Ditemukan 34 data

Urut Berdasarkan
 
Register : 12-05-2017 — Putus : 15-06-2017 — Upload : 27-12-2019
Putusan PA JAKARTA SELATAN Nomor 209/Pdt.P/2017/PA.JS
Tanggal 15 Juni 2017 — Pemohon melawan Termohon
250
  • 1spsn lineColor sv 0 spsn lineTypesv0fspsn lineWidth sv 0spsn lineDashing sv 0spsnfArrowheadsOKsv 1spsn fLinesv 1spsn lidRegroupsv0spsn dhgt sv 251660288 spsn fLayoutInCell sv 1spsn fLayoutInCell sv 1shp*shpinstshplid1042spsn relLeft sv 905spsn relTop sv455spsn relRight sv 1035spsn relBottom sv 533spsnfRelFlipH sv 0spsn fRelFlipV sv 0spsn shapeTypesv 0spsn geoRightsv 130spsn geoBottomsv 78spsn shapePath sv 4spsn pVerticies sv 8;18;(130,0);(115,4);(98,10);(82,17);(65,25);(50,33);(37,42);(27,47);(20,52
Register : 06-02-2024 — Putus : 30-04-2024 — Upload : 30-04-2024
Putusan PN KUTAI BARAT Nomor 23/Pid.Sus/2024/PN Sdw
Tanggal 30 April 2024 — Penuntut Umum:
1.MAHESA PRIYATAMA, S.H.
2.ALFANI AMALIA MUHTAR, S.H.
Terdakwa:
SULIYANTO Bin PONIRAN (alm)
2212
  • selama 3 (tiga) bulan;

    3.Menetapkanmasa penangkapan dan penahanan yang telah dijalani Terdakwa dikurangkan seluruhnya dari pidana yang dijatuhkan;

    4.Menetapkan Terdakwa tetap berada dalam tahanan;

    5.Menetapkan barang bukti berupa:

    -55 (lima puluh lima) poket narkotika jenis shabu-shabu masing-masing dibungkus plastik klip warna bening dengan berat kotor 20,52

