola Km/WC 20/22Sub Total 3.139.834,67II PEKERJAAN KUSEN, PINTU & JENDELAPek.Daun Pintu) Alumunium dengan7.
    PEKERJAAN SLOOF & ROLAG BATA Rp.11.586.356,79C. PEKERJAAN ARSITEKTURI. PEKERJAAN DINDING / PLESTERAN : Rp.3.139.834,67Il. PEKERJAANKUSEN PINTU & JENDELA : Rp.11.945.081,54V. PEKERJAAN LANTAI DAN KERAMIK : Rp.999 .817,00D. PEKERJAAN MEKANIKAL & ELEKTRIKALIII PEKERJAANELEKTRIKAL : Rp.6.000.000,00E.
    PEKERJAAN STRUKTURII PEKERJAAN PONDASI, SLOOF & ROLAG BATAPek.Pondasi P4 Batu kali Untuk Saluran 20,2 m3 532.740,0 TDK.SES.SPE4. Pek.Lantai Beton Tbl 5 cm adukan 1:3:5 0 m3 0 10.761.348 K10 u.bawah saluran 4,23 195.037,5 ,00 TDK.SES.SPE4 825.008,79 KSub Total 11.586.356,19C. PEKERJAAN ARSITEKTURI. PEKERJAAN DINDING / PLESTERAN5.
    PEKERJAAN STRUKTURII PEKERJAAN PONDASI, SLOOF & ROLAG BATAPek.Pondasi P4 Batu kali Untuk Saluran 20,2 m3 532.740,0 TDK.SES .SPEK4. Pek.Lantai Beton Tbl 5 cm adukan 1:3:5 0 m3 0 10.761.348 TDK.SES.SPEK10 u.bawah saluran 4,23 195.037,5 ,004 825.008 ,79Sub Total 11.586.356,79C. PEKERJAAN ARSITEKTURI. PEKERJAAN DINDING / PLESTERAN5.
Register : 09-07-2015 — Putus : 30-11-2015 — Upload : 04-02-2016
Putusan PN KUPANG Nomor 38/PIDSUS.TPK/2015/PN.KPG
Tanggal 30 Nopember 2015 — ALFONSIUS AFO NDAY
9751
  • Sloof Praktis uk. 15/20; Beton Me 2.13 4,116,106.34 8,767,306.50Bertulang K1757. Balok Ring Praktis uk. 15/20; Me 1.86 4,116,106.34 7,675,097.69Beton Bertulang K1758. Meja Beton Dudukan Me 0.35 2,184,785.71 772,758.71Wastafel; Beton Bertulang K175 Me 6.92 2,184,785.71 15,112,162.769. Plat Atap t=10 cmSUB JUMLAH B2 271,857,206.56B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002.
    Sloof Praktis uk. 15/20; Me 0.35 2,184,785.71 772,758.71Beton Bertulang K1757. Balok Ring Praktis uk. Me 6.92 2,184,785.71 15,112,162.7615/20; Beton Bertulang K1758. Meja Beton DudukanWastafel; Beton BertulangK1759. Plat atap t=10 cmSUB JUMLAH B2 279,960,085.62B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002. Instalasi Air Kotor PVC 4 M' 39.83 34,000.00 1,354,220.00 PVC 3 M!
    Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K175 Putusan No. 38/PIDSUS.TPK/2015/PN.KPG33 7. Balok Ring Praktis uk. 15/20; m3 1.86 1.80 0.06 0.22%Beton Bertulang K1758. Meja Beton Dudukan Wastafel:; m3 0.35 0.42 0.07 0.03%Beton Bertulang K1759 Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.
    Sloof 30/50;Beton BertulangK2753. Balok G11 uk.30/60; BetonBertulang K2754. Balok G12 uk.30/60; BetonBertulang K2755. Balok G13 uk.30/60; BetonBertulang K2756. Balok G14 uk.30/60; BetonBertulang K2757. Balok G15 uk.35/70; BetonBertulang K2758. Balok B1 uk.25/40; BetonBertulang K2759. Balok B2 uk.20/35; BetonBertulang K27510. Balok B3 uk.20/50; BetonBertulang K27511.
    Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K1757. Balok Ring Praktis uk. 15/20; m3 1.86 1.80 0.06 0.22%Beton Bertulang K1758. Meja Beton Dudukan Wastafel:; m3 0.35 0.42 0.07 0.038%Beton Bertulang K1759 Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22%B.6 PEKERJAAN SANITAIR1 Pas.
