Register : 29-08-2014 — Putus : 14-10-2014 — Upload : 13-09-2016
Putusan PT PALANGKARAYA Nomor 4/PID.SUS-TPK/2014/PT.PLK.
Tanggal 14 Oktober 2014 — BELGIE, ST Bin ANGGEN
8125
  • Gording Kayu Klas Il 5/10Pek. Kudakuda Konsul Atap Samping5/10 Kayu klas IlPek. Rangka Atap Kasau 5/7 dan Reng3/5 Kayu klas IlPek. lkatan Angin 5/10 Kayu klas IlPek. Lisplank 2/10 dan 2/20 Kayu klas Pek. Tawing Layar 2/15 Kayu klas Pek. Rangka Plafond Tepi 5/10, Antara 5/7Kayu klas IlPek.
    Gording / Nok 5/10 kayu klas IlPek. Kasau dan Reng 5/7 dan 3/5 Kayuklas llPek. Tawing Layar 2/20 Kayu klas 07.6.2F.01F.01F.38aF.01F.01F.0106.6.2806.6.2906.6.31F.38f 0,190,400,010,030,050,070,240,210,047,840,42MsMsMsMsMsMsMsMsMsM2M2 173.809,724.582.412,00114.560,3011.103,64572.801 ,50801.922,102.749.447,20328.838,00216.896,32544.197,92dari 144 Pts. 04/PID.SUSTIPIKOR/2014/P T.PLK. 12.13.14.15.16.Vil Pek. Lisplank 2/20 Kayu klas Pek. Atap Metal RoofPek.
    Gording Kay u Klas II 5/10Pek.
    Gording / Nok 5/10 kay uklas IIPek. Kasau dan Reng 5/7 dan 3/5 Kay u klas IIPek. Tawing Lay ar 2/20 Kay u klas Pek. Lisplank 2/20 Kayu klas Pek. Atap Metal RoofPek. Bubungan AtapPeny ediaan Tangki Air 1200 mlPek.
Putus : 14-10-2014 — Upload : 26-08-2015
Putusan PT KUPANG Nomor 54/Pid.Sus/2014/PT.KPG
Tanggal 14 Oktober 2014 — EDUARDUS TANESIB, S.T.
7236
  • UaniniMultika Sejahtera, yaitu :e Item pekerjaan listplank pada setiap rumah tidak dikerjakan karenatidak ada dalam RAB ; e Item pekerjan daun pintu 4 (empat) buah pada setiap rumah, tetapiyang dikerjakan hanya 2 (dua), karena dalam RAB hanyadiperhitungkan 2 (dua) pintu pada setiap rumah ;e Item pekerjaan rabat beton teras depan pada setiap rumah tidakdikerjakan ; dane Item pekerjaan gording tiang nok yang pada Gambar setinggi 1,40meter, tetapi yang dikerjakan pada setiap rumah hanya setinggi 1,20meter
Register : 04-12-2018 — Putus : 21-01-2019 — Upload : 23-01-2019
Putusan PT BANJARMASIN Nomor 9/PID.SUS-TPK/2018/PT BJM
Tanggal 21 Januari 2019 — Drs MAHMUDI BIN WIRYA SUHARTA
241212
  • Pekerjaan gording baja C.7540.15.3.2 menggunakan besi baja1681,56 Kg;f. Pengadaan dan pemasangan Escalator melalui mekanismeSubkontraktor;halaman 25 dari 115 halaman Putusan Nomor 9/PID.SUSTPK/2018/PT.BJMBahwa dalam pelaksanaannya Pembangunan Terminal Km. 6 KotaBanjarmasin Tahun 2013 s/d 2015 pekerjaan tersebut tidak dilaksanakanoleh saksi Ir. AGUS SUMARTONO beserta personil inti yang tercantumdalam dokumen konirak melainkan dilaksanakan oleh saksi Ir. FAHMINURRAHMAN yang selanjutnya saksi Ir.
    Pekerjaan gording baja C.7540.15.3.2 saksi Ir. FAHMI NURRAHMANmenggunakan besi baja seberat 685, 36 Kg yang seharusnya adalahseberat 1681,56 Kg;Selain itu saksi MUHAMMAD FIRMAN JAUHARI, ST., selaku Tim LeaderKonsultan Pengawas dalam melakukan pengawasan terhadap pekerjaanditemukan beberapa item pekerjaan yang tidak sesuai dengan kontrakbeserta addendumnya yaitu:a.
