Ditemukan 195 data

Urut Berdasarkan
 
Register : 22-11-2012 — Putus : 24-02-2014 — Upload : 13-07-2016
Putusan PN PEKANBARU Nomor 146/Pdt.G/2012/PN Pbr
Tanggal 24 Februari 2014 —
9437
  • Leveling Tanah Shoulder Tepi Runway.8. Penanaman Rumput Shoulder TermasukPerawatan.II. Pekerjaan Marking Runway.1. Penghapusan Marking Runway (Side Strip).2. Cat Dasar Marking.3.
    3,661.00 121,196,892.462Pemadatan tanah dasar 33,104.86 M23Pemasangan karung plastik di isi 77,495.00 14,122.00 1,094,384,390.00pasir 77,495.00 Bhot Ee ARETE CES, GL 18,079.00 25,156.00 454,795,324.00pemadatan 18,079.00 M3 Lapisam paste padat 3,301.02 128,491.00 424,151,360.82t= 10cm, tot. vol. 3,196.79 M3 3,031.02 M3 (padat)gembur Labuan cnushedaneregate Pasa 14,041.00 321,846.00 4,519,039,686.00course 14,041.00 MB (padat)t= 28cm, tot.vol.15,298.92 M3gemalur 74,562.03 9,700.00 723,251,691.007 Leveling
    Leveling Tanah Shoulder Tepi Runway.8. Penanaman Rumput Shoulder TermasukPerawatan.Pekerjaan Marking Runway.1. Penghapusan Marking Runway (Side Strip).2. Cat Dasar Marking.3.
Putus : 11-01-2016 — Upload : 22-11-2016
Putusan PN SEMARANG Nomor 126/Pid.Sus-TPK/2015/PN Smg
Tanggal 11 Januari 2016 — Raharjo, ST,MT(TERDAKWA)
8228
  • SEHARUSNYA DIBAYARNO URAIAN PEKERJAAN SATUAN VOLUME(AHLI) JUMLAH (Rp)1 2 3 11 13 PEKERJAAN PERSIAPANUitzet, bouwplank &1.1 mobilisasi Taksir . 15.642.500,00ll PEKERJAAN TANAH2.1 Galian tanah konstruksi ms 103,41 3.288.127,77il PEKERJAAN BAHU JALAN3.1 Bahu jalan tanah keras ms 340,20 66.449.187,243.3 Urugan material pilihan ms 1.858,55 423.670.785,75IV PEKERJAAN BERBUTIR4.1 LPAklasA ms 397,49 134.495.814,534.2 LPB/ Batu grosok pudel ms 75,74 19.579.760,884.3 LPB/Trass ms 1.387,51 313.502.534,914.5 Leveling
    Telford ms 138,65 28.206.820,384.5 Leveling Telford msV PEKERJAAN JALAN5.8 Lapis Pondasi Atas / ATB ms 348,63 698.157.179,31Lapis Aspal Pengikat / Prime5.10 Coat Ltr 3.258,50 43.519.841,27VI PEKERJAAN STRUKTUR6.1 Beton Klas 225 ms 114,71 112.029.895,056.4 Beton Klas 250 (ready mix) ms 1.798,63 1.753.714.278,486.5 Beton Klas 300 (ready mix) ms 1.059,96 1.069.332.451,276.6 Pembesian tulangan kg 19.872,93 275.274.758,766.7 Perancah m2 1.767,25 229.951.772,65Vil PEKERJAAN LAINLAIN7.1 Pasangan batu ms
Putus : 06-06-2016 — Upload : 31-05-2017
Putusan MAHKAMAH AGUNG Nomor 607 K/Pid.Sus/2016
Tanggal 6 Juni 2016 — Marson Markusin Saleh(T1),Dk,Ebonson (T2)
6531 Berkekuatan Hukum Tetap
  • No.607 K/Pid.Sus/2016 mor Pangan satuanLuas (Rp) (Rp) 1 Konstruksi Perluasan SawahLand ClearingPemotongan/Perencekan dan Pengumpulani Ha 22,5 1.000.000 22.500.000Land Leveling Perataan Tanah 1Ha 80 500.000 15.000.000Pembuatan Jaringan lrigasi/Drainase 1 Ha 80 1.000.000 30.000.000Pembuatan Pematang Batas Pemilikan 1Ha 15 1.500.000 22.500.000Total 90.000.000 di mana isi dari laporan pertanggungjawaban Tahap dan Tahap II tersebuttidak sesuai dengan fakta yang telah dilaksanakan di lapangan dan LaporanPertanggungjawaban
Putus : 30-04-2015 — Upload : 04-11-2015
Putusan PN GORONTALO Nomor 25/Pid.Sus-Tpk/2014/PN Gto
Tanggal 30 April 2015 — - RITO NASIBU, S.T., M. Eng.
