Register : 15-04-2016 — Putus : 18-05-2016 — Upload : 01-08-2016
Putusan PT PALU Nomor 3/Pid.Sus-TPK/2016/PT PAL
Tanggal 18 Mei 2016 — YUSNITA FITARINI SIBAY, S.T.
6229
  • Flanged Steel @ 20,00 bh 135.937,50 2.718.750,0042. Flanged Socket @1,00 bh 163.125,00 163.125,0043. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee = 2,00 bh 177.500,00 355.000,00PVC 4 x 35. All Socket Tee 1,00 bh 185.000,00 185.000,00PVC 4 x @ 46. All Socket Tee 2,00 bh 148.000,00 296.000,00PVC @ 3 x 37. All Socket Tee 2,00 Bh 85.000,00 170.000,00PVC 28. Gate Valve @ 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC @3 2,00 Bh 38.062,50 76.125,0010.
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh = 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh = 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve CI @ 4 1,00 Bh 1.495.312,50 1.495.312,50Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.98Pembuatan ReservoarPengukuran/pemasangan 1,00 Ls 250.000,00
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh = 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    All Flanged Bh 3,000 1,000 2,000 525.000,00Tee Y 1.050.000,003. All Flanged Bh 5,000 0,000 5,000 325.000,00Bend GIP 4 1625.000,004. Mur Baut Bh 352,000 150,000 192,000 8.775,005/8 3 1.684.800,005. Strainer 4 Bh 4,000 3,000 1.000 1.780.000,00 1 terpasang,1.780.000,0 2 tidak0 terpasan, itidak ada6.
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50CI @ 4Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer @ 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.982 Pembuatan Reservoar Halaman 31 dari 50 Putusan Nomor 3/
Register : 15-04-2016 — Putus : 18-05-2016 — Upload : 01-08-2016
Putusan PT PALU Nomor 4/Pid.Sus-TPK/2016/PT PAL
Tanggal 18 Mei 2016 — KADIR, S.T. alias KADIR NURDIN
10451
  • Flanged Steel @ 20,00 bh 135.937,50 2.718.750,0042. Flanged Socket @1,00 bh 163.125,00 163.125,004 Halaman 3 dari 51 Putusan Nomor 4/Pid.SusTPK/2016/PT.PAL 3. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee = 2,00 bh 177.500,00 355.000,00PVC 4 x 35. All Socket Tee 1,00 bh 185.000,00 185.000,00PVC 4 x 46. All Socket Tee 2,00 bh 148.000,00 296.000,00PVC 3 x 37. All Socket Tee 2,00 Bh 85.000,00 170.000,00PVC 28. Gate Valve @ 4 1,00 bh 1.495.312,50 1.495.312,509.
    All Flanged Tee Bh 5,000 1,000 ,4,000 423.000,00 1.692.000,00PVC 43. All Flanged Bh 5,000 3,000 2,000 364.500,00 729.000,00Bled PVC 4 4. All Flanged Bh 4,000 3,000 1,000 *1.495.312,00 1.495.312,00Gate Valve Cl45. Strainer 4 Bh 1,000 0,00 1,000 1.780.000,00 1.780.000,006 Mur Baut 5/8 Bh 176,000 41,00 8.775,00 1.184.625,003 135,0007. Pengecatan besi M? 0,720 0,000 0,720 30.362,45 21.860,96dan meni9.
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh = 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh = 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve CI @ 4 1,00 Bh 1.495.312,50 1.495.312,50Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer @ 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.98Pembuatan ReservoarPengukuran/pemasangan 1,00 Ls 250.000,00
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 = 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00 Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50CI @ 4Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer @ 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.98Pembuatan ReservoarPengukuran/pemasangan 1,00 Ls 250.000,00
Register : 16-10-2015 — Putus : 25-01-2016 — Upload : 29-07-2016
Putusan PN PALU Nomor 54/Pid.Sus-TPK/2015/PN.Pal
Tanggal 25 Januari 2016 — KADIR, ST Alias KADIR NURDN
13851
  • Flanged Steel @ 20,00 bh 135.937,50 2.718.750,0042. Flanged Socket @1,00 bh 163.125,00 163.125,004 Halaman 3 dari 51 Putusan Nomor 4/Pid.SusTPK/2016/PT.PAL 3. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee = 2,00 bh 177.500,00 355.000,00PVC 4 x 35. All Socket Tee 1,00 bh 185.000,00 185.000,00PVC 4 x 46. All Socket Tee 2,00 bh 148.000,00 296.000,00PVC 3 x 37. All Socket Tee 2,00 Bh 85.000,00 170.000,00PVC 28. Gate Valve @ 4 1,00 bh 1.495.312,50 1.495.312,509.
    All Flanged Tee Bh 5,000 1,000 ,4,000 423.000,00 1.692.000,00PVC 43. All Flanged Bh 5,000 3,000 2,000 364.500,00 729.000,00Bled PVC 4 4. All Flanged Bh 4,000 3,000 1,000 *1.495.312,00 1.495.312,00Gate Valve Cl45. Strainer 4 Bh 1,000 0,00 1,000 1.780.000,00 1.780.000,006 Mur Baut 5/8 Bh 176,000 41,00 8.775,00 1.184.625,003 135,0007. Pengecatan besi M? 0,720 0,000 0,720 30.362,45 21.860,96dan meni9.