Register : 09-10-2015 — Putus : 11-02-2016 — Upload : 28-07-2016
Putusan PN JAKARTA PUSAT Nomor 128/Pid.Sus/2015/PN.Tipikor.Jkt.Pst
Tanggal 11 Februari 2016 — Pidana Korupsi - PANGLIMA TARIGAN
7725
  • 15/15 dan sparing.24Pekerjaan Bekisting Untuk Sloof, pada Addendum terdapatVolume 104,21 m?
    pada Pemeriksaan Hasil Pelaksanaan Pekerjaan 1.620,71m', terdapat selisih Volume sebesar 252.96 m'.b) Pekerjaan Pasang Sloof 15/15 dan sparing.1.Pekerjaan Bekisting Untuk Sloof, pada Kontrak terdapatVolume 119.62 m? pada Pemeriksaan didapat HasilPelaksanaan Pekerjaan 61.20 m?
    .Pekerjaan Pasang Sloof 15/15 dan sparing.(3)Pekerjaan Bekisting Untuk Sloof, padaAddendum terdapat Volume 104,21 m? padaPemeriksaan didapat Hasil PelaksanaanPekerjaan 61.20 m?
    15/15 dan sparing.(1)Pekerjaan Bekisting Untuk Sloof, pada Kontrak terdapatVolume 119.62 m?
    15/15 dan sparing.(1) Pekerjaan Bekisting Untuk Sloof, pada Addendum terdapatVolume 104,21 m?
Putus : 23-04-2015 — Upload : 20-08-2015
Putusan PT KUPANG Nomor 14/Pid.Sus-TPK/2015/PT.KPG
Tanggal 23 April 2015 — SUSILO HADI, S.Pd
4420
  • Beton bertulang camp. 1PC:2Psr:3Krl Cor Beton Sloof 15/20 K 175 2,018 2,348 m3 Cor Beton Kolom Praktis 15/15K 175 0,878 0,638 m3 Cor Beton Ringbalk 15/20K 175 2,018 2,348 m3Pek. Pasangan Tembok Batu Potong 1 pc :57 psr 10,907 9,038 m38 Pek. Plesteran Dinding Tembok 1pc : 5 psr 210,000 164,325 m29 Pek. Acian 210,000 164,325 m210 Pek. Pengecetan Dinding Tembok 210,000 164,325 m2PEK. SALURAN DRAINASE TIPE 150C. TRAPESIUM1 Pek. Galian tanah 691,200 475,093 m32 Pek. Urugan Pasir 18,000 m33 Pek.
    MigB PEKERJAAN PAGAR TEMBOKDEPAN= 78,25 DARI 70 M' Pekerjaan Persiapan1 Pembersihan Lokasi 1.000 Ls2 Pengadaan Air Kerja 1.000 Ls Pekerjaan Galian dan Timbunaan1 Pekerjaan Galian Tanah 25.200 10.89 M32 Pekerjaan Urugan Pasir Bawah Pondasi 2.100 2.24 M33 Pekerjaan Urugan Tanah Galian 12.600 7.61 M3lll Pekerjaan Pasangan dan Plesteran1 Pasangan Aanstanpeng Batu Karang 8.400 M3Pekerjaan Pasangan Pondasi Batu2 Karang 1pC : 6Psr 22.050 16.04 M33 Pekerjaan Beton Bertulang Camp.1Pc:2Psr:3Krl Cor Beton Sloof
    Beton bertulang camp.6 1PC:2Psr:3Krl Cor Beton Sloof 15/20 K 175 2,018 2,348 m3 Cor Beton Kolom Praktis 15/15K 175 0,878 0,638 m3 Cor Beton Ringbalk 15/20K 175 2,018 2,348 m3Pek. Pasangan Tembok Batu Potong 17 pc: 5 psr 10,907 9,038 m3Pek. Plesteran Dinding Tembok 1pc : 58 psr 210,000 164,325 m29 Pek. Acian 210,000 164,325 m210 Pek. Pengecetan Dinding Tembok 210,000 164,325 m2 C. PEK. SALURAN........30 PEK. SALURAN DRAINASE TIPE 150C. TRAPESIUM1 Pek. Galian tanah 691,200 475,093 m32 Pek.