7829
  • Pek Site untukRSU Mobile 93 Pembentukan site2.000,00M22.000,00M2Tetap Urugan sirtuuntuk leveling site400,00M3400,00M3Tetap Urugan pasir alasdiratakan(manual)100,00M3100,00M3Tetap Pasangan pavingstone2.000,00M22.000,00M2Tetap Pasangankansteen finishingAd1:5180,00180,00Tetap VIPek PagarKeliling Site Galian tanahpondasi321.64M3399,15M3Tambah Urugan tanahkembali139,60M3164,21M3Tambah Urugan pasir alaspondasi30,50M328,46M3Kurang Pasangan batukosong82,13M385,38M3Tambah Pasangan batu :3191,64M3170,76M3Kurang
    Pemadatan, 15.000,00 M3 15.489,88 M3 Tambahperapian danperataan tanahbekas galian 111 Pek Trase jalanakses lingkunganRSU Pembentukandamija7.600,00M27.600,00M2Tetap Lapisan sirtuuntuk badan jalan1.200,00M3960,00M3Kurang Pek Saluran Galian tanahmanual905,83M3666,76M3Kurang Urugan pasir44,97M340,83M3Kurang Pasangan batu :5482,94M3362,71M3Kurang Plesteran 1 : 51.527,68M21.003,32M2Kurang Siaran 1:2129,36M2867,75M2Tambah Pek Site untukRSU Mobile Pembentukan site2.000,00M22.000,00M2Tetap NIPUrugan sirtuuntuk leveling
Register : 04-10-2018 — Putus : 19-02-2019 — Upload : 28-02-2019
Putusan PN BENGKULU Nomor 91/Pid.Sus-TPK/2018/PN Bgl
Tanggal 19 Februari 2019 — Penuntut Umum:
ALMAN NOVERI, SH.MH
Terdakwa:
Dr.HUSNI THAMRIN, SH.,MH Alias HUSNI Bin SULAIMAN Alm
89108
  • 0 681,23 5.068.335,68( leveling ) M?Timbunan PilhanBerbutirPenyiapan BadanJalan5.068.335,68DIVISI 5.PERKERASAN 508,40BERBUTIR M3 696.442,90 354.020.728,Lapis Pondasi 71Agg. Klas A354.020.728,71DIVISI 6.PERKERASANASPAL M? 347,20 2.059.593,30 715.090.794,Lapis Permukaan 24PenestrasiMacadam715.090.794,24DIVISI FeSTRUKTUR M?
    Pilihan(leveling ) Me 681,23 5.068.335,683. Timbunan Pilhan M?BerbutirPenyiapan BadanJalan5.068.335,68DIVISI 5.PERKERASAN 508,40BERBUTIR Me 696.442,90 354.020.728,71. Lapis Pondasi Agg. 1Klas A354.020.728,71DIVISI 6.PERKERASAN 347,201. ASPAL Me 2.059.593,30 715.090.794,2Lapis Permukaan 4Penestrasi Macadam715.090.794,24DIVISI 7.1.
    (leveling) M? 7.440,0 3. Timbunan Pilhan M? 0 681,23 5.068.335,68BerbutirPenyiapan Badan Jalan5.068.335,68DIVISI 5.PERKERASAN 508,401. BERBUTIR Me 696.442,90 354.020.728,Lapis Pondasi Agg. Klas 71A354.020.728,71DIVISI 6.PERKERASAN ASPAL 347,201. Lapis Permukaan M? 2.059.593,30 715.090.794,Penestrasi Macadam 24715.090.794,24DIVISI 7. STRUKTUR1.
