Ditemukan 760 data
4866 — 8277 — Berkekuatan Hukum Tetap
REPAIR AND MAINTENANCE/MAINTENANCE DEPOSIT4.1.
2203 — 1406
REPAIR AND MAINTENANCE/MAINTENANCE DEPOSIT4.1 The equipment will at all times be maintained by the borrowerin good working in accordance with its relevant operating andmaintenance manuals, and all required maintenance checksand repairs shall be made and carried out on a timely basis.For the purpose of assuring proper maintenance of theEquipment the Borrower will pay to the Lender a separateamount of US$ 31.250 (thirty one thousand two hundred fiftyUnited State Dollars) per month into an escrow monthlypayments
232 — 148
SKK Migas, Perihal Tender Proyek Pipeline repair,Optimization and Construction Service (LTSA CS16159146Conoco Philips Indonesia ;1 (satu) Lembar Biaya Pengurusan Pendirian PT ;1 (satu) Bendel Dokumen dalam plastik berisi surat PTPetrogas Jatim Utama kepada Kepala SK Migas Tertanggal 22Fears I 2 aman em ace crete ceHalaman 68 dari 207 halaman Putusan No. 13/PID/TPK/2014/PT.DKI.352.353.354.355.356.357.358.359.360.361.362.363.364.365.366.367.1 (satu) Bendel dokumen dalam Map warna biru yang berisisurat
198 — 180
SO00666/12/AW/Rev. 1 applied fordocking repair with term and condition.Dalam terjemahan ke dalam Bahasa Indonesia oleh PenerjemahBersumpah, Drs. Sulamo Popomaruto;"Bersama ini kami PT. Atamimi Group of Companies menunjukgalangan kapal saudarayaitu PT. Drydocks World Pertama Batamuntuk menerima Kapal MT.
Terbanding/Terdakwa : JHONI RIZKAL AMZA Bin H. AMIR DJABAR
440 — 335
Cahaya Tunggal Perkasa Brine Line Repair Containment, Nomor : A.0087/KU.302/CGC/KI-16, Lampiran : 1 (satu) berkas, tanggal 25 April 2016.
14. 1 (satu) lembar foto copy yang dilegalisir surat Pemindahan Bukuan, Nomor : B.0253/KU.302/CGC/KI-2016 tanggal 20 Mei 2016 yang ditandatangani oleh Sdr JHONY RIZKAL selaku Kepala Cabang Pratama Komersil Banten.
Sukabumi, Nama Proyek : Brine Line Repair, SPK/Kontrak/Surat No : E&C/BKI-CTP/IV/16/012, Lokasi : Sukabumi, Spesifikasi : Inspeksi.
Berdasarkan Penetapan Pengadilan Serang Nomor : 22 / Pid.Sus-TPK / 2021 / PN. Srg, tanggal 5 Oktober 2021 telah disetujui pelaksanaan penyitaan terhadap barang bukti tersebut dengan dasar Surat Perintah Penyitaan Nomor : SP.Sita/101/X/ Res.3.2/2021/Ditreskrimsus tanggal 01 Oktober 2021 disita dari Saksi Ida Suryani.
3. 1 (satu) bundel foto copy legalisir laporan profil risiko nama proyek : BRINE LINE REPAIR/CONTAINMENT.
Berdasarkan Penetapan Pengadilan Serang Nomor : 23 / Pid.Sus-TPK / 2021 / PN.
Data yang dikirim berupa Penawaran Harga Brine Line Repair, Penawaran Harga CSR DRAINAGE, Penawaran Harga Nego Brine Line Repair Indo Cahaya ke BKI, Penawaran Harga Nego Salak Lanslide Indo Cahaya ke BKI, Penawaran Harga Salak Land Slide dan Undangan Negoisasi Cahaya ke BKI.
10. 1 (satu) bundel print email Harga Nego CSR From : m wibawa (marthawibawa@gmail.com), To: donnyutha@yahoo.com, Date: Monday, March 20, 2017. Martha Wibawa 0811900227.
