Putus : 24-07-2012 — Upload : 12-07-2013
Putusan MAHKAMAH AGUNG Nomor 710 K/PID.SUS/2012
Tanggal 24 Juli 2012 — JONIARTO Bin M. YATTA
3219 Berkekuatan Hukum Tetap
  • STRUKTUR PLEA2 Sloof 15/20 82.1 m2 K62 18 a FF oO NViN 2a AF ODVilof Oo NVillKolom struktur 20/20Kolom praktis 11/11Ring balok 15/20PEKERJAAN DINDINGPas.
    Sloof 15/20 1,02 ms AnI.B.9a 6.582.055,95 7.108.620,432. Kolom struktur 20/20 1,08 m! B.6.45 61.031 415.010,80 pemb3. Kolom praktis 11/11 6,80 m? Anl.B.9 5.729.330,37 5.843.916,98) ersia4. Ring balok 15/20 1,02 17.598.736,89 nsloof10.pembersiankolomstruktur 410dan 48.pembersianRingBalok10Iv PEKERJAAN DINDING 82,1 m2 D.6.11 71.080,00 5.835.668,001. Pas. Batu bata 1:4 (3,40) 164,20 m2 Pt.6.4 23.900,00 3.924.380,002. Plesteran 1:4 (6,80) 0,25 i K.6.2 4.344.900,00 1.086.225,003.
    Sloof 15/202. Kolom struktur 20/20 1,02 m 33. Kolom praktis 11/11 1,08 m34. Ring balok 15/20 6,80 m31,02 m>IV PEKERJAAN DINDING1. Pas. Batu bata1 :42. Plesteran 1: 43. Kayu kusen pintu dan jendela 82,1 m44. Daun pintu panel (2 unit) 164,20 m4 Hal. 35 dari 43 hal. Put.
    STRUKTUR ms Anl.B.4 4.148.224 ,20 4.231.188,68) As Sloof 15/20 1,02 m3 Anl.B.9a 6.582.055,95 7.108.620,432. Kolom struktur 20/20 1,08 m1 B.6.45 61.031 415.010,80 pemb3. Kolom praktis 11/11 6,80 a Anl.B.9 5.729.330,37 5.843.916,98 ersia4. Ring balok 15/20 1,02 17.598.736,89 isloof10pembersiankolomstruktur 410dan 48pembersianRingBalok10IV PEKERJAAN DINDING 82,1 m? D.6.11 71.080,00 5.835.668,00)1. Pas. Batu bata 1:4 (3,40) 164,20 Pte.4 23.900,00 3.924.380,00 62 m22.
    STRUKTUR M3 4.148.224,20 1,02 4.148.224,20 1,02 3.676.419,01 4, Sloof 15/20 M3 6.582.055,95 1,08 6.582.055,95 1,08 5.799.858,43 554.769,67 Pembesian2. Kolom struktur 20/20 M3 61.031 6,80 61.031 6,80 415.010,80 1.308.762,00 tidak sesuai3, Kolom praktis 11/11 M 5,729.330,37 1,02 5,729.330,37 1,02 5.843.916,98 ukuran4, Ring balok 15/20 17.598.736,89 15.297.313,89 437.891 ,332.301.423,00IV PEKERJAAN DINDING M3 5.835.668,00 85,50 (3,40)1. Pas.
Register : 12-07-2014 — Putus : 24-12-2014 — Upload : 09-07-2015
Putusan PN PALU Nomor 38/Pid.Sus-TPK/2014/PN Pal
Tanggal 24 Desember 2014 — MOH. IQBAL PAKAMUNDI, S.E
10416
  • kembali M3 114,755 95,475 19,2804 Urugan Sirtu Peninggian bawah M3 1.248,000 1.223,543 24,457lantaiA.3 Pekerjaan PondasiPondasi Lajur M3 88,240 89,488 (1,248)Pondasi Plat setempat M3 10,575 10,575 Pondasi Plat setempat M3 5,288 2,700 2,588(Dudukan sapot)Pondasi Batu kali M3 65,44076559 57,200 8,241Aanstamping M3 A.4 Pekerjaan Beton1 Beton Rabat beton Pondasi M3 17,675 17,800 (0,125)2 Lajur M3 3,525 3,525 3 Beton Rabat beton Pondasi M3 4 Titik M3 35,190 34,762 0,428Beton Rabat bawah lantaiBeton balok Sloof
    kopel 20/40 M3 4,716 4,427 0,289(S1) M3 31,971 30,564 1,4077 Beton Sloof Praktis 15/20 M3 5,654 5,378 0,276Beton kolom 30/30 (K1)8 Beton kolom 28/33 (dudukan M3 17,301 17,247 0,0549 sapot) M3 6,189 6,190 (0,001)10 Beton kolom 30/30 (K2) M3 11 Beton kolom 60/60 (K3) M3 12 Beton kolom praktis 15/15 M3 13 Beton balok latei M3 14 Beton Plat Panggung M3 11,710 11,868 (0,158)15 Beton Plat Tribun M3 Beton Plat Tangga 18 A.52 owoO AON Oo FWD +=> ete oO 6 Beton Balok BordesPekerjaan pasangan danPlesteranPasangan
    mengakibatkan kerugian negara sebesar Rp. 774.949.407,48sebagaimana tertuang dalam Surat Kepala BPKP Perwakilan SulawesiTengah Nomor: SR2836/PW19/5/2013 tanggal 10 Desember 2013 perihalLaporan Hasil Perhitungan Kerugian Keuangan Negara atasPembangunan Realisasi Pembayaran kontrak untuk PembangunanGedung Serbaguna Dinas Kebudayaan dan Pariwisata Propinsi SulawesiTen gah; 222 ono nnn nnn nnn nnn nnn nnn nnn nn nnn nn en nnn nee nnn ote e 6 Beton Rabat beton PondasiTitikBeton Rabat bawah lantaiBeton balok Sloof
    kopel 20/40(S1)Beton Sloof Praktis 15/20Beton kolom 30/30 (K1)Beton kolom 28/33 (dudukansapot)Beton kolom 30/30 (K2)Beton kolom 60/60 (K3)Beton kolom praktis 15/15Beton balok lateiBeton Plat PanggungBeton Plat TribunBeton Plat TanggaBeton Balok BordesPekerjaan pasangan danPlesteranPasangan diding Bata 1: 3Pekerjaan Lantai IlPekerjaan BetonBeton Plat Lantai t=12 cmBeton Plat EntranceBeton Plat TribuneBeton Balok 30/70 (B2)Beton Balok 20/40 (B1)Beton Balok 15/40 (B6)Beton kolom 30/30 (K1Beton kolom
    kopel 20/40 M3 4,716 4,427 0,289(S1) M3 31,971 30,564 1,4077 Beton Sloof Praktis 15/20 M3 5,654 5,378 0,276Beton kolom 30/30 (K1)8 Beton kolom 28/33 (dudukan M3 17,301 17,247 0,0549 sapot) M3 6,189 6,190 (0,001)10 Beton kolom 30/30 (K2) M3 11 Beton kolom 60/60 (K3) M3 12 Beton kolom praktis 15/15 M3 13 Beton balok latei M3 14 Beton Plat Panggung M3 11,710 11,868 (0,158)15 Beton Plat Tribun M3 Beton Plat Tangga 198 Beton Balok BordesA.5 Pekerjaan pasangan danPlesteran1 Pasangan diding Bata 1: 3 M2
Register : 02-10-2012 — Putus : 19-02-2013 — Upload : 26-06-2013
Putusan PA BOJONEGORO Nomor 2319/Pdt.G/2012/PA.Bjn
Tanggal 19 Februari 2013 — PENGGUGAT TERGUGAT
71
  • su blecs wii SloOF cola jacy legllio!