    (leveling) Me 7.440,00 3. Timbunan Pilhan M? 681,23 5.068.335,68BerbutirPenyiapan Badan Jalan5.068.335,68DIVISI 5.PERKERASANBERBUTIR 508,401. Lapis Pondasi Agg. M? 696.442,90 354.020.728,7Klas A 1354.020.728,71DIVISI 6.PERKERASAN ASPAL 347,201. Lapis Permukaan Me 2.059.593, 715.090.794,2Penestrasi Macadam 30 4715.090.794,24DIVISI 7. STRUKTUR1.
Register : 02-05-2018 — Putus : 26-06-2018 — Upload : 12-07-2018
Putusan PN KARAWANG Nomor 40/Pdt.G/2018/PN Kwg
Tanggal 26 Juni 2018 — PT. PERTIWI LESTARI, selanjutnya disebut sebagai Pemohon Lawan: 1. KANTOR BADAN PERTANAHAN NASIONAL BPN KABUPATEN KARAWANG, selanjutnya disebut sebagai Termohon I; 2. PT. KERETA CEPAT INDONESIA CHINA, selanjutnya disebut sebagai Termohon II; 3. PT PILAR SINERGI BUMN INDONESIA PT PSBI, selanjutnya disebut sebagai Termohon III. 4. KANTOR JASA PENILAI PUBLIK MUTTAQIN BAMBANG PURWANTO ROZAK USWATUN DAN REKAN KJPP MBPRU, selanjutnya disebut sebagai Termohon IV;
241219
  • Rp.000/m2Iuas tanah Biaya Perijinan (Ijin Lokasi, Site Plan, IMB, dll) 5 80% 20% 75 Rp.000/m2luas tanah Biaya Manajemen Konstruksi (MK) 3% 97% 20 Rp.000/m2luas Saleable Land Biaya Pematangan (Leveling, dll) 5 3% 97% 100 Rp.000/m2 luas Saleable Land Biaya Konstruksi Sapras (Jalan, Saluran, PJU, dan Sarana lainnya) 3% 97% 500 Rp.000/m2luas Sarana dan PrasaranaTingkat Diskonto 5 12.07% tahun diasumsikan konstanPerhitungan Land Residual Technique Nilai Kerugian penurunan harga adalah selisih nilai ekonomiskawasan
    PrasaranaHarga Jual KSB/m2(Rp)Pajak Penjualan (Tanah)Progress Penjualan~Tahun Ke 2~ Tahun Ke 2~ Tahun Ke 3~Tahun Ke 4Tahun Ke 5~Tahun ke 6~Tahun Ke 7~Tahun Ke 8~Tahun Ke9~ Tahun ke 10Kenaikan Harga JualKenaikan Biaya PengembanganProgres Pengembangan Marketing/Penjualan Administrasi dan UmumBiaya Pengembangan Biaya Perencanaan (Gambar Site Plan, Gambar Teknik, dil)= Biaya Perijinan (Ijin Lokasi, Site Plan, IMB, Pemecahan, dll) Biaya Manajemen Konstruksi (MK) Biaya Pematangan (Cut & Fill/Grading/Leveling
Putus : 22-02-1017 — Upload : 19-09-2017
Putusan MAHKAMAH AGUNG Nomor 2602 K/PID.SUS/2016
Tanggal 22 Februari 1017 — TUTUK BUDI SUPRIYATMOKO, ST bin WAJAT
13852 Berkekuatan Hukum Tetap
  • Berita Acara Pemeriksaan Lapangan NomorBA.02.A/IV/Ad.BKL12tanggal 30 April 2012;Pada tanggal 21 Mei 2012 dilaksanakan pengukuran dan leveling lokasipekerjaan pembangunan dinding penahan gelombang Pelabuhan Pulau BaaiBengkulu Tahun Anggaran 2012, adapun hasilnyaadalah gambarkontur danberupa gambar rencana perubahan layout bangunan dinding penahangelombang (soft drawing) yang ditandatangani oleh saudara M. IrfanKurniawan selaku Project Manager PT. SKE, Lela Hayati, S.E.
