94 — 37
Leveling Tanah Shoulder Tepi Runway.8. Penanaman Rumput Shoulder TermasukPerawatan.II. Pekerjaan Marking Runway.1. Penghapusan Marking Runway (Side Strip).2. Cat Dasar Marking.3.
3,661.00 121,196,892.462Pemadatan tanah dasar 33,104.86 M23Pemasangan karung plastik di isi 77,495.00 14,122.00 1,094,384,390.00pasir 77,495.00 Bhot Ee ARETE CES, GL 18,079.00 25,156.00 454,795,324.00pemadatan 18,079.00 M3 Lapisam paste padat 3,301.02 128,491.00 424,151,360.82t= 10cm, tot. vol. 3,196.79 M3 3,031.02 M3 (padat)gembur Labuan cnushedaneregate Pasa 14,041.00 321,846.00 4,519,039,686.00course 14,041.00 MB (padat)t= 28cm, tot.vol.15,298.92 M3gemalur 74,562.03 9,700.00 723,251,691.007 Leveling
Leveling Tanah Shoulder Tepi Runway.8. Penanaman Rumput Shoulder TermasukPerawatan.Pekerjaan Marking Runway.1. Penghapusan Marking Runway (Side Strip).2. Cat Dasar Marking.3.
82 — 28
SEHARUSNYA DIBAYARNO URAIAN PEKERJAAN SATUAN VOLUME(AHLI) JUMLAH (Rp)1 2 3 11 13 PEKERJAAN PERSIAPANUitzet, bouwplank &1.1 mobilisasi Taksir . 15.642.500,00ll PEKERJAAN TANAH2.1 Galian tanah konstruksi ms 103,41 3.288.127,77il PEKERJAAN BAHU JALAN3.1 Bahu jalan tanah keras ms 340,20 66.449.187,243.3 Urugan material pilihan ms 1.858,55 423.670.785,75IV PEKERJAAN BERBUTIR4.1 LPAklasA ms 397,49 134.495.814,534.2 LPB/ Batu grosok pudel ms 75,74 19.579.760,884.3 LPB/Trass ms 1.387,51 313.502.534,914.5 Leveling
Telford ms 138,65 28.206.820,384.5 Leveling Telford msV PEKERJAAN JALAN5.8 Lapis Pondasi Atas / ATB ms 348,63 698.157.179,31Lapis Aspal Pengikat / Prime5.10 Coat Ltr 3.258,50 43.519.841,27VI PEKERJAAN STRUKTUR6.1 Beton Klas 225 ms 114,71 112.029.895,056.4 Beton Klas 250 (ready mix) ms 1.798,63 1.753.714.278,486.5 Beton Klas 300 (ready mix) ms 1.059,96 1.069.332.451,276.6 Pembesian tulangan kg 19.872,93 275.274.758,766.7 Perancah m2 1.767,25 229.951.772,65Vil PEKERJAAN LAINLAIN7.1 Pasangan batu ms
65 — 31 — Berkekuatan Hukum Tetap
No.607 K/Pid.Sus/2016 mor Pangan satuanLuas (Rp) (Rp) 1 Konstruksi Perluasan SawahLand ClearingPemotongan/Perencekan dan Pengumpulani Ha 22,5 1.000.000 22.500.000Land Leveling Perataan Tanah 1Ha 80 500.000 15.000.000Pembuatan Jaringan lrigasi/Drainase 1 Ha 80 1.000.000 30.000.000Pembuatan Pematang Batas Pemilikan 1Ha 15 1.500.000 22.500.000Total 90.000.000 di mana isi dari laporan pertanggungjawaban Tahap dan Tahap II tersebuttidak sesuai dengan fakta yang telah dilaksanakan di lapangan dan LaporanPertanggungjawaban
78 — 29
Pek Site untukRSU Mobile 93 Pembentukan site2.000,00M22.000,00M2Tetap Urugan sirtuuntuk leveling site400,00M3400,00M3Tetap Urugan pasir alasdiratakan(manual)100,00M3100,00M3Tetap Pasangan pavingstone2.000,00M22.000,00M2Tetap Pasangankansteen finishingAd1:5180,00180,00Tetap VIPek PagarKeliling Site Galian tanahpondasi321.64M3399,15M3Tambah Urugan tanahkembali139,60M3164,21M3Tambah Urugan pasir alaspondasi30,50M328,46M3Kurang Pasangan batukosong82,13M385,38M3Tambah Pasangan batu :3191,64M3170,76M3Kurang
Pemadatan, 15.000,00 M3 15.489,88 M3 Tambahperapian danperataan tanahbekas galian 111 Pek Trase jalanakses lingkunganRSU Pembentukandamija7.600,00M27.600,00M2Tetap Lapisan sirtuuntuk badan jalan1.200,00M3960,00M3Kurang Pek Saluran Galian tanahmanual905,83M3666,76M3Kurang Urugan pasir44,97M340,83M3Kurang Pasangan batu :5482,94M3362,71M3Kurang Plesteran 1 : 51.527,68M21.003,32M2Kurang Siaran 1:2129,36M2867,75M2Tambah Pek Site untukRSU Mobile Pembentukan site2.000,00M22.000,00M2Tetap NIPUrugan sirtuuntuk leveling