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh = 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh = 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve CI @ 4 1,00 Bh 1.495.312,50 1.495.312,50Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer @ 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.98Pembuatan ReservoarPengukuran/pemasangan 1,00 Ls 250.000,00
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 = 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00 Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50CI @ 4Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer @ 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.98Pembuatan ReservoarPengukuran/pemasangan 1,00 Ls 250.000,00
Putus : 29-03-2017 — Upload : 31-05-2017
Putusan MAHKAMAH AGUNG Nomor 2016 K/PID.SUS/2016
Tanggal 29 Maret 2017 — WAHYUDIN M. GAGARAMUSU, S.Sos. alias BUDO
10463 Berkekuatan Hukum Tetap
  • Flanged Steel @ 4 20,00 bh 135.937 ,50 2.718.750,002. Flanged Socket @ 4 1,00 bh 163.125,00 163.125,003. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee PVC @ 4 x 3 2,00 bh 177.500,00 355.000,005. All Socket Tee PVC @ 4 x @ 4 1,00 bh 185.000,00 185.000,006. All Socket Tee PVC @ 3 x @ 3 2,00 bh 148.000,00 296.000,007. All Socket Tee PVC @ 2 2,00 Bh 85.000,00 170.000,008. Gate Valve @ 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC @ 3 2,00 Bh 38.062,50 76.125,0010.
    1 0 0 1.0 0,00 1.780.00 terpasa00 0,00 ng, 2tidakterpasan,itidakadaPengelasa Cc 1.02 1.02 0,0 3.156,80 0,00n Flanged m 0,00 0,00 00stell 0 0PEMBUATAN RESERVOARBeton Ms 17.2 14.0 2506.36 Bertulang 60 8 3.1 2,53 7.976.391:2:3 82 3,48All Bh 5,00 1,00 ,4, 423.000, Flanged 0 0 00 00 1.692.00Tee PVC 0 0,004All Bh 5,00 3,00 364.500, Flanged 0 0 2,0 00 729.000, Hal. 8 dari 71 hal.
    Flanged Steel @ 4 20,00 bh 135.937,50 2.718.750,002. Flanged 1,00 bh 163.125,00 163.125,00Socket @ 43. Flanged 1,00 bh 163.125,00 163.125,00Spigot4. All Socket 2,00 bh 177.500,00 355.000,00Tee PVC @ 4KD 35. All Socket 1,00 bh 185.000,00 185.000,00Tee PVC @ 4KD 46. All Socket 2,00 bh 148.000,00 296.000,00Tee PVC @ 3KD 37. All Socket 2,00 Bh 85.000,00 170.000,00Tee PVC @ 2 Hal. 16 dari 71 hal. Putusan Nomor 2016 K/PID.SUS/2016 8. ae Valve 1,00 bh 1.495.312,5 1.495.312,50 09.
    Putusan Nomor 2016 K/PID.SUS/2016 Pipa Gip@4 204,00 M" 149.855,00 30.570.420,00Medium BAll Flanged Tee Y @ 4 3,00 Bh 525.000,00 1.575.000,00 All Flanged 5,00 Bh 325.000,00 1.625.000,00GIP @ 4Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00 All Flanged 1,00 Bh 1.495.312, 1.495.312,50Gate Valve 50Cl @ 4Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,0 cm 3.156,80 3.219.936,00067.508.775.98Pembuatan
    All Flanged Tee Bh 5,000 1,000 ,4,000 423.000,00 1.692.000,00PVC 43. All Flanged Bh 5,000 3,000 2,000 364.500,00 729.000,00 Hal.37 dari 71 hal. Putusan Nomor 2016 K/PID.SUS/2016 Bled PVC 4 4. All Flanged Bh 4,000 3,000 1,000 1.495.312,00 1.495.312,00Gate Valve Cl45. Strainer 4 Bh 1,000 0,00 1,000 1.780.000,00 1.780.000,006. Mur Baut 5/8 3 Bh 176,000 41,00 8.775,00 1.184.625,00135,0007. Pengecatan Me? 0,720 0,000 0,720 30.362,45 21.860,96besi dan meni9.
Register : 15-04-2016 — Putus : 18-05-2016 — Upload : 01-08-2016
Putusan PT PALU Nomor 5/Pid.Sus-TPK/2016/PT PAL
Tanggal 18 Mei 2016 — JONI B. RAMLI, S.T.
6322
  • Flanged Steel @ 20,00 bh 135.937,50 2.718.750,0042. Flanged Socket @1,00 bh = 163.125,00 163.125,0043. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee = 2,00 bh 177.500,00 355.000,00PVC @ 4 x 35. All Socket Tee 1,00 bh 185.000,00 185.000,00PVC 4 x @ 46. All Socket Tee 2,00 bh 148.000,00 296.000,00PVC 3 x 37. All Socket Tee 2,00 Bh 85.000,00 170.000,00PVC 28. Gate Valve @ 4 1,00 bh 1.495.312,50 1.495.312,509.
