Ditemukan 270 data

Urut Berdasarkan
 
Register : 29-10-2015 — Putus : 16-03-2016 — Upload : 28-12-2016
Putusan PN PANGKAL PINANG Nomor 35/Pid.Sus/TPK/2015/PN Pgp
Tanggal 16 Maret 2016 — SAPARUDIN, ST, MT Als KUDUK Bin HAZALI
180963
  • L- 535166 1 set Aggregate Crushing Value Apparatus 154 mm L- 536167 2 set Soundness Test Set L- 537168 1 set Sample Splitter 2 1/2", 8 holes L- 538169 1 set Sample Splitter 3", 8 holes L- 539170 1 set Sample Splitter 1", 12 holes L- 540171 1 set Sample Splitter 3/4", 12 holes L- 541172 1 set Sample Splitter 1/2", 12 holes L- 542173 1 pcs Wooden Sieve 3 1/2" Mesh 90.0 nun L- 543174 1 pcs Wooden Sieve 3" L- 544175 1 pcs Wooden Sieve 2 1/2 L- 545176 1 pcs Wooden Sieve 2" L- 546177 1 pcs
Register : 03-11-2015 — Putus : 16-03-2016 — Upload : 28-12-2016
Putusan PN PANGKAL PINANG Nomor 36/Pid.Sus/TPK/2015/PN Pgp
Tanggal 16 Maret 2016 — IRWANSYAH, SE Bin A. KARIM
1047
  • L- 535166 1 set Aggregate Crushing Value Apparatus 154 mm L- 536167 2 set Soundness Test Set L- 537168 1 set Sample Splitter 2 1/2", 8 holes L- 538169 1 set Sample Splitter 3", 8 holes L- 539170 1 set Sample Splitter 1", 12 holes L- 540171 1 set Sample Splitter 3/4", 12 holes L- 541172 1 set Sample Splitter 1/2", 12 holes L- 542173 1 pcs Wooden Sieve 3 1/2" Mesh 90.0 nun L- 543174 1 pcs Wooden Sieve 3" L- 544175 1 pcs Wooden Sieve 2 L- 545176 1 pcs Wooden Sieve 2" L- 546177 1
Register : 24-07-2013 — Putus : 12-09-2013 — Upload : 03-08-2015
Putusan PT JAKARTA Nomor 28/PID/TPK/2013/PT.DKI
Tanggal 12 September 2013 — Ir. RICKSY PREMATURI, Dipl. MM.
17294
  • Survey Crew (Mapping &Hole Digger) To Support Eist Activities Work Req No : IMS/118/ESW/09/10;1 (satu) Bundel foto copy Please HaulOut Treated Cocs From SBF 4C27 &GS06 To Spreading Areas Work Reg No : IMS/119/ESW/09/101 (satu) Bundel foto copy Please HaulIn Cocs To 4C27 & GSVI FromContaminated Area Work Req No : IMS/124/ESW/09/101 (satu) Bundel foto copy Please Process Cocs In Treatment Cell Until < 1 %.Work Req No : IMS/125/MAD/09/101 (satu) Bundel foto copy Please Conduct Manpower To Dig Sample Holes
Register : 27-10-2015 — Putus : 16-03-2016 — Upload : 28-12-2016
Putusan PN PANGKAL PINANG Nomor 33/Pid.Sus/TPK/2015/PN Pgp
Tanggal 16 Maret 2016 — Ir. DARUSMAN, M.T., Bin CIK DAMIT
140380
  • L- 535166 1 set Aggregate Crushing Value Apparatus 154 mm L- 536167 2 set Soundness Test Set L- 537168 1 set Sample Splitter 2 1/2", 8 holes L- 538169 1 set Sample Splitter 3", 8 holes L- 539170 1 set Sample Splitter 1", 12 holes L- 540171 1 set Sample Splitter 3/4", 12 holes L- 541172 1 set Sample Splitter 1/2", 12 holes L- 542173 1 pcs Wooden Sieve 3 1/2" Mesh 90.0 nun L- 543174 1 pcs Wooden Sieve 3" L- 544175 1 pcs Wooden Sieve 2 1/2 L- 545176 1 pcs Wooden Sieve 2" L- 546177 1 pcs
Putus : 28-08-2014 — Upload : 09-11-2016
Putusan MAHKAMAH AGUNG Nomor 1094 K/PID.SUS/2014
Tanggal 28 Agustus 2014 — BACHTIAR ABDUL FATAH
286353 Berkekuatan Hukum Tetap
  • Work Req Nomor IMS/125/MAD/09/10;1 (satu) bundel foto copy Please Conduct Manpower To Dig Sample Holes ofCocs. Work Req Nomor IMS/128/MAD/10/10;1 (satu) bundel foto copy Please Conduct Survey Crew To Survey Cocs AtMinas Area. Work Req Nomor IMS/129/MAD/10/10;1 (satu) bundel foto copy Sampling AT Minas/Kotabatak SBFs. Work ReqNomor IMS/131/MAD/10/10;1 (satu) bundel foto copy Please HaulIn Cocs From Cocs Area (5D54 & 4C63) To Stockpiles Of SBF 4C27 And SBF GS06.