Register : 29-07-2011 — Putus : 04-10-2011 — Upload : 21-10-2011
Putusan PT PALU Nomor 61/PID/2011/PT.PALU
Tanggal 4 Oktober 2011 — Drs. MATIUS NELLOH
6430
  • Pengumpulan dan penumpukan dahan danranting yang telah dipotong ke satu tempatyang dilakukan secara mekanik denganmenggunakan alat bulldozer;Pencabutan tunggul/ akar yang tersisa darihasil penebangan. yang dilakukan secaramekanik dengan menggunakan alat bulldozer;Pembakaran dan pembersihan semua hasiltebas, tebang, tumbang dan cabutan tunggul/akar setelah dikeringkan serta membersihkanlahan dari kotoran yang tersisa yangdilakukan secara manual dengan tenagamanusia;Pekerjaan perataan tanah (land leveling
Putus : 04-09-2015 — Upload : 19-05-2016
Putusan MAHKAMAH AGUNG Nomor 1668 K/PID.SUS/2015
Tanggal 4 September 2015 — JAKSA/PENUNTUT UMUM PADA KEJAKSAAN NEGERI KWANDANG ; JUNANGSIH alias JUN
6823 Berkekuatan Hukum Tetap
  • Urugan sirtu untuk leveling site 400,00 M3 84.500,00 33.800.000,003. Urugan pasir alas diratakan 100,00 M3 86.000,00 8.600.000,00(manual)4. Pasangan paving stone 2.000,00 M2 155.790,00 311.580.000,005. Pasangan kansteen finishing 180,00 M 127.029,11 22.876.580,43Ad 1:5Vi. Pekerjaan pagar keliling site 774.990.397,571. Galian tanah pondasi 321.64 M3 20.000,00 6.432.880,002. Urugan tanah kembali 139,60 M3 9.590,00 1.338.764,003. Urugan pasir alas pondasi 30,50 M3 86.000,00 2.623.000,004.
    Urugan sirtu untuk leveling site 400,00 M3 400,00 M3 Tetap3. Urugan pasir alas diratakan (manual) 100,00 M3 100,00 M3 Tetap4. Pasangan paving stone 2.000,00 M2 2.000,00 M2 Tetap5. Pasangan kansteen finishing Ad 1:5 180,00 M 180,00 M TetapVi. Pekerjaan Pagar Keliling Site1. Galian tanah pondasi 321.64 M3 399,15 M3 Tambah2. Urugan tanah kembali 139,60 M3 164,21 M3 Tambah3. Urugan pasir alas pondasi 30,50 M3 28,46 M3 Kurang4. Pasangan batu kosong 82,13 M3 85,38 M3 Tambah5.
    Urugan sirtu untuk leveling site 400,00 M3 84.500,00 33.800.000,003. Urugan pasir alas diratakan 100,00 M3 86.000,00 8.600.000,00 Hal. 27 dari 257 hal. Put. Nomor 1668 K/PID.SUS/2015 (manual) 4. Pasangan paving stone 2.000,00 M2 155.790,00 311.580.000,00oe Pasangan kansteen finishing 180,00 M 127.029,11 22.876.580,43Ad 1:5Vi. Pekerjaan pagar keliling site 774.990.397,571. Galian tanah pondasi 321.64 M3 20.000,00 6.432.880,002. Urugan tanah kembali 139,60 M3 9.590,00 1.338.764,003.