Register : 11-03-2016 — Putus : 18-04-2016 — Upload : 18-12-2019
Putusan PA JAKARTA SELATAN Nomor 0108/Pdt.P/2016/PA.JS
Tanggal 18 April 2016 — Pemohon melawan Termohon
2711
  • 1spsn lineColor sv 0 spsn lineTypesv0fspsn lineWidth sv 0spsn lineDashing sv 0spsnfArrowheadsOKsv 1spsn fLinesv 1spsn lidRegroupsv0spsn dhgt sv 251660288 spsn fLayoutInCell sv 1spsn fLayoutInCell sv 1shp*shpinstshplid1042spsn relLeft sv 905spsn relTop sv455spsn relRight sv 1035spsn relBottom sv 533spsnfRelFlipH sv 0spsn fRelFlipV sv 0spsn shapeTypesv 0spsn geoRightsv 130spsn geoBottomsv 78spsn shapePath sv 4spsn pVerticies sv 8;18;(130,0);(115,4);(98,10);(82,17);(65,25);(50,33);(37,42);(27,47);(20,52
Register : 12-01-2022 — Putus : 17-02-2022 — Upload : 22-02-2022
Putusan PT AMBON Nomor 4/PID.SUS-TPK/2022/PT AMB
Tanggal 17 Februari 2022 — Pembanding/Penuntut Umum III : AGUSJAYANTO, SH., MH
Terbanding/Terdakwa I : ABDUL ALAM HITIMALA
Terbanding/Terdakwa II : USMAN TUHUITU
16676
  • 684,077.10 18,716,349.463 Pengecoran ( Rebat M3 13.68 4,796,137.50 65,611,161.00Halaman 21 dari 110 Putusan Nomor 4/PID.SUSTPK/2022/PT.AMBBeton ) Camp. 1:3:4108,240, 735.46IV Pekerjaan AkhirPembersihan Lokasi1 setelah selesai Pekerjaan Ls 1.00 400,000.00 400,000.00Dokumentasi dan2 Laporan Ls 1.00 1,000,000.00 1,000,000.001,400,000.00Jumlah 126.154.012.21Kemudian terdapat selisin dari pembangunan jalan rabat beton tahun 2017tersebut dengan rincian sebagai berikut : Urugan Pasir = 23,40 Sak terpasang = 20,52
    terpasang = 20,52 Sakterpasang = 18,00 M2terpasang = 27,36 M2terpasang = 13,68 M2Sehingga total selisin dari pembangunan jalan rabat beton tahun anggaran 2017yang digunakan dari Alokasi Dana Desa Buano Utara Tahun Anggaran 2017 adalahRp. 61.290.642,92.Biaya pengeluaran dalam melaksanakan pekerjaan pembangunan Kantor BPDberdasarkan perhitungan Ahli adalah sebagai berikut ; Uraian Material / bahan yang dibelanjakan Satuan Volume Harga Satuan Jumlah Harga (Rp)NO (Rp)1 Batu Me 17.96 300.000,00 5.386.500,002
Register : 17-03-2016 — Putus : 02-08-2016 — Upload : 14-11-2016
Putusan PN BENGKULU Nomor 20/PID.SUS/TPK/2016/PN Bgl
Tanggal 2 Agustus 2016 — LELA HAYATI, SE Binti SULANA
14775
  • Urugan pasir, volume 20,52 M8d. lantai kerja, volume 10,26 M3CONDOaARWNMHal 11 dari 215 Hal Putusan Nomor 20/Pid.SusTPK/2016/PN Bgl(3) Pekerjaan tanaha. urugan pasir pantai setempat dipadatkan, volume 120,342,96 M3b. Pengadaan dan pamasangan getextile non woven, volume 21.713,58Ni)Bahwa untuk mengawasi pelaksanaan pekerjaan, telah ditunjuk PT.
    Urugan pasir, volume 20,52 M8d. lantai kerja, volume 10,26 M3(3) Pekerjaan tanaha. urugan pasir pantai setempat dipadatkan, volume 120,342,96 M8b. Pengadaan dan pamasangan getextile non woven, volume 21.713,58M8Bahwa untuk mengawasi pelaksanaan pekerjaan, telah ditunjuk PT. Deka Pentrasebagai konsultan pengawas dengan Surat Perjanjian Kerja (Kontrak) Nomor :HK.107/1/3/Ad.BKL12 tanggal 25 April 2012 yang ditandatangani oleh Lela Hayati,SE selaku PPK dan sdr. Ir.
    Urugan pasir, volume 20,52 M8d. lantai kerja, volume 10,26 M3(3) Pekerjaan tanaha. urugan pasir pantai setempat dipadatkan, volume 120,342,96 M3b. Pengadaan dan pamasangan getextile non woven, volume 21.713,58NS)Bahwa untuk mengawasi pelaksanaan pekerjaan, telah ditunjuk PT. Deka Pentrasebagai konsultan pengawas dengan Surat Perjanjian Kerja (Kontrak) Nomor :HK.107/1/3/Ad.BKL12 tanggal 25 April 2012 yang ditandatangani oleh Lela Hayati,SE selaku PPK dan sdr. Ir.