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh = 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh = 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve CI @ 4 1,00 Bh 1.495.312,50 1.495.312,50Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.98Pembuatan ReservoarPengukuran/pemasangan 1,00 Ls 250.000,00
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh 375.000,00 375.000,00Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    /149.855,00 7.193.040,00Flanged Steel @ 4 24,00 Bh 135.937,50 3.262.500,00 Flanged Socket @ 4 16,00 Bh /163.125,00 2.610.000,00Flanged Spigot @ 4 8,00 Bh 163.125,00 1.305.000,00All Flanged Bend Cl @ 4 x 16,00 Bh /364.500,00 5.832.000,0022,5 Paking Karet @ 4 36,00 Bh 17.500,00 630.000,00Mur Baut 5/8 3 288,00 Bh 8.775,00 2.527.200,00Clame sadle @ 4 8,00 Bh 102.825,00 822.600,00Pengelasan Flanged steel 360,00 Cm 3.156,80 1.136.448,00Besi siku 4,00 M!
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50CI @ 4Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.98 Halaman 31 dari 48 Putusan Nomor 5/Pid.SusTPK/2016/PT.PAL
Register : 19-04-2016 — Putus : 18-05-2016 — Upload : 03-09-2020
Putusan PT PALU Nomor 5/PID.TPK/2016/PT PAL
Tanggal 18 Mei 2016 — Pembanding/Terbanding/Terdakwa : JONI B. RAMLI, ST Diwakili Oleh : JONI B. RAMLI, ST
Terbanding/Pembanding/Penuntut Umum : PALUPI WIRYAWAN, SH
9537
  • Pengelasa Cm 1.020,0 1.020,0 0,000 3.156,80 0,00n Flanged 00 00stellI PEMBUATAN RESERVOAR1 Beton MS 17.260 14.08 3.182 2506.362,5 Bertulang 3 7.976.393,481:2:32. All Flanged Bh 5,000 1,000 ,4,00 423.000,00 Tee PVC 4 0 1.692.000,003. All Flanged Bh 5,000 3,000 2,000 364.500,00 729.000,00Bled PVC 44. All Flanged Bh 4,000 3,000 1,000 *1.495.312 Gate Valve ,00 1.495.312,00Cl 45. Strainer 4 Bh 1,000 0,00 1,000 1.780.000, 00 1.780.000,006.
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve CI @ 1,00 Bh 1.495.312,50 1.495.312,50 4 Halaman 17 dari 48 Putusan Nomor 5/Pid.SusTPK/2016/PT.PAL Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet 4 44,00 Bh 17.500,00 770.000,00Strainer @ 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.98Pembuatan
    ACCESSIRIESPENGURASAll Flanged Gate Valve 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh 375.000,00 375.000,00Paking Karet 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    Pengelasan cm 1.020,0 1.020,00 0,000 3.156,80 0,Flanged stell 00 0 00IL PEMBUATAN RESERVOAR1 Beton Me 17.260 14.08 2506.362,5Bertulang 3.182 3 7.976.393,1:2:3 482. All Flanged Bh 5,000 1,000 ,4,00 423.000,00Tee PVC 4 0 1.692.000,003. All Flanged Bh 5,000 3,000 364.500,00 Bled PVC 4 2,000 729.000,004. All Flanged Bh 4,000 3,000 1.495.312,Gate Valve Cl 1,000 00 1.495.312,4 005. Strainer 4 Bh 1,000 0,00 1.780.000,01,000 0 1.780.000,006.
    149.855,00 30.570.420,00BAll Flanged Tee Y 4 3,00 Bh 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh 325.000,00 1.625.000,00 Halaman 28 dari 48 Putusan Nomor 5/Pid.SusTPK/2016/PT.PAL Flanged Steel 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve 1,00 Bh 1.495.312,50 1.495.312,50CI @ 4Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged 1.020,00 cm 3.156,80 3.219.936,00steel67.508.775.98Pembuatan
Register : 19-04-2016 — Putus : 18-05-2016 — Upload : 02-09-2020
Putusan PT PALU Nomor 6/PID.TPK/2016/PT PAL
Tanggal 18 Mei 2016 — Pembanding/Terbanding/Terdakwa : WAHYUDIN M. GAGARAMUSU, S.Sos. alias BUDO Diwakili Oleh : WAHYUDIN M. GAGARAMUSU, S.Sos. alias BUDO
Terbanding/Pembanding/Penuntut Umum : PALUPI WIRYAWAN, SH
6123
  • Pengelasa Cm 1.020,0 1.020,0 0,000 3.156,80 0,00n Flanged 00 00stellIl PEMBUATAN RESERVOAR1 Beton Ms 17.260 14.08 3.182 2506.362,5 Bertulang 3 7.976.393,481:2:32. All Flanged Bh 5,000 1,000 ,4,00 423.000,00 Tee PVC 4 0 1.692.000,003. All Flanged Bh 5,000 3,000 2,000 364.500,00 729.000,00Bled PVC 44. All Flanged Bh 4,000 3,000 1,000 1.495.312 Gate Valve ,00 1.495.312,00Cl 45. Strainer 4 Bh 1,000 0,00 1,000 1.780.000, 00 1.780.000,006.