Register : 20-02-2017 — Putus : 16-11-2017 — Upload : 29-12-2017
Putusan PN JAKARTA SELATAN Nomor 92/Pdt.G/2017/PN JKT.SEL
Tanggal 16 Nopember 2017 — Penggugat:
1.ANTONI BANGUN, SH
2.Raoda U. Asipa
Tergugat:
1.PT. Prospek Duta Sukses
2.PT. Cowell Development Tbk
13673699
  • pelebaranjalan Pangeran Antasari seluas 1.125 M2 (Seribu seratus dua puluh limameter perseg));(il) Kementerian Pekerjaan Umum akan memberikan penjelasan kepadaseluruh dinas/instansi terkait dampak yang ditimbulkan akibat darirencana Kementerian Pekerjaan Umum terhadap perijinan yang dimilikioleh Tergugat I;(iit) Tergugat dan Kementerian Pekerjaan Umum akan membuat gambarteknis yang disepakati bersama terkait rencana jalan KementerianPekerjaan Umum yang mengenai lahan Tergugat I;(iv) Karena adanya perubahan leveling
Register : 27-10-2014 — Putus : 23-03-2015 — Upload : 04-06-2015
Putusan PN BANDUNG Nomor 110 / Pid.Sus / TPK / 2014 / PN.Bdg
Tanggal 23 Maret 2015 — dr.Hj. IDA LISNURIDA, MARS Binti H. MULYADI.
9815
  • Setting dan leveling unit genset, 3. Pengadaandan pemasangan tangki solar, 4. Piping fuel system genset baru, 5. Pemipaandari daily system, 6. Pengadaan dan pemasangan residential, 7. Ductingradiator, 8. Piping exhaust system, 9. Power Cable NYY, 10. Kable Ladder,11. Grounding System, 12. Grile Intake dan discharge, 13. Intake attenuator,14. Discharge attenuator.
    o1ooo" pengadaan kabel kontrol Setting dan leveling unit Genzet Pengadaan dan pemasangan tangki solar Piping fuel system genset baru Pemipaan dari daily system Pengadaan dan pemasangan residential Ducting radiator Piping exhaust system Power cable NYY Kabel ladder Grounding system Grile intake dan discharge Intake attenuator Discharge attenuator 82.
    Setting dan leveling unit genset, 3.Pengadaan dan pemasangan tangki solar, 4. Piping fuel system gensetbaru, 5. Pemipaan dari daily system, 6. Pengadaan dan pemasanganresidential, 7. Ducting radiator, 8. Piping exhaust system, 9. Power CableNYY, 10. Kable Ladder, 11. Grounding System, 12. Grile Intake dandischarge, 13. Intake attenuator, 14.
    Pengadaan tersebut kemudian di ulang lagi, dalam bentuk rincian 14 item/ komponenRp. 191.055.000, pengadaan kabel kontrol Setting dan leveling unit Genzet Pengadaan dan pemasangan tangki solar Piping fuel system genset baru Pemipaan dari daily system Halaman 227 dari 286 halaman, Putusan Nomor : 110/Pid.SusTPK/2014/PN.Bdg. 228 Pengadaan dan pemasangan residential Ducting radiator Piping exhaust system Power cable NYY Kabel ladder Grounding system Grile intake dan discharge Intake attenuator Discharge
Register : 03-03-2016 — Putus : 02-06-2016 — Upload : 04-04-2017
Putusan PN BENGKULU Nomor 17/PID.SUS.TPK/2016/PN.Bgl
Tanggal 2 Juni 2016 — AHYAT, S.IP,MM Bin JAPRI
7127
  • : 01/BAPLAPBD/DPU/BU/2013, dan dalam pelaksanaan kegiatan Peningkatan Jalan Hotmix DesaKemumuDusun Curup pada Dinas Pekerjaan Umum Kabupaten Bengkulu Utara TahunAnggaran 2013 terdapat perubahan kontrak yang berdasarkan pada Perubahan Perjanjian(Kontrak) nomor : 01/Perubahan KontrakY1/DPU/BU/2013 tanggal 06 Mei 2013 yaitu Volumeyang semula 3.000 Km menjadi 3.025 Km dan dilapangan dibutunkan volume pekerjaan tambahkurang antara lain:a.Lapis Pondasi Agregat kelas Ab.Lapis pondasi Agregat kelas B (Leveling
    Lapis pondasi Agregat kelas B (Leveling)c.Lapis Resappengikat Aspal caird.Lataston Lapis Pondasi (HRSBase) (Gradasi senjang / semi senjang)e. Aspal Minyakf. Bahan Anti Pengelupasang. Bahan pengisi (Filler) tambahan SemenDengan rincian pekerjaan / RAB setelah perubahan adalah : No.Mata Uraian satuan Perkiraa Harga Jumlah Keteranganpembaya n satuan hargaran kuantita (Rp) (Rp)SsA B C D F=(D x E)DIVISI 1.