    Urugan pasir, volume 20,52 M3Hal 165 dari 215 Hal Putusan Nomor 20/Pid.SusTPK/2016/PN Bgld. lantai kerja, volume 10,26 M3(3) Pekerjaan tanaha. urugan pasir pantai setempat dipadatkan, volume 120,342,96 M3b. Pengadaan dan pamasangan getextile non woven, volume21.713,58 M3Bahwa PT.
Register : 17-03-2016 — Putus : 02-08-2016 — Upload : 14-11-2016
Putusan PN BENGKULU Nomor 21/PID.SUS/TPK/2016/PN Bgl
Tanggal 2 Agustus 2016 — MUH. IRFAN KURNIAWAN,ST BIN MAT SAJUDI. BA
127149
  • Urugan pasir, volume 20,52 M3.d. Lantai kerja, volume 10,26 MBS.3. Pekerjaan tanah.a. Urugan pasir pantai setempat dipadatkan, volume 120.342,96 MB.b. Pengadaan dan pemasangan getextile non woven, volume 21.713,Bahwa selama pelaksanaan pekerjaan berlangsung, KPA maupun PPKmengetahui jika PT.SKE yang merupakan penyedia barang/jasa (kontraktor) padaONOARWN >a0Hal. 11 dari 182 hal.
    Pekerjaan dinding penahan beton.a.Plat t=10 cm, volume 51,3 MB.b.Dinding beton, volume 72,5 MB.c.Urugan pasir, volume 20,52 MB.d.Lantai kerja, volume 10,26 MB.3.
    Urugan pasir, volume 20,52 M3d. lantai kerja, volume 10,26 M3(3) Pekerjaan tanaha. urugan pasir pantai setempat dipadatkan, volume 120,342,96 M3b. Pengadaan dan pamasangan getextile non woven, volume21.713,58 M3Bahwa kontraktor pengawas Pembangunan konsitruksi Dinding PenahanGelombang Pelabuhan Pulau Baai Bengkulu tersebut adalah PT. DekaPentra berdasarkan Surat Perjanjian Kerja (Kontrak) NomorHK.107/1/3/Ad.BKL12 tanggal 25 April 2012 yang ditandatangani oleh LelaHayati, SE selaku PPK dan sar.
Register : 17-03-2016 — Putus : 02-08-2016 — Upload : 14-11-2016
Putusan PN BENGKULU Nomor 22/PID.SUS/TPK/2016/PN Bgl
Tanggal 2 Agustus 2016 — TUTUT BUDI SUPRIYATMOKO, ST BIN WAJAT
12462
  • Volume 1.083 M3.Batu kosong 150175 Kg/buah, volume 1.026 M3.ekerjaan dinding penahan beton.Plat t=10 cm, volume 51,3 M3.Dinding beton, volume 72,5M3.Urugan pasir, volume 20,52 M3.Lantai kerja, volume 10,26 M3.3. Pekerjaan tanah:Urugan pasir pantai setempat dipadatkan, volume 120.342,96M3.b. Pengadaan dan pemasangan getextile non woven, volume21.713,58 M3.woA VONOARWNHonmaoT7pU9A0Hal 11 dari 188 Hal Putusan Nomor 22/Pid.Sus. TPK/2016/PN.
    Volume 1.083 M3.Batu kosong 150175 Kg/buah, volume 1.026 M3.ekerjaan dinding penahan beton.Plat t=10 cm, volume 51,3 M3.Dinding beton, volume 72,5M3.Urugan pasir, volume 20,52 M3.Lantai kerja, volume 10,26 M3.oe Pekerjaan tanah:Urugan pasir pantai setempat dipadatkan, volume 120.342,96M3.b.
    Urugan pasir, volume 20,52 M3d. lantai kerja, volume 10,26 M3(3) Pekerjaan tanaha. urugan pasir pantai setempat dipadatkan, volume 120,342,96 M3b. Pengadaan dan pamasangan getextile non woven, volume21.713,58 M3Bahwa kontraktor pengawas Pembangunan konstruksi Dinding PenahanGelombang Pelabuhan Pulau Baai Bengkulu tersebut adalah PT. DekaPentra berdasarkan Surat Perjanjian Kerja (Kontrak) NomorHK.107/1/3/Ad.BKL12 tanggal 25 April 2012 yang ditandatangani oleh LelaHayati, SE selaku PPK dan sar.
Register : 16-09-2016 — Putus : 03-01-2017 — Upload : 19-12-2019
Putusan PA JAKARTA SELATAN Nomor 0359/Pdt.P/2016/PA.JS
Tanggal 3 Januari 2017 — Pemohon melawan Termohon
181
