Ditemukan 774 data
181 — 93 — Berkekuatan Hukum Tetap
Sloof Praktis uk. 15/20; Beton M3 2.13 4,116,106.34 8,767,306.50Bertulang K1757. Balok Ring Praktis uk. 15/20; M3 1.86 4,116,106.34 7,675,097.69Beton Bertulang K1758. Meja Beton Dudukan Wastafel; M3 0.35 2,184,785.71 112,758.71Beton Bertulang K1759. Plat Atap t=10 cm M3 6.92 2,184,785.71 15,112,162.76SUB JUMLAH B2 271,857,206.56B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002.
Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K1757. Balok Ring Praktis uk. 15/20; Beton m3 1.86 1.80 0.06 0.22%Bertulang K1758. Meja Beton Dudukan Wastafel; m3 0.35 0.42 0.07 0.03%Beton Bertulang K1759 Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22%B.6 PEKERJAAN SANITAIR1 Pas.
Sloof Praktis uk. 15/20; M3 0.35 2,184,785.71 772,758.71Beton Bertulang K1757. Balok Ring Praktis uk. M3 6.92 2,184,785.71 15,112,162.7615/20; Beton Bertulang K1758. Meja Beton DudukanWastafel; Beton BertulangK1759. Plat Atap t=10 cmSUB JUMLAH B2 271,857,206.56B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002.
Sloof Praktis uk. 15/20; Beton Bertulang m3 2.13 1.89 0.24 0.23%K1757. Balok Ring Praktis uk. 15/20; Beton m3 1.86 1.80 0.06 0.22%Bertulang K1758. Meja Beton Dudukan Wastafel; Beton m3 0.35 0.42 0.07 0.03%Bertulang K1759 Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.
Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K1757. Balok Ring Praktis uk. 15/20; Beton m3 1.86 1.80 0.06 0.22% Bertulang K175 Hal. 67 dari 89 hal. Put. No. 739 K/PID.SUS/2016 8. Meja Beton Dudukan Wastafel; m3 0.35 0.42 0.07 0.03%Beton Bertulang K1759 Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.
59 — 35 — Berkekuatan Hukum Tetap
Sloof Praktis uk. 15/20; Beton M? 2.13 4,116,106.34 8,767,306.50Bertulang K1757. Balok Ring Praktis uk. 15/20; Me 1.86 4,116,106.34 7,675,097.69Beton Bertulang K1758. Meja Beton Dudukan Wastafel; mM? 0.35 2,184,785.71 772,758.71Beton Bertulang K1759. Plat atap t=10 cm Me 6.92 2,184,785.71 15,112,162.76SUB JUMLAH B2 271,857,206.56B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002.
Sloof Praktis uk. 15/20; Beton M? 2.13 4,116,106.34 8,767,306.50Bertulang K1757. Balok Ring Praktis uk. 15/20; Me 1.86 4,116,106.34 7,675,097.69Beton Bertulang K1758. Meja Beton Dudukan Wastafel; M> 0.35 2,184,785.71 772,758.71Beton Bertulang K1759. Plat atap t=10 cm Me 6.92 2,184,785.71 15,112,162.76SUB JUMLAH B2 279,960,085.62B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002. Instalasi Air Kotor PVC 4 mM?
Sloof Praktis uk. 15/20; Beton Bertulang K175 m3 2.13 1.89 0.24 0.23%7. Balok Ring Praktis uk. 15/20; Beton Bertulang K m3 1.86 1.80 0.06 0.22%1758. Meja Beton Dudukan Wastafel; Beton Bertulang K m3 0.35 0.42 0.07 0.03%1759 Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.
Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K1757. Balok Ring Praktis uk. 15/20; Beton m3 1.86 1.80 0.06 0.22%Bertulang K1758. Meja Beton Dudukan Wastafel; m3 0.35 0.42 0.07 0.03%Beton Bertulang K1759 Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22%B.6 EKERJAAN SANITAIR1 Pas.
Pranata
Tergugat:
1.Phua Eng Siak
2.Ratnawati
88 — 46
Bahwa Tergugat Ilmembangun Blok F No.43 dan F No. 42 dengan cara sebelummembangun adalah merobohkan bangunan lama lalu menimbun tanah80 cm ke seluruh area tanah, Lalu membuat bangunan tingkat 2 yangterdiri dari bangunan dengan struktur pondasi sendiri yaitu; sloof, kolom,dan balok tersendiri tidak menggantung atau menumpang padabangunan lain. Bahwa Pondasi struktur bangunan Tergugat II tidak adamenyentuh Bangunan Pondasi Penggugat.
, untuk menopang bangunan tersebut; Bahwa gambar bangunan perencanaan sama dengan bangunan yangada saat ini; Bahwa Jjarak antara dinding bersama yang lama dengan dinding yangbaru hanya beberapa centimeter saja, dan dipasang sloof untuk menopangbangunan Tergugat; Bahwa jarak yang berdekatan tersebut tidak mempengaruhi bangunanrumah Penggugat sehingga tidak akan terjadi keretakan, karena bangunantersebut tidak jadi satu dengan bangunan rumah Penggugat.
Bahwa Ahli dahulu satu Tim denganConsultan Apriyadin, S.T yang merancang bangunan rumah para Tergugat.Bahwa pondasi bangunan milik para Tergugat tidak ada menduduki pondasibangunan rumah Penggugat, dan saat itu pada pondasi dingding pembatasmilik Tergugat dipasang sloof, untuk menopang bangunan tersebut.
Bahwa jarakantara dinding bersama yang lama dengan dinding yang baru hanya beberapacentimeter saja, dan dipasang sloof untuk menopang bangunanTergugat.Bahwa jarak yang berdekatan tersebut tidak mempengaruhi bangunanrumah Penggugat sehingga tidak akan terjadi keretakan, karena bangunantersebut tidak jadi satu pondasi dengan bangunan rumah Penggugat. Bangunanrumah Penggugat retak akibat ada tambahan lantai 2 (dua) tanopa membuatpondasi baru yang ditempel langsung diatas dingding bersama.
Bahwadengan adanya sloof yang dipasang antara pondasi rumah dengan dindingpembatas yang baru bisa mempengaruhi daya tekan untuk transfer tekanan kesekitarnya yaitu ke pondasi utama yang baru;Menimbang, bahwa dari keterangan Ahli para Tergugat yakni DidikSuwandhono dibawah sumpah menerangkan Ahli bekerja sebagai konsultandibidang sipil. Bahwa Para Tergugat pernah konsultasi kepada Ahli mengenaistruktur rumahnya/konsultasi mengenai gambar rumah yang akan dibangunpara Tergugat.
