Register : 28-02-2013 — Putus : 14-10-2014 — Upload : 12-11-2015
Putusan PENGADILAN PAJAK Nomor Put.56109/PP/M.IXA/19/2014
Tanggal 14 Oktober 2014 — Pemohon Banding dan Terbanding
14219
  • dimaksud disepakati untuk menggunakanRule of Origin (ROO) Form E atau Surat Keterangan Asal Barang Form E, yangdiatur secara rinci dalam Revised Operational Certification Procedures (OCP) ForThe Rules Of Origin Of The AseanChina Free Trade Area.a)bahwa berdasarkan Operational Certification Procedures for The Rules of Origin ofThe ASEANChina Free Trade Area Rule 20 disebutkan:product sent from an exporting party for exhibition in another party and sold during or after theexhibition into a party shall
    The name and address of the exhibiton mustbe indicated. a certificate issued by the relevant government authorities of the party where theexhibition took place together with supporting documents prescribed in rule 19 (d) may be required.bahwa berdasarkan Appendix 1: Revised Operational Certification Procedures (OCP)For The Rules Of Origin Of The AseanChina Free Trade Area Rule 23 dinyatakanThe Customs Authority of the importing Party shall accept a Certificate of Origin(Form E) in cases where the
    Thethird party invoice number should be indicated in Box 10 of the Certificate of Origin(Form E), the exporter and consignee must be located in the Parties and the copy ofthe third party invoice shall be attached to the Certificate of Origin (Form E) whenpresenting to the Customs Authority of the importing Party.bahwa berdasarkan Overleaf Notes Form E (ASEANChina Free Trade Area) butir 10dinyatakan Third Party Invoicing: In cases where invoices are issued by a thirdcountry, the Third Party Invoicing
    in Box 13 shall be ticked (Vv).
    Information such as name and country of the companyissuing the invoice shall be indicated in Box 7;bahwa berdasarkan Pasal 1 Peraturan Menteri Keuangan Nomor: 117/PMK.011/2012tanggal 10 Juli 2012 dinyatakan Menetapkan tarif bea masuk atas impor barang darinegara Republik Rakyat China dan negaranegara ASEAN dalam rangka ASEANChina Free Trade Area (ACFTA), sebagaimana tercantum dalam Lampiran yangmerupakan bagian tidak terpisahkan dari Peraturan Menteri ini.bahwa berdasarkan Pasal 2 Peraturan Menteri
Register : 01-03-2012 — Putus : 27-05-2013 — Upload : 12-12-2013
Putusan PENGADILAN PAJAK Nomor Put. 45141/PP/M.VIII/16/2013
Tanggal 27 Mei 2013 — Pemohon Banding dan Terbanding
12437
  • Terkait dengan Management Fee sebesar US$200,000.00bahwa berdasarkan Schedule 2 Management Administrative and Technical Services AgreemeKMC Oiltools PTE, LTD (KMCOS) dengan Pemohon Banding (Perusahaan) yang berlaku efekti1 Juli 2006 dinyatakan Sevices to provided under the agreement are such services as shall be 1from time to time by company to assist the company and its personnel to supplement the compatwork with respect to following:$2.1 Business planning$2.2 General Magemement and Administration
    Not later than Desember in each calendar year during the tetAgreeement, the parties shall agree an annual fee to apply for the following calendar year baseparties reasonable estimate of the amount of services to provided during the relevant calendar year; In addition to the fixed fee specified above , or agreed on an annual basis as provided herein, the shall also pay alloutof pocket disbursements and the third party expenses incurred by KNproviding the Services to the Company, to the extend that
    antara KMC Oil(Licensor) dan PT XXX dahulu PT KMC Oiltools (Licensee) dinyatakan : in considerationgranted herein, the Licensee hereby agrees to pay to the licensor a royalty equal to percentage rate ;in Schedule 1 of Licensees Gross Revenues from its business as shown in its audited accounts bahwa selanjutnya dalam angka 4 Schedule 1 perjanjian tersebut di atas , dinyatakanRoyalty Rate : 3 Per Cent (3%), except for the right to manufacture and sell product under thePatent, in which case the rate shall
Register : 27-06-2013 — Putus : 24-11-2014 — Upload : 18-12-2015
Putusan PENGADILAN PAJAK Nomor Put.57655/PP/M.IA/13/2014
Tanggal 24 Nopember 2014 — Pemohon Banding dan Terbanding
30133
  • PSC antara lain dinyatakan: The cost accruing therefrom shall be included in operating costs recoverable asprovided in section VI.