  • 1spsn lineColor sv 0 spsn lineTypesv0fspsn lineWidth sv 0spsn lineDashing sv 0spsnfArrowheadsOKsv 1spsn fLinesv 1spsn lidRegroupsv0spsn dhgt sv 251660288 spsn fLayoutInCell sv 1spsn fLayoutInCell sv 1shp*shpinstshplid1042spsn relLeft sv 905spsn relTop sv455spsn relRight sv 1035spsn relBottom sv 533spsnfRelFlipH sv 0spsn fRelFlipV sv 0spsn shapeTypesv 0spsn geoRightsv 130spsn geoBottomsv 78spsn shapePath sv 4spsn pVerticies sv 8;18;(130,0);(115,4);(98,10);(82,17);(65,25);(50,33);(37,42);(27,47);(20,52
Register : 08-11-2016 — Putus : 30-11-2016 — Upload : 18-12-2019
Putusan PA JAKARTA SELATAN Nomor 443/Pdt.P/2016/PA.JS
Tanggal 30 Nopember 2016 — Pemohon melawan Termohon
313
  • 1spsn lineColor sv 0 spsn lineTypesv0fspsn lineWidth sv 0spsn lineDashing sv 0spsnfArrowheadsOKsv 1spsn fLinesv 1spsn lidRegroupsv0spsn dhgt sv 251660288 spsn fLayoutInCell sv 1spsn fLayoutInCell sv 1shp*shpinstshplid1042spsn relLeft sv 905spsn relTop sv455spsn relRight sv 1035spsn relBottom sv 533spsnfRelFlipH sv 0spsn fRelFlipV sv 0spsn shapeTypesv 0spsn geoRightsv 130spsn geoBottomsv 78spsn shapePath sv 4spsn pVerticies sv 8;18;(130,0);(115,4);(98,10);(82,17);(65,25);(50,33);(37,42);(27,47);(20,52
Register : 11-04-2016 — Putus : 26-05-2016 — Upload : 18-12-2019
Putusan PA JAKARTA SELATAN Nomor 0149/Pdt.P/2016/PA.JS
Tanggal 26 Mei 2016 — Pemohon melawan Termohon
210
  • 1spsn lineColor sv 0 spsn lineTypesv0fspsn lineWidth sv 0spsn lineDashing sv 0spsnfArrowheadsOKsv 1spsn fLinesv 1spsn lidRegroupsv0spsn dhgt sv 251660288 spsn fLayoutInCell sv 1spsn fLayoutInCell sv 1shp*shpinstshplid1042spsn relLeft sv 905spsn relTop sv455spsn relRight sv 1035spsn relBottom sv 533spsnfRelFlipH sv 0spsn fRelFlipV sv 0spsn shapeTypesv 0spsn geoRightsv 130spsn geoBottomsv 78spsn shapePath sv 4spsn pVerticies sv 8;18;(130,0);(115,4);(98,10);(82,17);(65,25);(50,33);(37,42);(27,47);(20,52
Putus : 08-10-2014 — Upload : 15-12-2014
Putusan PN PADANG SIDEMPUAN Nomor 19/Pdt.G/2013/PN-PSP
Tanggal 8 Oktober 2014 — Ir. Hj. AISYAH YULYS NASUTION, Dipl HE (Penggugat), TAMBUNAN HASIBUAN (Tergugat I), SAHERAN (Tergugat II), JAFAR HASIBUAN Alias TK RAYA HASIBUAN (Tergugat III), SUNARDI (Tergugat IV), PANCA TANJUNG (Tergugat V), KHAIRUL EFENDI (Tergugat VI), SLAMET HARIYONO (Tergugat VII), PARMAN HASIBUAN (Tergugat VIII), TUKIMIN (Tergugat IX), SUTOYO (Tergugat X), PAMUSUK HASIBUANT (Tergugat XI), HULUMAN SITOMPUL (Tergugat XII), KASMIR RAMBE (Tergugat XIII), RINSON SILALAHI ( Tergugat XIV), MULLER MANURUNG (Tergugat XV), HARATUA WASHINGTON SIMANJUNTAK (Tergugat XVI), PINTO MANIK (Tergugat XVII), MARULI SIMARMATA (Tergugat XVIII), KHOIRUL SALEH (Tergugat XIX), IMAN HARAHAP (Tergugat XX), TUGIMAN EDY YUWONO (Tergugat XXI), DAKKAL HARAHAP (Tergugat XXII), SULASTRI (Tergugat XXIII), LIGAT HARAHA (Tergugat XXIV), KADDUL SIREGAR (Tergugat XXV), KHOIRUL ANWAR PANJAITAN (Tergugat XXVI), ALI MUSA TANJUNG (Tergugat XXVII), SAKTI HASIBUAN (Tergugat XXVIII), ILYAS SIREGAR (Tergugat XXIX), DARWIS RAMBE (Tergugat XXX), MAKMUR SIREGAR (Tergugat XXXI), AHMAD RAJA HASIBUAN (Tergugat XXXII), IMRON SIMAMORA (Tergugat XXXIII), KAAT (Tergugat XXXIV), SUGIONO (Tergugat XXXV), MUSLIM LUBIS (Tergugat XXXVI), ARIFIN SIMANJUNTAK (Tergugat XXXVII), ALI MUKTI NASUTION (Tergugat XXXVIII), MISDI (Tergugat XXXIX), HAMZAHYA DAMANIK (Tergugat XXXX), MAAS NASUTION (Tergugat XXXXI), SUTIYONO (Tergugat XXXXII), BUPATI PADANG LAWAS Cq CAMAT (Tergugat XXXXIII), ELLY SATYA PUTRI, SH, SpN (Tergugat XXXXIV), IRWANUDDIN, SH, SpN (Tergugat XXXXV)
74124
