Ditemukan 126 data

Urut Berdasarkan
 
Register : 27-12-2016 — Putus : 27-04-2017 — Upload : 20-06-2017
Putusan PN JAKARTA SELATAN Nomor 907/Pdt.G.KPPU/2016/PN JKT.SEL
Tanggal 27 April 2017 — - PT. COSL INDO - PT. HUSKY – CNOOC Madura Limited Lawan KOMISI PENGAWAS PERSAINGAN USAHA (KPPU)
399606
  • Tianjin, PRC PRC RIMB20,000,000 108% 100% Provision of driling(formerly known as Tianjin 7 September 1993 fluids servicesJinlong PetroChemical Company Ltd)((COSL ChemicalCOSL Holding AS Norway Norway NOK1,494,415,487 100% 100% Investment holding(formerly known as COSL Drillings 21 January 2005Europe AS)PT.
    Principal place paid share capital to the GroupName of entity registration of business paidin capital 2014 2013 Principal activitiesCOSL Driling PanPacifc Ltd, Singapore Singapore US$1 100% 100% Management of13 Anni 2009 jackup driling igsPT Samudra Timur Santosa Indonesia Indonesia US$250,000 49% 49% Provision of marine(PT STS" @) 27 July 2010 support andtransportation servicesCOSL OilTech (Singapore) Lt.
    PatN Description of Deficiency & Date Rectified e; Remark Domain Standard / CriticalityoO Recommendation Opened Y/N CloInsp Bodysedand NACE for sour service besuitability deliveredprior tothewelIsectionrequirement6 It is recommended that the Cement unit is Drilling SW Major 20.08.2015 Y 26.cement unit is at least rated ratedfor 15k, was 09.to 15,000 psi tested to 13k 201(80%) on Sept 526/15.7 Driling stand and kill Drilling SW Major 20.08.2015 N FOassembly are not currently SVavailable.
    S elShip Fire Fighting, Offshore First Aid, and Survival in qualification ifWater for Helicopter Disaster from approved schools request upon awardNational Staff position who have experience inoperating the Jack Up Driling Rig operating inIndonesiarelated experience onsite Rig Jack Up.
    Shall possess validcertificates for H2S, MIGAS/IWCF Driller level,Survival at Sea, Manipulation of Life Boat and Raft,Ship Fire Fighting, Offshore First Aid, and Survival inWater for Helicopter Disaster from approved schoolsNational Staff position who have experience inoperating the Jack Up Driling Rig operating inIndonesiaShall have at least five (6) years of derick manrelated experience onsite Rig Jack Up.
Putus : 13-09-2011 — Upload : 12-06-2012
Putusan MAHKAMAH AGUNG Nomor 1624 K/Pid.Sus/2011
Tanggal 13 September 2011 — AZWANSYAH HABIBIE ; JAKSA/PENUNTUT UMUM PADA KEJAKSAAN NEGERI STABAT
2715 Berkekuatan Hukum Tetap
  • Driling Machine / Bor 1 Rp. Rp.Duduk 950.000, 950.000,28. Inverter Welder Busur / 1 Rp. Rp.Trapo Las Listrik 900.000. 900.000.29. Two Strokes Motorcycle 2 Unit Rp. Rp12.000.000,Live / Sepeda Motor 2 6.000.000. TakEngine : 2 strokesmotorcycle engine, 80 110 cc Instrument : keytype ignition swich Subsystem : air coolingsystem, fuel system with1 liter fuel tankElectricity systemHead Ligt, Rear Light, Hal. 37 dari 88 hal. Put.
    Driling Machine / Bor 1 Rp. Rp. 950.000.Duduk 950.000.28. Inverter Welder Busur / 1 Rp. Rp. 900.000.Trapo Las Listrik 900.000.29. Two Strokes Motorcycle 2 Unit Rp. Rp12.000.000.Live / Sepeda Motor 2 6.000.000.TakEngine : 2 strokesmotorcycle engine, 80 110 cc Instrument : key Hal. 52 dari 88 hal. Put.