87. 1 (satu) lembar Surat Penunjukan Inspektor / Manager Proyek no.0029 tanggal 27 April 2016 kepada DONI PS, nama proyek Brine Line Repair.
88. 1 (satu) lembar Surat Penunjukan Inspektor / Manager Proyek no.0030 tanggal 27 April 2016 kepada DONI PS, nama proyek CSR-DRAINAGE.
Berdasarkan Penetapan Pengadilan Serang Nomor : 28 / Pid.Sus-TPK / 2021 / PN.
124 — 45 — Berkekuatan Hukum Tetap
TransferPricing, Topical Analyses, IBFD, 2013The most difficult aspect of applying the cost plus methodis defining the cost base and ensuring that in relevantrespects the cost base for a nonarms length transfer iscomparable to that for a transfer involving a third party.(...)In applying this method, the CRA identifies three costcategories: direct (citing raw materials as an example),indirect (costs that are product or transaction specific, butmay be allocated among several products or transactions;cited are repair
It is now clarified asreasonable cost, which should include the direct costssuch as raw materials, indirect costs such as repair andmaintenance which may be allocated among severalproducts, and operating expenses such as selling,general, and administrative expenses. (Bukti PK42)Terjemahannya:Dalam penerapan metode biaya plus adalah pentinguntuk menentukan biaya dengan benar.
AIDIL RAYA PUTERA, SH
Terdakwa:
MIRNA WATI BINTI H.HARISA
188 — 27
14 PCS
13
TABITA SMOOTH LOTION (PUTIH DAN KUNING)
KRIM
106 PCS
14
KISS BEAUTY 99% ALOE VERA (NATURAL GEL MASCARA)
CAIR
7 PCS
15
KISS BEAUTY AVOCADO (MOIST & REPAIR
Putus : 21-11-2013 — Upload : 10-09-2014Putusan PN TANJUNG PINANG Nomor 163/PID.B/2013/PN.TPI
Tanggal 21 Nopember 2013 — - RIKI (Terdakwa) - ABDURACHMAN, SH (JPU)
48 — 3Pada tanggal 25 Mei 2013 sekira pukul 05.00 Wib(pagi), Kapal repair dengan nama ASEAN EXPLORER) tiba dilokasiKabel putus (Lat 01 02.490 N dan Long 104 57.575 E) danmenemukan perahu nelayan yang mengapung disekitar kabel putus. Dankemudian Kapal menurunkan ROV (Remotely Operation Vihicle) untukmencari dan mendeteksi Kabel yang putus, setelah kabel putus, ditemukanternyata tertapat perangkap ikan disepanjang rute kapal yang putustersebut.
Putus : 04-08-2015 — Upload : 11-03-2016Putusan MAHKAMAH AGUNG Nomor 376/B/PK/PJK/2015
Tanggal 4 Agustus 2015 —
150 — 120 — Berkekuatan Hukum TetapTransferPricing, TopicalAnalyses, IBFD, 2013The most difficult aspect of applying the cost plus method is definingthe cost base and ensuring that in relevant respects the cost basefor a nonarms length transfer is comparable to that for a transferinvolving a third party. (...)In applying this method, the CRA identifies three cost categories:direct (citing raw materials as an example), indirect (costs that areproduct or transaction specific, but may be allocated among severalproducts or transactions; cited are repair
It is now clanfiedas reasonable cost, which should include the direct costs such asraw materials, indirect costs such as repair and maintenance whichmay be allocated among several products, and operating expensessuch as selling, general, and administrative expenses. (Bukti PK42)Terjemahannya:Dalam penerapan metode biaya plus adalah penting untukmenentukan biaya dengan benar.