    Pekerjaan gording baja C.7540.15.3.2 menggunakan besi baja1681,56 Kg;halaman 42 dari 115 halaman Putusan Nomor 9/PID.SUSTPK/2018/PT.BJMf. Pengadaan dan pemasangan Escalator melalui mekanismeSubkontraktor;Bahwa dalam pelaksanaannya Pembangunan Terminal Km. 6 KotaBanjarmasin Tahun 2013 s/d 2015 pekerjaan tersebut tidak dilaksanakanoleh saksi Ir. AGUS SUMARTONO beserta personil inti yang tercantumdalam dokumen konirak melainkan dilaksanakan oleh saksi Ir. FAHMINURRAHMAN yang selanjutnya saksi Ir.
    Pekerjaan gording baja C.7540.15.3.2 saksi Ir. FAHMI NURRAHMANmenggunakan besi baja seberat 685, 36 Kg yang seharusnya adalahseberat 1681,56 Kg;Selain itu saksi MUHAMMAD FIRMAN JAUHARI, ST., selaku Tim LeaderKonsultan Pengawas dalam melakukan pengawasan terhadap pekerjaanditemukan beberapa item pekerjaan yang tidak sesuai dengan kontrakbeserta addendumnya yaitu:halaman 43 dari 115 halaman Putusan Nomor 9/PID.SUSTPK/2018/PT.BJMa.
Register : 15-02-2021 — Putus : 05-07-2021 — Upload : 05-08-2021
Putusan PN BANDUNG Nomor 14/Pid.Sus-TPK/2021/PN Bdg
Tanggal 5 Juli 2021 — Penuntut Umum:
ACEP KOHAR, S.H.
Terdakwa:
ENDANG KUSNANDAR Bin Alm. DAYAT
12854
  • Overstek WE Kg 386,06 14.000 5.404.840150x75x5x719 Pas gording CNP Kg 5958,36 14.000 83.417.040125x50x20x3,220 Pas. Trekstang RB besi 12 Kg 1304,55 14.000 18.263.700mm21 Pas. Trekstang RB besi 16 Kg 139,16 14.000 1.948.240mm22. Pas. Baut M16 Kg 137 14.000 1.918.00023.
    Gording C100 2.083 ,84 kg7 (Pas. Baut mur dan walter moor 300,00 bh8 pekerjaan las dan bor baja 1,00 Is9 Pas. Penutup atap galvalum 543,00 m210 Pas.nok atap galvalume 32,00 m111 Pas. Talang galvalume rangka hollow 64,00 m1 2.
    Gording C100 2.083,84 kg7 Pas. Baut mur dan walter moor 300,00 bh8 pekerjaan las dan bor baja 1,00 ls9 Pas. Penutup atap galvalum 543,00 m210 Pas.nok atap galvalume 32,00 m111 Pas. Talang galvalume rangka hollow 64,00 m1 2. Pemadatan Jalan dan Pembangunan Jembatan Cipicung NO Uraian Pekerjaan Volume PEKERJAAN PERSIAPAN1 Pembersihan lokasi 1,00 Is2. Papan Nama Proyek 1,00 bhll PEKERJAAN TANAH1.
    Gording C100 84 kgPas. Baut mur dan walter 300,0 15.000,00 4.500.000,007 (moor O bh 4.500.000, 4.500.000,00 8 pekerjaan las dan bor baja 1,00 Is 00Pas. Penutup atap 543,0 125.000,00 67.875.000,009 galvalum O m2 10 Pas.nok atap galvalume 32,00)m1 55.000,00 1.760.000,00 Pas.
Register : 11-01-2013 — Putus : 05-02-2013 — Upload : 24-10-2013
Putusan DILMIL III 18 AMBON Nomor Reg/02-K/PM.III-18/AD/I/2013
Tanggal 5 Februari 2013 — Oditur Vs Pratu S.La.Ode.A.B.
4830
  • Bahwa benar pada tanggal 06 September 2011 di tempat yang samaTerdakwa mengajak Saksi1 lagi untuk melakukan hubungan badanpintu kamar terkunci namun jendela terbuka hanya ditutup dengankain gording saja.3.