Putus : 26-05-2010 — Upload : 12-12-2011
Putusan MAHKAMAH AGUNG Nomor 825 K/PID.SUS/2010
Tanggal 26 Mei 2010 —
2019 Berkekuatan Hukum Tetap
  • Kijang 5 KUnitRp.2.400.000Rp. 2.400.000, 20.Sistem Kemudi ManualSpecification ReculatingBallUnitRp. 2.000.000Rp. 2.000.000, 21.Lucking Chain Clamp /Penjepit Filter OilUnitRp. 325.000,Rp.325.000, 22.Cut Off Machine / MesinPotongRp. 985.000,Rp. 985.000, 23.Torque Welding / BlenderPotongRp. 700.000,Rp. 700.000, 24.Differential Gear Model /Sistem DiffrensialRp.2.500.000Rp. 2.500.000, 25.Transmition Sistem /Sistem TranmisiRp.2.250.000Rp.2.250. 000, 26.Banck Vise /Ragum 510Rp.600.000,Rp. 6.000.000, 2/7.Driling
    No. 825 K/Pid.Sus/2010 Penjepit Filter Oil 22.Cut Off Machine / MesinPotongRp. 985.000,Rp. 985.000, 23.Torque Welding / BlenderPotongRp. 700.000,Rp. 700.000, 24.Differential Gear Model /Sistem DiffrensialRp.2.500.000Rp. 2.500.000, 25.Transmition Sistem /Sistem TranmisiRp.2.250.000Rp.2.250. 000, 26.Banck Vise /Ragum 510Rp.600.000,Rp. 6.000.000, 2/7.Driling Machine / BorDudukRp. 950.000,Rp. 950.000, 28.Inverter Welder Busur /Trapo Las ListrikRp. 900.000,Rp. 900.000, 29.Two Strokes MotorcycleLive /
Putus : 06-02-2017 — Upload : 07-08-2017
Putusan PN PALEMBANG Nomor 1863/Pid.B/2016/PN.Plg
Tanggal 6 Februari 2017 — Lukman Sundana Als Luk King Sun Als Asun
408
  • berikut dibawah ini :1.Nota Faktur Penjualan Nomor : NTB13120811, tanggal 09 Des 2013,pipa pvc 3", tee 3", knee 3", lem pvc, pipa pvc 2", pipa pvc 1 1/2", pipapvc 1", pipa pvc 3/4", pipa pvc 1/2" senilai Rp.8.467.000,(delapan jutaempat ratus enam puluh tujuh ribu rupiah);Nota Faktur Penjualan Nomor : NTB14010201, tanggal 06 Jan 2014,semen 3 roda senilai Rp.8.850.000,(delapan juta delapan ratus limapuluh ribu rupiah);Nota Faktur Penjualan Nomor : NTB14010301, tanggal 06 Jan 2014,baut tenda 12mm x 7cm (driling
Register : 09-05-2011 — Putus : 07-06-2011 — Upload : 11-09-2012
Putusan PT MEDAN Nomor 01/PID.SUS/2011/PT.MDN
Tanggal 7 Juni 2011 — AZWANSYAH HABIBIE
6517
  • PBsTorque Welding /Blender PotongRp. 700.000,Rp. 700.000. 24.Differential Gear Rp.2.500.000, Rp. 2.500.000. 54 Model / SistemDiffrensial PoaTransmition Sistem /Sistem TranmisiRp 2.250. 000,Rp. 2.250. 000. 26.Banck Vise / Ragum 510Rp.600.000,Rp. 6.000.000, 27.Driling Machine / BorDudukRp.950.000,Rp. 950.000, 28.Welder/ Trapo LasInverterBusurListrikRp. 900.000,Rp. 900.000, 29.Two Strokes Motorcycle Live Sepeda Motor 2 TakEngine : 2. strokesmotorcycle engine, 80cc Instrument : keytype ignition swichSubsystem
    Kijang 5 KUnitRp. 2.400.000.Rp. 2.400.000. 20.Sistem Kemudi ManualSpecificationReculating BallUnitRp. 2.000.000.Rp. 2.000.000, 21.Lucking Chain Clamp /Penjepit Filter OilUnitRp.325.000.Rp.325.000. 22.Cut Off Machine /Mesin PotongRp.985.000.Rp.985.000. 2B.Torque Welding /Blender PotongRp.700.000.Rp.700.000. 24.GearSistemDifferentialModel /DiffrensialRp. 2.500.000.Rp.2.500.000. 25.Transmition Sistem /Sistem TranmisiRp. 2.250. 000.Rp. 2.250. 000. 26.Banck Vise / Ragum 5Rp.600.000.Rp. 6.000.000. 27.Driling
Register : 07-08-2019 — Putus : 24-10-2019 — Upload : 28-10-2019
Putusan PT JAKARTA Nomor 453/PDT/2019/PT DKI
Tanggal 24 Oktober 2019 — Pembanding/Penggugat : VIRGINIA INDONESIA CO., LLC.