Register : 01-04-2021 — Putus : 02-08-2021 — Upload : 04-08-2021
Putusan PN BANJARMASIN Nomor 10/Pid.Sus-TPK/2021/PN Bjm
Tanggal 2 Agustus 2021 — Penuntut Umum:
SAJIMIN, SH., MH
Terdakwa:
Fahrudi Firdaus Als. Fahru Bin H. Aliansyah
14042
  • Sloof Beton Bertulang 25/60 (61.9300 Kg Besi + Bekisting) 10.65 M?3. Kolom Beton Bertulang 20/30 (104.3800 Kg Besi + 23.59 M3Bekisting)4. Sloof Beton Bertulang 15/40 (108.2800 Kg Besi + Bekisting) 3.68 M35. Balok Beton Bertulang 15/30 (133.9800 Kg Besi + Bekisting) 8.29 M36. Sloof Beton Bertulang 15/30 (133.9800 Kg Besi + Bekisting) 3.20 M37. Pemadatan Beton 49.41 M31.4 PEKERJAAN PASANGAN1. Pasangan Batu Campuran 1: 4 188.26 M?2. Plesteran Campuran 1: 2 609.89 M33.
    Sloof Beton Bertulang 25/60 (61.9300 Kg Besi + Bekisting) 10.65 M310. Kolom Beton Bertulang 20/30 (104.3800 Kg Besi + 23.59 M3Bekisting)11. Sloof Beton Bertulang 15/40 (108.2800 Kg Besi + Bekisting) 3.68 M312. Balok Beton Bertulang 15/30 (133.9800 Kg Besi + Bekisting) 8.29 M313. Sloof Beton Bertulang 15/30 (133.9800 Kg Besi + Bekisting) 3.20 M314. Pemadatan Beton 49.41 M?1.4 PEKERJAAN PASANGAN4. Pasangan Batu Campuran 1: 4 188.26 M?5. Plesteran Campuran 1: 2 609.89 M?6.
    Sloof Beton Bertulang 25/60 (61.9300 Kg Besi + 10.65 M3Bekisting)17. Kolom Beton Bertulang 20/30 (104.3800 Kg Besi + 23.59 M3Bekisting)18. Sloof Beton Bertulang 15/40 (108.2800 Kg Besi + 3.68 M3Bekisting)19. Balok Beton Bertulang 15/30 (133.9800 Kg Besi + 8.29 M3Bekisting)20. Sloof Beton Bertulang 15/30 (133.9800 Kg Besi + 3.20 M3Bekisting)21. Pemadatan Beton 49.41 M?IL.4 PEKERJAAN PASANGAN7. Pasangan Batu Campuran 1: 4 188.26 M?8. Plesteran Campuran 1 : 2 609.89 M39.
    Sloof Beton Bertulang 25/60 (61.9300 Kg Besi + 10.65 M?Bekisting)24. Kolom Beton Bertulang 20/30 (104.3800 Kg Besi + 23.59 M3Bekisting)25. Sloof Beton Bertulang 15/40 (108.2800 Kg Besi + 3.68 M3Bekisting)26. Balok Beton Bertulang 15/30 (133.9800 Kg Besi + 8.29 M3Bekisting)2/7. Sloof Beton Bertulang 15/30 (133.9800 Kg Besi + 3.20 M3Bekisting)28. Pemadatan Beton 49.41 M3Il.4 PEKERJAAN PASANGAN10. Pasangan Batu Campuran 1: 4 188.26 M?11. Plesteran Campuran 1 : 2 609.89 M312.
Register : 17-02-2016 — Putus : 01-03-2016 — Upload : 22-08-2019
Putusan PT PADANG Nomor 1/PID.TPK/2016/PT PDG
Tanggal 1 Maret 2016 — Pembanding/Terbanding/Jaksa Penuntut : RAHMADANI, SH.MH
Terbanding/Pembanding/Terdakwa : Ir. MARA HUSNI Pgl. DATUAK
Terbanding/Terdakwa : KHUSLAINI, SE
8638
  • Bangunan Rumah JagaoO Pekerjaan Bongkaran meliputi bongkar dinding lama, dananyasebesar Rp. 1.500.000, (Satu juta lima ratus ribu rupiah).Halaman 7 dari 109 hal.Put.No.1/TIPIKOR/2016/PT:PDGPekerjaan Fondasi meliputi pasang bouplank dengan volume12,00M1, galian pondasi dengan volume 8,00 M3, Aan stampang denganvolume 2,00 M3, pasang pondasi batu kali dengan volume 3,75 M3,pasang sloof 15/20 dengan volume 0,38 M3, timbunan rabat denganvolume 3,13 M3, urugan pasir bawah lantai dengan volume 4,05 M3dan
    (dua juta dua ratusSembilan puluh satu ribu dua ratus empat puluh lima rupiah).Pekerjaan Pondasi meliputi galian pondasi dengan volume 16,96M3, urugan kembali dengan volume 4,24 M3, pasang aan stampingbatu kali dengan volume 4,24 M3, pasang pondasi batu kali denganvolume 11,93 M3, pasang sloof 15/20 dengan volume 0,80 M3,dengan total dananya sebesar Rp. 11.328.592,38, (Sebelas jut tigaratus dua puluh delapan ribu lima ratus Sembilan puluh dua rupiahtiga puluh delapan sen).Pekerjaan Beton /Dinding
    (dua juta dua rattus Sembilanpuluh satu ribu dua ratus empat puluh lima rupiah).oO Pekerjaan Pondasi meliputi galian pondasi dengan volume 16,96 M3menjadi 28,48 M3, urugan kembali dengan volume 4,24 M3 menjadi7,12 M3, pasang aan stamping batu kali dengan volume 4,24 M3menjadi 7,12 M3, pasang pondasi batu kali dengan volume 11,93 M3menjadi 10,01 M3, pasang sloof 15/20 dengan volume 0,795 M3menjadi 1,34 M3, dengan total dananya sebesar Rp. 11.328.592,38,(sebelas jut tiga ratus dua puluh delapan ribu
    Pekerjaan Pondasi meliputi galian pondasi Volume Rencana 9,17M3 sedang kan yang terpasang 8,93 M3, Aanstampang VolumeRencana 2,29 M3 sedang kan yang terpasang 2,23 M3, pasangpondasi batu kali Volume Rencana 4,30 M3 sedang kan yangterpasang 4,19 M3, pasang sloof 15/20 Volume Rencana 0,57 M3sedang kan yang terpasang 0,56 M3.Halaman 32 dari 109 hal.Put.No.1/TIPIKOR/2016/PT:PDGb.
    Pekerjaan Pondasi meliputi galian pondasi Volume Rencana 9,17M3 sedang kan yang terpasang 8,93 M3, Aanstampang VolumeRencana 2,29 M3 sedang kan yang terpasang 2,23 M3, pasangpondasi batu kali Volume Rencana 4,30 M3 sedang kan yangterpasang 4,19 M3, pasang sloof 15/20 Volume Rencana 0,57 M3sedang kan yang terpasang 0,56 M3.b.