    149.855,00 30.570.420,00All Flanged Tee Y 4 3,00 Bh 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve CI @ 1,00 Bh 1.495.312,50 1.495.312,504Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet 4 44,00 Bh 17.500,00 770.000,00Strainer @ 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.98Pembuatan ReservoarPengukuran/pemasangan 1,00; Ls 250.000,00 250.000,00BouplankGalian
    ACCESSIRIESPENGURASAll Flanged Gate Valve 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC 4 1,00 Bh 375.000,00 375.000,00Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    Pengelasan Cm 1.020,0 1.020,00 0,000 3.156,80 0,Flanged stell 00 0 00IL PEMBUATAN RESERVOAR1 Beton MS 17.260 14.08 2506.362,5Bertulang 3.182 3 7.976.393,1:2:3 482. All Flanged Bh 5,000 1,000 ,4,00 423.000,00Tee PVC 4 0 1.692.000,003. All Flanged Bh 5,000 3,000 364.500,00 Bled PVC 4 2,000 729.000,004. All Flanged Bh 4,000 3,000 1.495.312,Gate Valve Cl 1,000 00 1.495.312,4 005. Strainer 4 Bh 1,000 0,00 1.780.000,01,000 0 1.780.000,006.
    149.855,00 30.570.420,00BAll Flanged Tee Y @ 4 3,00 Bh 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve 1,00 Bh 1.495.312,50 1.495.312,50CI @ 4Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged 1.020,00 cm 3.156,80 3.219.936,00steel67.508.775.98Pembuatan ReservoarPengukuran/pemasanga 1,00 Ls 250.000,00 250.000,00n
Register : 16-09-2015 — Putus : 25-01-2016 — Upload : 26-07-2016
Putusan PN PALU Nomor 56/Pid.Sus-TPK/2015/PN Pal
Tanggal 25 Januari 2016 — WAHYUDIN M. GAGARAMUSU, S.Sos Alias BUDO
7114
  • All Flanged Tee Bh 5,000 1,000 ,4,000 423.000,00 1.692.000,00PVC 43. All Flanged Bh 5,000 3,000 2,000 364.500,00 729.000,00Bled PVC 4 4. All Flanged Bh 4,000 3,000 1,000 ~1.495.312,00 1.495.312,00Gate Valve Cl45. Strainer 4 Bh 1,000 0,00 1,000 1.780.000,00 1.780.000,006 Mur Baut 5/8 Bh 176,000 41,00 135,000 8.775,00 1.184.625,0037. Pengecatan besi M? 0,720 0,000 0,720 30.362,45 21.860,96dan meni9.
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh = 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh = 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve CI @ 4 1,00 Bh 1.495.312,50 1.495.312,50Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer @ 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.98Pembuatan ReservoarPengukuran/pemasangan 1,00 Ls 250.000,00
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh = 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,00 4.302.394,06.
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50CI @ 4Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer @ 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.98Pembuatan ReservoarPengukuran/pemasangan 1,00 Ls 250.000,00
    All Flanged Bh 3,000 1,000 2,000 525.000,00Tee Y 1.050.000,003.
Register : 19-04-2016 — Putus : 18-05-2016 — Upload : 03-09-2020
Putusan PT PALU Nomor 3/PID.TPK/2016/PT PAL
Tanggal 18 Mei 2016 — Pembanding/Terbanding/Terdakwa : YUSNITA FITARINI SIBAY, ST Diwakili Oleh : NASRUL JAMALUDIN SH
Terbanding/Pembanding/Penuntut Umum : PALUPI WIRYAWAN, SH
7531
  • Pengelasa Cm 1.020,0 1.020,0 0,000 3.156,80 0,00n Flanged 00 00stellIl PEMBUATAN RESERVOAR1 Beton MS 17.260 14.08 3.182 2506.362,5 Bertulang 3 7.976.393,481:2:32. All Flanged Bh 5,000 1,000 ,4,00 423.000,00 Tee PVC 4 0 1.692.000,003. All Flanged Bh 5,000 3,000 2,000 364.500,00 729.000,00Bled PVC 44. All Flanged Bh 4,000 3,000 1,000 *1.495.312 Gate Valve ,00 1.495.312,00Cl 45. Strainer 4 Bh 1,000 0,00 1,000 1.780.000, 00 1.780.000,006.
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh 525.000,00 1.575.000,00 Halaman 17 dari 50 Putusan Nomor 3/Pid.SusTPK/2016/PT.PAL All Flanged GIP @ 4 5,00 Bh 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve CI @ 1,00 Bh 1.495.312,50 1.495.312,504Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet 4 44,00 Bh 17.500,00 770.000,00Strainer @ 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.98Pembuatan
    ACCESSIRIESPENGURASAll Flanged Gate Valve 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh 375.000,00 375.000,00Paking Karet 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    16,500 0,000 13.754,2616,500 226.954,29All Flanged Bh 3,000 1,000 2,000 525.000,00 1.050.000Tee Y 00All Flanged Bh 5,000 0,000 5,000 325.000,00Bend GIP 4 1625.000,00Mur Baut 5/8 Bh 352,000 150,000 8.775,003 192,00 1.684.800,0 00Strainer 4 Bh 4,000 3,000 1.000 1.780.000,0 10 1.780.000, terpasang,00 2 tidakterpasan, itidak adaPengelasan cm 1.020,0 1.020,00 0,000 3.156,80 0,Flanged stell 00 0 00PEMBUATAN RESERVOARBeton MS 17.260 14.08 2506.362,5Bertulang 3.182 3 7.976.393,1:2:3 48All Flanged Bh 5,000
    149.855,00 30.570.420,00BAll Flanged Tee Y @ 4 3,00 Bh 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh 325.000,00 1.625.000,00Flanged Steel 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve 1,00 Bh 1.495.312,50 1.495.312,50CI @ 4Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged 1.020,00 cm 3.156,80 3.219.936,00steel67.508.775.98Pembuatan ReservoarPengukuran/pemasanga 1,00 Ls 250.000,00 250.000,00n
Register : 16-10-2015 — Putus : 25-01-2016 — Upload : 28-07-2016