Putus : 18-07-2012 — Upload : 17-05-2013
Putusan MAHKAMAH AGUNG Nomor 2427 K/PDT/2011
Tanggal 18 Juli 2012 — DIREKTUR PT. WARTA MUTIARA JEMBER dk ; MICHAEL TEGOEH dkk
7149 Berkekuatan Hukum Tetap
  • Gording Besi CNP 125 , 22.000 AoE! ue1 24m 17.500 962.500Pengecatan Besi CNP 125 Hal. 11 dari 22 hal. Put. No. 2427 K/PDT/2011 12 = Penutup Atap Asbes Gelombang 55 m! 74.500 4.656.250a1 Pas. Penggantung Plafond 55 m! 37.500 1.968.750= Pengecatan Dinding 62,5 m2 32.000 11.111.360#3 Pengecatan Plafond 52,5 m2 24.000 1.260.000. Pengenatain Pinang Partisi 347,23 me econ veoLapisan Waterprofing 6a e 2#6 Bongkar Keramik Lantai + Tangga , 12.500 815.75027 Pas.
Register : 12-02-2018 — Putus : 18-05-2018 — Upload : 04-05-2019
Putusan PT MANADO Nomor 24/PDT/2018/PT MND
Tanggal 18 Mei 2018 — Pembanding/Tergugat : YONGKIE LIMEN
Terbanding/Penggugat : TANRY STANLEY POTU
6540
  • acid an plamur serta di cat.Kusen dari kayu besi.Rangka jendela dari kayu linggua.Ventilasi dari kayu kls II.Kaca jendela ukuran 5 mm (bening) atau 3 mm (Rayben).Pintu utama dari kayu Linggua bentuk Panel (1 buah).Pintu lainnya rangka kayu kls II penutup tripleks dipolitur fernis.Pinggiran kusen pakai benangan (tali air).Rangka plafon dari kayu kls II.Penututp plavon dari tripleks 3 mm dan dicat.Pinggiran plafon bagian dalam pakai profil SP3 agatis, KM/SC danbagian luar pakai profil SP3.Kudakuda/gording
Register : 25-06-2014 — Putus : 12-11-2014 — Upload : 01-04-2015
Putusan PN AMBON Nomor 15/Pid.Sus/Tpk/2014/PN.Amb
Tanggal 12 Nopember 2014 — IDRIS MUKADAR
9135
  • Pekerjaan Pengatapan Pada pekerjaan Pengatapan terdapat 2 rumah yang belum dikerjakanbaik berupa kudakuda, gording kayu, penutup atap zenk, bubunganatap zenk (lokasi waemasin). Untuk pekerjaan lisplank atap terdapatkelebihan volume yaitu seharusnya 372 m sedangkan realisasidilapangan 426m5. Pekeriaan Pengecatan Pada pekerjaan pengecatan tidak seluruhnya dikerjakan olehrekanankontraktor, hanya terealisasi 40%6.
    Pekerjaan Pengatapan Pada pekerjaan Pengatapan terdapat 2 rumah yang belumdikerjakan baik berupa kudakuda, gording kayu, penutup atap zenk,bubungan atap zenk (lokasi waemasin). Untuk pekerjaan lisplankatap terdapat kelebihan volume yaitu seharusnya 372 m sedangkanrealisasi dilapangan 426m5. Pekerjaan Pengecatan Pada pekerjaan pengecatan tidak seluruhnya dikerjakan olehrekanan/kontraktor, hanya terealisasi 40%6.
    dan timbunan tanah kembali dan timbunanpeninggian lantai, sementara untuk pekerjaan kayu, yakni untuk tiangkayu, balok bawah, balok atas dan dinding sudah diselesaikan olehKontraktor, namun untuk pekerjaan daun yang sesuai RAB terdapat 4(empat) pintu yakni pintu utama, belakang dan 2 (dua) buah pintu kamarakan tetapi yang terealisasi hanya pintu utama dan belakang danselanjutnya untuk pekerjaan pengatapan di lokasi Waemae terdapat 2(dua) unit rumah yang belum dikerjakan baik pekerjaan kudakuda,gording
Register : 25-06-2014 — Putus : 10-11-2014 — Upload : 01-04-2015
Putusan PN AMBON Nomor 17/Pid.Sus-Tpk/2014/PN.Amb
Tanggal 10 Nopember 2014 — Ir. ABDUL RAHIM MARASABESSY
6339
  • Pekerjaan PengatapanPada pekerjaan Pengatapan terdapat 2 rumah yang belum dikerjakanbaik berupa kudakuda, gording kayu, penutup atap zenk, bubunganatap zenk (lokasi waemasin). Untuk pekerjaan lisplank atap terdapatkelebihan volume yaitu seharusnya 372 m sedangkan realisasidilapangan 426m ;5. Pekerjaan PengecatanPada pekerjaan pengecatan tidak seluruhnya dikerjakan olehrekanankontraktor, hanya terealisasi 40% ;6.