ALMAN NOVERI, SH.MH
Terdakwa:
Dr.HUSNI THAMRIN, SH.,MH Alias HUSNI Bin SULAIMAN Alm
89 — 108
0 681,23 5.068.335,68( leveling ) M?Timbunan PilhanBerbutirPenyiapan BadanJalan5.068.335,68DIVISI 5.PERKERASAN 508,40BERBUTIR M3 696.442,90 354.020.728,Lapis Pondasi 71Agg. Klas A354.020.728,71DIVISI 6.PERKERASANASPAL M? 347,20 2.059.593,30 715.090.794,Lapis Permukaan 24PenestrasiMacadam715.090.794,24DIVISI FeSTRUKTUR M?
Pilihan(leveling ) Me 681,23 5.068.335,683. Timbunan Pilhan M?BerbutirPenyiapan BadanJalan5.068.335,68DIVISI 5.PERKERASAN 508,40BERBUTIR Me 696.442,90 354.020.728,71. Lapis Pondasi Agg. 1Klas A354.020.728,71DIVISI 6.PERKERASAN 347,201. ASPAL Me 2.059.593,30 715.090.794,2Lapis Permukaan 4Penestrasi Macadam715.090.794,24DIVISI 7.1.
(leveling) M? 7.440,0 3. Timbunan Pilhan M? 0 681,23 5.068.335,68BerbutirPenyiapan Badan Jalan5.068.335,68DIVISI 5.PERKERASAN 508,401. BERBUTIR Me 696.442,90 354.020.728,Lapis Pondasi Agg. Klas 71A354.020.728,71DIVISI 6.PERKERASAN ASPAL 347,201. Lapis Permukaan M? 2.059.593,30 715.090.794,Penestrasi Macadam 24715.090.794,24DIVISI 7. STRUKTUR1.
(leveling) Me 7.440,00 3. Timbunan Pilhan M? 681,23 5.068.335,68BerbutirPenyiapan Badan Jalan5.068.335,68DIVISI 5.PERKERASANBERBUTIR 508,401. Lapis Pondasi Agg. M? 696.442,90 354.020.728,7Klas A 1354.020.728,71DIVISI 6.PERKERASAN ASPAL 347,201. Lapis Permukaan Me 2.059.593, 715.090.794,2Penestrasi Macadam 30 4715.090.794,24DIVISI 7. STRUKTUR1.
241 — 219
Rp.000/m2Iuas tanah Biaya Perijinan (Ijin Lokasi, Site Plan, IMB, dll) 5 80% 20% 75 Rp.000/m2luas tanah Biaya Manajemen Konstruksi (MK) 3% 97% 20 Rp.000/m2luas Saleable Land Biaya Pematangan (Leveling, dll) 5 3% 97% 100 Rp.000/m2 luas Saleable Land Biaya Konstruksi Sapras (Jalan, Saluran, PJU, dan Sarana lainnya) 3% 97% 500 Rp.000/m2luas Sarana dan PrasaranaTingkat Diskonto 5 12.07% tahun diasumsikan konstanPerhitungan Land Residual Technique Nilai Kerugian penurunan harga adalah selisih nilai ekonomiskawasan
PrasaranaHarga Jual KSB/m2(Rp)Pajak Penjualan (Tanah)Progress Penjualan~Tahun Ke 2~ Tahun Ke 2~ Tahun Ke 3~Tahun Ke 4Tahun Ke 5~Tahun ke 6~Tahun Ke 7~Tahun Ke 8~Tahun Ke9~ Tahun ke 10Kenaikan Harga JualKenaikan Biaya PengembanganProgres Pengembangan Marketing/Penjualan Administrasi dan UmumBiaya Pengembangan Biaya Perencanaan (Gambar Site Plan, Gambar Teknik, dil)= Biaya Perijinan (Ijin Lokasi, Site Plan, IMB, Pemecahan, dll) Biaya Manajemen Konstruksi (MK) Biaya Pematangan (Cut & Fill/Grading/Leveling
138 — 52 — Berkekuatan Hukum Tetap
Berita Acara Pemeriksaan Lapangan NomorBA.02.A/IV/Ad.BKL12tanggal 30 April 2012;Pada tanggal 21 Mei 2012 dilaksanakan pengukuran dan leveling lokasipekerjaan pembangunan dinding penahan gelombang Pelabuhan Pulau BaaiBengkulu Tahun Anggaran 2012, adapun hasilnyaadalah gambarkontur danberupa gambar rencana perubahan layout bangunan dinding penahangelombang (soft drawing) yang ditandatangani oleh saudara M. IrfanKurniawan selaku Project Manager PT. SKE, Lela Hayati, S.E.