    M3B PEKERJAAN PAGAR TEMBOKDEPAN= 78,25 DARI 70 M' Pekerjaan Persiapan1 Pembersihan Lokasi 1.000 Ls2 Pengadaan Air Kerja 1.000 Ls Pekerjaan Galian dan Timbunaan1 Pekerjaan Galian Tanah 25.200 10.89 M32 Pekerjaan Urugan Pasir Bawah Pondasi 2.100 2.24 M33 Pekerjaan Urugan Tanah Galian 12.600 7.61 M3lll Pekerjaan Pasangan dan Plesteran1 Pasangan Aanstanpeng Batu Karang 8.400 M3Pekerjaan Pasangan Pondasi Batu2 Karang 1pC : 6Psr 22.050 16.04 M33 Pekerjaan Beton Bertulang Camp.1Pc:2Psr:3Krl Cor Beton Sloof
Putus : 16-12-2010 — Upload : 17-05-2013
Putusan MAHKAMAH AGUNG Nomor 1277 K/PID.SUS/2010
Tanggal 16 Desember 2010 — JAINURI, SH.MH.
5731 Berkekuatan Hukum Tetap
  • tetapi yang dikerjakan hanyaseluas 244 M2;b Pembongkaran dan pemasangan sloof pada garasitidak dikerjakan ;c Pemasangan/penyambungan instalasi listrik tidakdikerjakan ;d Pekerjaan instalasi air diajukan pencairannyasebanyak 2 (dua) kali, dan lainlain ;e Bahwa Terdakwa Jainuri, SH.MH. selaku Pejabat Pembuat Komitmensebagaimana tugas dan wewenangnya tetapi tidak dilaksanakan sehinggamenyetujui bahwa pekerjaan Pembangunan Pos dan Garasi PemadamKebakaran Kec.
    Seruyan Hilir Tahun 2007 antara lain :Pekerjaan Pendahuluan :e Bangsal Kerja 15 buah : Rp. 2.625.000,00Pekerjaan Pembongkaran :e Pembongkaran Lantai Dermaga 147,75 M2: Rp. 1.390.615,62e Pembongkaran Sloof & Belagar 3,334 M2?
    ;a Pembongkaran dan pemasangan sloof pada garasi tidak dikerjakan ;b Pemasangan/penyambungan instalasi listrik tidak dikerjakan ;c Pekerjaan instalasi air diajukan pencairannya sebanyak 2 (dua) kali, danlainlain ; Bahwa Terdakwa Jainuri, SH.MH. selaku Pejabat Pembuat Komitmensebagaimana tugas dan wewenangnya tetapi tidak dilaksanakan sehinggamenyetujui bahwa pekerjaan Pembangunan Pos dan Garasi PemadamKebakaran Kec.
    Seruyan Hilir Tahun 2007 antara lain :Pekerjaan Pendahuluan :e Bangsal Kerja 15 buah : Rp. 2.625.000,00Pekerjaan Pembongkaran : Pembongkaran Lantai Dermaga 147,75 M2: Rp. 1.390.615,62e Pembongkaran Sloof & Belagar 3,334 M2?
    Pembongkaran dan pemasangan sloof pada garasi tidak dikerjakan. Sehinggapencairan dana proyek 100% atas pekerjaan tersebut mengakibatkan kerugian keuanganNegara sebesar Rp. 76.715.770, (tujuh puluh enam juta tujuh ratus lima belas ribu tujuhratus tujuh puluh rupiah) dan menguntungkan pemenang tender PT.
Register : 09-07-2015 — Putus : 30-11-2015 — Upload : 04-02-2016
Putusan PN KUPANG Nomor 36/PIDSUS.TPK/2015/PN.KPG
Tanggal 30 Nopember 2015 — BORGIAS PAU MOA, ST
14987
  • Sloof 30/50; Beton Bertulang K275 Vi 33.65 4,771,659.59 160,542,486.803. Balok G11 uk. 30/60; BetonBertulang K275 Me 13.41 5,213,443.16 69,912,272.824. Balok G12 uk. 30/60; BetonBertulang K275 Me 5.96 5,213,443.16 31 ,080,462.765. Balok G13 uk. 30/60; BetonBertulang K275 Vi 8.26 4,553,961.88 37 624,833.056.
    Sloof Praktis uk.15/20; Beton Me 6.92 2,184,785.71 15,112,162.76Bertulang K1757. Balok Ring Praktis uk.15/20; BetonBertulang K1758. Meja Beton DudukanWastafel; BetonBertulang K1759. Plat atap t=10 cmSUB JUMLAH B2 279,960,085.62B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002. Instalasi Air Kotor PVC 4 M' 39.83 34,000.00 1,354,220.00 PVC 3 M!
    Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K1757. Balok Ring Praktis uk. 15/20; Beton m3 1.86 1.80 0.06 0.22%Bertulang K1758. Meja Beton Dudukan Wastafel; Beton m3 0.35 0.42 0.07 0.03%Bertulang K1759 Plat Atap t= 10cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.
    Sloof Praktis uk. 15/20; Me 0.35 2,184,785.71 772,758.71Beton Bertulang K1757. Balok Ring Praktis uk. Me 6.92 2,184,785.71 15,112,162.7615/20; Beton BertulangK1758. Meja Beton DudukanWastafel; BetonBertulang K1759. Plat atap t=10 cm SUB JUMLAH B2 279,960,085.62 Putusan No. 36/PIDSUS.TPK/2015/PN.KPG 50 B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002.
    Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K1757. Balok Ring Praktis uk. 15/20; Beton m3 1.86 1.80 0.06 0.22%Bertulang K1758. Meja Beton Dudukan Wastafel; Beton m3 0.35 0.42 0.07 0.03%Bertulang K1759 Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.
Register : 12-07-2014 — Putus : 24-12-2014 — Upload : 09-07-2015
Putusan PN PALU Nomor 38/Pid.Sus-TPK/2014/PN Pal
Tanggal 24 Desember 2014 — MOH. IQBAL PAKAMUNDI, S.E
10116
  • kembali M3 114,755 95,475 19,2804 Urugan Sirtu Peninggian bawah M3 1.248,000 1.223,543 24,457lantaiA.3 Pekerjaan PondasiPondasi Lajur M3 88,240 89,488 (1,248)Pondasi Plat setempat M3 10,575 10,575 Pondasi Plat setempat M3 5,288 2,700 2,588(Dudukan sapot)Pondasi Batu kali M3 65,44076559 57,200 8,241Aanstamping M3 A.4 Pekerjaan Beton1 Beton Rabat beton Pondasi M3 17,675 17,800 (0,125)2 Lajur M3 3,525 3,525 3 Beton Rabat beton Pondasi M3 4 Titik M3 35,190 34,762 0,428Beton Rabat bawah lantaiBeton balok Sloof
    kopel 20/40 M3 4,716 4,427 0,289(S1) M3 31,971 30,564 1,4077 Beton Sloof Praktis 15/20 M3 5,654 5,378 0,276Beton kolom 30/30 (K1)8 Beton kolom 28/33 (dudukan M3 17,301 17,247 0,0549 sapot) M3 6,189 6,190 (0,001)10 Beton kolom 30/30 (K2) M3 11 Beton kolom 60/60 (K3) M3 12 Beton kolom praktis 15/15 M3 13 Beton balok latei M3 14 Beton Plat Panggung M3 11,710 11,868 (0,158)15 Beton Plat Tribun M3 Beton Plat Tangga 18 A.52 owoO AON Oo FWD +=> ete oO 6 Beton Balok BordesPekerjaan pasangan danPlesteranPasangan
    mengakibatkan kerugian negara sebesar Rp. 774.949.407,48sebagaimana tertuang dalam Surat Kepala BPKP Perwakilan SulawesiTengah Nomor: SR2836/PW19/5/2013 tanggal 10 Desember 2013 perihalLaporan Hasil Perhitungan Kerugian Keuangan Negara atasPembangunan Realisasi Pembayaran kontrak untuk PembangunanGedung Serbaguna Dinas Kebudayaan dan Pariwisata Propinsi SulawesiTen gah; 222 ono nnn nnn nnn nnn nnn nnn nnn nn nnn nn en nnn nee nnn ote e 6 Beton Rabat beton PondasiTitikBeton Rabat bawah lantaiBeton balok Sloof