Register : 11-12-2012 — Putus : 08-03-2013 — Upload : 28-07-2016
Putusan PN JAKARTA PUSAT Nomor 81/Pid.B/TPK/2012/PN.Jkt.Pst
Tanggal 8 Maret 2013 — Pidana Korupsi - HERLAND bin OMPO
19588
  • Work Req No : IMS/125/MAD/09/10;1 (satu) Bundel foto copy Please Conduct Manpower ToDig Sample Holes Of Cocs Work Req No : IMS/128/71.72.73.74.75.76.V7.78.79.80.81.MAD/10/10;1 (satu) Bundel foto copy Please Conduct Survey CrewTo Survey Cocs At Minas Area Work Req No : IMS/129/MAD/10/10;1 (satu) Bundel foto copy Sampling AT Minas/KotabatakSBF s Work Req No : IMS/131/MAD/10/10;1 (satu) Bundel foto copy Please HaulIn Cocs From CocsArea (5D54 & 4C63) To Stockpiles Of SBF 4C27 AndSBF GS06 Work Reg No
Register : 22-08-2017 — Putus : 19-04-2018 — Upload : 17-05-2018
Putusan PN DEPOK Nomor 176/Pdt.G/2017/PN DPK
Tanggal 19 April 2018 — 1. PT. Swakarya Adi Sejahtera 2. PT. Swakarya Permaijaya., Dkk Melawan 1. PT. Bank Maybank Indonesia, Tbk 2. PT. Bank CIMB Niaga Tbk., Dkk
197805
  • Karabha Digdaya tidak akan menerbitkan TMC melebihi dari jumlah2400 TMC selama jangka waktu 5 tahun terhitung dari akta perdamaian inidihomologasi, untuk fasilitas 27 holes.
Putus : 08-09-2016 — Upload : 14-03-2018
Putusan MAHKAMAH AGUNG Nomor 36 PK/Pid.Sus/2015
Tanggal 8 September 2016 — Ir. RICKSY PREMATURY, Dipl. M.M
312275 Berkekuatan Hukum Tetap
  • Work Req No : IMS/125/MAD/09/10;1 (satu) bundel fotokopi Please Conduct Manpower To DigSample Holes Of Cocs Work Reg No : IMS/128/MAD/10/10:1 (satu) bundel fotokopi Please Conduct Survey Crew To SurveyCocs At Minas Area Work Req No : IMS/129/MAD/10/10;1 (satu) bundel fotokopi Sampling AT Minas/Kotabatak SBF sWork Reg No : IMS/131/MAD/10/10:1 (satu) bundel fotokopi Please Haulln Cocs From Cocs Area(5D54 & 4C63) To Stock Piles Of SBF 4C27 And SBF GS06Work Req No : IMS/136/ESW/11/10;1 (satu) bundel
Register : 27-12-2016 — Putus : 27-04-2017 — Upload : 20-06-2017
Putusan PN JAKARTA SELATAN Nomor 907/Pdt.G.KPPU/2016/PN JKT.SEL
Tanggal 27 April 2017 — - PT. COSL INDO - PT. HUSKY – CNOOC Madura Limited Lawan KOMISI PENGAWAS PERSAINGAN USAHA (KPPU)
416612
  • DatN Description of Deficiency & Date Rectified e; Remark Domain Standard / CriticalityoO Recommendation Opened Y/N CloInsp Bodysedwith 2 x 12 side outlets as Mandrel for drilling 201stipulated in Exhibit A1 Top Holes and 5Point 26.5. utilize the DiverterOverboard lines.37 Shall provide Coflexip New C&K hoses Drilling HCML Major 28.08.2015 Y 28.flexible hoses and NEW available onboard 08.spares as stipulated Exhibit the rig. 201A1 Point 26.6 and 26.7. 538 Shall provide as per COSL will do the Drilling
Register : 16-02-2017 — Putus : 19-04-2017 — Upload : 19-09-2022
Putusan PT JAMBI Nomor 1/PID.TPK/2017/PT JMB
Tanggal 19 April 2017 — Pembanding/Terbanding/Penuntut Umum : INSYAYADI
Terbanding/Pembanding/Terdakwa : Prof. Dr. Drs. H. AULIA TASMAN, M.Sc Phd Bin SAHARJIUN Diwakili Oleh : Prof. Dr. Drs. H. AULIA TASMAN, M.Sc Phd Bin SAHARJIUN
18233
  • 1 (satu) unit rak tabung reaksi (12 holes).
  • 1 (satu) unit slide box, 100 slides.
  • 4 (empat) unit slide tray multi colour, 20 slides.
  • 1 (satu) unit epicenter workstation.
  • 1 (satu) unit chemistry analyzer.
  • 1 (satu) unit soccorex 1 ul.
  • 5 (lima) unit soccorex 5-50 ul.
  • 5 (lima) unit soccorex 10-100 ul.
  • 5 (lima) unit soccorex 100-1000 ul.
  • 1 (satu) unit urine analyzer.