    theAccounting Procedure attached hereto by written agreement of PERTAMINA, CNWwill not incur interest expenses to finance its operations hereunder".bahwa terkait dengan alokasi biaya overhead kantor pusat, terdapat beberapaketentuann yang berlaku, antara lain :Article l angka 2 ExibitC PSC, antara lain dinyatakan:Overhead allocation.General and administrative costs, other than direct charges, allocable to thisoperation should be determined by a detailed study, and the method determinedby such study shall
    The method selected mustbe approved by PERTAMINA, and such approval can be reviewed peridacly byPERTAMINA and CNW";" The Last sentence of Article 3.3 of Exibit D the PSC is amended to be: "The Directand indirect costs incurred by PHE OGAN KOMERING as Operator andTALISMAN in so providing assistance to Operator shall be charged to the JointAccount and sahall be Included in operating costs";Surat Direktur Utama Pertamina Nomor: 947/C.0000/81 Tanggal 5 Juni Tahun 1981,antara lain dinyatakan:" berdasarkan
    Bandingsebagai kontraktor dalam pelaksanaan Production Sharing Contrac (PSC) untuk BlokOgan Komering.MenimbangMemperhatikanMengingatMemutuskanbahwa berdasarkan uraian tersebut, Majelis berpendapat bahwa alokasi biayaoverhead dari kantor pusat (Talisman Ltd Canada) kepada Pemohon Banding bukanmerupakan obyek PPh Pasal 26.bahwa ditinjau dari Perjanjian Penghidaran Pajak Berganda (P3B) antara PemerintahIndonesia dengan Canada Article 7 (1) dianyatakan:"The profits of an enterprise of a Contracting State shall
Putus : 22-11-2016 — Upload : 13-02-2017
Putusan MAHKAMAH AGUNG Nomor 808/B/PK/PJK/2016
Tanggal 22 Nopember 2016 — PT. PERTAMINA (PERSERO) vs. DIREKTUR JENDERAL PAJAK
3838 Berkekuatan Hukum Tetap
  • If at fuich time this Proves mot to bo the ease,Special allocation Procedgres Tesoeeling Blank OperatingCosta wlll ba adopted as may ba 4pprenriate,The charges Provided for in Seceian @.01 shall be specifiedUeparately for each sales Contract and aebject ts Separasefash calls and debit notes by Plant Operater and Paid byProducers in accordance with the Agcounting Preceduce,Such charges and Payments. shall. be: subject! te adprovided in the Accounting Procedure.
    Putusan Nomor 808/B/PK/PJK/2016 =The due date for @ach cash eal Shall bea set by BlaniY aneOperator, provided Plant Operatorgives Producers. ' bal, @& leastWO Weeks! advance notice of guch due date .Ba.Each cash eai1 shall set ferth infollowing:reasonable detail the(1) current cash status (all funds Fecelved. pursuant topeier cash calls nade in the curcent falendar yearand any iateres: earned thereon.
    TE the cash calls for a given mesath in the aggregate exceedactual expenditures fer said month, che cash call nexeSucceeding the issuance of the cebift ccke referred to inSection 7 belew shall be reduced by the ameyunt of auchSEC#ES.Es To the extent practicable, Flant Operater shall place thefunds received persuans o cash calle in faterestearaingaccounts; all interest earned thereen Shall be credited tePlant Operating Cests aad Rotice of such amgunts Shall bedelivered ta the Producers.
    ARTICLE 6Diastisements Wire Resrectvo Process Counce6.1 Pertamina and the Contractors shall submit to the Trusteeinvoices received by them from the Liquefaction Company on accountof LNG Processing Feos.
    Io the extent that funds ore then held inthe Badak Poyment Account the Trustee shall, promptly upon receiptof notice from both Pertamina and the Contractors that any suchinvoice has been approved for payment, pay to the Liquefaction Compooy from the Dodok Payment Account the amount of such invoice,pursuant to procedures to be agreed upon pursuant te Section 6.2,62 Portamina and the Contrastors shall agree with the Liquefaction Company on appropriate procedures for the payment of funds10poyalile to
Register : 27-06-2013 — Putus : 24-11-2014 — Upload : 18-12-2015
Putusan PENGADILAN PAJAK Nomor Put.57676/PP/M.IA/16/2014
Tanggal 24 Nopember 2014 — Pemohon Banding dan Terbanding
17849
  • PSC antara lain dinyatakan: The cost accruing therefrom shall be included in operating costs recoverable asprovided in section VI.
    theAccounting Procedure attached hereto by written agreement of PERTAMINA, CNWwill not incur interest expenses to finance its operations hereunder".bahwa terkait dengan alokasi biaya overhead kantor pusat, terdapat beberapaketentuann yang berlaku, antara lain :Article Ill angka 2 Exibit C PSC, antara lain dinyatakan:Overhead allocation.General and administrative costs, other than direct charges, allocable to thisoperation should be determined by a detailed study, and the method determined bysuch study shall
    The Last sentence of Article 3.3 of Exibit D the PSC is amended to be: "The Directand indirect costs incurred by PHE OGAN KOMERING as Operator and TALISMANin so providing assistance to Operator shall be charged to the Joint Account andsahall be Included in operating costs".Surat Direktur Utama Pertamina Nomor: 947/C.0000/81 Tanggal 5 Juni Tahun 1981,antara lain dinyatakan:" perdasarkan halhal tersebut diatas dan Pertamina selaku pemegang managementdidalam penerapan management control sesuai dengan
Register : 03-02-2017 — Putus : 16-03-2017 — Upload : 09-06-2017
Putusan MAHKAMAH AGUNG Nomor 325 B/PK/PJK/2017
Tanggal 16 Maret 2017 — DIREKTUR JENDERAL PAJAK VS PT. CHEVRON PACIFIC INDONESIA;
5730 Berkekuatan Hukum Tetap
  • ;The obligations of PERTAMINA hereunder shall be deemedto have complied with the delivery to CONTRACTOR withinone hundred and twenty (120) days after the end of eachCalender Year, of documentary proof in accordance with theIndonesian fiscal laws that liability for the above mentionedtaxes has been satisfied, except that with repect to any ofsuch liabilities which CONTRACTORS may be obliged to paydirectly, PERTAMINA shall reimburse it only out of its shareof production hereunder within sixty (60)
    Overhead Allocation;General and Administrative cost, other than direct charges,allocable to this operation should be determined by a detailedstudy, and the method determined by such study shall be appliedeach Year consistenly.