Putusan PN PALU Nomor 55/Pid.Sus-TPK/2015/PN Pal
Tanggal 25 Januari 2016 — JONI B. RAMLI, ST
9835
  • /149.855,00 30.570.420,00Medium BAll Flanged Tee Y 3,00 Bh 525.000,00 1.575.000,00o4All Flanged GIP @ 5,00 Bh 325.000,00 1.625.000,004Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate 1,00 Bh 1.495.312,50 1.495.312,50Valve CI 4Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged 1.020,00 cm 3.156,80 3.219.936,00steel67.508.775.982Pembuatan ReservoarPengukuran/ 1,00 Ls 250.000,00 250.000,00pemasanganBouplankGalian
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh 525.000,00 1.575.000,00 23 All Flanged GIP @ 4 5,00 Bh 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve CI @ 4 1,00 Bh 1.495.312,50 1.495.312,50Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.982 Pembuatan ReservoarPengukuran/pemasangan 1,00 Ls 250.000,00
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh = 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    149.855,00 30.570.420,00BAll Flanged Tee Y@ 3,00 Bh 525.000,00 1.575.000,004All Flanged GIP @ 4 5,00 Bh = 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate 1,00 Bh 1.495.312,50 1.495.312,50Valve CI 4Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged 1.020,00 cm 3.156,80 3.219.936,00steel67.508.775.982 Pembuatan ReservoarPengukuran/ 1,00 Ls 250.000,00 250.000,00pemasangan
    ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh 1.495.312,50 1.495.312,50Valve @ 4All Flanged tee PVC /1,00 Bh 525.000,00 525.000,00O4Flanged Socket PVC 1,00 Bh 163.125,00 163.125,00O4Flanged Sigot PVC @ 1,00 Bh 163.125,00 163.125,00AAll Flanged Bend 1,00 Bh = 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,065.
Putus : 07-03-2017 — Upload : 29-05-2019
Putusan MAHKAMAH AGUNG Nomor 2031 K/PID.SUS/2016
Tanggal 7 Maret 2017 — JONI B. RAMLI, S.T.
10853 Berkekuatan Hukum Tetap
  • 149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh 525.000,00 1.575.000,00All Flanged GIP 4 5,00 Bh 325.000,00 1.625.000,00Flanged Steel 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve 1,00 Bh 1.495.312,50 1.495.312,50CI @ 4Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet 4 44,00 Bh 17.500,00 770.000,00 Hal. 3 dari 55 hal.
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 1,00 Bh 1.495.312,50 1.495.312,504All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00a. Flanged Sigot PVC @ 1,00 Bh 163.125,00 163.125,004b. All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4c. Paking Karet 4 * 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block Beton 1,00 PktGalian Tanah Biasa 3,00 M? 24.990,00 74.970,00Urugan Tanah 1,00 M?
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve 1,00 Bh 1.495.312,50 1.495.312,50CI @ 4Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer @ 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.982 Pembuatan ReservoarPengukuran/pemasangan 1,00 Ls 250.000,00
    ACCESSIRIESPENGURASAll Flanged Gate Valve 1,00 Bh 1.495.312,50 1.495.312,504All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00 Hal. 15 dari 55 hal. Putusan Nomor 2031 K/PID.SUS/2016 d. Flanged Sigot PVC 1,00 Bh 163.125,00 163.125,004e. All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @4*f.
    ACCESSIRIESPENGURASAll Flanged Gate Valve 1,00 Bh 1.495.312,50 1.495.312,504All Flanged tee PVC 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00g. Flanged Sigot PVC @ 1,00 Bh 163.125,00 163.125,004h. All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @4*i. Paking Karet 4 5,00 Bh 17.500,00 87.500,00ur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block Beton 1,00 PktGalian Tanah Biasa 3,00 M? 24.990,00 74.970,00Urugan Tanah 1,00 M?
Putus : 10-05-2017 — Upload : 12-02-2018
Putusan MAHKAMAH AGUNG Nomor 2029 K/PID.SUS/2016
Tanggal 10 Mei 2017 — KADIR, S.T., alias KADIR NURDIN
664270 Berkekuatan Hukum Tetap
  • Abstrak : Dalam perkara ini, majelis hakim pada Pengadilan Negeri Palu menghukum Terdakwa karena terbukti melakukan tindak pidana korupsi sebagaimana dirumuskan dalam Pasal 3 UU Tipikor. Terhadap perbuatannya, Majelis Hakim menghukum terdakwa dengan pidana ... [Selengkapnya]
  • 149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve 1,00 Bh 1.495.312,50 1.495.312,50CI @ 4Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet 4 44,00 Bh 17.500,00 770.000,00 Hal. 3 dari 58 hal.
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 1,00 Bh 1.495.312,50 1.495.312,504All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00a. Flanged Sigot PVC @ 1,00 Bh 163.125,00 163.125,004b. All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4c. Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,065.
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 1,00 Bh 1.495.312,50 1.495.312,504All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00d. Flanged Sigot PVC @ 1,00 Bh 163.125,00 163.125,004e. All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4f.
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve 1,00 Bh 1.495.312,50 1.495.312,50CI @ 4Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,00 Hal. 25 dari 58 hal.