Register : 03-03-2016 — Putus : 09-05-2016 — Upload : 14-09-2016
Putusan PT JAKARTA Nomor 165/PDT/2016/PT.DKI
Tanggal 9 Mei 2016 — PEM RI CQ MENKEU RI CQ KANWIL IV DIRJEND BEA CUKAI JKT CQ KEPALA KANTOR PELAYANAN UTAMA BEDA DAN CUKAI TYPE A TANJUNG PRIOK >< PT.JAKARTA DISTRIBUTION CENTER CS
10151
  • Lantai halaman kiri bangunan (sebelah Timur) mengalami penurunanyang sangat parah, hingga mencapai kedalaman maksimum hinggaEB pannehal 5 dari 40 hal Put Nomor 165/PDT/2016/PT.DKI11.10.11.12.13.14.Tanah dibawah sloof bangunan sebelah kiri (Selatan Timur) turunhingga terjadi rongga yang mencapai sekitar 50 cm;Lantai halaman depan bangunan juga mengalami penurunan yangcukup parah dan miring ke arah kiri bangunan;Lantai 1 (satu) ruang utama atau tengah terjadi penurunan parah,mencapai kedalaman maksimum
    hingga 30 cm;Lantai 1 (satu) ruang belakang (ruang service) terjadi penurunan parah,mencapai kedalaman maksimum hingga 30 cm;Halaman belakang (dalam) terjadi penurunan parah mencapaikedalaman maksimum hingga 30 cm;Hampir seluruh dinding bangunan di lantai 1 (satu) mengalami rusakyang sangat parah, yang terjadi akibat penurunan sloof/tiebiem yangmenahan dinding tersebutJuga hampir seluruh dinding dalam atau pembatas pembangunan daribangunan tersebut mengalami retak sedang sampai berat, yang terjadiakibat
    penurunan tanah dan sloof penahan dinding tersebut;Kusen pintu atau jendela kaca besar di belakang ruang utamamengalami penurunan yang cukup parah, diperkirakan hinggamencapai 10 CM: 2222 enn nnn nn nn nnn nnn nnn nen ee ee neeHampir seluruh dinding luar bangunan di lantai 2 (dua) juga mengalamiretak sedang sampai berat;Kamar mandi pada sisi utara atau timur, mengalami penurunan yangsangat signifikan, dimana dindingnya mengalami retak berat danlantainya turun, sehingga terlihat miring ke belakang
    Akibat penurunan tanah tersebut diatas, seluruh dinding rumah tinggalBpk.HERYANTO ABIDIN LAUW, di Jl.Danau Sunter Selatan Blok. 5No.12.A tersebut mengalami retakretak berat, hal ini karena seluruhbalok sloof atau tiebiem turun dan kemungkinan ada beberapa yangae le la ll el3.
Register : 11-01-2016 — Putus : 25-05-2016 — Upload : 20-02-2017
Putusan PN SEMARANG Nomor 2/Pid.Sus-TPK/2016/PN Smg
Tanggal 25 Mei 2016 — Ir. MUHAMMAD ZUHRI, MM Bin SAMSURI
10924
  • di Bill of Quantity (BQ) dan untuk asal dokumen spesifikasi teknisdan BQ tersebut saksi dapatkan dari PPK saksi GIRI SAPUTRO.Bahwa spesifikasi teknis dan uraian pekerjaan tidak menyebutkan kualitasbeton untuk sloof, kolom, balok dan plat lantai tapi tertulis mengacu kepadadokumen pengadaan Pokja dan mungkin di sesuaikan dengan mutu beton K300 ~ fc 26,40 Mpa.Bahwa analisa harga satuan pekerjaan sloof, kolom, balok dan plat lantaipada penawaran PT Duta Rama adalah dengan kualitas beton K 225 fc19,30
    DUTARAMA terkait dengan spesifikasi tekhnis kualitas beton untuk sloof, kolom,balok dan plat lantai dengan mutu beton K 300 ~ fc 26,40 Mpa dengananalisa harga satuan pekerjaan sloof, kolom, balok dan plat lantai padapenawaran PT Duta Rama adalah dengan kualitas beton K 2252 fc 19,30Mpa tersebut adalah adanya awal terjadinya kesalahan pada dokumenpengadaan untuk produk dari PPK yaitu spesifikasi tekhnis dan BQ yangsaksi upload lewat LPSE terjadi perbedaan untuk mutu beton sehingga dariPT.
    Bahwa saksi menjelaskan kualitas beton untuk sloof, kolom, balok dan platlantai pada dokumen Bendel HPS ( Harga Perkiraan Sendiri ), Bill OfQuantity ( RAB Kosong / tanpa harga satuan) adalah mutu K 225 sedangkandi Spesifikasi dan tehnik adalah mutu K 300 dan ada perbedaan di dokumendokumen mengenai perihal tersebut saksi tidak tahu dan memang adaperbedaan Untuk kualitas beton untuk sloof, kolom, balok dan plat lantaipada dokumen Bendel HPS ( Harga Perkiraan Sendiri ), Bill Of Quantity (RAB Kosong
    MULTI BETON KARYA MANDIRI Pati.Bahwa yang telah melakukan pemesanan terhadap cor beton untukmengerjakan bagian bagian ( plie cap, sloof, kKolom lantai 1 lantai atap,balok, ring balok, cor plat dan minipile ) adalah Sdr. BUDI HARSONO, ST (Selaku Direktur Cab. PT. DUTA RAMA Cab. Rembang ).Bahwa mengenai mutu beton yang di pesan oleh terdakwa BUDIHARSONO, ST untuk mengerjakan bagian bagian ( pile cap, sloof, kolomlantai 1 lantai atap, balok, ring balok, cor plat dan minipile ) ke PT.
    beton untuk sloof, kKolom, balokdan plat lantai yaitu dengan mutu K 275.Bahwa berdasarkan dokumen spesifikasi tekhnis, uji Kualitas beton untuksloof, kolom, balok dan plat lantai adalah setara K 300.Bahwa terjadi perbedaan pada kualitas beton untuk sloof, kolom, balok danplat lantai antara Hasil Test yang di keluarkan dari PT.
Register : 09-07-2015 — Putus : 30-11-2015 — Upload : 04-02-2016
Putusan PN KUPANG Nomor 36/PIDSUS.TPK/2015/PN.KPG
Tanggal 30 Nopember 2015 — BORGIAS PAU MOA, ST
15491
  • Sloof 30/50; Beton Bertulang K275 Vi 33.65 4,771,659.59 160,542,486.803. Balok G11 uk. 30/60; BetonBertulang K275 Me 13.41 5,213,443.16 69,912,272.824. Balok G12 uk. 30/60; BetonBertulang K275 Me 5.96 5,213,443.16 31 ,080,462.765. Balok G13 uk. 30/60; BetonBertulang K275 Vi 8.26 4,553,961.88 37 624,833.056.
    Sloof Praktis uk.15/20; Beton Me 6.92 2,184,785.71 15,112,162.76Bertulang K1757. Balok Ring Praktis uk.15/20; BetonBertulang K1758. Meja Beton DudukanWastafel; BetonBertulang K1759. Plat atap t=10 cmSUB JUMLAH B2 279,960,085.62B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002. Instalasi Air Kotor PVC 4 M' 39.83 34,000.00 1,354,220.00 PVC 3 M!
    Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K1757. Balok Ring Praktis uk. 15/20; Beton m3 1.86 1.80 0.06 0.22%Bertulang K1758. Meja Beton Dudukan Wastafel; Beton m3 0.35 0.42 0.07 0.03%Bertulang K1759 Plat Atap t= 10cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.
    Sloof Praktis uk. 15/20; Me 0.35 2,184,785.71 772,758.71Beton Bertulang K1757. Balok Ring Praktis uk. Me 6.92 2,184,785.71 15,112,162.7615/20; Beton BertulangK1758. Meja Beton DudukanWastafel; BetonBertulang K1759. Plat atap t=10 cm SUB JUMLAH B2 279,960,085.62 Putusan No. 36/PIDSUS.TPK/2015/PN.KPG 50 B6 PEKERJAAN SANITAIR1. Pasangan Bak Air Bh 6.00 600,000.00 3,600,000.002.
    Sloof Praktis uk. 15/20; Beton m3 2.13 1.89 0.24 0.23%Bertulang K1757. Balok Ring Praktis uk. 15/20; Beton m3 1.86 1.80 0.06 0.22%Bertulang K1758. Meja Beton Dudukan Wastafel; Beton m3 0.35 0.42 0.07 0.03%Bertulang K1759 Plat Atap t= 10 cm m3 6.92 3.39 3.52 0.22%PEKERJAAN SANITAIRB.61 Pas.
Putus : 19-03-2014 — Upload : 24-03-2015
Putusan MAHKAMAH AGUNG Nomor 17 K/PID.SUS/2014
Tanggal 19 Maret 2014 — Pemohon Kasasi II/Terdakwa: H. ZAKRI > 21086 Berkekuatan Hukum Tetap
  • Pekerjaan pondasi sayap kanan dan sayap kiri diganti dari pondasiplat menerus menjadi pondasi plat setempat ditambah cerocok kayu;Pekerjaan penulangan berupa balok ring , kolom dan balok sloof,sesuai dengan kontrak, besi yang sebahagian besar digunakanadalah D19 (Ulir Ukuran 19), namun dalam pelaksanaannya besiyang dipakai adalah P16 (Polos ukurani6) dengan jarakpembegelan yang juga tidak sesuai dengan kontrak;Hal. 7 dari 158 hal. Put.
    Balok sloof dan balok ring pada auditorium mempunyai kekuatanyang lebih rendah dari yang seharusnya, yaitu untuk balok s/oof96,816 kNm
Register : 07-03-2013 — Putus : 03-07-2013 — Upload : 24-06-2014
Putusan PN MAMUJU Nomor 05/Pid. Sus/TPK/2013/PN.MU
Tanggal 3 Juli 2013 — PAULINA RARA,B.Amd.Pd
7831
  • Pondasi Batu Belah 1:4 C.11 4.10) m3 2,899,246.95 11,886,912.513 Beton Sloof 1:2:3 (S1 20/25)4 Beton Sloof 1:2:3 (SI 15/20) C.10 1.05) 43 2,99 1,232.24 3,140,793.855 Beton Kolom 1:2:3 (K1 20/25)6 Beton Kolom Selasar 1:2:3 (Kl C.12 3.55 3 3,669,219.45 13,025,729 .0615/15)7 Betom Kolom Praktis !
    869,774.091 Beton Sloof 1:2:3 (S1 20/25) C.16 0.07) m3 2,899,246.95 392,089.062 Betom Kolom Praktis !:2:3 (Kp13:13) C.3 12.00 3 3,236,232.08 1,156,812.193. Pas. Dinding Bata 1:54 Plesteran Dinding 1:5 C5 24.00 m2 96,401.02 888,054.115 Pekerjaan AcianC.9 37,002.2515,957.90Ill. PEKERJAAN PENGECATAN 11 12.00 12,830.56 153,966.721 Pek. Plamur Dinding 13 24.00 m2 8,835.24 212,045.762 Pek. Cat TembokTotal 366,012.48GRAND 5,105,659.87TOTALBC.
    Pondasi Batu Belah 1:4 C.11 4.10 m3 2,899,246.95 11,886,912.51B.Beton Sloof 1:2:3 (S1 20/25) 4.Beton Sloof 1:2:3 (S1 15/20) C.10 1.05 3 2,991,232.24 3,140,793.855.Beton Kolom 1:2:3 (K1 20/25)6.Beton Kolom Selasar 1:2:3 (KI C.12 3.55 3 3,669,219.45 13,025,729.0615/15)7.Betom Kolom Praktis !
    869,774.09DINDINGC.16 0.07) m3 2,899,246.95 392,089.061.Beton Sloof 1:2:3 (S1 20/25)2.Betom Kolom Praktis !:2:3 (Kp C.3 12.00 m3 3,236,232.08 1,156,812.1913:13)3.Pas. Dinding Bata 1:5 C5 24.00) m2 96,401.02 888,054.114.Plesteran Dinding 1:55.Pekerjaan Acian C9 37,002.2515,957.90Il. PEKERJAAN PENGECATAN Ll 12.00 12,830.56 153,966.72)1.Pek. Plamur Dinding 13 24.00 m? 8,835.24 212,045.76)2.Pek. Cat TembokII. Total 366,012.48GRAND TOTAL B 5,105,659.87C.
    PEKERJAAN BETON DAN C.10 0.30) m3 869,774.09DINDINGC.16 0.07 m3 2,899,246.95 392,089.06)1.Beton Sloof 1:2:3 (S1 20/25)2.Betom Kolom Praktis !:2:3 (Kp C3 12.00) m3 3,236,232.08 1,156,812.1913:13)3.Pas. Dinding Bata 1:5 C.5 24.00) 42 96,401.02 888,054.114.Plesteran Dinding 1:55.Pekerjaan Acian C9 37,002.2515,957.90Il. PEKERJAAN PENGECATAN Ll 12.00 12,830.56 153,966.72)1.Pek. Plamur Dinding 13 24.00) m2 8,835.24 212,045.762.Pek.
Register : 01-04-2021 — Putus : 02-08-2021 — Upload : 04-08-2021
Putusan PN BANJARMASIN Nomor 9/Pid.Sus-TPK/2021/PN Bjm
Tanggal 2 Agustus 2021 — Penuntut Umum:
SAJIMIN, SH., MH
Terdakwa:
RHAMA JUNI SAPUTRA Als RHAMA Bin JAIRIN ZAIN
15838
  • Sloof Beton Bertulang 25/60 (61.9300 Kg Besi + 10.65 M3Bekisting)3. Kolom Beton Bertulang 20/30 (104.3800 Kg Besi + 23.59 M3 Putusan Nomor 9/Pid.SusTPK/2021/PN.Bjm Hal.14 dari.112 Bekisting)4. Sloof Beton Bertulang 15/40 (108.2800 Kg Besi + 3.68 M3Bekisting)5. Balok Beton Bertulang 15/30 (133.9800 Kg Besi + 8.29 M3Bekisting)6. Sloof Beton Bertulang 15/30 (133.9800 Kg Besi + 3.20 M3Bekisting)7. Pemadatan Beton 49.41 M?1.4 PEKERJAAN PASANGAN1. Pasangan Batu Campuran 1: 4 188.26 M?2.