Terbanding/Tergugat : PT. Bank DKI
19382855
  • Garansi Bank ini diterbitkan oleh Tergugat untuk menjaminpelaksanaan perjanjian kerjasama jasa pengeboran = antaraPenggugat, selaku pemberi kerja, dan PT Resources Jaya TeknikManagement Indonesia (PT RMI, dalam pailit) selakukontraktor/penyedia jasa, berdasarkan perjanjian Minimum 1500 HPHalaman 10 putusan perkara Nomor : 453/Pdt/2019/PT.DKIFast Moving Driling Rig Services No. 53540R tertanggal 1 Juni 2013("Perjanjian Jasa").7.
Register : 27-02-2013 — Putus : 29-10-2015 — Upload : 27-08-2018
Putusan PN JAKARTA SELATAN Nomor 133/PDT.G/2013/PN.JKT.SEL
Tanggal 29 Oktober 2015 — FRANCISCO NORIEGA MALAVE Lawan 1.PT TUCAN PUMPCO SERVICES INDONESIA 2.TUCAN PETROLEUM INDONESIA LLC 3.OVERSEAS PRIVATE INVESTMENT CORPORATION (OPIC) 4.PT PERINTIS GEOCEM 5.FRANCISCO JAVIER GALI JR 6.PERINTIS GUNAWAN 7.TITI HADILA YAHYA 8.FRANCISCO GALI COLL 9.NELSON MATA BELOSEVICH 10.MARCUS RUBEN NGARBINGAN 11.DONDI INDRAYANA 12.PEMERINTAH REPUBLIK INDONESIA CQ KEMENTRIAN DAN HAK ASASI MANUSIA RI CQ DIREKTORAT JENDERAL ADM HUKUM UMUM 13.PEMERINTAH REPUBLIK INDONESIA CQ KEMENTRIAN DAN HAK ASASI MANUSIA RI CQ KANTOR PENDAFTARAN FIDUSIA WILAYAH DKI JAKARTA
255124
  • InvoiceNomor0010/MTR/INV/II08 tertanggal 14Maret 2008Container 40 FTCLumut Balae Assetsesuai LocalPurchasingOrder/Work OrderPT Trans Nomor 12010,17 e0Apr Tioma tertanggal 28 USD 10,274.002008 Jaya Maret 2008,Invoice Nomor19TPSVINVTTJ/IV/08& Nomor22/TPSIINVTTJ/IV/08PT CiptaHasil Mover Rental for29Apr Sugiarto MOB of TC0818 USD 2,358.702008 Sugiarto Lumut BalaeTsipto PO.8041289HartonoEquipmentAccessoriesSAS Oil Sesuai Journal6May Drilling Voucher Sub19 USD 13,100.002008 Alisa Ledger V.0174Isnami IDRSAS OIL DRILING
    23,833.63mur maya Nomor 0010/MTR/INV/III08 tertanggal 14 Maret2008Container 40 FTC LumutBalae Asset sesuai LocalPurchasing Order/WorkPT Tarts Order Nomor 12010,17 29Apr2008 Tj tertanggal 28 Maret 2008, USD 10,274.00ioma JayaInvoice Nomor19TPSI/INVTTJ/IV/08&Nomor 22/TPSI/INVTTJ/IV/08PT Ciptaeiate Mover Rental for MOB of18 29Apr2008 Suaiarts TC08 Lumut Balae USD 2,358.709 PO.8041289TsiptoHartonoEquipment AccessoriesSesuai Journal VoucherSAS Oil Sub Ledger V.0174IDR19 6May2008 DrillingAlisa SAS OIL DRILING
Register : 03-10-2019 — Putus : 17-12-2019 — Upload : 23-12-2019
Putusan PN NGAWI Nomor 166/Pid.B/2019/PN Ngw
Tanggal 17 Desember 2019 — Penuntut Umum:
HARYONO, SH.MH
Terdakwa:
TYAGITA AMANDHA NANTASIA Binti HENGKY HENDRATMOKO
11824
  • SaudariEka Oktavia Als Vivi dimasukkan menggunakan nama suaminya yaituSdr.Agus Supriyono dan akhirnya terjadi kesepakatan harga sepeda motorHonda CRF dengan harga sebesar Rp.31.400.000, (tiga puluh satu jutaempat ratus ribu rupiah) dan sepeda Motor tersebut harus indent terlebihdahulu kurang lebih selama 1 (satu)bulan, lalu istri saksi menyerahkanuang tunai sebesar Rp.5.000.000, (lima juta rupiah) sebagai tanda jadiyang diterima oleh Saudari Eka Oktavia Als Vivi melalui Transfermenggunakan mesin Driling
    nama suaminya yaituSdr.Agus Supriyono dan akhirnya terjadi kesepakatan harga sepeda motorHonda CRF dengan harga sebesar Rp.31.400.000, (tiga puluh satu jutaempat ratus ribu rupiah) dan sepeda Motor tersebut harus indent terlebihdahulu kurang lebih selama 1 (satu) bulan, lalu saksi menyerahkan uangtunai sebesar Rp.5.000.000, (lima juta rupiah) sebagai tanda jadi yangditerima oleh Saudari Eka Oktavia Als Vivi melalui Transfer menggunakanHalaman 32 dari 91 Putusan Nomor 166/Pid.B/2019/PN.Ngwmesin Driling
Register : 21-09-2023 — Putus : 04-12-2023 — Upload : 04-12-2023
Putusan PN PALEMBANG Nomor 1006/Pid.B/2023/PN Plg
Tanggal 4 Desember 2023 — Penuntut Umum:
ICHSAN AZWAR, S.H,.M.H
Terdakwa:
1.Febrina Binti Amancik (Alm).
2.Nadya Amelia Binti Amancik
8866
    1. 3 (tiga) lembar surat pengumumam pemberitahuan pengadaan sebagai berikut :
    1. 2 (dua) lembar sura Pengumuman No.UM-672/K20330/2018-S7 Tentang Pemberitahuan Pengadaan Peralatan Laboratorium Driling atas nama PT. Pertamina (Persero) Asset 2 Prabumulih tanggal 25 September 2018.
    2. 1 (satu) lembar surat pengumuman Pengadaan No. USY7138AAAC89, Pengadaan No. USY 7138AAAC90, Pengadaan No. USY 7138AAAC33, Pengadaan No. USY 7138AAAC34.
Register : 13-11-2019 — Putus : 15-07-2020 — Upload : 14-10-2020
Putusan PN JAKARTA PUSAT Nomor 104/Pid.Sus-TPK/2019/PN Jkt.Pst
Tanggal 15 Juli 2020 — Penuntut Umum:
Yanuar Utomo, SH., M.Hum
Terdakwa:
Perry Widyananda
517239
  • Pakarti Rekayasa Utama: Driling Services: Mud 309,284.25 309,284.25Logging23 PT MI Indonesia 1,734,581. 1,734,581.62Schlumberger Company: 62Driling Fluid24 PT. Dowell Anadrill Schlumberger (termasuk pek. Eks 9,961.102. 9,961.102.49plosive dari PT. Schlumberger Geophysics Nusantara) 49Cementing, Fracturing EWL: DST25 PT.