93 — 56 — Berkekuatan Hukum Tetap
Pekerjaan pendahuluan Rp. 29.367.132,50,;Pekerjaan tiang pancang + Sloof + Skoor Rp. 344.115.669,38,;Pekerjaan lantai dan Gelagar Rp. 97.495.427,70,;Pekerjaan beton, tiang dan balok ulin Rp. 97.695.850,71,;Pekerjaan dinding dan plester Rp. 113.908.372,71,;Pekerjaan Atap/kap Rp. 144.696.858,56.;Perkerjaan Plafond Rp. 49.670.285,50,;on oo SF SNPekerjaan kusen, pintu, jendela & penggantung Rp. 37.050.728,69,;Hal. 3 dari 40 hal. Put. No. 134 PK/PID.SUS/20139.
ulin (gelagar tiang) 10/10:Volume Gelagan sloof ulin 10/10 sesuai RAB : 31,97 M3;Investigasi : 15,40 M3;Selisih : 16,57M3; Pemasangan lantai papan ulin 2/20:Volume lantai papan ulin 2/20 sesuai RAB : 498,75 M3;Investigasi ; 465,20 M3;Selisih : 33,55 M3; Cor lantai beton dengan tulangan susut (tebal 7 cm):Volume lantai beton dengan tulangan susut sesuai RAB : 34,95 M3;Investigasi : 32,48 M3;Selisih : 2,47 M3; Tiang ulin 8/8:Hal. 5 dari 40 hal.
No. 134 PK/PID.SUS/2013delapan puluh enam ribu seratus delapan puluh satu rupiah koma tiga belassen) dengan rincian sebagai berikut:Teom nN pos PP DNek 12.13.14.15.16.17.Pasang Sloof ulin (glagar tiang) 10/10 Rp.41.102.920,63;Pasang lantai papan ulin 2/20 Rp.1.966.868, 75;Cor lantai beton dengan tulangan susut tebal 7 cm Rp.1.131.021,65;Tiang ulin 8/8 Rp.2.182.895,00;Pasang kawat loket pada tiang tulang Rp. 956.250,00;List plafond gibsum tb. 7 cm (ruang bagian dalam) Rp. 401.625,00;Shower + kran
Pekerjaan tiang pancang + Sloof + Skoor Rp. 344.115.669,38,;3. Pekerjaan lantai dan Gelagar Rp. 97.495.427,70,;Pekerjaan beton, tiang dan balok ulin Rp. 97.695.850,71,;Pekerjaan dinding dan plester Rp.113.908.372,71,;Pekerjaan Atap/kap Rp. 144.696.858,56.;Perkerjaan Plafond Rp. 49.670.285,50,;Pekerjaan kusen, pintu, jendela & penggantung Rp. 37.050.728,69,;oe N oOoPekerjaan pengecetan dan finising Rp. 42.754.017,63.,;10. Pekerjaan plumbing dan sanitair Rp. 45.176.437,50,;11.
Pasang Sloof ulin (glagar tiang) 10/10 Rp.41.102.920,63;Pasang lantai papan ulin 2/20 Rp.1.966.868,75;Cor lantai beton dengan tulangan susut tebal 7 cm Rp.1.131.021,65;Tiang ulin 8/8 Rp.2.182.895,00;Pasang kawat loket pada tiang tulang Rp. 956.250,00;List plafond gibsum tb. 7 cm (ruang bagian dalam) Rp. 401.625,00;Shower + kran + aksesoris Rp.1.606.500,00;Pompa air 200 watss setara sanyo Rp. 637.500,00;oe nN FoF DfPenyambungan daya ke sekring box Rp. 1.530.000,00;oO.
Terbanding/Terdakwa : JACOB WAAS
96 — 43
PEKERJAAN BETON,LANTAI DAN PLESTERAN1 Pekerjaan Sloof Beton 15/20 M3 1.40 5.110.63 7.154.88(144.27 kg/M3) 0.70 2.982 Pekerjaan Ring Balok 15/20M3 1.40 6.453.81 9.035.32(144.27 kg/M3) 6.33 4.893 Pekerjaan Kolom 15/15 cmMs3 0.90 6.012.22 5.419.09(144.27 kg/M3) 0.33 8.304 Pekerjaan Kolom 20/20 M3 0.30 6.012.22 1.806.36(144.27 kg/M3) 0.33 6.105 Pekerjaan Plat Beton Penutup M3 4.70 6.702.95 31.503.8IPAL t = 15 cm (120.00 kg 0.70 68.29/m3)6 Pekerjaan Plat Beton Dasar M3 4.70 6.702.95 31.503.8Bak IPAL t
PEKERJAAN BETON, LANTAIDAN PLESTERAN1 Pekerjaan sloof beton 15/20 M3 1.40 1.15 (100kg/M3)2 Pekerjaan ring balok 15/20 M3 1.40 1.07 (120Kg/M3)3 Pekerjaan kolom 15/15cm M3 0.90 1.17 +(110Kg/M3)4 Pekerjaan kolom 20/20 M3 0.30 0.52 +(110Kg/M3)5 Pekerjaan plat beton penutup M3 4.70 3.72 IPAL t=15cm (100Kg/M3)6 Pekerjaan plat bleton dasar bak M3 4.70 3.60 IPAL t=15cm (100Kg/M3)7 Pekerjaan dinding beton bak M3 10.86 7.47 IPAL 15cm (100Kg/M3)8 Pekerjaan dinding keramik 20/20 M2 98.79 87.35 cm9 Pekerjaan
PEKERJAAN BETON,LANTAI DANPLESTERAN1 Pekerjaan Sloof Beton M3 0.83 4.020.8 6.227.415/20 (100 kg/M3) 10.25 11.542 Pekerjaan Ring Balok M3 0.83 4.724.7 5.507.415/20 (120 kg/M3) 40.72 53.79 Halaman 16 dari 83 Putusan No. 02/Pid.
M2 74.63 59.28 1:43 Pemasangan batu kali untuk M3 2.51 8.98 +pondasi4 Pemasangan batu kosong t=15 M3 2.87 3.76 +cm5 Pemasangan dinding batu angin Bh 9.00 16.00 +6 Pemasangan bata pondasi M2 2.40 AdIV PEKERJAAN BETON, LANTAIDAN PLESTERAN1 Pekerjaan sloof beton 15/20 M3 0.83 1.29 +(100kg/M3)2 Pekerjaan ring balok 15/20 M3 0.83 0.97 +(120Kg/M3)3 Pekerjaan kolom 15/15cm M3 0.90 1.08 +(110Kg/M3)4 Pekerjaan kolom 20/20 M3 0.30 0.27 Halaman 23 dari 83 Putusan No. 02/Pid.