    The laws of the Republic oflndonesia shall apply to thisContract;"Halaman 26 dari 49 halaman. Putusan Nomor 325/B/PK/PJK/20172.2.
    No term or provision of this contract, including theagreement of the Parties to submit to arbitratton hereunder,shall prevent or limit the Goverment of Republic Indonesiafrom exercising its inalienable rights;Section VIl Payments:Any payments required to be made pursuant to this Contractshall be made within thirty (30) days following the end ofthemonth in which the obligation to make such payments occurs.Section IV Rights and Obligations ofthe Parties:1.2. CONTRACTOR shall:(b).
    PERTAM1NA shall reimburse it only out ofits share of production hereunder wrflnh1 sixty (60)days after receipt of invoice therefor.
Putus : 20-07-2016 — Upload : 13-09-2016
Putusan MAHKAMAH AGUNG Nomor 487/B/PK/PJK/2016
Tanggal 20 Juli 2016 — DIREKTUR JENDERAL PAJAK vs. PT. LATEXCO INDONESIA
3631 Berkekuatan Hukum Tetap
  • Perjanjian Penghindaran Pengenaan Pajak Berganda antara PemerintahRepublik Indonesia dan Pemerintah Singapura, antara lain diatur halhalsebagai berikut:Pasal 5 angka 7 :An enterprise of a Contracting State shall not be deemed to have apermanent establishment in the other Contracting State merely because itHalaman 9 dari 19 halaman Putusan Nomor 487/B/PK/PJK/2016carries on business in that other State through a broker, generalcommission agent or any other agent of an independent status, wheresuch
    persons are acting in the ordinary course of their businessPasal 10:Dividends paid by a company which is a resident of a Contracting State toa resident of the other Contracting State may be taxed in that other State.However, such dividends may be taxed in the Contracting State of whichthe company paying the dividends is a resident, and according to the lawof that State, but if the recipient is the beneficial owner of the dividendsthe tax so charged shall not exceed:10% of the gross amount of the
    dividends if the recipient is a companywhich owns directly at least 25% of the capital of the company paying thedividends;15% of the gross amount of the dividends in all other cases.The competent authorities of the Contracting States shall by mutualagreement settle the mode of application of these limitations.The provisions of this paragraph shall not affect the taxation of thecompany on the profits out of which the dividends are paid.The term "dividends" as used in this Article means income from
    Both parties undertake toexercise the obligations arising under this agreement in good faith andfair dealing;Article 3 : Area and/or ClienteleThis agency agreement shall apply to the following area:Peoples Republic Of China, Hongkong, Macao, Taiwan, Korea, Japan,Vietnam, Laos, Cambodia, Myanmar, Singapore, Malaysia, Thailand,Philippines, Indonesia, India, Srilanka, Pakistan, Australia and NewZealand. Other Countries can be included upon agreement of LID;Article 12 : Fees1.
    Bahwa berdasarkan ketentuan Pasal 10 butir 2 huruf b PersetujuanPenghindaran Pajak Berganda antara Indonesia dan Singapura antaralain diatur :However, such dividends may be taxed in the Contracting State of whichthe company paying the dividends is a resident, and according to the lawof that State, but if the recipient is the beneficial owner of the dividendsthe tax so charged shall not exceed 15% of the gross amount of thedividends in all other cases.Bahwa dividen dapat dikenakan pajak di Indonesia
Register : 02-11-2011 — Putus : 10-01-2013 — Upload : 14-07-2013
Putusan PENGADILAN PAJAK Nomor PUT.42591/PP/M.IX/19/2013
Tanggal 10 Januari 2013 — Pemohon Banding dan Terbanding
12231
  • lanjut pengajuan keberatan telah dilakukan penelitianterhadap ketentuan tarif, dasar SPTNP dan data pendukung lainnya.2. bahwa berdasarkan PIB, Inward Manifest (BC 1.1), B/L dan Form E diketahuitanggal Form E nomor E114404041920019 yaitu tanggal 09 Juli 2011 diterbitkansebelum tanggal B/L nomor POBUSHG110700012 yaitu tanggal 16 Juli 2011.3. bahwa berdasarkan Operational Certification Procedures for The Rules of Originof The ASEANChina Free Trade Area, Article 10 disebutkan: The Certificate ofOrigin shall
    Operational Certification Procedures ASEANChina FreeTrade Area (ACFTA) serta menimbulkan persepsi yang berbedabeda karena tidakmenyebutkan secara eksplisit dan terukur berapa hari sebelum pengapalan yangdapat ditoleransi agar preferensi tarif dalam rangka ASEANChina Free Trade Area(ACFTA) dapat digunakan;bahwa berdasarkan Revised Operational Certification Procedures for The Rules ofOrigin of The ASEANChina Free Trade Area, Appendix 1 Rule 11 disebutkan: /nprinciple, a Certificate of Origin (Form E) shall
    In exceptional cases where the Certificate of Origin (Form E) has not beenissued by the time of shipment or no later than three (3) days from the date ofshipment, at the request of the exporter, the Certificate of Origin (Form E) shall beissued retroactively in accordance with the domestic laws, regulations andadministrative rules of the exporting Party within twelve (12) months from the date ofshipment, in which case it is necessary fo indicate ISSUED RETROACTIVELY?