64 — 30
Pengumpulan dan penumpukan dahan danranting yang telah dipotong ke satu tempatyang dilakukan secara mekanik denganmenggunakan alat bulldozer;Pencabutan tunggul/ akar yang tersisa darihasil penebangan. yang dilakukan secaramekanik dengan menggunakan alat bulldozer;Pembakaran dan pembersihan semua hasiltebas, tebang, tumbang dan cabutan tunggul/akar setelah dikeringkan serta membersihkanlahan dari kotoran yang tersisa yangdilakukan secara manual dengan tenagamanusia;Pekerjaan perataan tanah (land leveling
68 — 23 — Berkekuatan Hukum Tetap
Urugan sirtu untuk leveling site 400,00 M3 84.500,00 33.800.000,003. Urugan pasir alas diratakan 100,00 M3 86.000,00 8.600.000,00(manual)4. Pasangan paving stone 2.000,00 M2 155.790,00 311.580.000,005. Pasangan kansteen finishing 180,00 M 127.029,11 22.876.580,43Ad 1:5Vi. Pekerjaan pagar keliling site 774.990.397,571. Galian tanah pondasi 321.64 M3 20.000,00 6.432.880,002. Urugan tanah kembali 139,60 M3 9.590,00 1.338.764,003. Urugan pasir alas pondasi 30,50 M3 86.000,00 2.623.000,004.
Urugan sirtu untuk leveling site 400,00 M3 400,00 M3 Tetap3. Urugan pasir alas diratakan (manual) 100,00 M3 100,00 M3 Tetap4. Pasangan paving stone 2.000,00 M2 2.000,00 M2 Tetap5. Pasangan kansteen finishing Ad 1:5 180,00 M 180,00 M TetapVi. Pekerjaan Pagar Keliling Site1. Galian tanah pondasi 321.64 M3 399,15 M3 Tambah2. Urugan tanah kembali 139,60 M3 164,21 M3 Tambah3. Urugan pasir alas pondasi 30,50 M3 28,46 M3 Kurang4. Pasangan batu kosong 82,13 M3 85,38 M3 Tambah5.
Urugan sirtu untuk leveling site 400,00 M3 84.500,00 33.800.000,003. Urugan pasir alas diratakan 100,00 M3 86.000,00 8.600.000,00 Hal. 27 dari 257 hal. Put. Nomor 1668 K/PID.SUS/2015 (manual) 4. Pasangan paving stone 2.000,00 M2 155.790,00 311.580.000,00oe Pasangan kansteen finishing 180,00 M 127.029,11 22.876.580,43Ad 1:5Vi. Pekerjaan pagar keliling site 774.990.397,571. Galian tanah pondasi 321.64 M3 20.000,00 6.432.880,002. Urugan tanah kembali 139,60 M3 9.590,00 1.338.764,003.