PEKERJAAN BETON,LANTAI DAN PLESTERAN1 Pekerjaan Sloof Beton 15/20M3 1.40 5.110.63 7.154.88(144.27 kg/M3) 0.70 2.982 Pekerjaan Ring Balok 15/20M3 1.40 6.453.81 9.035.32(144.27 kg/M3) 6.33 4.893 Pekerjaan Kolom 15/15 cmMS83 0.90 6.012.22 5.419.09(144.27 kg/M3) 0.33 8.304 Pekerjaan Kolom 20/20 M3 0.30 6.012.22 1.806.36(144.27 kg/M3) 0.33 6.105 Pekerjaan Plat Beton Penutup M3 4.70 6.702.95 31.503.8IPAL t = 15 cm (120.00 kg 0.70 68.29 /m3) Halaman 30 dari 83 Putusan No. 02/Pid.
227 — 80
pekerjaan tambahan isi betongrouting kolom 80/80, melanjutkan pekerjaan pelebaran kolom bawah (tapakkolom), melanjutkan pekerjaan dinding geser, melanjutkan pekerjaan selimutbeton sloof 80/50 cm, melanjutkan pekerjaan galian sloof 80/50, melanjutkanpekerjaan timbunan bekas galian, pekerjaan plester 1:4 (lantai 1) danpekerjaan plester 1:4 (lantai 2).Laporan kemajuan pekerjaan Minggu X (periode 29 Oktober 2012 s/d 04November 2012), kemajuan pekerjaan telah mencapai bobot 46,0117 %(empat puluh enam
koma nol satu satu tujuh persen), meliputi melanjutkanpasang penyangga balok dari pohon kelapa, melanjutkan pekerjaan selimutbeton kolom 50/50 cm menjadi 80/80 cm, melanjutkan pekerjaan tambahan isibeton grouting kolom 80/80, melanjutkan pekerjaan pelebaran kolom bawah(tapak kolom), melanjutkan pekerjaan dinding geser, melanjutkan pekerjaanselimut beton sloof 80/50 cm, melanjutkan pekerjaan galian sloof 80/50,melanjutkan pekerjaan timbulan bekas galian, pekerjaan balok RB betonbertulang Uk.15x20
Laporan kemajuan pekerjaan Minggu V (periode 24 September 2012 s/d30 September 2012), kemajuan pekerjaan telah mencapai bobot 10,1456% (sepuluh koma satu empat lima enam persen), meliputi melanjutkanHalaman 74 dari 249 Putusan Nomor 03/Pid.SusTP K/2016/PN Pdgpekerjaan pendahuluan, melanjutkan pekerjaan selimut beton kolom50/50 cm menjadi 80/80 cm, pasang penyangga balok dari pohon kelapa,pekerjaan selimut beton sloof 80/50 cm, pekerjaan galian sloof 80/50,melanjutkan pekerjaan sloof S1 beton bertulang
(empat juta empat ratus tiga puluh lima ribu seratusrupiah).Pekerjaan Selimut Beton Sloof 80/50 Cm, Volumenya 34,88 M3(tiga puluh empat koma delapan puluh delapan meter kubik),harga satuannya Rp. 5.868.934. (lima juta delapan ratus enampuluh delapan ribu sembilan ratus tiga puluh empat rupiah).Pekerjaan Galian Sloof 80/50 Cm, Volumenya 76,78 M3 (tujuhpuluh enam koma tujuh puluh delapan meter kubik), hargasatuannya Rp. 44.275.
(enam puluh tujuh ribu empatratus dua puluh dua rupiah).13) Pekerjaan Selimut Beton Sloof 80/50 Cm, Volumenya34,88 M3 (tiga puluh empat koma delapan puluhdelapan meter kubik), harga satuannya Rp. 5.868.934. (lima juta delapan ratus enam puluh delapan ribusembilan ratus tiga puluh empat rupiah).14) Pekerjaan Galian Sloof 80/50 Cm, Volumenya 76,78 M3(tujuh puluh enam koma tujuh puluh delapan meterkubik), harga satuannya Rp. 44.275.
82 — 65 — Berkekuatan Hukum Tetap
Sloof 30/50; BetonBertulang K275. Balok G11 uk.30/60; BetonBertulang K275Balok G12 uk.30/60; BetonBertulang K275Balok G13 uk.30/60; BetonBertulang K275Balok G14 uk.30/60; BetonBertulang K275Balok G15 uk.35/70; BetonBertulang K275.
Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K1757. Balok Ring Praktis uk. 15/20; m3 1.86 1.80 0.06 0.22%Beton Bertulang K1758. Meja Beton Dudukan m3 0.35 0.42 0.07 0.038%Wastafel; Beton Bertulang K1759 Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22% Hal. 27 dari 97 hal. Put. No. 841 K/Pid.Sus/2016 PEKERJAAN SANITAIRB.61 Pas.
Sloof 30/50; BetonBertulang K2753. Balok G11 uk.30/60; BetonBertulang K2754. Balok G12 uk.30/60; BetonBertulang K2755. Balok G13 uk.30/60; BetonBertulang K2756. Balok G14 uk.30/60; BetonBertulang K2757. Balok G15 uk.35/70; BetonBertulang K2758.
Sloof 30/50; BetonBertulang K275. Balok G11 uk.30/60; BetonBertulang K275. Balok G12 uk.30/60; BetonBertulang K275. Balok G13 uk.30/60; BetonBertulang K275. Balok G14 uk.30/60; BetonBertulang K275. Balok G15 uk.35/70; BetonBertulang K275. Balok B1 uk. 25/40;Beton Bertulang K275. Balok B2 uk. 20/35;Beton Bertulang K275.
Sloof Praktis uk. 15/20; m3 2.13 1.89 0.24 0.23%Beton Bertulang K1757. Balok Ring Praktis uk. m3 1.86 1.80 0.06 0.22%15/20; Beton Bertulang K1758. Meja Beton Dudukan m3 0.35 0.42 0.07) 0.038%Wastafel; Beton BertulangK1759 Plat Atap t= 10cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.
Terbanding/Terdakwa : PAULUS SOUHUWAT, ST. M.Si
65 — 28
PEKERJAAN BETON, LANTAI DANPLESTERAN1 Pekerjaan Sloof Beton 15/20 (144.27 M3 1.40 5.110.630.70 7.154.882.98kg/M3)2 Pekerjaan Ring Balok 15/20 (144.27 M3 1.40 6.453.816.33 9.035.324.89kg/M3)3 Pekerjaan Kolom 15/15 cm (144.27 M3 0.90 6.012.220.33 5.419.098.30kg/M3)4 Pekerjaan Kolom 20/20 (144.27 M3 0.30 6.012.220.33 1.806.366.10kg/M3)5 Pekerjaan Plat Beton Penutup IPAL ft M3 4.70 6.702.950.70 31.503.868.29= 15 cm (120.00 kg /m3)6 Pekerjaan Plat Beton Dasar Bak IPAL M3 4.70 6.702.950.70 31.503.868.29T
PEKERJAAN BETON,LANTAI DAN PLESTERAN1 Pekerjaan Sloof Beton 15/20 M3 1.40 4.998.661.70 6.998.126.38(100 kg/M3)2 Pekerjaan Ring Balok 15/20 M3 1.40 6.375.960.44 8.926.344.62(144.27 kg/M3) Halaman 28 dari 146 Putusan No. 01/Pid.