    Pakarti Rekayasa Utama: Driling Services: Mud 309,284.25 309,284.25Logging23 PT MI Indonesia Schlumberger Company: Driling Fluid 1,734,581. 1,734,581.662 224 PT. Dowell Anadrill Schlumberger (termasuk pekerjaan 9,961.102. 9,961.102.4Eksplosive dari PT. Schlumberger Geophysics 49 9Nusantara): Cementing, Fracturing EWL, dst25 PT.
    Elnusa Driling Services, PT. Carana Bunga Persada,adalah saksi.Bahwa Saksi membuat pengumuman lelang atas permintaan dari DodiJatnika dan Terdakwa.Bahwa data atau bahan untuk pembuatan pengumuman lelang, Saksidapat dari Terdakwa yang secara lisan disampaikan kepada saksi.
Register : 20-11-2013 — Putus : 23-01-2014 — Upload : 03-09-2019
Putusan PT PEKANBARU Nomor 27/Tipikor/2013/PT PBR
Tanggal 23 Januari 2014 — Pembanding/Terbanding/Terdakwa : HARDANI BIN PAINO HASRI MARDI
Terbanding/Pembanding/Jaksa Penuntut : RESTU ADI CAHYONO, SH
4218
  • Put.No.27/TIPIKOR/2013/PTR cable clamp Ground 96 Unit 2.784.00 116.000, 2.668.00road driling 0, 0,headdiameter5/8Ground 32 Zak 13.440.0 13.440.0enhance 00, 00,material(GEM)UBold 14 Unit 80.640.0 80.640.0Ground to 40 00, 00,doublecable clampJasa 48 Titik 58.800.0 58.800.0Pantek/ 00, 00,Sumur BorCable STP 4 Kota AMP 16.200.0 16.200.0 Cat 5 dan k 00, 00,UPT cat 5Connektor 4 Bua AMP 16.632.0 16.632.0 STP cable h 00, 00,RJ45Power cable 4 Bua 21.200.0 21.200.0connector h 00, 00,systemSwitching 4 Bua 3.600.00
Register : 30-04-2015 — Putus : 29-06-2015 — Upload : 28-07-2015
Putusan PN JAKARTA PUSAT Nomor 9/PDT.SUS-PAILIT/2015/PN.NIAGA.JKT.PST
Tanggal 29 Juni 2015 — PT WIRANA NUSANTARA ENERGY >< PT. TANGKUBAN PARAHU GEOTHERMAL POWER
829526
  • LALAI MEMENUHI KEWAJIBAN YANGDITENTUKAN DALAM PERJANJIAN (WANPRESTASI) MEMPUNYAI PIUTANG ATASPEKERJAAN YANG TIDAK BERPRESTASI (EXCEPTIO NON ADIMPLETI CONTRACTUS);TERMOHON PAILIT sudah berkalikali menegur Pemohon Pailit agar segera menyelesaikan pekerjaanpemboran dengan mendatangkan drilling rig yang baru sesuai "Amandemen sebagaimana terbukti darisuratsurat teguran TERMOHON PAILIT kepada Pemohon Pailit sebagai berikut:1 Surat No. 130/090/TPGP/2014 tanggal 18 juni 2014 perihal : kesiapan Operasi Driling
    demobilisasi 40%;Minutes of Rig Meeting tanggal 08 Mei 2014,yang dihadiridan ditandatangani oleh perwakilan Pemohon Pailit danTermohon Pailit di lapangan, yang intinya bahwa performaRig BSA#01 sudah menunjukkan adanya rangkaiankerusakan pada peralatan sehingga harus ditindak lanjutiserta pengadaan material semen yang terlambat;Berita Acara tanggal 21 Mei 2014, yang ditandatanganiperwakilan Pemohon Pailit dan Termohon Pailit yang padaintinya bahwa Pemohon Pailit bersedia mengganti Drilling RigBSA#O1 dengan Driling
Register : 19-03-2013 — Putus : 26-07-2012 — Upload : 23-05-2014
Putusan PN BATULICIN Nomor 56/Pid.B/2012/PN.Btl.