Register : 14-08-2018 — Putus : 13-11-2018 — Upload : 05-09-2019
Putusan PN SEMARANG Nomor 66/Pid.Sus-TPK/2018/PN Smg
Tanggal 13 Nopember 2018 — Penuntut Umum:
TOMMY U. SETYAWAN, SH.
Terdakwa:
RIZKI GALIH SAPUTRA Bin KHAERUN
6730
  • denganpengerjaannya Terdakwa yang melakukannya.Bahwa untuk pekerjaan uitzet (pengukuran) lokasi pekerjaan JalanKalijambePonolawen (paket 1) dilakukan pada tanggal 4 Mei 2012, yangdihadiri oleh perwakilan dari DPU Kabupaten Pekalongan, perwakilan BagPembangunan dan Terdakwa sendiriBahwa pekerjaan mulai dilaksanakan pada 24 April 2012, sedangkan padawaktu itu. pekerjaan yang pertama Terdakwa kerjakan adalah yaitupembersihan di lokasi lapangan, droping material, pemerataan jalan denganmenggunakan sirtu (leveling
Putus : 04-05-2015 — Upload : 13-10-2015
Putusan PN MAKASSAR Nomor 98/Pid.Sus.Tpk/2014/PN.Makassar.
Tanggal 4 Mei 2015 — - MUH. NAWIR, SP. BIN PATTA IMAN Vs. _ JPU
9210
  • sebesar Rp. 150.000.000, (seratus limapuluh juta rupiah) pada kelompok tani Cahaya Baru turun atau cair padatahun 2011 akan tetapi bulanya lupa;Bahwa pencairan dana untuk kegiatan perluasan sawah pada kelompoktani Cahaya Baru tahun 2011 ada 4 (empat) kali pencairan yaitu Tahap sebesar Rp. 45.000.000, (empat puluh lima juta rupiah) dipergunkanuntuk pekerjaan persiapan dan pekerjaan konstruksi Tahap Il sebesarRp. 45.000.000, (empat puluh lima juta rupiah) dipergunakan untukpekerjaan persiapan land leveling
    dan pemanfaat sawah dan saprotan,Tahap Ill sebesar Rp. 45.000.000, (empat puluh lima juta rupiah)dipergunakan untuk pekerjaan persiapan Land Leveling danPemanfaatan sawah dan saprotan, Tahap IV sebesar Rp. 15.000.000,(lima belas juta rupiah) dipergunakan untuk pekerjaan persiapan,pemanfaatn sawah dan saprotan;Bahwa setiap pecairan dana membuka rekening atas nama kelompoktani di Bank SulSel dengan No Rek tidak tahu dan yang mengetahuiadalah ketua kelompok tani;Bahwa kegiatan untuk kegiatan perluasan
Putus : 29-09-2016 — Upload : 02-03-2017
Putusan PN SERANG Nomor 21/PID.SUS/TPK/2016/PN.SRG
Tanggal 29 September 2016 —
7614
  • Turn Table, Tangga Turn table harus terbuat dari bahan hightdan rescur Platfor tensile steel dan dirancang untuk leveling(Cage) tangga sampai sudut 10 derajat secaraotomatis.
    Turn Table, Tangga Turn table harus terbuat dari bahan hight tensiledan rescur Platfor steel dan dirancang untuk leveling tangga(Cage) sampai sudut 10 derajat secara otomatis.Tangga type telescopic terdiri dari 1 boom utamadan 4 sliding section dengan tinggi kerja daritanah ke lantai platform > 42 m. disalin denganstabilitas tinggi yang terbuat dari hinght strengthsteel RHS (profil kotak).
    Srg. otomatis (automatic ground leveling system)bukaan maksimum kaki kiri / kanan > 5000 MM.dan tiaptiap kaki dilengkapi dengan sensorgroundpresure agar dapat secara otomatismembatasi/menghentikan gerakan operasitangga.