PEKERJAAN BETON, LANTAI DANPLESTERAN1 Pekerjaan Sloof Beton 15/20 (144.27 M3 1.40 5.110.630.70 7.154.882.98 Halaman 61 dari 146 Putusan No. 01/Pid.
PEKERJAAN BETON,LANTAI DAN PLESTERAN1 Pekerjaan Sloof Beton 15/20 M3 1.40 4.998.661.70 6.998.126.38(100 kg/M3)2 Pekerjaan Ring Balok 15/20 M3 1.40 6.375.960.44 8.926.344.62(144.27 kg/M3) Halaman 81 dari 146 Putusan No. 01/Pid.
M2 18.79 Ad1:46 Pasangan batu kali untuk talud M3 3.99 AdP=4,2mIV PEKERJAAN BETON, LANTAIDAN PLESTERAN1 Pekerjaan sloof beton 15/20 M3 1.40 1.21 (100kg/M3)2 Pekerjaan ring balok 15/20 M3 1.40 0.97 (120Kg/M3)3 Pekerjaan kolom 15/15cm M3 0.90 1.44 +(110Kg/M3)4 Pekerjaan kolom 20/20 M3 0.60 0.58 Halaman 95 dari 146 Putusan No. 01/Pid.
48 — 25 — Berkekuatan Hukum Tetap
Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Hal. 19 dari 99 hal. Putusan Nomor 846 K/PID.SUS/2016 Bertulang K1757. Balok Ring Praktis uk. 15/20; Beton m3 1.86 1.80 0.06 0.22%Bertulang K1758. Meja Beton Dudukan Wastafel; m3 0.35 0.42 0.07 0.03%Beton Bertulang K1759. Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22% B.6PEKERJAAN SANITAIR1 Pas.
Ipc: 5psrA3 PEKERJAAN BETON1 Pondasi Footplat; Beton Bertulang m3 35.26 36.16 0.90 3.19%K2752 Sloof 30/50; Beton Bertulang K m3 40.37 37.56 2.81 5.41%2753 Balok G11 uk. 30/60; Beton m3 14.04 14.52 0.48 2.29%Bertulang K2754 Balok G12 uk. 30/60; Beton m3 6.46 6.21 0.27 0.98%Bertulang K275 Hal. 36 dari 99 hal.
Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K1757. Balok Ring Praktis uk. 15/20; Beton m3 1.86 1.80 0.06 0.22%Bertulang K1758. Meja Beton Dudukan Wastafel; m3 0.35 0.42 0.07 0.03%Beton Bertulang K1759. Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22%B.6 PEKERJAAN SANITAIR1 Pas.
Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K17516. Balok Ring Praktis uk. 15/20; Beton m3 1.86 1.80 0.06 0.22%Bertulang K17517. Meja Beton Dudukan Wastafel; m3 0.35 0.42 0.07 0.03%Beton Bertulang K17518. Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22%B.6 PEKERJAAN SANITAIR1 Pas.
Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K17525. Balok Ring Praktis uk. 15/20; Beton m3 1.86 1.80 0.06 0.22% Bertulang K175 Hal. 81 dari 99 hal. Putusan Nomor 846 K/PID.SUS/2016 26. Meja Beton Dudukan Wastafel; m3 0.35 0.42 0.07 0.03%Beton Bertulang K17527. Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22%B.6 PEKERJAAN SANITAIR1 Pas.
56 — 31 — Berkekuatan Hukum Tetap
Sloof Praktis uk. 15/20; M3 0.35 2,184,785.71 772,758.71Beton Bertulang K1757. Balok Ring Praktis uk. M3 6.92 2,184,785.71 15,112, 162.7615/20; Beton BertulangK1758. Meja Beton DudukanWastafel; BetonBertulang K1759. Plat atap t=10 cmSUB JUMLAH B2 271,857,206.56B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002. Instalasi Air Kotor PVC4 M! 39.83 34,000.00 1,354,220.00 PVC3 M! 26.47 28,000.00 741,160.00 PVC 2,5 VT M!
Sloof Praktis uk. 15/20; Ms 0.35 2,184,785.71 772,758.71Beton Bertulang K1757. Balok Ring Praktis uk. M3 6.92 2,184,785.71 15,112, 162.7615/20; Beton BertulangK1758. Meja Beton DudukanWastafel; BetonBertulang K1759. Plat atap t=10 cmSUB JUMLAH B2 279,960,085.62B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002. Instalasi Air Kotor PVC 4 M! 39.83 34,000.00 1,354,220.00 PVC3 M! 26.47 28,000.00 741,160.00 PVC 2,5 VT M!
Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 ~0.24 0.23%Bertulang K1757. Balok Ring Praktis uk. 15/20; m3 1.86 1.80 0.06 0.22%Beton Bertulang K1758. Meja Beton Dudukan m3 0.35 0.42 0.07 0.03%Wastafel; Beton Bertulang K1759 Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.
Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K1757. Balok Ring Praktis uk. 15/20; m3 1.86 1.80 0.06 0.22%Beton Bertulang K1758. Meja Beton Dudukan m3 0.35 0.42 0.07 0.03% Wastafel; Beton Bertulang K Hal. 52 dari 95 hal. Put. Nomor 847 K/Pid.Sus/2016 175 9 Plat Atap t= 10cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.
Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 ~0.24 0.23%Bertulang K1757. Balok Ring Praktis uk. 15/20; m3 1.86 1.80 0.06 0.22%Beton Bertulang K1758. Meja Beton Dudukan Wastafel:; m3 0.35 0.42 0.07 0.038%Beton Bertulang K1759 Plat Atap t= 10cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.
Terbanding/Terdakwa : Hi. AS'AD Hi. SAEPA, S.Sos ALIAS H. AS'AD
99 — 28
Sloof Beton (Basement) 35/70 K 275 (1.160 MS 284.20 3.498.865,25Mi) 994.377.504,80Pek. Sloof Beton 20x40 K 275 (1.384 M) MB 110.72 2.331.439,25Pek. Cor Plat Beton Basement Tb=15 cm (L=3456 Me 518.40 2.003.754,00 BBB isk ASAEnm) K 250 1.038.746.037,60Pek. Kolom Beton 50 x 50 cm (T=3.5 m) K 275 M8 49.00 4.338.696,25(56 Kolom) 212.596.116,38Pek. Kolom Beton 50 x 50 cm (T=0.5 m) K 275 M8 4.75 4.338.696,25(38 Kolom) 20.608.807,20Pek.