    Pekerjaan Pengatapan Pada pekerjaan Pengatapan terdapat 2 rumah yang belum dikerjakanbaik berupa kudakuda, gording kayu, penutup atap zenk, bubunganatap zenk (lokasi waemasin). Untuk pekerjaan lisplank atap terdapatkelebihan volume yaitu seharusnya 372 m sedangkan realisasidilapangan 426m ;5. Pekerjaan Pengecatan Pada pekerjaan pengecatan tidak seluruhnya dikerjakan olehrekanan/kontraktor, hanya terealisasi 40% ;6.
    dan timbunan tanah kembali dan timbunanpeninggian lantai, sementara untuk pekerjaan kayu, yakni untuk tiangkayu, balok bawah, balok atas dan dinding sudah diselesaikan olehKontraktor, namun untuk pekerjaan daun yang sesuai RAB terdapat 4(empat) pintu yakni pintu utama, belakang dan 2 (dua) buah pintu kamarakan tetapi yang terealisasi hanya pintu utama dan belakang danselanjutnya untuk pekerjaan pengatapan di lokasi Waemae terdapat 2(dua) unit rumah yang belum dikerjakan baik pekerjaan kudakuda,gording
Putus : 23-05-2012 — Upload : 30-10-2014
Putusan PN SEMARANG Nomor 7/ Pid.Sus/ 2012/ PN.TIPIKOR.SMG
Tanggal 23 Mei 2012 — PADHY RAHARJO Bin SOEGIJARTO HS
5014
  • beton k 0.95 m3 Vil.16 2,602,749.8/2,472,612.31125 02 Sloof 15/20 mutu betonk 125 = 1.32 m3 VII.16 2,602,749.8)3,435,629.740 3 Ring balk 10/15 mutu betonk 0.88 m3 VII.16 2,602,749.8)2,290,419.82125 04 Kolom teras 0.51 m3 VII.16 2,602,749.8 1 ,327,402.4005 Rabat beton keliling bangunan 4.40 m2 VII.4 48,789.28 214.672.836 Get U 20 20.00 m X.12 43,070.00 861,400.00SUB JUMLAH VI 10,602,137.10Vil PEKERJAAN KONSTRUKSIATAP1 Ps.Konstyruksi kudakuda kayu 0.63 m3 VI.51 8,778,277.15,530,314.63kamper 92 Ps Gording
    mutu betonk 0.95 m3 VIL16 2,602,749.80 2,472,612.311252 Sloof 15/20 mutu betonk 125 = /1.32 m3 VIL16 2,602,749.80 3,435,629.743 Ring balk 10/15 mutu betonk = 0.88 m3 VIL16 2,602,749.80 2,290,419.821254 Kolom teras 0.51 m3 VIIL16 2,602,749.80 1,327,402.405 Rabat beton keliling bangunan /4.40 m2 VIL4 48,789,28 214.672.836 Get U 20 20.00 m X.12 43,070.00 861,400.00SUB JUMLAH VI 10,602,137.10Vil PEKERJAAN KONSTRUKSIATAB1 Ps.Konstyruksi kudakuda kayu 0.63 m3 VI.51 8,778,277.19 5,530,314.63kamper2 Ps Gording
    betonk 0.95 m3 VIL16 2,602,749.80 2,472,612.311252 Sloof 15/20 mutu betonk 125 = 1.32 m3 VIIL16 2,602,749.80 3,435,629.743 Ring balk 10/15 mutu betonk ~=/0.88 m3 VIL16 2,602,749.80 2,290,419.821254 Kolom teras 0.51 m3 VIIL16 2,602,749.80 1,327,402.405 Rabat beton keliling bangunan /4.40 m2 VII.4 48,789,28 214.672.836 Get U 20 20.00 m X.12 43,070.00 861,400.00 SUB JUMLAH VI 10,602,137.10 115 Vil j)PEKERJAAN KONSTRUKSIATAB1 Ps.Konstyruksi kudakuda kayu 0.63 m3 VI.51 8,778,277.19 5,530,314.63kamper2 Ps Gording
    .16 2,602,749.8/2,472,612.beton k 125 0 312 Sloof 15/20 mutu beton 1.32 m3 VII.16 2,602,749.8 3,435,629.k 125 0 743 Ring balk 10/15 mutu= 0.88 m3 VII.16 2,602,749.8/2,290,419.beton k 125 0 824 Kolom teras 0.51 m3 /VII.16 2,602,749.81,327,402.0 405 Rabat beton keliling 4.40 m2 VII.4 48,789,28 214.672.83bangunan6 Get U 20 20.00m X.12 /43,070.00 /861,400.00SUB JUMLAH VI 10,602,137.10 129 Vil PEKERJAANKONSTRUKSI ATAP1 Ps.Konstyruksi kuda (0.63 m3 VI.51 8,778,277.1 5,530,314.kuda kayu kamper 9 632 Ps Gording