Putus : 20-09-2017 — Upload : 13-03-2018
Putusan MAHKAMAH AGUNG Nomor 1675 K/Pid.Sus/2017
Tanggal 20 September 2017 — RICHARD NAINGGOLAN, S.Sos alias RICARD bin J. NAINGGOLAN
99100 Berkekuatan Hukum Tetap
  • Provinsi Riau sebesarRp.500.000.000,00.110) Fotokopi dokumen yang telah dilegalisir Surat Perintah PencairanDana Nomor : 008320E/008/110 tanggal 20 September 2013 SatkerDinas Tanaman Pangan dan Hortikultura Provinsi Riau sebesarRp.500.000.000,00.111) Fotokopi dokumen yang telah dilegalisir Revisi Rencana UsulanKegiatan Kelompok (RUKK), September 2013 (tanpa tanggal) a.nKelompok Tani Tunas Harapan senilai Rp.500.000.000,00 (PekerjaanPersiapan Rp.11.100.000,00 ; Land Clearing Rp.200.000.000,00 ;Land Leveling
Putus : 04-06-2015 — Upload : 16-09-2015
Putusan PN SURABAYA Nomor 26/Pid.Sus/Tpk/2015/Pn.Sby
Tanggal 4 Juni 2015 — GUSYANTO, S.Pd TITIK PUJIASTUTI OKTAVIA, SE BAYU JATI ABRIANTO, S.Pd Bin M.USMAN KEJAKSAAN NEGERI TRENGGALEK
365
  • kepadamelakukan pengawasan masalah mutu beton untuk di lakukan perawatan beton denganpenyiraman air ke atas beton sehari 3 kali yaitu pagi, siang dan sore, untuk menjaga retakagar dibuat dilatasi/pemutusan per 2 kali lebar ;Bahwa dalam pelaksanaan kegiatan PPIP lebih memberdayakan masyarakat setempatdengan membuat shift waktu pada kelompokkelompok masyarakat, mempersiapkan terpalsebanyak mungkin untuk antisipasi hujan yang datang tibatiba guna menutupi rabat betonyang masih baru, untuk mencapai leveling
    jalan agar tidak bergelombang bisa dilakukandengan leveling batu atau sertu yang dipadatkan, untuk berem jalan biar tidak terlaludangkal dan tidak membahayakan pengguna jalan supaya diuruk dengan menggerakkanmasyarakat setempat, untuk level permukaan rabat yang masih baru itu agar dibuatpermukaan kasar ; 2072220222 2222222222222 ==Bahwa Pembangunan jalan rabat beton program pembangunan infrastruktur perdesaan(PPIP) T.A. 2013 di Desa Dermosari dilaksanakan Sejak tanggal 6 Nopember 2013 sampaidengan
Putus : 18-06-2012 — Upload : 05-04-2013
Putusan PN MEDAN Nomor 7/ Pid. Sus. K / 2012 / PN. Mdn
Tanggal 18 Juni 2012 — - MAHYARUDDIN DALIMUNTHE, ST
4913
  • Pengaspalan ;Bahwa benar untuk proyek tersebut bahan bahannya adalah : LevelingLapis Bawah (LLB), Sirtu (campuran pasir dan batu), Leveling Lapis Atas(LLA), Best Cost (campuran batu pecah, pasir dan perekat), Aspal Beton atauHotmix dengan memakai alat alat berat berupa : Pinizer, Tandem, Graider,Walas dan peralatan kecil seperti : cangkul, sekop dan Plongky ;Bahwa saksi bekerjasama dengan Ardiansyah alias Aan dan buruh sebanyak 4(empat) orang telah melaksanakan pekerjaan / proyek tersebut sejak tanggal24
Register : 04-09-2015 — Putus : 23-11-2015 — Upload : 21-12-2015
Putusan PN PALANGKARAYA Nomor 53/Pid.Sus-TPK/2015/PN Plk