Putus : 21-11-2013 — Upload : 02-09-2014Putusan PN TANJUNG PINANG Nomor 162/PID.B/2013/PN.TPI
Tanggal 21 Nopember 2013 — - E D Y (Terdakwa) - ABDURACHMAN, SH (JPU)
55 — 3Pada tanggal 25 Mei 2013 sekira pukul 05.00 Wib(pagi), Kapal repair dengan nama ASEAN EXPLORER) tiba dilokasiKabel putus (Lat 01 02.490 N dan Long 104 57.575 E) danmenemukan perahu nelayan yang mengapung disekitar kabel putus. Dankemudian Kapal menurunkan ROV (Remotely Operation Vihicle) untukmencari dan mendeteksi Kabel yang putus, setelah kabel putus, ditemukanternyata tertapat perangkap ikan disepanjang rute kapal yang putustersebut.
Register : 31-07-2023 — Putus : 13-12-2023 — Upload : 14-12-2023Putusan PN SERANG Nomor 24/Pid.Sus-TPK/2023/PN SRG
Tanggal 13 Desember 2023 — Penuntut Umum:
Achmad Afriansyah, S.H
Terdakwa:
RADITIYA SUNGKAWA
160 — 237Cahaya Tunggal Perkasa Brine Line Repair Containment, Nomor : A.0087/KU.302/CGC/ KI-16, Lampiran : 1 (satu) berkas, tanggal 25 April 2016.
- 1 (satu) lembar foto copy yang dilegalisir surat Pemindahan Bukuan, Nomor : B.0253/KU.302/CGC/KI-2016 tanggal 20 Mei 2016 yang ditandatangani oleh Sdr JHONY RIZKAL selaku Kepala Cabang Pratama Komersil Cilegon.
- 1 (satu) bundel foto copy legalisir laporan profil risiko nama proyek : BRINE LINE REPAIR/CONTAINMENT.
- 1 (satu) bundel print email Trs:Fwd: Emailing Drawing Drainage.PDF From Jhony Rizkal (jhonyrizkal@yahoo.com) To : donnyutha@yahoo.com, Date : Tuesday, April 12, 2016.
Data yang dikirim berupa Penawaran Harga Brine Line Repair, Penawaran Harga CSR DRAINAGE, Penawaran Harga Nego Brine Line Repair Indo Cahaya ke BKI, Penawaran Harga Nego Salak Lanslide Indo Cahaya ke BKI, Penawaran Harga Salak Land Slide dan Undangan Negoisasi Cahaya ke BKI.
- 1 (satu) bundel print email Harga Nego CSR From : m wibawa (marthawibawa@gmail.com), To: donnyutha@yahoo.com, Date: Monday, March 20, 2017. Martha Wibawa 0811900227.
- 1 (satu) lembar Surat Penunjukan Inspektor / Manager Proyek no.0029 tanggal 27 April 2016 kepada DONI PS, nama proyek Brine Line Repair.
- 1 (satu) lembar Surat Penunjukan Inspektor / Manager Proyek no.0030 tanggal 27 April 2016 kepada DONI PS, nama proyek CSR-DRAINAGE.
- 1 (satu) bundel Surat Perjanjian Pelaksanaan Pekerjaan Brine Line Repair nomor : E&C/BKI-CTP/IV/16/012 tanggal 12-04-2016 antara PT. Cahaya Tunggal Perkasa Engineering dan PT. Biro Klasifikasi Indonesia yang di tandatangani oleh Raditiya Sungkawa dan Ir. Jhony Rizkal A.
- 1 (satu) bundel rekening koran Bank Mandiri KCP Bekasi Taman Galaxi atas nama Martha Wibawa dengan nomor rekening 167-00-7007002-3.
Dikembalikan kepada Sdr. Sudirman
Register : 27-05-2016 — Putus : 24-08-2016 — Upload : 01-11-2016Putusan PN PONTIANAK Nomor 56/Pdt.G-ARB/2016/PN Ptk.