Putus : 11-12-2014 — Upload : 09-09-2015
Putusan PT KUPANG Nomor 71/PID.SUS-TPK/2014/PT.KPG
Tanggal 11 Desember 2014 — Junus Fanggidae, S.E
8739
  • Kudakuda, gording, Kayu kls II (non 68,00 M22. lokal) 8,00 M3. Pek. Atap seng gelombang BJLS 0.20 1,40 M34. Pek. Bubungan seng plat BJLS 0.30 33,00 M5. Pek. Tiang dan regel kayu klas I (non lokal) 1,10 M36. Pek. Lisplang kayu klas II 2/20 (non lokal) Pek. Dinding papan kayu klas IT (non lokal) VII. PEK. PENGGANTUNG DAN PENGUNCI /12,00 Bh1. Pek. Baut mur kuda2 12 mm 30,00 Bh2: Pek. Baut mur kudakuda 10 mm 6,00 Bh3. Pek. Beugel sudut 16 mm 3,00 Bh4. Pek. Beugel U Plat 16 mm 12,00 BhDs Pek.
    Kudakuda, gording, Kayu kls II (non6g 00 M22. lokal) 8,00 IM35 Pek. Atap seng gelombang BJLS 0.20 1,40 M34. Pek. Bubungan seng plat BJLS 0.30 33,00 M5. Pek. Tiang dan regel kayu klas II (non lokal) 1,10 M36. Pek. Lisplang kayu klas IT 2/20 (non lokal)Pek. Dinding papan kayu klas II (non lokal)VIL. PEK. PENGGANTUNG DAN PENGUNCI1. Pek. Baut mur kuda2 12 mm2. Pek. Baut mur kudakuda 10 mm3. Pek. Beugel sudut 16 mm4. Pek. Beugel U Plat 16 mmDo: Pek. Platstreep6. Pek.
Register : 19-06-2014 — Putus : 18-07-2014 — Upload : 04-12-2019
Putusan PT AMBON Nomor 2/PID.TPK/2014/PT AMB
Tanggal 18 Juli 2014 — Pembanding/Jaksa Penuntut : YE AL MAHDALY, SH
Terbanding/Terdakwa : ACHMAD RUMARATU, S.Pd. MM
14837
  • Gording kayu klas II3 Kosen pintu, jendela 1,67 5,620,243,05dan ventilasi kayu klas 0,42 2,221,401,00 4. Jendela kaca polos 3mm 12,79 3,261,450,005. Bingkai jendela panel 6,29 3,523,834,12 Halaman 8 dari 52 Putusan No. 02/Pid. Tipikor/2014/PT.AMB. 6. Pintu panel 6,30 2,058,808,507. Papan lisplang 3/20 12,08 510,150,48kayu klas II8. Plafon triplek + rangka 177,24 24,302,794,32plafond kayu klas II9. List plafond triplek 280,40 1,618,118,3010. Tutup atap zink BJLS 0,20 mm 248,71 20,004,988,8511.
    Gording kayu klas II3. Kosen pintu, jendela dan ventilasi kayu klas 2,221,401,00 1,67 5,620,243,054. Jendela kaca polos 3 0,42 mm 5. Bingkai jendela panel 12,79 3,261,450,006. Pintu panel 6,29 3,523,834,127. Papan lisplang 3/20 6,30 2,058,808,50kayu klas II 12,08 510,150,488. Plafon triplek + rangka =plafond kayu klas II 177,24 24,302,794,329.
Putus : 18-07-2014 — Upload : 02-03-2015
Putusan PT AMBON Nomor 2/PID.TIPIKOR/2014/PT.AMB
Tanggal 18 Juli 2014 — ACHMAD RUMARATU, S.Pd., MM
8528
  • Gording kayu klas Il3. Kosen pintu, jendeladan ventilasi kayu klas4. Jendela kaca polos 3mm5. Bingkai jendela panelPintu panelPapan lisplang 3/20No kayu klas Il 2,221,401,00 1,30 6,197,249,501,67 5,620,243,0512,796,296,3012,083,261,450,003,523,834, 122,058,808,50510,150,48 Halaman 8 dari 52 Putusan No. 02/Pid.Tipikor/2014/PT.AMB. 8. Plafon triplek + rangka 177,24 24,302,794,32plafond kayu klas Il 9. List plafond triplek 280,40 1,618,118,3010.