    Sloof Beton Bertulang 25/60 (61.9300 Kg Besi + Bekisting) 10.65 M33. Kolom Beton Bertulang 20/30 (104.3800 Kg Besi + 23.59 M3Bekisting)4. Sloof Beton Bertulang 15/40 (108.2800 Kg Besi + 3.68 M3Bekisting)5. Balok Beton Bertulang 15/30 (133.9800 Kg Besi + 8.29 M3Bekisting)6. Sloof Beton Bertulang 15/30 (133.9800 Kg Besi + 3.20 M3Bekisting)7. Pemadatan Beton 49.41 M?Il.4 PEKERJAAN PASANGAN Putusan Nomor 9/Pid.SusTPK/2021/PN.Bjm Hal.21 dari.112 1. Pasangan Batu Campuran 1: 4 188.26 3 2.
    Sloof Beton Bertulang 25/60 (61.9300 Kg Besi + 10.65 M3Bekisting)10. Kolom Beton Bertulang 20/30 (104.3800 Kg Besi + 23.59 M3Bekisting)11. Sloof Beton Bertulang 15/40 (108.2800 Kg Besi + 3.68 M3Bekisting)12. Balok Beton Bertulang 15/30 (133.9800 Kg Besi + 8.29 M3Bekisting)13. Sloof Beton Bertulang 15/30 (133.9800 Kg Besi + 3.20 M3Bekisting)14. Pemadatan Beton 49.41 M3IL.4 PEKERJAAN PASANGAN4. Pasangan Batu Campuran 1: 4 188.26 M?5. Plesteran Campuran 1: 2 609.89 M36.
    Sloof Beton Bertulang 25/60 (61.9300 Kg Besi + 10.65 M3Bekisting)17. Kolom Beton Bertulang 20/30 (104.3800 Kg Besi + 23.59 M3Bekisting)18. Sloof Beton Bertulang 15/40 (108.2800 Kg Besi + 3.68 M3Bekisting)19. Balok Beton Bertulang 15/30 (133.9800 Kg Besi + 8.29 M3Bekisting)20. Sloof Beton Bertulang 15/30 (133.9800 Kg Besi + 3.20 M3Bekisting)21. Pemadatan Beton 49.41 M?Il.4 PEKERJAAN PASANGAN7. Pasangan Batu Campuran 1: 4 188.26 M?8. Plesteran Campuran 1: 2 609.89 M39.
Register : 22-07-2020 — Putus : 01-09-2020 — Upload : 01-09-2020
Putusan PT SAMARINDA Nomor 12/PID.TPK/2020/PT SMR
Tanggal 1 September 2020 — Pembanding/Terdakwa : SAID SYAHRUZZAMAN, ST BIN AJI SAID MACHMUD Diwakili Oleh : ABDUL KHALID, Amd.,SH
Terbanding/Pembanding/Penuntut Umum : SUBANDI, SH.
178186
  • Pekerjaan Kg 40,695,7 26.282,00 1.069.565.472pembesian sloof 4 857. Pekerjaan Kg 56,225,9 26.282,00 1.477.730.607pembesian 6 13kolom8. Pekerjaan Kg 9.677,95 26.282,00 254.355.934,4pembesian 6angkur lantai9.
    Pekerjaan Kg 42.076,8 26.282,00 1.122.421.972,3pembesian sloof 71 77. Pekerjaan Kg 39.339,9 26.282,00 1.033.933.857,4pembesian 99 0kolom8. Pekerjaan Kg 11.172,8 26.282,00 293.643.950,11pembesian 16angkur lantai9. Pekerjaan Kg 15.357,9 26.282,00 403.638.144,41pembesian 69drainase10.
    Pekerjaan Kg 8.481,54 26.136,00 221.673.604,69pembesian 3wiremesh M1011. 1 m2 pasang M2 832.475, 238.782,0 198.780.093,21bekisting kolom 00 012. 1 m2 pasang M2 1.375,87 238.782,0 328.533.467,90 Halaman 29 dari 210 hal Putusan Nomor 12/PID.TPK/2020/PT SMR. bekisting sloof & 2 0balok13. 1 m2 pasang M2 767,302 238.782,0 183.217.906,16bekisting 0drainaseSub Total 5.381.824.898,70D. PEKERJAAN LAINLAIN1. Pagarsementara M1 61,800 388.202,0 23.990.883,60dari seng 0gelombangtinggi 2 m2.
    Beton Ready Mix K250 M3 245,49 2.011.732, 493.855.622,8untuk Sloof 00 72. Beton Ready Mix K250 M3 267,26 2.011.732, 537.655.494,3untuk cor lantai tebal 20 00 2cm3. Beton Ready Mix K250 M3 150,40 2.011.732, 302.564.492,8untuk kolom 80/80 cm 00 04. Beton Ready Mix K250 M3 107,31 2.011.732, 215,876.546,8untuk kolom 60/60 cm 00 45. Beton Ready Mix K250 M3 234,55 2.011.732, 471.855.764,0untuk cor drainase 00 6 Halaman 91 dari 210 hal Putusan Nomor 12/PID.TPK/2020/PT SMR. 6.
    Beton Ready Mix K250 M3 225,516 2.011.732,00 453.677.753,untuk Sloof 712. Beton Ready Mix K250 M3 148,915 2.011.732,00 299.577.322,untuk cor lantai tebal 20 25cm3. Beton Ready Mix K250 M3 119,355 2.011.732,00 240.110.031,untuk kolom 80/80 cm 454. Beton Ready Mix K250 M3 70,971 2.011.732,00 142.774.873, Halaman 93 dari 210 hal Putusan Nomor 12/PID.TPK/2020/PT SMR. untuk kolom 60/60 cm 185. Beton Ready Mix K250 M3 228,580 2.011.732,00 459.841.921,untuk cor drainase 856.
Register : 20-06-2019 — Putus : 12-09-2019 — Upload : 19-09-2019
Putusan PN KENDARI Nomor 16/Pid.Sus-TPK/2019/PN Kdi
Tanggal 12 September 2019 — Penuntut Umum:
BUSTANIL N. ARIFIN, SH
Terdakwa:
MUHAMMAD KASIM alias KASIM
10172
  • Sloof 15 X Volume3 20 Camp 1:2:3 1.08 Me Onh2 (04) KurangPek. Balok Latey 4 Camp 1:2:3 14.50 M 14.50 0.00 TetapPek. Ringbalk 15 Volume5 X 20 Camp 1:2: 1.55 M3 0.77 (0.8) Kurang3PEKERJAANV. RANGKA ATAPDAN PLAFONDPas. Atap Volume1 Spandek 720.37 M2 572.67 (147.7) BaranZincalume 0,4 mm gg Pas. Nok Bala 62.49 M' 62.95 0.5 NoluimisRingan TambahPas. Lisplank3 GRC Ukuran 30 221.62 M 169.69 (51.9) Kurangcm4 Talang Air Hujan 13.76 M' 16.40 2.6 vorumetPas.