1.ANTONI BANGUN, SH
2.Raoda U. Asipa
Tergugat:
1.PT. Prospek Duta Sukses
2.PT. Cowell Development Tbk
1367 — 3699
pelebaranjalan Pangeran Antasari seluas 1.125 M2 (Seribu seratus dua puluh limameter perseg));(il) Kementerian Pekerjaan Umum akan memberikan penjelasan kepadaseluruh dinas/instansi terkait dampak yang ditimbulkan akibat darirencana Kementerian Pekerjaan Umum terhadap perijinan yang dimilikioleh Tergugat I;(iit) Tergugat dan Kementerian Pekerjaan Umum akan membuat gambarteknis yang disepakati bersama terkait rencana jalan KementerianPekerjaan Umum yang mengenai lahan Tergugat I;(iv) Karena adanya perubahan leveling
98 — 15
Setting dan leveling unit genset, 3. Pengadaandan pemasangan tangki solar, 4. Piping fuel system genset baru, 5. Pemipaandari daily system, 6. Pengadaan dan pemasangan residential, 7. Ductingradiator, 8. Piping exhaust system, 9. Power Cable NYY, 10. Kable Ladder,11. Grounding System, 12. Grile Intake dan discharge, 13. Intake attenuator,14. Discharge attenuator.
o1ooo" pengadaan kabel kontrol Setting dan leveling unit Genzet Pengadaan dan pemasangan tangki solar Piping fuel system genset baru Pemipaan dari daily system Pengadaan dan pemasangan residential Ducting radiator Piping exhaust system Power cable NYY Kabel ladder Grounding system Grile intake dan discharge Intake attenuator Discharge attenuator 82.
Setting dan leveling unit genset, 3.Pengadaan dan pemasangan tangki solar, 4. Piping fuel system gensetbaru, 5. Pemipaan dari daily system, 6. Pengadaan dan pemasanganresidential, 7. Ducting radiator, 8. Piping exhaust system, 9. Power CableNYY, 10. Kable Ladder, 11. Grounding System, 12. Grile Intake dandischarge, 13. Intake attenuator, 14.
Pengadaan tersebut kemudian di ulang lagi, dalam bentuk rincian 14 item/ komponenRp. 191.055.000, pengadaan kabel kontrol Setting dan leveling unit Genzet Pengadaan dan pemasangan tangki solar Piping fuel system genset baru Pemipaan dari daily system Halaman 227 dari 286 halaman, Putusan Nomor : 110/Pid.SusTPK/2014/PN.Bdg. 228 Pengadaan dan pemasangan residential Ducting radiator Piping exhaust system Power cable NYY Kabel ladder Grounding system Grile intake dan discharge Intake attenuator Discharge
71 — 27
: 01/BAPLAPBD/DPU/BU/2013, dan dalam pelaksanaan kegiatan Peningkatan Jalan Hotmix DesaKemumuDusun Curup pada Dinas Pekerjaan Umum Kabupaten Bengkulu Utara TahunAnggaran 2013 terdapat perubahan kontrak yang berdasarkan pada Perubahan Perjanjian(Kontrak) nomor : 01/Perubahan KontrakY1/DPU/BU/2013 tanggal 06 Mei 2013 yaitu Volumeyang semula 3.000 Km menjadi 3.025 Km dan dilapangan dibutunkan volume pekerjaan tambahkurang antara lain:a.Lapis Pondasi Agregat kelas Ab.Lapis pondasi Agregat kelas B (Leveling
Lapis pondasi Agregat kelas B (Leveling)c.Lapis Resappengikat Aspal caird.Lataston Lapis Pondasi (HRSBase) (Gradasi senjang / semi senjang)e. Aspal Minyakf. Bahan Anti Pengelupasang. Bahan pengisi (Filler) tambahan SemenDengan rincian pekerjaan / RAB setelah perubahan adalah : No.Mata Uraian satuan Perkiraa Harga Jumlah Keteranganpembaya n satuan hargaran kuantita (Rp) (Rp)SsA B C D F=(D x E)DIVISI 1.
TOMMY U. SETYAWAN, SH.