    ACCESSIRIESPENGURASAll Flanged Gate Valve 1,00 Bh 1.495.312,50 1.495.312,504All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00g. Flanged Sigot PVC @ 1,00 Bh 163.125,00 163.125,004h. All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4i. Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,065.
Register : 15-04-2016 — Putus : 18-05-2016 — Upload : 02-08-2016
Putusan PT PALU Nomor 6/Pid.Sus-TPK/2016/PT PAL
Tanggal 18 Mei 2016 — WAHYUDIN M. GAGARAMUSU, S.Sos. alias Budo
7731
  • All Flanged Tee Bh 5,000 1,000 ,4,000 423.000,00 1.692.000,00PVC 43. All Flanged Bh 5,000 3,000 2,000 364.500,00 729.000,00Bled PVC 4 4. All Flanged Bh 4,000 3,000 1,000 ~1.495.312,00 1.495.312,00Gate Valve Cl45. Strainer 4 Bh 1,000 0,00 1,000 1.780.000,00 1.780.000,006 Mur Baut 5/8 Bh 176,000 41,00 135,000 8.775,00 1.184.625,0037. Pengecatan besi M? 0,720 0,000 0,720 30.362,45 21.860,96dan meni9.
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh = 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh = 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve CI @ 4 1,00 Bh 1.495.312,50 1.495.312,50Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer @ 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.98Pembuatan ReservoarPengukuran/pemasangan 1,00 Ls 250.000,00
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh = 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,00 4.302.394,06.
    149.855,00 30.570.420,00All Flanged Tee Y @ 4 3,00 Bh 525.000,00 1.575.000,00All Flanged GIP @ 4 5,00 Bh 325.000,00 1.625.000,00Flanged Steel @ 4 68,00 Bh 135.937,50 9.243.750,00All Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50CI @ 4Mur Baut 352,00 Bh 8.775,00 3.088.800,00Paking Karet @ 4 44,00 Bh 17.500,00 770.000,00Strainer @ 4 4,00 Bh 1.790.000,00 7.120.000,00Pengelasan Flanged steel 1.020,00 cm 3.156,80 3.219.936,0067.508.775.98Pembuatan ReservoarPengukuran/pemasangan 1,00 Ls 250.000,00
    All Flanged Bh 3,000 1,000 2,000 525.000,00Tee Y 1.050.000,003.
Putus : 21-02-2018 — Upload : 20-12-2019
Putusan MAHKAMAH AGUNG Nomor 70 K/Pid/2018
Tanggal 21 Februari 2018 — SIGIT AGUS SUYATNO, SE.;
5016 Berkekuatan Hukum Tetap
  • 2018Menyatakan Terdakwa SIGIT AGUS SUYATNO, SE. telah terbuktisecara sah dan meyakinkan melakukan tindak pidana Penggelapansebagaimana tersebut dalam ketentuan Pasal 372 KUHP dalamdakwaan kedua Penuntut Umum;Menjatuhkan pidana kepada Terdakwa SIGIT AGUS SUYATNO, SE.dengan pidana penjara selama 3 (tiga) tahun dikurangi selamaTerdakwa dalam tahanan sementara dengan perintah agar Terdakwatetap ditahan;Menyatakan barang bukti berupa:a.Permintaan penawaran harga STEAM TRAP TLV SPESIFIKASITIFE JHS5SHB FLANGED
    SIGIT AGUS SUYATNO, SE. dengan emailsigitmahkota@gmail.com tentang pembelian 10 (sepuluh) bijiSTEAM TRAP TLV SPESIFIKASI TIFE JHSSHB FLANGED;q. 1 (satu) biji STEAM TRAP TLV SPESIFIKASI TIFE JH5SHBFLANGED;Dikembalikan kepada saksi Indrasari;4. Menyatakan supaya Terdakwa membayar biaya perkara sebesarRp5.000,00 (lima ribu rupiah);Membaca Putusan Pengadilan Negeri Gresik Nomor313/Pid.B/2017/PN.Gsk tanggal 16 Oktober 2017 yang amarselengkapnya sebagai berikut:1.
    No. 70 K/Pid/2018Memulihkan hak Terdakwa dalam kemampuan, kedudukan dan harkatserta martabatnya;Memerintahkan barang bukti berupa:Permintaan penawaran harga STEAM TRAP TLV SPESIFIKASITIFE JHS5SHB FLANGED tanggal 30 September 2016;Surat Penawaran Harga Nomor 294/SPBMh/IX/2016 tanggal 30September 2016;PURCHASE ORDER Nomor 1609.GSK.00615 (REVISI) tanggal 2September 2016;PURCHASE ORDER Nomor 1609.GSK.00615 (REVISI II) tanggal2 September 2016;PURCHASE ORDER Nomor 1610.GSK.00615 (REVISI Ill)tanggal 5 Oktober
    SIGIT AGUS SUYATNO, SE. dengan emailsigitmahkota@gmail.com tentang pembelian 10 (sepuluh) bijiSTEAM TRAP TLV SPESIFIKASI TIFE JHSSHB FLANGED; 1 (satu) biji STEAM TRAP TLV SPESIFIKASI TIFE JH5SHBFLANGED;Kesemuanya dikembalikan kepada Saksi Indrasari;Membebankan biaya perkara kepada Negara;Membebaskan Terdakwa dari Rumah Tahanan Negara segerasetelah putusan ini diucapkan;Membaca Akta Permohonan Kasasi Nomor 313/Pid.B/2017/PN.Gskyang dibuat oleh Panitera pada Pengadilan Negeri Gresik, yangmenerangkan
    PerkasaJaya Suplindo Raya) terdapat hubungan hukum jual beli berupa 10(sepuluh) Steam Trap TLV Spesifikasi Tipe JHSSHB Flanged sehargaRp340.000.000,00 (tiga ratus empat puluh juta rupiah). SetelahTerdakwa menerima uang pembayaran tersebut dari PT.