Register : 10-07-2013 — Putus : 23-04-2014 — Upload : 28-03-2015
Putusan PENGADILAN PAJAK Nomor Put-52068/PP/M.XVIIA/19/2014
Tanggal 23 April 2014 — Pemohon Banding dan Terbanding
11928
  • menyerahkan hard copy bukti Proceed Devisa Impor ydibayar per rekening bank devisa;bahwa pada persidangan Pemohon Banding sampaikan surat tanpa nomor tanggalFebruari 2014, mengenai Tanggapan atas For E yang pada pokoknya menyatakan seb:berikut:1.Pada Rules of Origin (ROO) For The AseanChina Free Trade Area (ACFTA) fchapter 3 article 3.2 Origin Criteria disebutkan bahwa:For the purposes of this chapter, goods imported by a party which are consigned withe meaning of article 3.8 (Direct consignment), shall
    in the territory of the exporting pprovided the said goods are eligible under Article 3.4 (Not Wholly ObtaineProduced Goods) or 3.5.bahwa jika diartikan pada article 3.2 chapter 3 tersebut dinyatakan bahwa baik batWholly Obtained (WO) requirement a) maupun bukan Wholly Obtained (Non Vrequirement b) di atas adalah berhak mendapatkan preferential tarrif treatment sepanjmengikuti ketentuan article 3.8 yakni "direct consigment" di mana arti direct consignpada article 3.8 adalah "an originating good shall
    On Comprehensive Economic CoOperation BetweenAssociation Of South East Asian Nation And The Peoples Republic Of China (ProtKedua Untuk Mengubah Persetujuan Perdagangan Barang Dalam Persetujuan KeranKerja Mengenai Kerjasama Ekonomi Menyeluruh Antara NegaraNegara Anggota AsosBangsaBangsa Asia Tenggara Dan Republic Rakyat China), yaitu pada Annex 3 "RulesOrigin For The The AseanChina Free Trade Area", dinyatakan:Rule 2: Origin CriteriaFor the purposes of this Agreement, products imported by a Party shall
    be deemed toriginating and eligible for preferential concessions if they conform to the orrequirements under any one of the following:Products which are wholly obtained or produced as set out and defined in Rule 3; orProducts not wholly produced or obtained provided that the said products are eligunder Rule 4, Rule 5 or Rule 6.bahwa pada Rule 3, disebutkan, sebagaimana kutipan berikut:Rule 3: Wholly Obtained ProductsWithin the meaning of Rule 2 (a), the following shall be considered as wholly produce.obtained
Register : 27-06-2013 — Putus : 24-11-2014 — Upload : 18-12-2015
Putusan PENGADILAN PAJAK Nomor Put.57662/PP/M.IA/13/2014
Tanggal 24 Nopember 2014 — Pemohon Banding dan Terbanding
22061
  • PSC antara lain dinyatakan: The cost accruing therefrom shall be included in operating costs recoverable asprovided in section VI.
    theAccounting Procedure attached hereto by written agreement of PERTAMINA, CNWwill not incur interest expenses to finance its operations hereunder";bahwa terkait dengan alokasi biaya overhead kantor pusat, terdapat beberapaketentuann yang berlaku, antara lain :Article l angka 2 ExibitC PSC, antara lain dinyatakan:Overhead allocation.General and administrative costs, other than direct charges, allocable to thisoperation should be determined by a detailed study, and the method determinedby such study shall
    The method selected mustbe approved by PERTAMINA, and such approval can be reviewed peridacly byPERTAMINA and CNW';" The Last sentence of Article 3.3 of Exibit D the PSC is amended to be: "The Directand indirect costs incurred by PHE OGAN KOMERING as Operator andTALISMAN in so providing assistance to Operator shall be charged to the JointAccount and sahall be Included in operating costs";Surat Direktur Utama Pertamina Nomor: 947/C.0000/81 Tanggal 5 Juni Tahun 1981,antara lain dinyatakan:" berdasarkan
    Bandingsebagai kontraktor dalam pelaksanaan Production Sharing Contrac (PSC) untuk BlokOgan Komering.bahwa berdasarkan uraian tersebut, Majelis berpendapat bahwa alokasi biayaoverhead dari kantor pusat (Talisman Ltd Canada) kepada Pemohon Banding bukanmerupakan obyek PPh Pasal 26.MenimbangMemperhatikanMengingatMemutuskanbahwa ditinjau dari Perjanjian Penghidaran Pajak Berganda (P3B) antara PemerintahIndonesia dengan Canada Article 7 (1) dianyatakan:"The profits of an enterprise of a Contracting State shall
Register : 27-06-2013 — Putus : 24-11-2014 — Upload : 18-12-2015
Putusan PENGADILAN PAJAK Nomor Put.57660/PP/M.IA/13/2014
Tanggal 24 Nopember 2014 — Pemohon Banding dan Terbanding
22068
  • PSC antara lain dinyatakan: The cost accruing therefrom shall be included in operating costs recoverable asprovided in section VI.