Tanggal 24 Agustus 2016 — PEJABAT PEMBUAT KOMITMEN (PPK) 04 KEGIATAN PEMBANGUNAN JALAN PONTIANAK + JALAN DALAM KOTA â TAYAN qq. KEMENTRIAN PEKERJAAN UMUM REPUBLIK INDONESIA PT. WASKITA KARYA (Persero) TBK â DEVISI REGIONAL TIMUR
342 — 129Solo Riyadi Limbong nomorRSC/ENG/PM/EKB01/518 tanggal 25 Mei 2012;Fotocopy Surat Pemohon (Kontraktor) kepada Team Leader RSC EINRIPnomor 66 / EXT / WK / DV / D.22.D09025 / 2012 tanggal 2 juni 2012perihal expences and excess due to cross fall and super elevationimprovement;Fotocopy Memorandum konsultan pengawas (SSERSC EINRIP) kepadaCSERSC EINRIP nomor RSC/SSE/CR/EKB01/314 tanggal 11 Juni2012 perihal Approve of request for work of repair Sta 0+000 s/d 1+00;Fotocopy Surat Konsultan pengawas (SSERSC
Author : Rahmad Setiawan; J. Satrio;Cessie
6409 — 13660- Beberapa segi lembaga hukum cessie perlu mendapat perhatian, yaitu1. pengertian tentang cessie perlu diseragamkan agar dalam pelaksanaannya bisa menghasilkan keputusan yang baik;2. bahwa penyerahan benda-benda tak bertubuh yang bukan berupa ... [Selengkapnya]
His insurer B pays the costs of repair but only against transferby A of his right against perpetrator X. The instrument of assignment is drawn up.Subsequently A goes bankrupt. Then X suddenly emerges. B promptly informs X ofthe proprietary instrument of assignment. If article 3:94 para. 2 BW were absent, thenB would nevertheless miss out (see art. 35 par. 1 Fw).
Putus : 04-08-2015 — Upload : 10-03-2016Putusan MAHKAMAH AGUNG Nomor 375 B/PK/PJK/2015
Tanggal 4 Agustus 2015 — PT. YASULOR INDONESIA VS DIREKTUR JENDERAL PAJAK
253 — 243 — Berkekuatan Hukum Tetap,Topical Analyses, IBFD, 2013;The most difficult aspect of applying the cost plus method isdefining the cost base and ensuring that in relevant respects thecost base for a nonarms length transfer is comparable to thatfor a transfer involving a third party. (...)In applying this method, the CRA identifies three cost categories:direct (citing raw materials as an example), indirect (costs that areproduct or transaction specific, but may be allocated amongseveral products or transactions; cited are repair
Register : 11-04-2013 — Putus : 25-07-2013 — Upload : 21-10-2013Putusan PN TANJUNG KARANG Nomor 26/PID.TK/2013/PN.TK
Tanggal 25 Juli 2013 — ATARI bin NOTODIHARJO
92 — 21Nero Auto Boddy dengan Auto 2000 Raden Intan adalahsebagai Vendor / perusahaan menerima pemborongan pekrjaan perbaikan boddykendaraan (boddy repair) yang mana alamat Kantor dan bengkel CV. Nero AutoBoddy ada dibelakang (masih satu lingkungan) Auto 2000 Raden Intan.Bahwa menurut Saksi, Terdakwa tidak dapat mewakili Auto 2000 CabangRajabasa karena dia bekerja pada Auto 2000 Cab.