    Sloof 15x20 (0.bk) Kg/Cm2 130.82 2005. Ring balk 15x20(0.bk) Kg/Cm2 161.82 200 Halaman 21 dari 136 halaman, Putusan No. 16/Pid.SusTPK/2019/PN. KdiBahwa Saksi MUHAMMAD NASIR, SKM., M.Kes selau PPK yang telahmembayarkan 100% kegiatan Pembangunan Peningkatan Puskesmas NonRawat Inap menjadi Rawat Inap Puskesmas Bobolio Kecamatan WawoniiSelatan pada Dinas Kesehatan dan Sosial Kab.
    Bahwa yang saksi lakukan pengujian adalah pada struktur bangunan antaralain Item Pekerjaan Kolom Utama Teras, Kolom Praktis, Balok Latey, Sloof,Ring Balok.Halaman 67 dari 136 halaman, Putusan No. 16/Pid.SusTPK/2019/PN. Kdi Bahwa pengetesan yang saksi lakukan pada item tersebut diatas saat itusecara keseluruhan sudah mencantumkan pekerjaan beton sesuai yangtertera dalam kontrak atas pekerjaan tersebut .
    Sloof 15 X VolumeTamb2 20 Camp 1:2:3 6.39 M3 6.41 0.0 ahhPek. Balok Latey Volume3 Camp 1: 2:3 102.07 M 89.00 (13.1) KurangPek. Ringbalk 15 Volume4 X 20 Camp 1:2: 6.39 M3 5.03 (1.4) Kurang3PEKERJAANXV RANGKA ATAPDAN PLAFONDPas. KudakudaBaja Ringan Volume1 Untuk Atap 605.83 M2 661.67 55.8 faribahSpandekPas. AtapSpandek Volume2 Zincalume 0,4 605.83 M2 661.67 55.8 ambahmm3 Pas. Nok Baja 49.50 M' 59.00 95 VolumeTambRingan ahPas.
    Sloof 15 X VolumeTamb2 20 Camp 1:2:3 6.39 M3 6.41 0.0 ahPek. Balok Latey Volume3 Camp 1: 2:3 102.07 M 89.00 (13.1) KurangPek. Ringbalk 15 Welume4 X 20 Camp 1:2: 6.39 M3 5.03 (1.4)3 KurangPEKERJAANXV RANGKA ATAPDAN PLAFONDPas. KudakudaBaja Ringan Volume1 Untuk Atap 605.83 M2 661.67 55.8 tarnibaliSpandekPas. AtapSpandek Volume2 Zincalume 0,4 605.83 M2 661.67 55.8 ambahmm3 Pas. Nok Baja 49.50 M' 59.00 95 VolumeTambRingan ahPas.
Register : 29-04-2014 — Putus : 13-06-2014 — Upload : 03-09-2020
Putusan PT PALU Nomor 17/PID.TPK/2014/PT PAL
Tanggal 13 Juni 2014 — Pembanding/Terdakwa : HARTONO TAULA Diwakili Oleh : ANDIE H. MAKKASAU, SH.,MH
Terbanding/Jaksa Penuntut : CAHYADI SABRI, SH
6329
  • Sloof Beton 30/45 1:2: 3 Me 130.869 Rp. 2,710,993.00 Rp. 354,784,942.925. Pek. Sloof Beton 15/45 1:2:3 Me 3.804 Rp. 2,710,993.00 Rp. 10,312,617.376. Pek. Kolom Beton 40 x 40 1: 2:3 (bwh0,0) M8 35.645 Rp. 3,687,580.00 Rp. 131,443,789.107. Pek. Kolom Beton 50 x 50 1: 2:3 (bwh0,0) MS 37.562 Rp. 3,687,580.00 Rp. 138,512,879.96Rp. 884,828,004.47V. PEKERJAAN LAINLAIN1. Pek. Dokumentasi Proyek. Ls 1.000 Rp. 1,150,000.00 Rp. 1,200,000.002. Pek. Administrasi. Ls 1.000 Rp. 2,500,000.00 Rp. 1,241,500.003.
    Balok/sloof beton (basement) 35/70 1:2:3, kuantitas sesuai kontrak =66,640 m3 dengan harga sebesar Rp. 209.384.379,40 sedangkankuantitas terlaksana = 61,495 m3 dengan harga sebesarRp. 193.218.673,64 sehingga selisin kuantitas = 5,145 m3 atau Selisihharga sebesar Rp. 16.165.705, 76;9.
    Sloof Beton 30/45 1:2:3 Ms 130.869 Rp. 2,710,993.00 Rp. 354,784,942.925. Pek. Sloof Beton 15/45 1:2:3 Ms 3.804 Rp. 2,710,993.00 Rp. 10,312,617.376. Pek. Kolom Beton 40 x 40 1: 2 : 3 (bwh 0,0) Ms 35.645 Rp. 3,687,580.00 Rp. 131,443,789.107. Pek. Kolom Beton 50 x 50 1: 2 : 3 (bwh 0,0) Ms 37.562 Rp. 3,687,580.00 Rp. 138,512,879.96Rp. 884,828,004.47V. PEKERJAAN LAINLAIN1. Pek. Dokumentasi Proyek. Ls 1.000 Rp. 1,150,000.00 Rp. 1,200,000.002. Pek. Administrasi.
Putus : 05-04-2016 — Upload : 17-01-2017
Putusan MAHKAMAH AGUNG Nomor 3 K/Pid/2016
Tanggal 5 April 2016 — Ir. SUBANDRIYO;
6749 Berkekuatan Hukum Tetap
  • kerusakankerusakan antara lain dinding merembes, plafon ambrol,sambungan paralon air tidak di lem, pemasangan sambungan listrik asalasalan, pembuangan tinja di saluran sungai, paving blok di halaman luarsama tinggi dengan lantai rumah, kebocoran plafon ;Selain itu ada beberapa pekerjaan tidak sesuai : Terdakwa telah membuat ke dalam pondasi hanya sedalam + 30 cm, sloofukuran tidak sesuai 12 cm X 10 cm sedangkan di RAB ukuran 15/30;Hal. 2 dari 15 hal Putusan Nomor 3 K/Pid/2016 Ukuran besi untuk sloof
    bentuk Hotel tidak sesuai dengan gambar jugabanyak kerusakankerusakan antara lain dinding merembes, plafon ambrol,sambungan paralon air tidak di lem, pemasangan sambungan listrik asalasalan, pembuangan tinja di saluran sungai, paving blok di halaman luarsama tinggi dengan lantai rumah, kebocoran plafon ;Selain itu ada beberapa pekerjaan tidak sesuai : Terdakwa telah membuat ke dalam pondasi hanya sedalam + 30 cm, sloofukuran tidak sesuai 12 cm X 10 cm sedangkan di RAB ukuran 15/30; Ukuran besi untuk sloof
Register : 08-05-2013 — Putus : 17-09-2013 — Upload : 02-12-2016
Putusan PN MEDAN Nomor 54/PID.SUS.K/2013/PN Mdn
Tanggal 17 September 2013 — - BERNARD CHRISTIAN FAEBUADODO, DAELIST - VERCELLY AJUSMAN DAELI, ST - FARISMAN HAREFA Alias AMA SILVEN - Drs. ATOZISOCHI DAELI, MSP
8119
  • volume pekerjaannya sesuai denganpanjang, lebar, tinggi dan luasnya ;Bahwa adapun pekerjaan yang tidak dapat dilakukan pemeriksaan karenatertanam di dalam tanah atau di dalam sloof beton adalah sebagai berikut :e Pasangan lantai kerja batu kosong;e Tapak dan stick pondasi beton bertulang;112Bahwa adapun pekerjaan yang sebagian diperiksa dan sebagian lagi tidakdiperiksa karena tertanam di dalam tanah adalah sebagai berikut :e Sloof beton bertulang;2.