Pasangan batu bata 1:3 u/ 1276,000 114.239.004,00 915,750 81.986.181,75 360,25 32.252.822,25bekesting sloof 35/70 (1160 m)5. Pasangan batu bata 1:3 u/ 692,000 61.954.068,00 383,800 34.361.230,20 308,200 27.592.837,80bekesting sloof 20/40 (1384 m)6. Sloof beton (basement) 35/70 K 284,200 994.377.504,05) 202,003 706.781.277,10 82,197 287.596.226,95275 (1160 m)Ye Sloof beton 20/40 K275 (1384 110,720 258.136.953,76 64,432 150.219.293,76 46,288 107.917.660,00m)8.
Sloof Beton 20/40 K275 (pada 3,400 14.320.192,25 3,400 14.320.192,25Teras)15. Kolom Beton 50/50 T = 1,05 m K 3,600 15.619.306,50 3,600 15.619.306,50275 (12 kolom/pada Teras),16.
Sloof Beton (Basement) 35/70 K 275 Me 284.20 3.498.865,25 994.377.504,802 (1.160 M) Me 110.72 2.331.439,25 258.136.954,053 Pek. Sloof Beton 20x40 K 275 (1.384 M) Ms 518.40 2.003.754,00 1.038.746.037,60Pek. Cor Plat Beton Basement Tb=15 cm4 (L=3456 m2) K 250 Me 49.00 4.338.696,25 212.596.116,38Pek. Kolom Beton 50 x 50 cm (T=3.5 m) K5 275 (56 Kolom) Me 4.75 4.338.696,25 20.608.807,20Pek. Kolom Beton 50 x 50 cm (T=0.5 m) K6 275 (38 Kolom) Me 45.08 4.764.090,59 214.765.203,927 Pek.
Pasangan batu bata 1:3 u/ 1276,000 114.239.004,00 915,750 81.986.181,75 360,25 32.252.822,25bekesting sloof 35/70 (1160 m)5. Pasangan batu bata 1:3 u/ 692,000 61.954.068,00 383,800 34.361.230,20 308,200 27.592.837,80bekesting sloof 20/40 (1384 m)6. Sloof beton (basement) 35/70 284,200 994.377.504,05 202,003 706.781.277,10 82,197 287.596.226,95K275 (1160 m)7. Sloof beton 20/40 K275 (1384 110,720 258.136.953,76 64,432 150.219.293,76 46,288 107.917.660,00m)8.
76 — 20
Sloof Beton 15/20 1,157 jm? An21 2.831.765,7 3.276.352,9752 Pek. Kolom Struktur 30/30 0,756 m? An21 2.831.765,7 2.140.814,9153 Pek. Kolom Struktur 20/25 0,194 m? An20 2.831.765,7 549.362,5654 Pek. Ring Balok Beton 0,662 m?
Sloof Beton 15/20 1,157 m? An21 2.831.765, 3.276.352,97752 Pek. Kolom Struktur 30/30 0,756 m? An21 2.831.765, 2.140.814,91753 Pek. Kolom Struktur 20/25 0,194 m? An20 2.831.765, 549.362,56754 Pek. Ring Balok Beton 0,662 m?
Sloof Beton 15/20 1,157 m? An21 2.831.765,7 3.276.352,975 20 2 Pek. Kolom Struktur 30/30 0,756 m? /An21 2.831.765,7 2.140.814,9153 Pek. Kolom Struktur 20/25 0,194 m3 An20 2.831.765,7 549.362,5654 Pek. Ring Balok Beton 0,662 m?
Sloof Beton 15/20 1,157 m3 An21 2.831.765,7 3.276.352,9752 Pek. Kolom Struktur 30/30 0,756 m? An21 2.831.765,7 2.140.814,9153 Pek. Kolom Struktur 20/25 0,194 m? /An20 2.831.765,7 549.362,5654 Pek.
Sloof Beton 15/20 1,157 m? An21 2.831.765,7 3.276.352,9752 Pek. Kolom Struktur 30/30 0,756 m? An21 2.831.765,7 2.140.814,9153 Pek. Kolom Struktur 20/25 0,194 m? /An20 2.831.765,7 549.362,5654 Pek.
68 — 34
Sloof Beton 30/45 1:2 :3 Ms 130.869 Rp. 2,710,993.00 Rp. 354,784,942.925. Pek. Sloof Beton 15/451 :2:3 Ms 3.804 Rp. 2,710,993.00 Rp. 10,312,617.376. Pek. Kolom Beton 40 x 40 1: 2:3 (bwh 0,0) M% 35.645 Rp. 3,687,580.00 Rp. 131,443,789.107. Pek. Kolom Beton 50 x 50 1: 2 :3(bwh 0,0) M% 37.562 Rp. 3,687,580.00 Rp. 138,512,879.96Rp. 884,828,004.47V. PEKERJAAN LAINLAIN1s Pek. Dokumentasi Proyek. Ls 1.000 Rp. 1,150,000.00 Rp. 1,200,000.002. Pek. Administrasi.
Balok/sloof beton (basement) 35/70 1:2:3, kuantitas sesuaikontrak = 66,640 m3 dengan harga sebesar Rp.209.384.379,40 sedangkan kuantitas terlaksana = 61,495 m3dengan harga sebesar Rp.193.218.673,64 sehingga selisih kuantitas = 5,145 m3 atauselisih harga sebesar Rp.16.165. 705, /65 222222 222 nnn nnn n nn nnn nn nn nee8.
Sloof Beton30/451:2:3Pek.
Sloof Beton15/451:2:3 MsMsMsMsMsMsMsMsMsMsMsMsMs 1.0001.0004,340.000316.001,327.133331.783282.62375.674253.9741,242.11224.62453.42414.784130.8693.804 Rp. 3.000,000.00Rp. 350,000.00Rp. 42,000.00Rp. 51.430.00Rp. 24,665.00Rp. 7,575.00Rp. 105.875.00Rp. 10,950.00Rp. 251,442.00Rp. 420,110.00Rp. 414,770.00Rp. 3,512,205.00Rp. 3,512,205.00Rp. 2,710,993.00Rp. 2,710,993.00Rp. 3.000,000.00Rp. 350,000.00Rp. 182,280,000.00Rp. 16,251,880.00 Rp. 201.881.880.00 Rp. 32,733,735.45Rp. 2,513,256.23Rp. 29,922,710.13Rp
Balok/sloof beton (basement) 35/701:2:3, kuantitas sesuai kontrak = 66,640m3 dengan harga sebesar Rp.209.384.379,40 sedangkan kuantitasterlaksana = 61,495 m3 dengan hargasebesar Rp.193.218.673,64 sehingga selisihkuantitas = 5,145 m3 atau selisih hargasebesar Rp.16.165. 705, /6;.
74 — 14
Sloof Beton 15/20 1,157 m3 An21 2.831.765, 3.276.352,97752 Pek. Kolom Struktur 30/30 0,756 m? An21 /2.831.765, 2.140.814,91753 Pek. Kolom Struktur 20/25 0,194 m? An20 2.831.765, 549.362,56754 Pek. Ring Balok Beton 0,662 m?