    Gording kayu klas Il3. Kosen pintu, jendela dan ventilasi kayu klas 2,221,401,00 1,67 5,620,243,054. Jendela kaca polos 3 0,42 mm 5. Bingkai jendela panel 12,79 3,261 ,450,006. Pintu panel 6,29 3,523,834, 127. Papan lisplang 3/20 6,30 2,058,808,50kayu klas Il 12,08 510,150,488. Plafon triplek + rangka plafond kayu klas Il 177,24 24,302,794,329.
Putus : 27-04-2015 — Upload : 11-05-2016
Putusan MAHKAMAH AGUNG Nomor 902 K/PID.SUS/2014
Tanggal 27 April 2015 — AMIR YUNUS , dkk
4127 Berkekuatan Hukum Tetap
  • Acian M2 13,429,00 351.70 4.722,979.30JUMLAH 67.547,513.40C PEKERJAAN ATAP1 Pekerjaan kudakuda M3 5,724,700,00 1.08 6,182,676,00(Kelas II)2 Pekerjaan Gording M3 5,374,420.00 1.75 9,405,235.00(Kelas II)Pekerjaan Atas Seng M2 39,206,00 284.10 11,138,424.60Pekerjaan Nok seng M1 22,632,00 20.10 454,903,20JUMLAH 27,181,238.80D PEKERJAANLANTAI1 Pekerjaan Rabat M3 419,580.00 12.11 5,081,113.80Lantai2 Pas Lantai Keramik M2 70,782.00 173.14 12,255,195.48 Hal. 4 dari 57 hal.
    PEKERJAAN ATAP1 Pekerjaan Kuda M3 5,724,700,00 1.08 6,182,676,00Kuda (Kelas II)2 Pekerjaan Gording M3 5,374,420.00 1.75 9,405,235.00(Kelas II)3 Pekerjaan Atas M2 39,206,00 284.10 11,138,424.60Seng4 Pekerjaan Nok M1 22,632,00 20.10 454,903,20SengJUMLAH 27,181,238.80D. PEKERJAANLANTAI1 Pekerjaan Rabat M3 419,580.00) 12.11 5,081,113.80Lantai2 Pas Lantai Keramik M2 70,782.00 173.14 12,255,195.4830 x30JUMLAH 17,336,309.28E. PEK.
Putus : 20-11-2017 — Upload : 13-03-2018
Putusan MAHKAMAH AGUNG Nomor 277 K/Pid.Sus/2017
Tanggal 20 Nopember 2017 — Terdakwa I Drs. MUHAMMAD SUHUFI dan Terdakwa II Drs. H. ABDUL HASIR
10841 Berkekuatan Hukum Tetap
  • 15.31 6.066.204,758 Pek. sloel 15/20 M3 3,953,143,00 2.40 9.487.543,209 Pek. kolom 15/20 M3 4,680,125,00 1.78 8.330.622,5010 Pek. ring balik praktis M2 71,591,00 133.00 9.521.603,0011 Pek. dinding 1:4 M2 61,720,00 194.10 11.979.852,0012 Pek. plesteran 1:4 M2 22,845,60 332.40 7.593.877 ,4413 Pek. plesteran beton M2 32,069,92 19.20 615.742,4614 Pek. acian M2 13,429,00 351.70 4.722.979,30JUMLAH 67.547.513,40C PEKERJAAN ATAP1 Pekerjaan kudakuda (Kelas II) M3 5.724.700,00 1.08 6.182.676,002 Pekerjaan gording
Register : 20-03-2015 — Putus : 24-04-2015 — Upload : 24-04-2015
Putusan PT YOGYAKARTA Nomor 3/PID.SUS-TPK/2015/PT YYK
Tanggal 24 April 2015 — ALBERTUS NURJATI PURNOMO, S.PT, MAP
7735
  • Gun.1 (satu) lembar asli kwitansi tanggal 27 desember 2012 senilaiRp. 5.000.000 guna membayar pembayaran pasang gording darilas P bayu.1 (satu) lembar asli kwitansi tanggal 10 Januari 2013 senilai Rp.2.000.000 yang diterima oleh P. Gun guna membayar membayarmaterial P.