    Sloof beton bertulang, tidak dapat diperiksa karena sudah ada dindingbeton di atasnya.121d. Pasangan batu kali, tidak dilakukan pengukuran dan pemeriksaankarena telah di plaster.e.
    Sloof Beton Bertulang Camp 1:2:3 Ukuran 30 cm X 40 cm, volumeberubah dari 37,800 m* menjadi 51,480 m*%harga satuan tetapsehingga jumlah total harga berubah dari Rp.176.959.566,00(seratustujuh puluh enam juta sembilan ratus lima puluh sembilan ribu limaratus enam puluh enam rupiah)menjadi Rp.241.002.075,60 (duaratus empat puluh satu juta dua ribu tujuh puluh lima rupiah) ;e.
    Sloof beton bertulang, tidak dapat diperiksa karena sudah ada dindingbeton di atasnya ;4. Pasangan batu kali, tidak dilakukan pengukuran dan pemeriksaankarenatelah diplaster;5.
    Olehkarenanya Majelis Hakim berpendapat bahwa terhadap adanya temuan selisihvolume terhadap bangunan berupa pasangan lantai kerja batu kosong,tapakdan stick pondasi beton bertulang serta sloof beton bertulangyangsebagian atau seluruhnya tertanam dalam tanah yang diperhitungkan oleh ahliIr. M. KOSTER SILAEN, MT harus dikesampingkan ;Menimbang, bahwa terhadap temuan ahli Ir.
Register : 02-04-2012 — Putus : 26-09-2012 — Upload : 08-04-2014
Putusan PN PALU Nomor 17/Pid.Sus/2012/PN.PL
Tanggal 26 September 2012 — HARTONO TAULA
9812
  • Sloof Beton M3 130.869 Rp. 2,710,993.00 Rp.30/45 1:2:3 354,784,942.92Pek. Sloof Beton M3? 3.804 Rp. 2,710,993.00 Rp.15/45 1:2:3 10,312,617.37Pek. Kolom Beton M? 35.645 Rp. 3,687,580.00 Rp.40 x40 1:2:3 131,443,789.10(bwh 0,0)Pek. Kolom Beton M? 37.562 Rp. 3,687,580.00 Rp.50 x50 1: 2:3 138,512,879.96(bwh 0,0)Rp.884,828,004.47PEKERJAANLAINLAINPek. Dokumentasi Ls 1.000 Rp. 1,150,000.00 Rp.Proyek. 1,200,000.00Pek. Administrasi. Ls 1.000 Rp. 2,500,000.00 Rp.1,241,500.00Pengurusan IMB.
    Balok/sloof beton (basement) 35/70 1:2:3, kuantitas sesuai kontrak =66,640 m3 dengan harga sebesar Rp. 209.384.379,40 sedangkan kuantitasterlaksana = 61,495 m3 dengan harga sebesar Rp. 193.218.673,64sehingga selisih kuantitas = 5,145 m3 atau selisih harga sebesar Rp.16.165.705, 76 j2n nannies.
    uraian pada point a, b, dan c di atas maka rekapitulasi harga keseluruhanuntuk Pekerjaan TahapI, adalah sebagai berikut:Harga keseluruhan real cost: Harga pekerjaan sesuai kontrak (terbayar) sebesar Rp. 1.755.843.815,72,; Harga pekerjaan terlaksana (perhitungan) sebesar Rp. 1.476.256.616,99.; Selisih harga (pekerjaan kurang) sebesar Rp. 279.587.198,73,;Disamping melakukan perhitungan volime fisik atas pekerjaan terlaksana Tim tenaga AhliIndependen juga melakukan uji mutu beton pada elemen struktur Sloof
    Sloof Beton M? 130.869 Rp. Rp.30/45 1:2:3 2,710,993.00 354,784,942.92Ss Pek. Sloof Beton M? 3.804 Rp. Rp.15/45 1:2:3 2,710,993.00 10,312,617.37 Pek. Kolom M3 35.645 Rp. Rp.Beton 40 x 40 1: 3,687,580.00 131,443,789.102 :3 (bwh 0,0)Pek. Kolom M3 37.562 Rp. Rp.Beton 50 x 50 1: 3,687,580.00 138,512,879.962 :3 (bwh 0,0)Rp.884,828,004.47PEKERJAANLAINLAINPek. Ls 1.000 Rp. Rp.Dokumentasi 1,150,000.00 1,200,000.00Proyek.Pek. Ls 1.000 Rp. Rp.Administrasi. 2,500,000.00 1,241,500.00Pengurusan Ls 1.000 Rp.
    Balok/sloof beton (basement) 35/70 1:2:3,kuantitas sesuai kontrak = 66,640 m3 dengan hargasebesar Rp. 209.384.379,40 sedangkan kuantitasterlaksana = 61,495 m3 dengan harga sebesar Rp.193.218.673,64 sehingga selisih kuantitas = 5,145m3 atau selisih harga sebesar Rp.16.165.705,76;9.
Register : 16-01-2019 — Putus : 25-04-2019 — Upload : 15-10-2019
Putusan PN SURABAYA Nomor 12/Pid.Sus-TPK/2019/PN Sby
Tanggal 25 April 2019 — Penuntut Umum:
HERPIN HADAT, SH.
Terdakwa:
KOKO ANDRYANTO, ST Bin H. SUBANDRIO.
8329
  • Besi tulangan untuk sloof;b. Besi tulangan untuk kolom praktis;c. Besi tulangan untuk ring balk;d. Campuran trasram untuk pasangan dinding los daging,loket, mushala dan MCK;halaman 80 dari 621 halamane. Kayu kusen loket, los daging, mushala dan MCK;f. Rangka atap untuk mushala dan MCK.Hasil pemeriksaan bahan yang telah dilakukan bersamadengan Tim PPHP sebagai berikut :a.f.Besi tulangan untuk sloof menggunakan besi 10 berjumlah4 namun untuk begel sudah tidak terlihat;.
    Besi tulangan untuk sloof;b. Besi tulangan untuk kolom praktis;c. Besi tulangan untuk ring balk;d. Campuran trasram untuk pasangan dinding los daging,loket, mushala dan MCK;e. Kayu kusen loket, los daging, mushala dan MCK;f. Rangka atap untuk mushala dan MCK.Hasil pemeriksaan bahan yang telah dilakukan bersamadengan Tim PPHP sebagai berikut :a.f.Besi tulangan untuk sloof menggunakan besi 10 berjumlah4 namun untuk begel sudah tidak terlihat;.
    Pekerjaan pagar sampai pada tahap pemasangan beton sloof.
    Besi tulangan untuk sloof;b. Besi tulangan untuk kolom praktis;c. Besi tulangan untuk ring balk;d. Campuran trasram untuk pasangan dinding los daging, loket,mushala dan MCK;e. Kayu kusen loket, los daging, mushala dan MCK;f. Rangka atap untuk mushala dan MCK.Hasil pemeriksaan bahan yang telah dilakukan bersama dengan TimPPHP sebagai berikut :a.f.Besi tulangan untuk sloof menggunakan besi 10 berjumlah 4namun untuk begel sudah tidak terlihat;.