Sloof Beton 15/20 1,157 m? An21 2.831.7653.276.3575 2,972 Pek. Kolom Struktur 30/30 0,756 m? An21 2.831.765 monet75 4,913 Pek. Kolom Struktur 20/25 0,194 m? An20 2.831.765549.362,75 564 Pek. Ring Balok Beton 0,662 m?
Sloof Beton 15/20 1,157 jm? An21 2.831.765, 3.276.352,975 72 Pek. Kolom Struktur 30/30 0,756 m? An21 2.831.765,/2.140.814,975 13 Pek. Kolom Struktur 20/25 0,194 m? An20 2.831.765,549.362,56754 Pek.
Sloof Beton 15/20 1,157 m3 An21 2.831.765, 3.276.352,97752 Pek. Kolom Struktur 30/30 0,756 m? An21 2.831.765, 2.140.814,91753 Pek. Kolom Struktur 20/25 0,194 m? /An20 2.831.765, 549.362,56754 Pek. Ring Balok Beton 0,662 m?
adalah15/30 atau 15/40 disesuaikan dengan kebutuhanbanyaknya lantai, dengan ukuran besi berdiameter16" (0.16 6 )Has/7 Pemeriksaan :Kondisi Sloof yang terpasang dilapangan ratarata hanyamenggunakan sloof untuk kontruksi bangunan 1 lantaiyaitu dengan dimensi Sloof 15/20 cm, dengan pembesianterpasang rata rata berdia meter 10" (kurus) setaradengan besi ukuran 8" (full).Ring atau tulangan cincin beton terpasang rataratamenggunakan ukuran /berdiameter 6 " (0 6").
Terbanding/Jaksa Penuntut : EMAN SULAEMAN, SH
86 — 28
1,276.00 89.529,00 114.239.004,00Bakesting Sloof 35/70 (1.160 M?)Pek. Pasangan Batu Bata 1:3 utk M? 692.00 89.529,00 61.954.068,00Bakesting Sloof 20/40 (1.384 M?)325.914.427,37IV. PEKERJAAN BETONPek. Sloof Beton (Basement) 35/70 K 275 M2 284.20 3.498.865,25 994.377.504,80(1.160 M) Me 110.72 2.331.439,25 258.136.954,05Pek.Sloof Beton 20x40K 275(1.384M)Pek. Cor Plat Beton Basement Tb=15 cm M2? 518.40 2.003.754,00 1.038.746.037,60(L=3456 m2) K 250Pek.
Pasangan batu bata 1:3 u/ bekesting sloof 20/40 (1384 m), kuantitassesuai kontrak = 692,000 m2 dengan harga sebesar Rp. 61.954.068,00sedangkan kuantitas terlaksana = 383,800 m2 dengan harga sebesar Rp.Halaman 9 dari 69 halamanPutusan Nomor : 13/PID.SUS/TIPIKOR/2014/PT.PALU.34.361.230,20 sehingga selisin kuantitas = 308,200 m2 atau selisih hargasebesar Rp. 27.592.837,80.Sloof beton (basement) 35/70 K275 (1160 m), kuantitas sesuai kontrak= 284,200 m3 dengan harga sebesar Rp. 994.377.504,05 sedangkankuantitas
Sloof beton 20/40 K275 (1384 m), kuantitas sesuai kontrak = 110,720 m3dengan harga sebesar Rp. 258.136.953,76 sedangkan kuantitas terlaksana= 64,432 m3 dengan harga sebesar Rp. 150.219.293,76 sehingga selisihkuantitas = 46,288 m3 atau selisin harga sebesar Rp. 107.917.660,00.Cor plat beton basement Tb=15 cm (L=3456 m2) K250, kuantitas sesuaikontrak = 518,400 m3 dengan harga sebesar Rp. 1.038.746.073,60sedangkan kuantitas terlaksana = 441,498 m3 dengan harga sebesar Rp.884.653.383,49 sehingga selisih
Sloof Beton (Basement) 35/70 K 275 M$ 284.20 3.498.865,25 994.377.504,80(1.160 M) Ms 110.72 2.331.439,25 258.136.954,052 Pek. Sloof Beton 20x40K 275(1.384 M)3 Pek. Cor Plat Beton Basement Tb=15 cm M2? 518.40 2.003.754,00 1.038.746.037,60(L=3456 m2?) K 2504 Pek. Kolom Beton 50 x 50 cm (T=3.5 m) M 49.00 4.338.696,25 212.596.116,38K 275 (56 Kolom)5 Pek. Kolom Beton 50 x 50 cm (T=0.5 m) M 4.75 4.338.696,25 20.608.807,20K 275 (38 Kolom)6 Pek.
174 — 30
Struktur 35 90/25 m 2,315,937.08 13.10 15.15 2.050Beton Sloof Struktur 36 (k1) 20/20 m 6,025,201.48 12.70 12.06 0.644Beton Sloof Ringbalk 3 j7 (Rt) 15/20 m 3,358,468.79 7.49 8.40 0.910Beton Sloof Ringbalk 3 ;8 (tempat patung) 20/20 m 2,903,554.64 0.90 0.96 0.060Beton plat leuvel9 Lengkung (Topi m?
Struktur 35 90/25 m 2,315,937.08 13.10 15.15 2.050Beton Sloof Struktur 36 (k1) 20/20 m 6,025,201.48 12.70 12.06 0.644Beton Sloof Ringbalk 3 j7 (R1) 15/20 m 3,358,468.79 7.49 8.40 0.910Beton Sloof Ringbalk 38 (tempat patung) 20/20 m 2,903,554.64 0.90 0.96 0.060Beton plat leuvel9 Lengkung (Topi m?
4,505.00 67.58 96.35 28.767Jumlah PEKERJAAN BETON DANPASANGAN2 santa KetjaGamp 135010) is 420,680.00 2.05 2.05 0.0003 Beton PondasiFootplat (FPI) m 1,196,207.71 5.33 5.40 0.0705 Beton Sloot Struktur 20/25 m 2,315,937.08 73.10 15.15 2.0506 ooo Sloof Stroktur (KT) 8 6,025,201.48 12.70 12.06 0.6447 oe Sloof Ringbalk (R1) 3 3,958,468.79 7.49 8.40 0.9108 netung)2020 (tempat 3 92903,554.64 0.90 0.96 0.0609 op!
Struktur 20/25 = 12,315,937.08 13.10 15.15 2.0506 ooo Sloof Struktur (k1) 43 6 995,901.48 12.70 12.06 0.6447 nope Sloof Ringbalk (RI) 3 358,468.79 7.49 8.40 0.910Beton Sloof Ringbalk 3 ;8 empatpaiune/@030 m?