    theAccounting Procedure attached hereto by written agreement of PERTAMINA, CNWwill not incur interest expenses to finance its operations hereunder";bahwa terkait dengan alokasi biaya overhead kantor pusat, terdapat beberapaketentuann yang berlaku, antara lain :Article l angka 2 ExibitC PSC, antara lain dinyatakan:Overhead allocation.General and administrative costs, other than direct charges, allocable to thisoperation should be determined by a detailed study, and the method determined bysuch study shall
    The method selected must beapproved by PERTAMINA, and such approval can be reviewed peridacly byPERTAMINA and CNW';" The Last sentence of Article 3.3 of Exibit D the PSC is amended to be: "The Directand indirect costs incurred by PHE OGAN KOMERING as Operator and TALISMANin so providing assistance to Operator shall be charged to the Joint Account andsahall be Included in operating costs";Surat Direktur Utama Pertamina Nomor: 947/C.0000/81 Tanggal 5 Juni Tahun 1981,antara lain dinyatakan:" berdasarkan
    Bandingsebagai kontraktor dalam pelaksanaan Production Sharing Contrac (PSC) untuk BlokOgan Komering.bahwa berdasarkan uraian tersebut, Majelis berpendapat bahwa alokasi biayaoverhead dari kantor pusat (Talisman Ltd Canada) kepada Pemohon Banding bukanmerupakan obyek PPh Pasal 26.MenimbangMemperhatikanMengingatMemutuskanbahwa ditinjau dari Perjanjian Penghidaran Pajak Berganda (P3B) antara PemerintahIndonesia dengan Canada Article 7 (1) dianyatakan:"The profits of an enterprise of a Contracting State shall
Putus : 28-04-2016 — Upload : 06-09-2016
Putusan PN SERANG Nomor 57/Pid.Sus-TPK/2015/PN.Srg
Tanggal 28 April 2016 — ADRIAN ROESLY, SE
393518
  • Outriggers Setup time sec 25 Bodyworks and Lockers :Body shall be constructed from aluminum light weight box tube constructionwith aluminum paneling, platform shall be paneled by chequred antislipperyaluminium plates, equipment locker shall be provided at suitable areas fromstoring delivery hoses, nozzles and some tools, lockers shall be closed byroller shutters and/or doors.Fire PumpVehicle shall equipped with fire pump, capacity of the pump shall be min.2000 lpm at 10 bar, pump shall be single
    Ladder set shall not to crash tobodywork or drivers cabin. It shall not be possible to operate the jacks whenthe ladder is not at parking position or reverse when the jack are not settledladder shall not operate. All moment shall slow down when it reaches end ofmovement. Controlling and governing system shall be designed to operatethe ladder with smooth movements without any jerks. Shakes etc.
    There shallbe a screen for operator which shall include visual and numeric information ofthe ladder set. Design of the main operator console shall be ergonomic, userfriendly. All governing and controlling system shall be redundant type, all necessary warning labels shall be properly attached where needed.Turntable, Ladder set and rescue cage;Turntable shall be constructed by high tensile steel and shall be designed tolevel ladder set and turntable up to 10 degree slope automatically.
    Lift shall have an operating speed of 1.2 m/s uphill and 1,5 m/s downhill.Lift movement shall be controlled by the ladder extension joystick so a switchover button shall be installed at main control panel.Electrical system;A separate fuse board shall be installed for the fire truck body, cables shall benumber or colour coded, electrical scheme shall be sticked inside the electrical panel cover.
    Generatorto operate from operator seat.Paint WorkThe vehicle shall be Ral 3000 Fried red color, Paint work shall be handledwith care, shiny pant shall be applied on the vehicle, for reflective and decorative effect white stripes shall besticked on to body and roller shutters, the ladder set shall be silver grey colour, the bottom of the vehicle shall be paintedblack colour with antiOgravel paint.
Register : 27-06-2013 — Putus : 24-11-2014 — Upload : 18-12-2015
Putusan PENGADILAN PAJAK Nomor Put.57658/PP/M.IA/13/2014
Tanggal 24 Nopember 2014 — Pemohon Banding dan Terbanding
22856
  • PSC antara lain dinyatakan: The cost accruing therefrom shall be included in operating costs recoverable asprovided in section VI.
    theAccounting Procedure attached hereto by written agreement of PERTAMINA, CNWwill not incur interest expenses to finance its operations hereunder";bahwa terkait dengan alokasi biaya overhead kantor pusat, terdapat beberapaketentuann yang berlaku, antara lain :Article l angka 2 ExibitC PSC, antara lain dinyatakan:Overhead allocation.General and administrative costs, other than direct charges, allocable to thisoperation should be determined by a detailed study, and the method determinedby such study shall
    The method selected mustbe approved by PERTAMINA, and such approval can be reviewed peridacly byPERTAMINA and CNW';" The Last sentence of Article 3.3 of Exibit D the PSC is amended to be: "The Directand indirect costs incurred by PHE OGAN KOMERING as Operator andTALISMAN in so providing assistance to Operator shall be charged to the JointAccount and sahall be Included in operating costs";Surat Direktur Utama Pertamina Nomor: 947/C.0000/81 Tanggal 5 Juni Tahun 1981,antara lain dinyatakan:" berdasarkan
    Bandingsebagai kontraktor dalam pelaksanaan Production Sharing Contrac (PSC) untuk BlokOgan Komering.bahwa berdasarkan uraian tersebut, Majelis berpendapat bahwa alokasi biayaoverhead dari kantor pusat (Talisman Ltd Canada) kepada Pemohon Banding bukanmerupakan obyek PPh Pasal 26.MenimbangMemperhatikanMengingatMemutuskanbahwa ditinjau dari Perjanjian Penghidaran Pajak Berganda (P3B) antara PemerintahIndonesia dengan Canada Article 7 (1) dianyatakan:"The profits of an enterprise of a Contracting State shall
Register : 27-06-2013 — Putus : 24-11-2014 — Upload : 18-12-2015
Putusan PENGADILAN PAJAK Nomor Put.57670/PP/M.IA/16/2014
Tanggal 24 Nopember 2014 — Pemohon Banding dan Terbanding
16837
  • PSC antara lain dinyatakan: The cost accruing therefrom shall be included in operating costs recoverable asprovided in section VI.