    Gun.1 (satu) lembar asli kwitansi tanggal 27 desember 2012 senilai Rp.5.000.000 guna membayar pembayaran pasang gording dari las Pbayu.1 (satu) lembar asli kwitansi tanggal 10 Januari 2013 senilai Rp.2.000.000 yang diterima oleh P. Gun guna membayar membayarmaterial P.
Putus : 12-11-2015 — Upload : 02-03-2017
Putusan PN SERANG Nomor 23/PID.SUS-TPK/2015/PN.SRG
Tanggal 12 Nopember 2015 — Ir. IMAM POERWONO Bin SUKADI;
8726
  • Pekerjaan atap. kayu gording eks kamper medan hanya dipasang 20 % saja. Rangka atap eks kayu borneo super dipasang 30 % saja. Penutup atap genteng palentong eks jatiwangi tidak dipasang2.6. Pekerjaan Lantai. Lantai kerja 30/30 cm hanya dikerjakan 50% saja.2.7. Pekerjaan kunci dan gantungan. Kunci tanam KM/WC silinder harga pasaran Rp. 115.000, yangdiajukan dalam RAB 1 unit Rp. 183.315. Kunci tanameexses, harga pasaran Rp. 150.000. yang diajukandalam RAB Rp. 252.500.
    Kayu gording eks kamper medan dipasang 15% saja. Rangka atap eks kayu Borneo super dipasang 15% saja. Penutup atap genteng palentong ex jatiwangi tidak dipasang. Bidang Rawat Jalan :6.1. Pekerjaan bongkaran : Bongkar lantai keramik 30% dikerjakan.6.2. Pekerjaan atap. Baut mur 12 cm R. 3.000, dipasaran umum dalam RAB Rp. 4.250. Rangka atap eks kayu borneo super dikerjakan 20%.6.3. Pekerjaan plapon : List propel harga pasaran Rp. 12.500, dalam RABRp. 78.685.6.4.
    Pekerjaan atap kayu gording eks kamper medan hanya dipasang 20 % saja Rangka atap eks kayu borneo super dipasang 30 % saja Penutup atap genteng palentong eks jatiwangi tidak dipasang2.6. Pekerjaan Lantai Lantai kerja 30/30 cm hanya dikerjakan 50% saja.2.7.
    Pekerjaan atapKayu gording eks kamper medan dipasang 15% sajaRangka atap eks kayu Borneo super dipasang 15% sajaPenutup atap genteng palentong ex jatiwangi tidak dipasangBidang Rawat Jalan :.
Putus : 28-04-2017 — Upload : 30-10-2017
Putusan MAHKAMAH AGUNG Nomor 12 K/PID.SUS/2016
Tanggal 28 April 2017 — Drs. SUDARLIM THIRAYO, MM.;
174124 Berkekuatan Hukum Tetap
  • Rangka Kap, Kudokuda & Gording m3 L138Kaso don Re m2 4444Atap Saku Roof m2 mH4s8Bubungan Sakura Roof mi 47.04Rangks Platend Tn m2 536 0)5 Platond Tropicks m2 536.00PEK. KUSCT DAN ALAT PENGGANTUNGKunct Fintu 2 Slog bhGrendel Pint bha3. Emesel PinbiGrendel Jenedela= Engsel dendelaPas. G * JendeloPus: Hak Kail AnginPas. Kawnl, Beurel, Ancker dan BawPas. Rtching Satmniess. Tha " Hal. 13 dari 54 hal. Put. No. 12 K/PID.SUS/2016 VI PEKERJAAN PENGECATAN1 Pek.
    Rangka Kap, Kudokuda & Gording m3 L138Kaso don Re m2 4444Atap Saku Roof m2 mH4s8Bubungan Sakura Roof mi 47.04Rangks Platend Tn m2 536 0)5 Platond Tropicks m2 536.00PEK. KUSCT DAN ALAT PENGGANTUNGKunct Fintu 2 Slog bhGrendel Pint bha3. Emesel PinbiGrendel Jenedela= Engsel dendelaPas. G * JendeloPus: Hak Kail AnginPas. Kawnl, Beurel, Ancker dan BawPas. Rtching Satmniess. Tha " Hal. 29 dari 54 hal. Put. No. 12 K/PID.SUS/2016 VI PEKERJAAN PENGECATAN1 Pek.