  • Biaya oleh lahan 64 Ha : 64 Ha x Rp. 5.000.000/Ha= Rp. 320.000.000,b. 1) Biaya bibit, tanam, rawatan awal: 20,52 Ha x Rp. 27.500.000,/Ha= Rp. 564.300.000,2) Biaya pemeliharaan 3 th: 20,52 Ha x Rp. 10.000.000/Ha/Th x 3 th= Rp. 615.600.000,c. 1) Biaya rawatan extra 3 th: 12,696 Ha x Rp. 15.000.000,/Ha/th x 3th= Rp. 571.320.000,2) Kerugian pengurangan 2 th panen: 12,696 Ha x Rp. 341.632.100, = Rp. 722.557.000,d.
Register : 28-07-2021 — Putus : 13-12-2021 — Upload : 15-12-2021
Putusan PN AMBON Nomor 26/Pid.Sus-TPK/2021/PN Amb
Tanggal 13 Desember 2021 — Penuntut Umum:
1.JUNITA SAHETAPY, S.H
2.M. YONGEN PANGKEY, S.H
3.AGUSJAYANTO, SH., MH
4.FARIDS DHESTARASTRA MUSA, SH., MH
5.GARUDA CAKTI VIRA TAMA, SH
6.DENNY I. SITUMORANG, SH
Terdakwa:
1.ABDUL ALAM HITIMALA
2.USMAN TUHUITU
181117
  • Mangga) ==MPengecoran ( RebatBeton ) Camp. 1:3:3.4 MsIV Pekerjaan AkhirPembersihan Lokasisetelah selesai1 Pekerjaan LsDokumentasi dan2 Laporan LsJumlah18.0027.3613.681.001.0013,322,751.751,328,512.50 23,913,225.00684,077.10 18,716,349.464,796,137.50 65,611,161.00108,240,735.46400,000.00 400,000.001,000,000.00 1,000,000.001,400,000.00126.154.012.21Kemudian terdapat selisih dari pembangunan jalan rabat beton tahun 2017 tersebutdengan rincian sebagai berikut : Urugan Pasir = 23,40 Sak terpasang = 20,52
    Camp. 1:3:4) M8 13.68 4,796,137.50 65,611,161.00108,240,735.46Halaman 224 dari 284 Putusan Nomor 26/Pid.SusTPkK/2021/PN AmbPekerjaan AkhirPembersihan Lokasisetelah selesai1 Pekerjaan LsDokumentasi dan2 Laporan LsJumlah1.00 400,000.00 400,000.001.00 1,000,000.00 1,000,000.001,400,000.00126.154.012.21Kemudian terdapat selisih dari pembangunan jalan rabat beton tahun 2017 tersebutdengan rincian sebagai berikut : Urugan Pasir Pasangan Batu Penyusunan batu 5 x 7 Pengecoran Rebat= 23,40 Sak terpasang = 20,52
    atauwadah untuk kebutuhan bahan dengan tetapan harga bahan per meter kubik4,36 M3 semen, 0,52 M3 pasir, dan 0,87 M3 kerikil sehingga nilai pekerjaanterpasang yang ditemui senilai Rp.126.154.012,21.Bahwa dalam hasil pemeriksaan serta melakukan perhitungan volume, makaterdapat Kekurangan dan Kelebihan Volume Pekerjaan pada beberapa itemHalaman 266 dari 284 Putusan Nomor 26/Pid.SusTPkK/2021/PN Ambpekerjaan seperti :Kekurangan Volume Pekerjaan untuk Jalan Setapak : Urugan Pasir = 23,40M terpasang = 20,52
Register : 23-04-2020 — Putus : 09-07-2020 — Upload : 02-08-2020
Putusan PN KENDARI Nomor 14/Pid.Sus-TPK/2020/PN Kdi
Tanggal 9 Juli 2020 — Penuntut Umum:
ANDI GUNAWAN
Terdakwa:
MUH. FAHRUL SURIAWAN SIRANG, S.E.
15293
  • Beton Mutu Sedang fc2,92 ms 1.882.384,82 4.743.609,7520 Mpa7.2 Baja Tulangan U 24 Polos/Ulir 299,53 Kg 20.691,00 6.197 .575,23Pasangan Batu 20,52 ms 886.675,89 18.194.589,26Jumlah 1.504.592.812,64PPN 10% 150.459.281,26Jumlah Total 1.655.052.093,90Pembulatan 1.655.000.000,00 Bahwa benar, ada Laporan Hasil Pemeriksaan Lapangan dan PerhitunganVolume lapis pondasi agregat Kelas B oleh Tim Ahli Dinas Pekerjaan UmumHal. 40 dari 76 Hal.
Register : 03-02-2022 — Putus : 12-05-2022 — Upload : 17-05-2022
Putusan PN DENPASAR Nomor 122/Pid.Sus/2022/PN Dps
Tanggal 12 Mei 2022 — Penuntut Umum:
I Wayan Sutarta, SH
Terdakwa:
I Kadek Krisna Jaya
246
  • - 21,45 gram brutto atau 20,52 gram netto (kode B7).

    - 21,92 gram brutto atau 20,99 gram netto (kode B8).

    - 23,53 gram brutto atau 22,60 gram netto (kode B9).

    - 22,98 gram brutto atau 22,05 gram netto (kode B10).

    - 22,64 gram brutto atau 21,71 gram netto (kode B11).

    - 23,40 gram brutto atau 22,47 gram netto (kode B12).