    theAccounting Procedure attached hereto by written agreement of PERTAMINA, CNWwill not incur interest expenses to finance its operations hereunder".bahwa terkait dengan alokasi biaya overhead kantor pusat, terdapat beberapaketentuann yang berlaku, antara lain :Article Ill angka 2 Exibit C PSC, antara lain dinyatakan:Overhead allocation.General and administrative costs, other than direct charges, allocable to thisoperation should be determined by a detailed study, and the method determined bysuch study shall
    The Last sentence of Article 3.3 of Exibit D the PSC is amended to be: "The Directand indirect costs incurred by PHE OGAN KOMERING as Operator and TALISMANin so providing assistance to Operator shall be charged to the Joint Account andsahall be Included in operating costs".Surat Direktur Utama Pertamina Nomor: 947/C.0000/81 Tanggal 5 Juni Tahun 1981,antara lain dinyatakan:" perdasarkan halhal tersebut diatas dan Pertamina selaku pemegang managementdidalam penerapan management control sesuai dengan
Register : 29-06-2021 — Putus : 24-08-2021 — Upload : 30-11-2021
Putusan PT JAKARTA Nomor 315/PDT/2021/PT DKI
Tanggal 24 Agustus 2021 — Pembanding/Tergugat III : Samadhi Capital Consulting Pte. Ltd Diwakili Oleh : Samadhi Capital Consulting Pte. Ltd
Pembanding/Tergugat IV : Lego Industry Pte. Ltd Diwakili Oleh : Samadhi Capital Consulting Pte. Ltd
Terbanding/Penggugat : PT Arsynergy Resources Diwakili Oleh : LONTOH & PARTNERS
Turut Terbanding/Tergugat I : Technics Offshore Engineering Pte., Ltd
Turut Terbanding/Tergugat II : PT Technics Offshore Jaya
Turut Terbanding/Tergugat V : PT Mega Altra Titan
10697
  • Subject to Paragraph 21b, any Dispute shall be settled byarbitration administered by the Indonesian NationalArbitration Board ! Badan Arbitrase Nasional IndonesiaHalaman 23 dari 59 Putusan Nomor 315/PDT/2021/PT DKI(BANI) and conducted in accordance with its rules ineffect at the time. The place of arbitration shall be Jakarta,Indonesia and the arbitration shall be conducted by threearbitrators. The language to be used in the arbitrationproceedings shall be English.
    The Parties shall selecttheir respective arbitrators within 60 days from the date ofnotice the demand for arbitration. After both Parties haveselected their arbitrators, such arbitrators shall select athird arbitrator within 30 days thereof.
    ArbitrationAny Dispute that is not resolved through good faithnegotiations under Section 5.1 shall, unless the Partiesagree otherwise, be decided by Indonesian NationalArbitration Board / Badan Arbitrase Nasional Indonesia(BANI) and conducted in accordance with its rules ineffect at the time. The place of arbitration shall be Jakarta,Indonesia and the arbitration shall be conducted by threearbitrators. The language to be used in the arbitrationproceedings shall be English.
    Subject to Paragraph 21b, any Dispute shall be settled byarbitration administered by the Indonesian NationalArbitration Board/Badan Arbitrase Nasional Indonesia (BAN!)and conducted in accordance with its rules in effect at thetime. The place of arbitration shall be Jakarta, Indonesia andthe arbitration shall be conducted by three arbitrators. Thelanguage to be used in the arbitration proceedings shall beEnglish.
Putus : 31-05-2010 — Upload : 19-12-2011
Putusan MAHKAMAH AGUNG Nomor 43/B/PK/PJK/2008
Tanggal 31 Mei 2010 —
3110 Berkekuatan Hukum Tetap
  • frominception (January 1993) through August 2002 in theamount of US$ 121,849,538.59 including financing costof US prime rate plus 2% applied to any remainingbalance after the initial seven (7) year period fromJanuary 1993 to Desember 1999 computed on a monthlybasis as per the enclose.We also would like to put your attention that sincethe entire Toll Fee payment has been completed inAugust 2002, therefore the Paying Agent Agreement(IAPA) in accordance with Article 8 of the Payingagent Agreement shall
    Recovery Of Project Development CostFor the purpose of full recovery of ProjectDevelopment Cost, Toll Fee shall be Payablemonthly by KE5 Paying Agent from the dateof first delivery of gas to PLN throughoutthe duration of the Operation Period untilreceipt of the total compensation of US$115,920,000 to GUF for financing of theProject. Such commencement of delivery ofgas to PLN shall not be reasonably delay.The schedule for supply of projected totalHal. 16 dari 26 hal.Put.