Terdakwa:
RIZKI GALIH SAPUTRA Bin KHAERUN
67 — 30
denganpengerjaannya Terdakwa yang melakukannya.Bahwa untuk pekerjaan uitzet (pengukuran) lokasi pekerjaan JalanKalijambePonolawen (paket 1) dilakukan pada tanggal 4 Mei 2012, yangdihadiri oleh perwakilan dari DPU Kabupaten Pekalongan, perwakilan BagPembangunan dan Terdakwa sendiriBahwa pekerjaan mulai dilaksanakan pada 24 April 2012, sedangkan padawaktu itu. pekerjaan yang pertama Terdakwa kerjakan adalah yaitupembersihan di lokasi lapangan, droping material, pemerataan jalan denganmenggunakan sirtu (leveling
92 — 10
sebesar Rp. 150.000.000, (seratus limapuluh juta rupiah) pada kelompok tani Cahaya Baru turun atau cair padatahun 2011 akan tetapi bulanya lupa;Bahwa pencairan dana untuk kegiatan perluasan sawah pada kelompoktani Cahaya Baru tahun 2011 ada 4 (empat) kali pencairan yaitu Tahap sebesar Rp. 45.000.000, (empat puluh lima juta rupiah) dipergunkanuntuk pekerjaan persiapan dan pekerjaan konstruksi Tahap Il sebesarRp. 45.000.000, (empat puluh lima juta rupiah) dipergunakan untukpekerjaan persiapan land leveling
dan pemanfaat sawah dan saprotan,Tahap Ill sebesar Rp. 45.000.000, (empat puluh lima juta rupiah)dipergunakan untuk pekerjaan persiapan Land Leveling danPemanfaatan sawah dan saprotan, Tahap IV sebesar Rp. 15.000.000,(lima belas juta rupiah) dipergunakan untuk pekerjaan persiapan,pemanfaatn sawah dan saprotan;Bahwa setiap pecairan dana membuka rekening atas nama kelompoktani di Bank SulSel dengan No Rek tidak tahu dan yang mengetahuiadalah ketua kelompok tani;Bahwa kegiatan untuk kegiatan perluasan
76 — 14
Turn Table, Tangga Turn table harus terbuat dari bahan hightdan rescur Platfor tensile steel dan dirancang untuk leveling(Cage) tangga sampai sudut 10 derajat secaraotomatis.
Turn Table, Tangga Turn table harus terbuat dari bahan hight tensiledan rescur Platfor steel dan dirancang untuk leveling tangga(Cage) sampai sudut 10 derajat secara otomatis.Tangga type telescopic terdiri dari 1 boom utamadan 4 sliding section dengan tinggi kerja daritanah ke lantai platform > 42 m. disalin denganstabilitas tinggi yang terbuat dari hinght strengthsteel RHS (profil kotak).
Srg. otomatis (automatic ground leveling system)bukaan maksimum kaki kiri / kanan > 5000 MM.dan tiaptiap kaki dilengkapi dengan sensorgroundpresure agar dapat secara otomatismembatasi/menghentikan gerakan operasitangga.
99 — 100 — Berkekuatan Hukum Tetap
Provinsi Riau sebesarRp.500.000.000,00.110) Fotokopi dokumen yang telah dilegalisir Surat Perintah PencairanDana Nomor : 008320E/008/110 tanggal 20 September 2013 SatkerDinas Tanaman Pangan dan Hortikultura Provinsi Riau sebesarRp.500.000.000,00.111) Fotokopi dokumen yang telah dilegalisir Revisi Rencana UsulanKegiatan Kelompok (RUKK), September 2013 (tanpa tanggal) a.nKelompok Tani Tunas Harapan senilai Rp.500.000.000,00 (PekerjaanPersiapan Rp.11.100.000,00 ; Land Clearing Rp.200.000.000,00 ;Land Leveling
36 — 5
kepadamelakukan pengawasan masalah mutu beton untuk di lakukan perawatan beton denganpenyiraman air ke atas beton sehari 3 kali yaitu pagi, siang dan sore, untuk menjaga retakagar dibuat dilatasi/pemutusan per 2 kali lebar ;Bahwa dalam pelaksanaan kegiatan PPIP lebih memberdayakan masyarakat setempatdengan membuat shift waktu pada kelompokkelompok masyarakat, mempersiapkan terpalsebanyak mungkin untuk antisipasi hujan yang datang tibatiba guna menutupi rabat betonyang masih baru, untuk mencapai leveling