Tanggal 26 Juli 2012 — JONHI PARUBAK Bin BENYAMIN PARUBAK; DEDY RIAN SAPUTRA Bin JAMAL;
3213
  • SinturiDinamik Driling dan kedua orang Petugas Brimob tersebut naik ke atas tongkangposisi kapal berada di Pelabuhan Lamongan Sorbes Jawa Timur.Bahwa kapal TB. Varia Usaha 9 menarik TK. Lintas Segara 9 berlayar dariPelabuhan Lamongan Sorbes Jawa Timur dengan tujuan Pelabuhan MaloiSangkulirang Kalimantan Timur pada hari Rabu tanggal 4 Januari 2012 sekirapukul 14.00 Wib.Bahwa pada waktu terjadinya penembakan oleh anggota Brimob yang berada diatas TK.
Register : 20-12-2023 — Putus : 17-01-2024 — Upload : 18-01-2024
Putusan PT PALEMBANG Nomor 358/PID/2023/PT PLG
Tanggal 17 Januari 2024 — Pembanding/Terbanding/Terdakwa I : Febrina Binti Amancik (Alm). Diwakili Oleh : Harry Hendra, S.H., M.H.
Terbanding/Pembanding/Penuntut Umum : ICHSAN AZWAR, S.H,.M.H
Terbanding/Terdakwa : Nadya Amelia Binti Amancik
860
    • 3 (tiga) lembar surat pengumumam pemberitahuan pengadaan sebagai berikut :
    • 2 (dua) lembar sura Pengumuman No.UM-672/K20330/2018-S7 Tentang Pemberitahuan Pengadaan Peralatan Laboratorium Driling atas nama PT. Pertamina (Persero) Asset 2 Prabumulih tanggal 25 September 2018.
    • 1 (satu) lembar surat pengumuman Pengadaan No. USY7138AAAC89, Pengadaan No. USY 7138AAAC90, Pengadaan No. USY 7138AAAC33, Pengadaan No.
Putus : 10-10-2013 — Upload : 30-01-2014
Putusan PN PEKANBARU Nomor 31/PID.SUS/TIPIKOR/2013/PN.PBR
Tanggal 10 Oktober 2013 — HARDANI Bin PAINO HASRI MARDI
3811
  • ./84.000,116.000, 2.668.000,driling headdiameter 5/8M Ground 32 Zak 13.440.000 13.440.000,enhance 7 material (GEM)N UBold Ground 144 Unit 80.640.000 80.640.000,to double cable 0 7 clampO Jasa Pantek/ 48 Titik 58.800.000 58.800.000,Sumur Bor 7 6 Cable STP Cat 4 Kotak AMP 16.200.000 16.200.000 5 dan UPT cat 5 7 i7 Connektor STP /4 Buah AMP 16.632.000 16.632.000 cable RJ45 7 i8 Power cable 4 Buah 21.200.000 21.200.000,connector system9 Switching Hub /4 Buah 3.600.000, 3.600.000, Link 16 portand router10
Register : 15-10-2020 — Putus : 10-12-2020 — Upload : 10-12-2020
Putusan PT JAKARTA Nomor 39/PID.TPK/2020/PT DKI
Tanggal 10 Desember 2020 — Pembanding/Terbanding/Terdakwa : Perry Widyananda
Terbanding/Pembanding/Penuntut Umum : Yanuar Utomo, SH., M.Hum
5102184
  • Pakarti Rekayasa Utama: Driling Services: Mud 309,284.25 309,284.25Logging23 PT MI Indonesia 1,734,581. 1,734,581.62Schlumberger Company: 62Driling Fluid24 PT. Dowell Anadrill Schlumberger (termasuk pek. Eks 9,961.102. 9,961.102.49plosive dari PT. Schlumberger Geophysics Nusantara) 49Cementing, Fracturing EWL: DST25 PT.
    Pakarti Rekayasa Utama: Driling Services: Mud 309,284.25 309,284.25Logging23 PT MI Indonesia Schlumberger Company: Driling Fluid 1,734,581. 1,734,581.662 224 PT. Dowell Anadrill Schlumberger (termasuk pekerjaan 9,961.102. 9,961.102.4Eksplosive dari PT. Schlumberger Geophysics 49 9Nusantara): Cementing, Fracturing EWL, dst25 PT.