Register : 16-03-2018 — Putus : 11-04-2018 — Upload : 06-01-2020
Putusan PT BANDUNG Nomor 6/PID.TPK/2018/PT BDG
Tanggal 11 April 2018 — Pembanding/Penuntut Umum : TASJRIFIN M.A HALIM,SH.,MH
Terbanding/Terdakwa : Ir. YAYAT AHMAD SUDRAJAT
3231206
  • Black steel pipe Sch 40 1%" 63 Mt 63 MtFittings Welded joint, flanged & 1 lot 1 lotscrewedPerlengkapan, Stop kran flanged 8 bh 8 bhcast iron (12 kg/cm?), 4Lantai 3Pipa, black steel pipe (Shcedule40):Black steel pipe Sch 40 4" 124 M? 124 M?Black steel pipe Sch 40 2%" 412 Mt 412 M?Black steel pipe Sch 40 1%" 51M? 51M?Fittings Welded joint, flanged & 1 lot 1 lotscrewedPerlengkapan, Stop kran flanged 8 bh 8 bhcast iron (12 kg/cm?)
    FittingsMalleable iron screwed & flanged 1 lot 1 lotfitting, Elbows 902, reducing tee,reducing socket, tee, socket, flangedPerlengkapanGate valve flanged cast iron 12 bh 12 bh(10kg/cm?) @ 4"Gate valve flanged cast iron water 8 bh 8 bhhammer (10kg/cm?) @ 4"Flexible joint flanged, bahan rubber 16 bh 16 bh& nylon atau karet kloropen(10kg/cm2) @ 4"Y strainer flanged, cast iron pada 8 bh 8 bhpipa hisap pompa (10kg/cm?)
    /jamTotal head: 30mPutaran : 2.950 romPower: disesuaikanMerkChemical dosing pump 1 unit 1 unitMultimedia filter c/w accessories + 1 unit 1 unitpondasiCarbon filter 1 unit 1 unitGate valve, flanged kls 10 kg/cm2 @ 4 bh 4 bh3"Check valve, flanged kls 10 kg/cm? 2 bh 2 bh@ 3"Flexible joint kls 10 kg/cm? @ 3" 4 bh 4 bhY strainer, flanged kls 10 kg/cm? @ 2 bh 2 bh3"Foot valve, flanged kls 10 kg/cm? 2 bh 2 bh3"Pipa GIP kelas medium 3" 42 M?
    66 MtFittingsMalleable iron screwed & flanged 1 lot 1 lotfitting, Eloows 902, reducing tee,reducing socket, tee, socket, flangedPerlengkapanGate valve flanged cast iron 12 bh 12 bh(10kg/cm?) @ 4"Gate valve flanged cast iron water 8 bh 8 bhhammer (10kg/cm?) @ 4"Flexible joint flanged, bahan rubber 16 bh 16 bh& nylon atau karet kloropen(10kg/cm?) 4"Y strainer flanged, cast iron pada 8 bh 8 bhpipa hisap pompa (10kg/cm?)
    /jamTotal head: 30mPutaran : 2.950 rpmPower : disesuaikanMerkChemical dosing pump 1 unit 1 unitMultimedia filter c/w accessories + 1 unit 1 unitpondasiCarbon filter 1 unit 1 unitGate valve, flanged kls 10 kg/cm2 @ 4 bh 4 bh3"Check valve, flanged kls 10 kg/cm? 2 bh 2 bh@ 3"Flexible joint kls 10 kg/cm? @ 3" 4 bh 4 bhY strainer, flanged kls 10 kg/cm? @ 2 bh 2 bh3"Foot valve, flanged kls 10 kg/cm? 2 bh 2 bh3"Pipa GIP kelas medium 3" 42 M? 42 M?
Register : 02-01-2018 — Putus : 16-10-2017 — Upload : 11-01-2018
Putusan PN GRESIK Nomor 313/PID.B/2017/PN GSK
Tanggal 16 Oktober 2017 —
13178
  • Memerintahkan Barang Bukti berupa : Permintaan penawaran harga STEAM TRAP TLV SPESIFIKASI TIFE JH5SH-B FLANGED tanggal 30 September 2016 ; Surat Penawaran Harga Nomor : 294/SPB-Mh/IX/2016, tanggal 30 September 2016; PURCHASE ORDER No : 1609.GSK.00615 (REVISI) tanggal 02 September 2016 ; PURCHASE ORDER No : 1609.GSK.00615 (REVISI II ) tanggal 02 September 2016 ; PURCHASE ORDER No : 1610.GSK.00615 (REVISI III ) tanggal 05 Oktober
    Tertanggal 11 Januari 2017 ; 29 (dua puluh sembilan) lembar Email antara sdri SITA PUSPITASARI dengan Email pjsrpuspita2@gmail.com dengan sdr SIGIT AGUS SUYATNO, SE dengan email sigitmahkota@gmail.com, tentang pembelian 10 Biji STEAM TRAP TLV SPESIFIKASI TIFE JH5SH-B FLANGED ; 1 Biji STEAM TRAP TLV SPESIFIKASI TIFE JH5SH-B FLANGED ;Kesemuanya dikembalikan kepada Saksi Indrasari ;5. Membebankan biaya perkara kepada Negara ;6.