Struktur20/252,315,937.0813.1015.152.050 Beton Sloof Struktur(k1) 20/206,025,201.4812.7012.060.644 Beton Sloof Ringbalk(R1) 15/203,358,468.797.498.400.910 Beton Sloof Ringbalk(tempat patung) 20/202,903,554.640.900.960.060 Beton plat leuvelLengkung (Topitempat patung)2,230,759.351.282.881.599 10Pasangan Pagar Batacamp 1:6407,693.77341.80383.7541.950 12Pleteran Pagar camp1:6 tb 15 mm15,385.152,034.422,088.4153.990 13Sponengan Sudut4,432.5011,644.5614,591.362,946.800 14Ornamen Pagar BatuRandoom Terpasang100,000.00189.32213.6024.279
71 — 25
Sloof 15/20 m3 1.026. Pek. kolom praktis 15/15 m3 1.027. Pek. ring balok 15/20 m3 1.028. Pek. beton balok lantai m3 1.209. Pek. beton plat lantai dak m3 1.7510. Pek. Plesteran 1: 2 m2 147.0011. Beton tumbuk1:3:5 m3 13.7212. Pek. cat tembok m2 84.0013. Water proofing m2 50.4014. Pipa PVC % m' 78.0015. Pipa GIP % m' 56.0016. Knee % bh 30.00D. Pekerjaan Intake1. Urugan tanah kembali dipadatkan m3 4.202. Kunci mainhold (bak pengendap) unit 1.00E. Saringan Pasir Lambat1.
Sloof 15/20 m3 1.02 96 .066. Pek. kolom praktis 15/15 m3 1.02 48 04)7. Pek. ring balok 15/20 m3 1.02 96 .068. Pek. beton plat lantai m3 1.63 68 37 9. Pek. beton balok lantai m3 1.20 60 .6010. Pek. Beton plat lantai dak m3 1.75 32 4311. Pek. Pasangan bata 1 : 2 m3 4.30 45 12. Pek. Plesteran 1 : 2 m2 147.00 .00 .0013. Beton tumbuk 1:3:5 m3 13.72 30 4214. Pengadaan/pemasangan kran dia. % inci + pipa bh 72 15. Plat mainhold unit 6.00 .00 16. Kunci mainhold bh 6.00 00 17.
Sloof 15/20 m3 1.026. Pek. kolom praktis m3 1.0215/157. Pek. ring balok m3 1.0215/208. Pek. beton balok m3 1.20lantai9. Pek. beton plat m3 1.75lantai dak10. Pek. Plesteran 1 : m2 147.00211. Beton tumbuk 1 : m3 13.72B:512. Pek. cat tembok m2 84.0013. Water proofing m2 50.4014. Pipa PVC % m' 78.0015. Pipa GIP % m' 56.0016. Knee %4 bh 30.00D.
Sloof 15/20 m3 1.02 96 .066. Pek. kolom praktis 15/15 m3 1.02 .48 04)7. Pek. ring balok 15/20 m3 1.02 96 .068. Pek. beton balok lantai m3 1.20 .60 .609. Pek. beton plat lantai dak m3 1.75 32 .4310. Pek. Plesteran 1: 2 m2 147.00 .00 .0011. Beton tumbuk1:3:5 m3 13.72 .30 4212. Pek. cat tembok m2 84.00 .80 .2013. Water proofing m2 50.40 24 1614. Pipa PVC % m' 78.00 .0015. Pipa GIP %4 m' 56.00 .60 .4016. Knee % bh 30.00 .00 .00D. Pekerjaan Intake1.
Sloof 15/20 m3 1.02 .96 .066. Pek. kolom praktis 15/15 m3 1.02 48 047. Pek. ring balok 15/20 m3 1.02 .96 .06 8. Pek. beton plat lantai m3 1.63 .689. Pek. beton balok lantai m3 1.20 .60 .6010. Pek. Beton plat lantai dak m3 1.75 32 311. Pek. Pasangan bata 1 : 2 m3 4.30 5 12. Pek. Plesteran 1: 2 m2 147.00 .00 .0013. Beton tumbuk 1:3:5 m3 13.72 30 4214. Pengadaan/pemasangan kran bh 72 dia. % inci + pipa15. Plat mainhold unit 6.00 .00 16. /Kunci mainhold bh 6.00 .00 17.
Terbanding/Pembanding/Terdakwa : BAKHRUDIN, SE MM Diwakili Oleh : YANDI HENDRAWAN, S.H
439 — 263
Hasil Pengujian Hammer Test sudan memenuhipersyaratan kekuatan beton yang tercantum pada kontrak yaituK350c) Hasil pengujian kuat tekan beton hasil corring tidakmemenuhi persyaratan kekuatan beton yang tercantum padakontrak yaitu K350.d) Hasil Rebar Scanning secara umum nilai ratarata jarakantar dowel dan tie bar melebihi jarak yang seharusnyatercantum dalam gambar kontrak.e) Hasil Pengujian Chipping menguatkan hasil rebar scanningyang telah dilakukan yaitu:(1) Pada titik 1 yang tidak ada dowel dan sloof
Tidak terdapat sloof melintang danmembujur jalan;(4) Pada titik 4 ditemukan 1 buah besi dowel diameter25 mm 2 besi sloof arah melintang dan besi sloof arahmembujur ukutan 10mm yang seharusnya ukuran 12mm,yang berarti terdapat perbedaan diameter besi sloof;(5) Pada titik 5 ditemukan 1 buah tie bar diameter 16sepanjang 30 cm seharusnya 35 cm, 2 besi sloof melintangdiameter 10 dan besi sloof membujur ukuran 8mm yangseharusnya ukuran 12mm yang berarti terdapat perbedaanpanjang besi tie bar dan diameter
besi sloof;f) Terdapat hasil perbedaan panjang jalan, dari data lapangan2.220 meter, Sedangkan menurut kontrak adalah 2.236 metersehingga terdapat selisih sepangan 16 meter.g) Terdapat perbedaan hasil uji kuat tekan beton antarapengujian dengan Hammer Test dengan Pengujian hasil Corring.Dimana menurut hasil Hammet Test telah memenuhi persyaratansedangkan hasil Corring tidak memenuhi.h) Terdapat ketidaksesuaian spesifikasi pada pekerjaanpembesian yaitu ketidaksesuaian jumlah dan panjang dowel,jumlah
Tidak terdapat sloof melintangdan membujur jalan;(4) Pada titik 4 ditemukan 1 buah besi dowel diameter25 mm 2 besi sloof arah melintang dan besi sloof arahmembujur ukutan 10mm yang seharusnya ukuran 12mm,yang berarti terdapat perbedaan diameter besi sloof;(5) Pada titik 5 ditemukan 1 buah tie bar diameter 16sepanjang 30 cm seharusnya 35 cm, 2 besi sloofmelintang diameter 10 dan besi sloof membujur ukuran8mm yang seharusnya ukuran 12mm yang berartiterdapat perbedaan panjang besi tie bar dan diameterbesi
sloof;(6) Terdapat hasil perbedaan panjang jalan, dari datalapangan 2.220 meter, sedangkan menurut kontrakadalah 2.236 meter sehingga terdapat selisin sepangan16 meter.f) Terdapat perbedaan hasil uji kuat tekan beton antarapengujian dengan Hammer Test dengan Pengujian hasilCorring.