    kopel 20/40(S1)Beton Sloof Praktis 15/20Beton kolom 30/30 (K1)Beton kolom 28/33 (dudukansapot)Beton kolom 30/30 (K2)Beton kolom 60/60 (K3)Beton kolom praktis 15/15Beton balok lateiBeton Plat PanggungBeton Plat TribunBeton Plat TanggaBeton Balok BordesPekerjaan pasangan danPlesteranPasangan diding Bata 1: 3Pekerjaan Lantai IlPekerjaan BetonBeton Plat Lantai t=12 cmBeton Plat EntranceBeton Plat TribuneBeton Balok 30/70 (B2)Beton Balok 20/40 (B1)Beton Balok 15/40 (B6)Beton kolom 30/30 (K1Beton kolom
    kopel 20/40 M3 4,716 4,427 0,289(S1) M3 31,971 30,564 1,4077 Beton Sloof Praktis 15/20 M3 5,654 5,378 0,276Beton kolom 30/30 (K1)8 Beton kolom 28/33 (dudukan M3 17,301 17,247 0,0549 sapot) M3 6,189 6,190 (0,001)10 Beton kolom 30/30 (K2) M3 11 Beton kolom 60/60 (K3) M3 12 Beton kolom praktis 15/15 M3 13 Beton balok latei M3 14 Beton Plat Panggung M3 11,710 11,868 (0,158)15 Beton Plat Tribun M3 Beton Plat Tangga 198 Beton Balok BordesA.5 Pekerjaan pasangan danPlesteran1 Pasangan diding Bata 1: 3 M2
Putus : 16-06-2014 — Upload : 27-01-2017
Putusan PT BANDA ACEH Nomor 10/PID-TIPIKOR/2014/PT-BNA
Tanggal 16 Juni 2014 — I. Saleh Kadri, SE, M.Si Bin H. Sakum II. H. Mik’un Sijabat, S.Pd Bin Alm H. Angkat Sijabat
5831
  • TanahLokasi di LuarBangunan Seteballm (Teras Depan,Belakang, Kiri danKanan SesuaiGambar)86.23668,950.005,945,972.200.47 Urugan PasirDibawah Lantai56.138134,950.007,575,836.600.60 Urugan TanahBawah Lantai957.96268,950.0066,051,497.145.22 85,045 7718.93 6.7 IllPEKERJAANBETONBERTULANG Beton Cor 1 : 3:5T=5cm (Lt.Kerja di BawahSloof Gantung)3.689527,382.001,945,644.040.15 Beton Cor 1:3 ::5T=5cm (Lt.Kerja di BawahKeramik)28.069527,382.0014,803,111.721.17 Pondasi Tapak11.523,259, 131.0031,049,189.12297 Sloof
    20/30(Diatas BatuGunung) 7.725 3,875,776.0029,940,369.60 2.36 Hal 7 dari Hal 36 Putusan No.10/Pid.Tipikor/2014/PT.BNA Sloof 20/305 (Gantung) 15.327 M 4,186,926.00 64,173,014.80 5.076 Kaki Kolom 25/25 6.300 M 5,245,475.00 33,046,492.50 2.61Kolom 30/307 (Tiang Teras) 0.828 M* 5,245,475.00 4,343,253.30 0.34Kolom Praktis8 (13/13) 7.137 M?
    Urugan TanahLokasi di LuarBangunan Setebal1m (Teras Depan,Belakang, Kiri danKanan SesuaiGambar)86.23668,950.005,945,972.200.47 Urugan PasirDibawah Lantai56.138134,950.007,575,836.600.60 Urugan TanahBawah Lantai957.962 68,950.0066,051,497.14 522 85,045 978.93 6.7 IiPEKERJAANBETONBERTULANG Beton Cor 1 : 3:5T=5cm (Lt.Kerja di BawahSloof Gantung)3.689527,382.001,945,644.040.15 Beton Cor 1: 3:5T=5cm (Lt.Kerja di BawahKeramik)28.069527,382.0014,803,111.721.17 Pondasi Tapak11.523,259,131.0037,545,189.12207 Sloof
    20/30(Diatas BatuGunung)Td2o3,875,776.0029,940,369.602.36 Sloof 20/30(Gantung)15.3274,186,926.0064,173,014.805.07 Kaki Kolom 25/256.3005,245,475.0033,046,492.502.61 Kolom 30/30(Tiang Teras) 0.828 5,245,475.00 4,343,253.30 0.34 Hal 17 dari Hal 36 Putusan No.10/Pid.Tipikor/2014/PT.BNA Kolom Praktis8 (13/13) 7.137 Me 6,864,336.00 48,990,766.03 3.87Balok Daag9 (13/35) 9.293 M* 6,093,786.00 56,629,553.30 4.47Plat Daak + Plat10 Sun Wearing 16.020 M 3,975,318.00 63,684,594.36 5.0311 Balok Latal 13/18 3.734