Tanggal 23 Nopember 2015 — MARSON MARKUSIN SALEH, DK
7615
  • ClearingPembabatan / Penebasan semak belukar 1 Ha 80 1.250.000 37.500.000Penebangan/ Penumbangan pohon1 Ha 80 1.500.000 45.000.000Pemotongan/ Perencekan dan pengumpulani Ha 7,5 /1.000.000 7.500.000Total 90.000.000 Halaman 28 dari 146 Putusan Nomor 53/Pid.SusTPK/2015/PN Pik Laporan Pertanggung Jawaban Tahap II No. jUraian Kegiatan Perluasal Arel TanamanVolume Unit CostTotal Biaya Pangan satuanLuas (RP) (RP) Konstruksi Perluasan Sawah Land Clearing Pemotongan / Perencekan dani Ha (22,5 /1.000.000 22.500.000 Land Leveling
    Land Leveling Halaman 36 dari 146 Putusan Nomor 53/Pid.SusTPK/2015/PN Pik Perataan Tanah 1 Ha 30 Rp. Rp.500.000, 15.000.000,Pembuatan Jaringan 1 Ha 30 Rp. Rp.lrigasi 1.000.000, 30.000.000,Pembuatan pematang 1 Ha 30 Rp. Rp.batas pemilikan 1.500.000, 45.000.000,3 Pemanfaatan SawahPengelolaan tanah 1 Ha 30 Rp. Rp.1.000.000, 30.000.000,Pembelian benih 1 Ha 30 Rp. Rp.300.000, 9.000.000Pembelian pupuk,obatobatan, dll. Urea 150 kg 30 Rp. Rp.5.000. 22.500.000, SP 36 50 kg 30 R.
Register : 03-04-2018 — Putus : 23-05-2018 — Upload : 15-07-2020
Putusan PT JAKARTA Nomor 8/PID.TPK/2018/PT DKI
Tanggal 23 Mei 2018 — Pembanding/Penuntut Umum : T.M PAKPAHAN, SH., MH.
Terbanding/Terdakwa : UPIK ROSALINA WASRIN
310147
  • Kontrak : 36/SHS.03/SP/III/2013DU/1151/S.Perj/11 Pekerjaan Pembukaan Lahan dan Pencetakan Sawah SertaInfrastruktur Penunjang Lainnya. 104. 11 (Satu)Lembar Asli Peta Luasan Land Leveling Sungai Besar No. Kontrak :36/SHS.03/SP/III/2013 DU/1151/S.Perj/11 Pekerjaan Pembukaan Lahan danPencetakan Sawah Serta Infrastruktur Penunjang Lainnya. 105. 11 (Satu)Lembar Asli Peta Lokasi Desa S. Jawi dan S.Pelang No.
    Sawah Sejumlah Rp.6,500,000(enam juta lima ratus ribu rupiah ), SAPUAN Pembayaran Leveling Sawah Se Hal.466 dari 582 hal.
    Pupuk Indonesia (Persero). 3102. 1 (Satu) Lembar Asli As Build Drawing peta Leveling Harapan Baru. Hal.562 dari 582 hal. Putusan No.08/PID.SUS.
    /TPK/2018PT DKI. 3103. 1 (Satu) Lembar Asli As Build Drawing peta Leveling Sungai Jawi dan Sungai Pelang. 3104. 1 (Satu) Lembar Asli As Build Drawing peta situasi Sungai Awan. 3105. 1 (Satu) Lembar Asli As Build Drawing peta Leveling Sukamaju. 3106. 1 (Satu) Lembar Asli As Build Drawing peta situasi Sukamaju. 3107. 1 (Satu) Lembar Asli As Build Drawing peta situasi Sungai Putri. 3108. 1 (Satu) Lembar Asli As Build Drawing peta Leveling Sungai Putri. 3109. 1 (Satu) Lembar Asli As Build Drawing peta
    situasi Kuala Satong. 3110. 1 (Satu) Lembar Asli As Build Drawing peta Leveling Kuala Satong. 3111. 1 (Satu) bendel fotocopy legalisir Laporan Pendahuluan Studi Kelayakan PembukaanLahan dan Percetakan Sawah Serta Infrastruktur Lainnya di Kabupaten Ketapang,Kalimantan Barat PT.