Terbanding/Terdakwa : KARTONO
132 — 73
Pekerjaan Beton Beton Lantai Kerja mengalami selisin sebesar 0.28 % Pekerjaan Pondasi Poot Plat selish sebesar 4.91 % Sloof 20/30 menglami selisih sebesar 6.09 %c.
Berdasarkan pengamatanlangsung ahli dilapangan serta pengamatan bukti visual sesuaifotofoto Kegiatan Pekerjaan) pemasangan foot plate / cakarayam telah sesuai dengan RAB (bukti terlampir).Halaman 65 dari 98 Putusan Nomor 8/PID.TPK./2021/PT.MTR.3)4) Bahwa tidak benar Pendapat ahli EDY PURNAMA tentangadanya pekerjaan sloof sebesar 6.09% yang tidakdilaksanakan.Pendapat ahli EDY PURNAMA tersebut adalah kebohonganyang nyata. karena faktanya sloof sudah terpasang denganpembesian yang berukuran 14 mm satandar
SNI sebagaimanayang tertuang dalam RAB perubahan terakhir, fakta ini sangatjelas terbukti berdasarkan pengamatan visual ahli berupa fotofoto pemasangan besi sloof dengan besi yang besar seukuranjari orang dewasa.
20/30 secara sempurna danmenurut hemat Majelis bahwa pemasangan sloof terhadap suatubangunan merupakan salah satu persyaratan untuk dapatberdirinya suatu bangunan secara kokoh dan gedung serba gunatersebut telah berdiri dan sudah digunakan untuk kegiatanmasyarakat desa Lampok diantaranya untuk kegiatan Kades Cup ;Halaman 67 dari 98 Putusan Nomor 8/PID.TPK./2021/PT.MTR.Menimbang, bahwa dengan demikian terhadap kekurangan volumeuntuk pekerjaan sloof 20/30 sebesar 6,09 % tidak diperhitungkansebagai
20/30 secara sempurna danmenurut hematMajelis bahwapemasangan sloof terhadap suatu bangunanmerupakansalahsatupersyaratanuntukdapatberdirinyasuatubangunan secara kokoh dan gedung serba guna tersebut telah berdiridansudahdigunakanuntukkegiatanmasyarakatdesaLampokdiantaranya untuk kegiatan Kades Cup ;Pertimbangan Judex Factie tingkat pertama tersebut diatas, layakuntuk dikuatkan.
28 — 12 — Berkekuatan Hukum Tetap
Balok sloof dan balok ikat 20/30 ad. 1:2:3 3,24 NB 3.803.579,31 12.314.088,028. Pek. Balok ikat selasar 15/20 ad. 1:2:3 0,24 NB 3.803.579,31 1.597.503,31Jumlah 53.345.199,82IV PEK. STRUKTUR/ BETON BERTULANGLANTAI 21. Pek. Balok lantai utama 30/60 ad 1:2:3 6,78 Ne 3.803.579,31 25.778.758,772. Pek. Balok anak 30/45 ad 1:2:3 1,08 Me 3.803.579,31 4.107.865,653. Pek. Balok Selasar 20/30 ad 1:2:3 0,84 Me 3.803.579,31 3.195.006,624. Pek.
Sloof Beton 15/20 ad 1:2:3 0,66 M3 2.241.515,83 1.479.400,453. Pek. Kolom beton bertulang ad. 1:2:3 0,68 Ms 2.241.515,83 1.513.023,194. Pek. Ring Blk ad. 1:2:3 0,87 Me 2.241.515,83 1.950.118,775 Pek. Dinding Batu Bata ad. 1:4 37,03 M? 77.004,50 2.851 .476,646 Pek. Plesteran Dinding ad 1:4 126,60 M? 23.462,34 2.970.285,327 Pek. Lantai Kerja 1,02 Ms 588.943,21 600.722,07Jumlah 14.41.746,31IV. PEK. KAYU, ATAP DAN PLAFON1 Pek. Jendela Ventilasi 5,00 Lbg 105.646,86 528.234,292 Pek.
Balok sloof dan balok ikat 20/30 ad. 1:2:3 3,24 Me 3.803.579,31 12.314.088,028. Pek. Balok ikat selasar 15/20 ad. 1:2:3 0,24 Me 3.803.579,31 1.597.503,31Jumlah 53.345.199,82IV PEK. STRUKTUR/ BETON BERTULANG LANTAI 21, Pek. Balok lantai utama 30/60 ad 1:2:3 6,78 Me 3.803.579,31 25.778.758,772. Pek. Balok anak 30/45 ad 1:2:3 1,08 Ms 3.803.579,31 4.107.865,653. Pek. Balok Selasar 20/30 ad 1:2:3 0,84 Ms 3.803.579,31 3.195.006,624. Pek.
Balok sloof dan balok ikat 20/30 ad. 3,24 Me 3.803.579,31 /12.314.088,021:2:38. Pek. Balok ikat selasar 15/20 ad. 1:2:3 0,24 Me 3.803.579,31 1.597.503,31Jumlah 53.345.199,82IV PEK. STRUKTUR/ BETON BERTULANGLANTAI 2As Pek. Balok lantai utama 30/60 ad 1:2:3 6,78 Ms 3.803.579,31 25.778.758,772. Pek. Balok anak 30/45 ad 1:2:3 1,08 M3 3.803.579,31 4.107.865,653. Pek. Balok Selasar 20/30 ad 1:2:3 0,84 M3 3.803.579,31 3.195.006,624. Pek.
Sloof Beton 15/20 ad 1:2:3 0,66 Ms 2.241.515,83 1.479.400,453. Pek. Kolom beton bertulang ad. 1:2:3 0,68 Ms 2.241 .515,83 1.513.023,194. Pek. Ring Blk ad. 1:2:3 0,87 Ms 2.241.515,83 1.950.118,775 Pek. Dinding Batu Bata ad. 1:4 37,03 M2 77.004,50 2.851.476,646 Pek. Plesteran Dinding ad 1:4 126,60 M2 23.462,34 2.970.285,327 Pek. Lantai Kerja 1,02 Ms 588.943,21 600.722,07Jumlah 14.41.746,31IV. PEK. KAYU, ATAP DAN PLAFON1 Pek. Jendela Ventilasi 5,00 Lbg 105.646,86 528.234,292 Pek.