    Budi Mulyafor Jasa Driling Site Preparation Untuk sumur NGBU 03 Di WilayahBlok Alas Dara Kemuning;0.37: 1 (satu) Bundel Dokumen fotocopy bukti PembayaranPelaksanaan Pekerjaan PT. ABS, Agreement title: Sosial Community,pada pelaksanaan Manajemen Proyek Pemboran Terpadu PertaminaEPC ADK 2014;0.38: 1 (satu) Bundel Dokumen fotocopy bukti PembayaranPelaksanaan Pekerjaan PT.
    Budi Mulya for Jasa Driling SitePreparation Untuk sumur NGBU 03 Di Wilayah Blok AlasDara Kemuning;627) 0.37: 1 (satu) Bundel Dokumen fotocopy buktiPembayaran Pelaksanaan Pekerjaan PT. ABS, Agreementtitle: Sosial Community, pada pelaksanaan ManajemenProyek Pemboran Terpadu Pertamina EPC ADK 2014;628) 0.38: 1 (satu) Bundel Dokumen fotocopy buktiPembayaran Pelaksanaan Pekerjaan PT.
    Budi Mulya, terkait tanda terimapembayaran Jasa Drilling Site Preparation NGBU 03Sebesar Rp1.837.740.000,00;Hal . 351 Putusan No.39/PidSusTPK/2020/PT.DKI.954) Pc.4: 3 (Tiga) Lembar Rekening Koran Bank BNICabang Cepu; Milik CV Budi Mulya Nomor Rekening0032945219;955) P.c.5: 1 (Satu) bundel Laporan Serah Terima PekerjaanJasa Driling Site Preparation Untuk Sumur NGBU 03 DiWilayah Blok Alas Dara Kemuning tanggal 3 Nopember2014; Kontrak No: 14103000504/ABSADK/IX/14 tanggalKontrak 5 September 2014; antara
Register : 20-10-2022 — Putus : 09-01-2023 — Upload : 13-01-2023
Putusan PN JAMBI Nomor 513/Pid.Sus/LH/2022/PN Jmb
Tanggal 9 Januari 2023 — Penuntut Umum:
MUHAMMAD GEMPA AWALION PUTRA ,SH.MH
Terdakwa:
DASMAN PERANGIN NANGIN Als GUNI Bin DAUD PERANGIN NANGIN
7516
  • Bohai Driling Service Indonesia Nomor : 007/TBP/Penawaran/V/2021 Tanggal 03 May 2021 Perihal Penawaran Harga BBM HSD Solar Periode 01-15 Mei 2021.
  • 1 (satu) lembar surat PT. Tiga Bambu Perkasa Tujuan Pimpinan Perusahaan PT. Tri Mitra Lestari Nomor : 008/TBP/Penawaran/V/2021 Tanggal 03 May 2021 Perihal Penawaran Harga BBM HSD Solar Periode 01-15 Mei 2021.
  • 1 (satu) lembar surat PT. Tiga Bambu Perkasa Tujuan Pimpinan Perusahaan PT.
    Tiga Bambu Perkasa Tujuan Pimpinan Perusahaan PT.Bohai Driling Service Indonesia Nomor : 019/TBP/Penawaran/V/2021 Tanggal 19 Mei 2021 Perihal Penawaran Harga BBM HSD Solar Periode 15 -31 Mei 2021.
  • 1 (satu) lembar surat PT. Tiga Bambu Perkasa Tujuan Pimpinan Perusahaan PT.Tri Mitra Lestari Nomor : 020/TBP/Penawaran/V/2021 Tanggal 19 Mei 2021 Perihal Penawaran Harga BBM HSD Solar Periode 15 -31 Mei 2021.
  • 1 (satu) lembar surat PT.
Register : 20-10-2022 — Putus : 09-01-2023 — Upload : 13-01-2023
Putusan PN JAMBI Nomor 512/Pid.Sus/LH/2022/PN Jmb
Tanggal 9 Januari 2023 — Penuntut Umum:
MUHAMMAD GEMPA AWALION PUTRA ,SH.MH
Terdakwa:
ELI MARDHIAH Binti ISMAIL
11227
  • Bohai Driling Service Indonesia Nomor : 007/TBP/Penawaran/V/2021 Tanggal 03 May 2021 Perihal Penawaran Harga BBM HSD Solar Periode 01-15 Mei 2021.