    No.43/B/PK/PJK/2008.volume of gas shall be as below Year of supply MMSCF per year1990 (part) (or as described below)199 14,0001992 14,0001993 14,0001994 14,0001995 14,0001996 14,0001997 (part) 14,000 minus (1990amount )Total : 100,800 MMSCF Supply of gas during 1990 will depend on theactual date of first delivery and any shortfall insupply of gas in 1990 will be supplied in 1997.In case the Toll Fee actually paid to GUF by theend of the seventh (7th) year of Operation Periodis less than US$ 115,920,000
    No.43/B/PK/PJK/2008.menggunakan fasilitas pipa gas tersebut dalamrangka menyalurkan gas (Gas Handling) kepada PLN.Hal ini juga dapat dilihat dari bukti buktisebagai berikute Pasal 8 Basic Term dari KE5Paying Agent Agreement tanggal 1Pebruari 1989 antara Pertamina danKodeco Energy Co, Ltd dan NorthseaServices Limited dan BDN (BuktiUtama PK9), yang menyatakanThis Agreement shall become effective whensigned by the parties and shall remain in fullforce and effect for a period from the date offirst delivery
    Fasilitas pipa gas adalahmilik Kodeco selama 7tahun yang nantinya akandiserahkan kepadaPertamina.Fasilitas Pipa Gas bukan milikKodeco dengan mengacu kepdaketentuan Section Xx dariPSC/TAC (Bukti Utama PK7) /(Bukti Utama PK8), sebagaiberikutEquipment Purchased byParties pursuant to theProgram becomes the property ofPertamina (in case of import,when landed at the Indonesian ports of import) and will beused in Petroleum Operationhereunder.Hal ini jugadengan PerjanjianUtama PK1), yaituRecitals yangbahwaGUF shall
Register : 13-01-2017 — Putus : 21-02-2017 — Upload : 18-04-2017
Putusan MAHKAMAH AGUNG Nomor 229 B/PK/PJK/2017
Tanggal 21 Februari 2017 — DIREKTUR JENDERAL PAJAK VS PT. MUKUNI INDONESIA;
3514 Berkekuatan Hukum Tetap
  • Putusan Nomor 229/B/PK/PJK/2017exclusive right to export the product subject to Mikuni's priorwritten approval;Article 6 Compensation and Payment1) Licensee shall pay to Mikuni the follOWing compensation asa consideration for the licensing, knowhow, patents andother information supllied to Licensee under Article.a)b)2)3)Initial Payment:schedule A VM type carburetor:Mother die VM17SH150: set J 15,000,000.00 paymentdue date: end of May 2007 VM17SH180: 1 set J15,000,000.00 payment due date: end of May
    2007After conclusion of agreement, Mikuni will issue invoiceand Licensee shall upon receipt of an invoice from Mikuni,pay the amount by payment due date mentioned above.The period covered shall be 5 years;Running RoyaltyDuring the term of agreement, the running royaltyequivalent to 3% of the net selling prices of the productslisted on schedule 'A ' and B' manufactured and sold byLicensee as defined in 2) of this clause shall be paid byLicensee to Mikuni.
    Provided, however the products notmanufactured by Licensee and soled by pass trough salessystem shall be excluded.
    The period coverd shall be 5years;The net selling price referred to in above 1)b) means theamount derived after deducting FOB price for thecomponents purchased by Licensee from Mikuni andimport duty (except those to be refunded), which areincluded in the selling price, from total amount of sellingprice of the product sold to third party by Licensee (incase of export: Exfactory, and in case of sales inIndonesia: customer delivery price);During the term of this agreement, Licensee shall payonce every
    Thepayment shall be made within 90 days after the last day ofeach semiannual business term.
Register : 01-04-2013 — Putus : 30-04-2014 — Upload : 27-03-2015
Putusan PENGADILAN PAJAK Nomor Put-52208/PP/M.XVIIA/19/2014
Tanggal 30 April 2014 — Pemohon Banding dan Terbanding
12130
  • Padahal ASEAN Trade in Goods Agreement (ATIGA), Annex 8OCP for the ROO, Rule 13 paragraph 2 berbunyi Jn cases when a Certificate of Origin(Form D) is rejected by the customs authority of the importing Member State, the subjectCertificate of Origin (Form D) shall be marked accordingly in Box 4 and the originalCertificate of Origin (Form D) shall be returned to the issuing authority within a reasonableperiod not exceeding sixty (60) days.
    The issuing authority shall be duly notified of thegrounds for the denial of tariff preference. Berdasarkan OCP Rule 13 paragraph 2 NegaraAnggota pengimpor tidak boleh melakukan penolakan sepihak Form D.e Bahwa ATIGA telah diratifikasi oleh Pemerintah RI dengan Peraturan Presiden Nomor 2Tahun 2010 tanggal 5 Januari 2010 sehingga mengikat menurut hukum.
    Relevant Government authorities in theimporting Member State shall accept Certificates of Origin (Form D) in caseswhere the sales invoice is issued either by a company located in a thirdcountry or by an ASEAN exporter for the account of the said company,provided that the goods meet the requirements of Chapter 3 of thisAgreement. 2.