jalan agar tidak bergelombang bisa dilakukandengan leveling batu atau sertu yang dipadatkan, untuk berem jalan biar tidak terlaludangkal dan tidak membahayakan pengguna jalan supaya diuruk dengan menggerakkanmasyarakat setempat, untuk level permukaan rabat yang masih baru itu agar dibuatpermukaan kasar ; 2072220222 2222222222222 ==Bahwa Pembangunan jalan rabat beton program pembangunan infrastruktur perdesaan(PPIP) T.A. 2013 di Desa Dermosari dilaksanakan Sejak tanggal 6 Nopember 2013 sampaidengan
49 — 13
Pengaspalan ;Bahwa benar untuk proyek tersebut bahan bahannya adalah : LevelingLapis Bawah (LLB), Sirtu (campuran pasir dan batu), Leveling Lapis Atas(LLA), Best Cost (campuran batu pecah, pasir dan perekat), Aspal Beton atauHotmix dengan memakai alat alat berat berupa : Pinizer, Tandem, Graider,Walas dan peralatan kecil seperti : cangkul, sekop dan Plongky ;Bahwa saksi bekerjasama dengan Ardiansyah alias Aan dan buruh sebanyak 4(empat) orang telah melaksanakan pekerjaan / proyek tersebut sejak tanggal24
76 — 15
ClearingPembabatan / Penebasan semak belukar 1 Ha 80 1.250.000 37.500.000Penebangan/ Penumbangan pohon1 Ha 80 1.500.000 45.000.000Pemotongan/ Perencekan dan pengumpulani Ha 7,5 /1.000.000 7.500.000Total 90.000.000 Halaman 28 dari 146 Putusan Nomor 53/Pid.SusTPK/2015/PN Pik Laporan Pertanggung Jawaban Tahap II No. jUraian Kegiatan Perluasal Arel TanamanVolume Unit CostTotal Biaya Pangan satuanLuas (RP) (RP) Konstruksi Perluasan Sawah Land Clearing Pemotongan / Perencekan dani Ha (22,5 /1.000.000 22.500.000 Land Leveling
Land Leveling Halaman 36 dari 146 Putusan Nomor 53/Pid.SusTPK/2015/PN Pik Perataan Tanah 1 Ha 30 Rp. Rp.500.000, 15.000.000,Pembuatan Jaringan 1 Ha 30 Rp. Rp.lrigasi 1.000.000, 30.000.000,Pembuatan pematang 1 Ha 30 Rp. Rp.batas pemilikan 1.500.000, 45.000.000,3 Pemanfaatan SawahPengelolaan tanah 1 Ha 30 Rp. Rp.1.000.000, 30.000.000,Pembelian benih 1 Ha 30 Rp. Rp.300.000, 9.000.000Pembelian pupuk,obatobatan, dll. Urea 150 kg 30 Rp. Rp.5.000. 22.500.000, SP 36 50 kg 30 R.
Terbanding/Terdakwa : UPIK ROSALINA WASRIN
310 — 147
Kontrak : 36/SHS.03/SP/III/2013DU/1151/S.Perj/11 Pekerjaan Pembukaan Lahan dan Pencetakan Sawah SertaInfrastruktur Penunjang Lainnya. 104. 11 (Satu)Lembar Asli Peta Luasan Land Leveling Sungai Besar No. Kontrak :36/SHS.03/SP/III/2013 DU/1151/S.Perj/11 Pekerjaan Pembukaan Lahan danPencetakan Sawah Serta Infrastruktur Penunjang Lainnya. 105. 11 (Satu)Lembar Asli Peta Lokasi Desa S. Jawi dan S.Pelang No.
Sawah Sejumlah Rp.6,500,000(enam juta lima ratus ribu rupiah ), SAPUAN Pembayaran Leveling Sawah Se Hal.466 dari 582 hal.
Pupuk Indonesia (Persero). 3102. 1 (Satu) Lembar Asli As Build Drawing peta Leveling Harapan Baru. Hal.562 dari 582 hal. Putusan No.08/PID.SUS.
/TPK/2018PT DKI. 3103. 1 (Satu) Lembar Asli As Build Drawing peta Leveling Sungai Jawi dan Sungai Pelang. 3104. 1 (Satu) Lembar Asli As Build Drawing peta situasi Sungai Awan. 3105. 1 (Satu) Lembar Asli As Build Drawing peta Leveling Sukamaju. 3106. 1 (Satu) Lembar Asli As Build Drawing peta situasi Sukamaju. 3107. 1 (Satu) Lembar Asli As Build Drawing peta situasi Sungai Putri. 3108. 1 (Satu) Lembar Asli As Build Drawing peta Leveling Sungai Putri. 3109. 1 (Satu) Lembar Asli As Build Drawing peta
situasi Kuala Satong. 3110. 1 (Satu) Lembar Asli As Build Drawing peta Leveling Kuala Satong. 3111. 1 (Satu) bendel fotocopy legalisir Laporan Pendahuluan Studi Kelayakan PembukaanLahan dan Percetakan Sawah Serta Infrastruktur Lainnya di Kabupaten Ketapang,Kalimantan Barat PT.