  • 1 (satu) lembar surat PT. Tiga Bambu Perkasa Tujuan Pimpinan Perusahaan PT. Tri Mitra Lestari Nomor : 008/TBP/Penawaran/V/2021 Tanggal 03 May 2021 Perihal Penawaran Harga BBM HSD Solar Periode 01-15 Mei 2021.
  • 1 (satu) lembar surat PT. Tiga Bambu Perkasa Tujuan Pimpinan Perusahaan PT.
    Tiga Bambu Perkasa Tujuan Pimpinan Perusahaan PT.Bohai Driling Service Indonesia Nomor : 019/TBP/Penawaran/V/2021 Tanggal 19 Mei 2021 Perihal Penawaran Harga BBM HSD Solar Periode 15 -31 Mei 2021.
  • 1 (satu) lembar surat PT. Tiga Bambu Perkasa Tujuan Pimpinan Perusahaan PT.Tri Mitra Lestari Nomor : 020/TBP/Penawaran/V/2021 Tanggal 19 Mei 2021 Perihal Penawaran Harga BBM HSD Solar Periode 15 -31 Mei 2021.
  • 1 (satu) lembar surat PT.
Putus : 17-10-2019 — Upload : 19-02-2020
Putusan MAHKAMAH AGUNG Nomor 3318 K/Pid.Sus/2019
Tanggal 17 Oktober 2019 — KOKOS JIANG alias KOKOS LEO LIM
431379 Berkekuatan Hukum Tetap
  • Tansri Madjid Energi(Kesepakatan) tanggal 26 Maret 2012 antara Khairil Wahyuni danKokos Leo Lim;Berita Acara Hasil Driling Nomor :022/BANTME/2012 tanggal 31 Mei2012 PT. PLN Batubara dengan PT. TME jumlah SumberdayaBatubara PIT 3 pada Blok 4 sebesar 45.354.560 ton;Surat PT. TME nomor: C017 L025/TME/V/2012 tanggal 31 Mei 2012periode Invoice No. 002/TME/PRBB/III/12 ditujukan kepada KhairilWahyuni Payment Request Rp347.353.629.000 kwitansi no.
    perihal Penyediaan Batubara untuk PLTU MilikPT PLN;303) Surat PT Tansri Madjid Energi Nomor : C017 L024/TME/III /2012tanggal 8 Maret 2012 ditujukan kepada Khairil Wahyuni Dirut PTPLN Batubara, Perihal : Hasil Pemboran Pit 1 dan Pit 2 pada Blok1 ditandatangani oleh Kokos Leo;304) Kesepakatan Pembayaran Dimuka Cadangan Batubara Terkira Pit1 dan Pit 2 Blok 1 dalam wilayah Drilling PT Tansri Madjid Energi(Kesepakatan) tanggal 26 Maret 2012 antara Khairil Wahyuni danKokos Leo Lim;305) Berita Acara Hasil Driling
Register : 09-03-2018 — Putus : 17-04-2018 — Upload : 19-04-2018
Putusan PN JAKARTA SELATAN Nomor 36/Pid.Prap/ 2018 /PN.Jkt.Sel
Tanggal 17 April 2018 —
162106
  • 1Tanggal O02 Maret 2011 dan Bukti Pengeluaran Bank sebesar Rp.15.000.000.000,00 (lima belas milyar rupiah) tanggal 10 Juni 2011Pembayaran Tahap Il atas modal kerja Untuk Perolehan CadanganBatubara 1.000.000 MT sesuai Nota Kerjasama Operasi PenambanganBatubara 02/NK/DIRPLNBB/2011 Tanggal 02 Maret 2011 diberitanda T37;Copy dari copy 1 (satu) eksp bukti Pengeluaran Bank sebesar Rp.100.000.010.000,00 (seratus milyar sepuluh ribu rupiah) uraianPembayaran Pengikatan Deposit Mineable Reserve Atas Hasil Driling