    Pekerjaan pagar sampai pada tahap pemasangan beton sloof.Dengan kondisi kemajuan pekerjaan tersebut di atas jenis pekerjaanpondasi yang meliputi galian tanah, urugan tanah dan pasangan batukali tidak dapat diperiksa lagi karena sudah ditumpuk pekerjaanlainnya namun untuk pekerjaan beton sloof ke atas masih dapatdiperiksa;Hasil pemeriksaan bahan sebagai berikut :a. Besi tulangan untuk sloof menggunakan besi 10 berjumlah 4namun untuk begel sudah tidak terlihat;b.
Putus : 12-05-2016 — Upload : 20-10-2016
Putusan MAHKAMAH AGUNG Nomor 8 K/Pdt.Sus-KPPU/2016
Tanggal 12 Mei 2016 — KOMISI PENGAWAS PERSAINGAN USAHA (KPPU) REPUBLIK INDONESIA VS PT GAUNG NUSA PERSADA
254152 Berkekuatan Hukum Tetap
  • ps41.972.846,5541.972.846,5541.972.846,55 Plesteran Beton Kolom,Listplank 1pc : 3ps47.119.752,7747.119.752,7747.119.752,77 Finishing Plesteran ( Acian )188.819.200,83188.819.200,83188.819.200,83 Prime coat Plat Atap 31.200.850,00 31.200.850,00 31.200.850,00 PEKERJAAN BETON MUTUK. 225 Beton lantai kerja bawahpondasi49.135.892,4149.135.892,4149.135.892,41 Beton pondasi platsetempat 2,50 X 2,50116.705.169,42116.740.369,53116.740.369,53 Beton pondasi platsetempat 3,00 X 3,00533.321.625,81533.421.946,19533.421.946,19 Beton sloof
    30/ 40 cm325.154.248,67325.493.224,52325.493.224,52 Beton sloof 20/ 30 cm26.350.211,4326.382.551,4326.382.551,43 Beton sloof 15/ 20 cm13.271.879,1613.301.033,5713.301.033,57 Beton kolom 60 cm (geret3 & 4)111.374.386,00111.656.854,23111.572.113,79 Beton kolom 60/ 60 cm801.840.159,07804.065.679,88803.398.023,88 Beton kolom 60/ 60 cmgreet 284.195.354,9884.426.355,0684.357.055,06 Beton kolom 30/ 30 cm96.122.648,1996.482.018,1296.374.207,12 Beton tangga100.772.674,74100.994.042,60100.994.042,60 Beton
    GENSETPEKERJAAN PENDAHULUANGalian Tanah Pondasi 1.724.085,00 1.724.085,00 1.724.085,00Mengurug Kembali 431.021,25 431.021,25 431.021 ,25Urugan Pasir Pondasi 263.958,75 263.958,75 263.958,75Urugan Pasir Lantai 351.945,00 351.945,00 351.945,00PEKERJAAN BETON MUTU K.225Beton Lantai kerja bawah 1.251.244,10 1.251.244,10 1.251.244,10pondasi Beton Pondasi PlatSetempat 1,50 x 1,5018.024.117,6718.027.508,1018.027.508,10 Beton Sloof 20/ 25cm10.515.750,9210.538.850,9210.538.850,92 Pondsi Mesin8.010.718,978.012.225,828.012.225,82
Register : 28-06-2018 — Putus : 15-01-2019 — Upload : 01-02-2019
Putusan PN BATAM Nomor 171/Pdt.G/2018/PN Btm
Tanggal 15 Januari 2019 — Penggugat:
PT WAHANA PRATAMA MANDIRI
Tergugat:
PT KARYA NUSANTARA INDAH EXPRESS
6534
  • Sengkang dengan total harga pekerjaan sesuaiSurat Uraian Pekerjaan Dan Harga Pekerjaansebesar r Rp 47.500, (empat puluh tujuh ribulima ratus rupiah);Halaman 65 dari 192 Putusan Perdata Gugatan Nomor 171/Pat.G/2018/PN Btm1.3.1.3.1.1.3.2.1.2.3.4.Bekisting dengan total harga pekerjaan sesuaiSurat Uraian Pekerjaan Dan Harga Pekerjaansebesar Rp 999.000, (Sembilan ratus sembilanpuluh sembilan ribu rupiah);Pekerjaan sloof :Sloof Ln 6000 :1.3.1.1.1.3.1.2.1.3.1.3.1.3.1.4.Beton K 250 dengan total harga pekerjaansesuai
    Sengkang dengan total harga pekerjaan sesuaiSurat Uraian Pekerjaan Dan Harga Pekerjaansebesar Rp 47.500, (empat puluh tujuh ribulima ratus rupiah);Halaman 79 dari 192 Putusan Perdata Gugatan Nomor 171/Pat.G/2018/PN Btm2.3.2.3.1.2.3.2.2.2.3.4.Bekisting dengan total harga pekerjaan sesuaiSurat Uraian Pekerjaan Dan Harga Pekerjaansebesar Rp 999.000, (Sembilan ratussembilan puluh sembilan ribu rupiah);Pekerjaan sloof :Sloof Ln 6000 :2aclel.2.3.1.2.2.3.1.3.2.3.1.4.Beton K 250 dengan total harga pekerjaansesual
    Pekerjaan sloof berupa Sloof Ln 6000 dan Sloof Ln 4500,masingmasing pekerjaan itu dikerjakan Penggugat d.K denganmenggunakan material berupa hasil campuran semen, pasir,dan kerikil adukan tangan, padahal menurut perjanjian masingHalaman 143 dari 192 Putusan Perdata Gugatan Nomor 171/Pat.G/2018/PN Btm1.6.ee1.8.1Dmasing pekerjaan itu harus dengan menggunakan Beton K 250(redimix);Pekerjaan Balok berupa : Beam Ln 6000 Bi, Beam Ln4500 B1, Beam Ln 1000 B1, Beam Ln 7000 B2 , Beam B3300x350, masingmasing
    berupa Sloof Ln 6000 dan Sloof Ln 4500,masingmasing pekerjaan itu dikerjakan Penggugat d.K denganmenggunakan material berupa hasil campuran semen, pasir,dan kerikil adukan tangan, padahal menurut perjanjian masingmasing pekerjaan itu harus dengan menggunakan Beton K 250(redimix);Pekerjaan Balok berupa : Beam Ln 6000 B1, Beam Ln4500 Bi, Beam Ln 1000 B1, Beam Ln 7000 B2, Beam B3300x350, masingmasing pekerjaan itu dikerjakan Penggugatd.K dengan menggunakan material berupa hasil campuransemen, pasir
    berupa Sloof Ln 6000 dan Sloof Ln 4500,masingmasing pekerjaan itu dikerjakan Penggugat d.K denganmenggunakan material berupa hasil campuran semen, pasir,dan kerikil adukan tangan, padahal menurut perjanjian masingmasing pekerjaan itu harus dengan menggunakan Beton K 250(redimix);Pekerjaan Balok berupa : Beam Ln 6000 Bi, Beam Ln4500 Bi, Beam Ln 1000 B1, Beam Ln 7000 B2, Beam B3300x350, masingmasing pekerjaan itu dikerjakan Penggugatd.K dengan menggunakan material berupa hasil campuranHalaman 146