Register : 25-04-2014 — Putus : 19-09-2014 — Upload : 12-02-2015
Putusan PN AMBON Nomor 05/Pid.Sus/Tpk/2014/PN.AB
Tanggal 19 September 2014 — THOMMY WATTIMENA Alias THOMY
8442
  • Pasang kudakuda kayu kelas M3 2.67 2.67 2. pasang gording kayu kelas Il M3 2.76 2.16 3. pasang liskplank kayu kelas Il MI 71.00 71.00 4. pasang atap zink gelombang M2 400.63 400.63 BJLS 0.20 Halaman 14 dari 92 Putusan Nomor 05/Pid.Sus/Tpk/2014/PN.AB 5. pasang rangka kayu plafond M2 270.40 270.40 kayu klasll + triplek 3 mm6. pasang bumbungan zink plat Mr 48.60 e 48.60 BJLS 0.20Vill Pekerjaan kunci & penggantung1. pasang kunci tanam Bh 3.00 = 3.00 2. pasang engsel pintu Psg 6.00 6.00 3. pasang engsel
    Pasang kudakuda kayu M3 2.67 . 2.67 ekelas 2. pasang gording kayu M3 2.76 = 2.76 =kelas Il3. pasang liskplank kayu M 71.00 71.00 kelas Il4. pasang atap zink M2 400.63 400.63 gelombang BuJLS 0.205. pasang rangka kayu M2 270.40 270.40 plafond kayu klasil +triplek 3 mm6. pasang bumbungan zink M 48.60 . 48.60 e Halaman 22 dari 92 Putusan Nomor 05/Pid.Sus/Tpk/2014/PN.AB plat BULS 0.20 Vill Pekerjaan kunci &penggantung1. pasang kunci tanam Bh 3.00 3.00 2. pasang engsel pintu Psg 6.00 6.00 3. pasang engsel
    Pasang kudakuda kayu M3 2.67 2.67 kelas 2. pasang gording kayu M3 2.76 7 2.76 kelas Il3. pasang liskplank kayu M 71.00 = 71.00 :kelas Il4. pasang atap zink M2 400.63 = 400.63 gelombang BJLS 0.205. pasang rangka kayu M2 270.40 a 270.40 plafond kayu klasil + triplek 3 mm Halaman 48 dari 92 Putusan Nomor 05/Pid.Sus/Tpk/2014/PN.AB 6. pasang bumbungan zink M 48.60 = 48.60 :plat BULS 0.20Vil Pekerjaan kunci &I penggantung1. pasang kunci tanam Bh 3.00 = 3.00 2. pasang engsel pintu Psg 6.00 = 6.00 3. pasang
Register : 23-05-2018 — Putus : 13-07-2018 — Upload : 25-07-2018
Putusan PT KUPANG Nomor 11/PID.SUS-TPK/2018/PT KPG
Tanggal 13 Juli 2018 — -. ABIDIN HAJI SULAIMAN alias ABIDIN
10950
  • Tito Cipta Teknik untuk melakukan pembayaranterhadap pekerjaan yang telah dilakukan berupa : HARGA JUMLAHN URAIAN voSAT SATUAN HARGAO ) PEKERJAAN L(Rp) (Rp) (1) (2) (3) (4) (5) (6) Halaman 19 dari 66 halaman Putusan Perkara No.11/Pid.SusTPK/2018/PT.KPG Pekerjaan Atap 1 Kap KudaKuda Me 0,93 5.261.966, 4.893.629 ,28kayu kls ll 972 Gording kayu kls M3 1,00 5.305.744, 5.305.744,77I 773 Atap seng Lor 107. 41.410,00 4.430.870gelombang Bijls 000,20 mm4 Pas. Lisplank 2 x M?
    Tito Cipta Teknik untuk melakukan pembayaranterhadap pekerjaan yang telah dilakukan berupa : HARGA JUMLAHURAIANNO SAT VOL SATUAN HARGAPEKERJAAN(Rp) (Rp) (1) (2) (3) (4) (5) (6) I Pekerjaan Atap Halaman 44 dari 66 halaman Putusan Perkara No.11/Pid.SusTPK/2018/PT.KPG 1 Kap KudaKuda Ms 0,93 5.261.966,9 4.893.629,28kayu kls Il 72 Gording kayu kis M? 1,00 5.305.744,7 5.305.744,77Il 73 Atap seng Lbr 107.00 41.410,00 4.430.870gelombang Bijls0,20 mm4 Pas. Lisplank 2x M?