    The exporter shall indicate third country invoicing and suchinformation as name and country of the company issuing the invoice in theCertificate of Origin (Form D).FaktaBahwa Form D yang diterbitkan oleh Ministry of International Trade andIndustry, Malaysia telah memenuhi Rule 23 OCP yaitu:a. Space/Ruang 13, kotak ThirdCountry Invoicing telah diberi TANDA, danb.
    Direct consignmentDasar hukumASEAN Trade in Goods Agreement (ATIGA), Article 32, DirectConsignment, pada angka 2 huruf (b) disebutkan: The following shall beconsidered as consigned directly from the exporting Member State to theimporting Member State: goods transported through one or more MemberStates, other than the exporting Member State and the importing MemberState, or through a nonMember State, provided that: (i) the transit entry isjustified for geographiphal reason or by consideration related
Register : 24-02-2012 — Putus : 31-01-2013 — Upload : 14-07-2013
Putusan PENGADILAN PAJAK Nomor PUT.43070/PP/M.VII/19/2013
Tanggal 31 Januari 2013 — Pemohon Banding dan Terbanding
11326
  • CukaiNomor :SE16/BC/2010 tanggal 4 Agustus 2010, pada Angka 1 huruf menyebutkanThird Country Invoicing adalah invoice yang diterbitkan oleh perusahaan yangberlokasi di negaranegara anggota FTA atau negara bukan anggota FTA untukkepentingan perusahaan pengekspor yang berlokasi di negara anggota FTA.Rule 23, Appendix 1, Attachment A, Revised Operational Certification Procedures(OCP) For The Rules of Origin of The AseanChina Free Trade Area, menyatakan :The Customs Authority of the importing Party shall
    The third party invoice number should be indicated in Box 10 of theCertificate of Origin (Form E), the exporter and consignee must be located in theParties and the copy of the third party invoice shall be attached to the Certificate ofOrigin (Form E) when presenting to the Customs Authority of the importing Party.bahwa berdasarkan pemeriksaan Majelis atas buktibukti yang disampaikan di dalampersidangan, kedapatan sebagai berikut :bahwa berdasarkan pemeriksaan Majelis atas PIB Nomor 416515 tanggal
    Offshore) Co Ltd 1703 AIA Tower, Ave Com De Macau,sehingga eksportirnya berada di Macao;bahwa nilai FOB pada Form E Nomor E114100101320462 tanggal 07 Oktober 201 1adalah USD 8162.40 berbeda dengan nilai FOB pada invoice yang dilampirkan,yaitu USD. 8166.96;bahwa dengan demikian Majelis menyimpulkan Rule 23, Appendix 1, Attachment A,Revised Operational Certification Procedures (OCP) For The Rules of Origin of TheAseanChina Free Trade Area, yang menyatakan :The Customs Authority of the importing Party shall
    The third party invoice number should be indicated in Box 10 of theCertificate of Origin (Form E), the exporter and consignee must be located in theParties and the copy of the third party invoice shall be attached to theCertificate of Origin (Form E) when presenting to the Customs Authority of theimporting Party.tidak terpenuhi sehingga dengan demikian tidak dapat diberikan preferensi tarifberdasarkan ACFTA;berdasarkan nomor urut 4540 Lampiran Il Peraturan Menteri Keuangan RepublikIndonesia Nomor
Register : 27-06-2013 — Putus : 24-11-2014 — Upload : 18-12-2015
Putusan PENGADILAN PAJAK Nomor Put.57654/PP/M.IA/13/2014
Tanggal 24 Nopember 2014 — Pemohon Banding dan Terbanding
22593
  • PSC antara lain dinyatakan:The cost accruing therefrom shall be included in operating costs recoverable asprovided in section VI.
    theAccounting Procedure attached hereto by written agreement of PERTAMINA,CNW will not incur interest expenses to finance its operations hereunder";bahwa terkait dengan alokasi biaya overhead kantor pusat, terdapat beberapaketentuann yang berlaku, antara lain :Article l angka 2 ExibitC PSC, antara lain dinyatakan:Overhead allocation.General and administrative costs, other than direct charges, allocable to thisoperation should be determined by a detailed study, and the method determinedby such study shall
    The Last sentence of Article 3.3 of Exibit D the PSC is amended to be: "The Directand indirect costs incurred by PHE OGAN KOMERING as Operator andTALISMAN in so providing assistance to Operator shall be charged to the JointAccount and sahall be Included in operating costs".Surat Direktur Utama Pertamina Nomor: 947/C.0000/81 Tanggal 5 Juni Tahun 1981,antara lain dinyatakan:" berdasarkan halhal tersebut diatas dan Pertamina selaku pemegangmanagement didalam penerapan management control sesuai dengan
    penerimaan bagi hasil untuk Pemohon Bandingsebagai kontraktor dalam pelaksanaan Production Sharing Contrac (PSC) untuk BlokOgan Komering.bahwa berdasarkan uraian tersebut, Majelis berpendapat bahwa alokasi biayaoverhead dari kantor pusat (Talisman Ltd Canada) kepada Pemohon Banding bukanmerupakan obyek PPh Pasl 26.bahwa ditinjau dari Perjanjian Penghidaran Pajak Berganda (P3B) antara PemerintahIndonesia dengan Canada Article 7 (1) dianyatakan:" The profits of an enterprise of a Contracting State shall