Putus : 10-06-2015 — Upload : 10-03-2016
Putusan MAHKAMAH AGUNG Nomor 176/B/PK/PJK/2015
Tanggal 10 Juni 2015 —
136 Berkekuatan Hukum Tetap
  • 4913152676C SHROUDENGINE 27.852.85920 114 491315267 290 SHROUDENGINE 27.852.85921 415 510010338 1P TANKCOMPFUEL 180.433.46722 121 920450011 PINSNAP 20.323.90523 122 920451449 BEARING BALL 71.897.78124 136 921701796 CLAMP 113.475.13625 142 110541681 ELECARICDEVICE 309.17026 143 110541681 ELECARICDEVICE 309.17027 144 120531467 CON SION 7.468.70828 145 491060090 COVER MUFFLER 3.738.07929 146 921431087 COLLAR 398.09230 147 921520332 COLLAR 398.09231 148 921520776 COLLAR 398.09232 149 921531941 BOLT FLANGED
    8x80 48.70633 150 921711602 CLAMP 256.85334 151 921711602 CLAMP 256.85335 152 921720386 SCREW 34.09336 153 921720387 SCREW 34.09337 154 921720394 SCREW 6X12 34.09338 155 922000444 WASHER 15 3X24X12 40.40739 156 922101397 NUT POP 6MM L 15 721.92440 157 410321055 NIPPLE SPOKE 763.34841 158 920591916 TUBE 4X9X935 WHITE 265.70142 159 921530503 BOLT 6X12 48.70643 160 921530578 BOLT 6X8 48.70644 161 130J0512 BOLT FLANGED 5X12 48.706 Halaman 11 dari 19 halaman.
Register : 11-05-2020 — Putus : 30-09-2020 — Upload : 14-08-2021
Putusan PN MEDAN Nomor 30/Pid.Sus-TPK/2020/PN Mdn
Tanggal 30 September 2020 — Penuntut Umum:
EDWARD SINURAT, SE. MH
Terdakwa:
OKTAVIA SIHOMBING
17056
  • 2020/PN Mdn Pengamanan pipa distribusi, pompa dan PLC sebesar Rp.28.433.000.Bahwa Jangka waktu pelaksanaan kontrak awal 240 hari, adendumperpanjangan waktu 26 hari, dan perpanjangan waktu dengan SPK 15hari, total 281 hari, biaya keamanan yang diterima adalah untuk 400 hari x@ Rp. 50.000 total Rp. 20.000.00, sehingga Terdakwa menerimakelebinan 119 hari x @ Rp. 50.000 total Rp. 5.950.000;Bahwa Terdakwa tidak ingat apakah pelaksanaan pekerjaan lainlain,pengadaan dan pemasangan aksesoris pompa intake, flanged
Register : 11-05-2020 — Putus : 30-09-2020 — Upload : 14-08-2021
Putusan PN MEDAN Nomor 31/Pid.Sus-TPK/2020/PN Mdn
Tanggal 30 September 2020 — Penuntut Umum:
EDWARD SINURAT, SE. MH
Terdakwa:
HERIANTO, SE
11731
  • .28.433.000.Bahwa Jangka waktu pelaksanaan kontrak awal 240 hari, adendumperpanjangan waktu 26 hari, dan perpanjangan waktu dengan SPK 15hari, total 281 hari, biaya keamanan yang diterima adalah untuk 400 hari xHalaman 193 dari 331 halaman Putusan Nomor 31/Pid.SusTPK/2020/PN Mdn@ Rp. 50.000 total Rp. 20.000.00, sehingga Saksi menerima kelebihan119 hari x @ Rp. 50.000 total Rp. 5.950.000;Bahwa Saksi tidak ingat apakah pelaksanaan pekerjaanlainlain,pengadaan dan pemasangan aksesoris pompa intake, flanged
Register : 11-05-2020 — Putus : 30-09-2020 — Upload : 14-08-2021
Putusan PN MEDAN Nomor 29/Pid.Sus-TPK/2020/PN Mdn
Tanggal 30 September 2020 — Penuntut Umum:
EDWARD SINURAT, SE. MH
Terdakwa:
ZAHARUDDIN SINAGA, SE
14747
  • .28.433.000.Bahwa Jangka waktu pelaksanaan kontrak awal 240 hari, adendumperpanjangan waktu 26 hari, dan perpanjangan waktu dengan SPK 15hari, total 281 hari, biaya keamanan yang diterima adalah untuk 400 hari xHalaman 182 dari 318 halaman Putusan Nomor 29/Pid.Sus TPK/2020/PN Mdn@ Rp. 50.000 total Rp. 20.000.00, sehingga Saksi menerima kelebihan119 hari x @ Rp. 50.000 total Rp. 5.950.000;Bahwa Saksi tidak ingat apakah pelaksanaan pekerjaanlainlain,pengadaan dan pemasangan aksesoris pompa intake, flanged