Register : 04-04-2018 — Putus : 13-03-2019 — Upload : 10-09-2019Putusan PN JAKARTA UTARA Nomor 192/Pdt.G/2018/PN .Jkt Utr
Tanggal 13 Maret 2019 — Penggugat:
PT. MARINA ANCOL GREEN HOTEL
Tergugat:
1.PT. KARUNIA INDAH SEJAHTERA
2.PT. PROSYS ENGINEERS INTERNATIONAL
3.SIANTO YOHANES
4.SUPENDI WIDJAJA
5.KURNIA TUGIONO
157 — 128MAGH sebagai berikut:"Semua pekerjaan kontraktor, baik kontraktor sipil, Finishing maupunMEP sudah selesai 100 % dan berfungsi dengan baik, sampaipekerjaan repair semua sudah diselesaikan, untuk itu mohon BeritaAcara Serah Terima dapat ditanda tangani sebagai dasar daripenyelesaian proyek ini.Tergugat Il telah menyerahkan Berita Acara Serah Terimasebagaimana merupakan tanda telah terselesaikannya pekerjaanproyek renovasi Discovery Hotel & Convention Ancol kepadaPenggugat.Namun demikian, pada faktanya
Register : 21-09-2021 — Putus : 21-10-2021 — Upload : 06-12-2021Putusan PT BANDUNG Nomor 29/PID.TPK/2021/PT BDG
Tanggal 21 Oktober 2021 — Pembanding/Penuntut Umum : ARIAWAN AGUSTIARTONO
Terbanding/Terdakwa : ARIE WIBOWO
144 — 90Nomor 6 Tanggal 17 Mei 2016, dimana PT DI seluruhsahamnya (100%) dimiliki oleh negara dan PT Dimerupakan suatu BadanUsaha Milik Negara yang bergerak dalam industri pesawat terbang antaralain melaksanakan rancang bangun (design pesawat terbang), rekayasapesawat terbang, development pesawat terbang, jasa engineering,penyedia sistem senjata, dan jasa MRO (Maintenance, Repair, Overhaul).Bahwa sebagai produsen produk dirgantara beserta perawatannya, PT DImemiliki KonSsumen yang berasal dari dalam dan
Nomor 6 Tanggal 17 Mei 2016, dimana PT DIseluruh sahamnya (100%) dimiliki oleh negara dan PT DIlmerupakansuatu Badan Usaha Milik Negara yang bergerak dalam industri pesawatterbang antara lain melaksanakan rancang bangun (design pesawatterbang), rekayasa pesawat terbang, development pesawat terbang,jasa engineering, penyedia sistem senjata, dan jasa MRO(Maintenance, Repair, Overhaul). Bahwa Terdakwa selaku Kepala Divisi Pemasaran dan PenjualanDirektorat Aircraft Integration PT.
Register : 29-09-2017 — Putus : 05-12-2017 — Upload : 09-01-2018Putusan PT JAKARTA Nomor 592/PDT/2017/PT.DKI
Tanggal 5 Desember 2017 — PT.KORINDO JASA PETRA >< PT.PERTAMINA TRANS KONTINENTAL CS
148 — 95To perform Vessels restoration shall include any repairs,retrofitting, modifications; overhauls and plat renewals (duringafloat repair and dry dock);5. Commissioning to meet BKI Classification Society andCompany Operation requirement;6. Towng back to Ardjuna Marine Terminal as appointed byCompany;7. To perform other associated Work as required by Company;Terjemahan bebas dari Tergugat:1. Menarik Kapal dari Terminal Pelabuhan Ardjuna ke lokasiKontraktor;2.
Register : 04-08-2022 — Putus : 12-10-2022 — Upload : 14-10-2022Putusan PN PADANG Nomor 598/Pid.Sus/2022/PN Pdg
Tanggal 12 Oktober 2022 — Penuntut Umum:
1.DEWI PERMATA ASRI, SH
2.MISZUARTY, SH. MH.
Terdakwa:
PUTRI REGITA YUNIAR PGL. PUTRI BINTI Alm EDWARD SEBASTIAN
47 — 23- 1 (satu) vial repair ukuran 10 ml botol runcing bekas pakai.
- 1 (satu) micro pigment alis 12 ml runcing bekas pakai.
- 1 (satu) botol bounding ukuran 5 ml botol runcing bekas pakai.
- 1 (satu) botol bounding ukuran 5 ml bekas pakai.
- 1 (satu) vial anastasi luae 2 ml bekas pakai.
- 61 (enam puluh satu) jarum sulam alis.
- 6 (enam) butir clnnamycin hydrochloride 30 mg.
- 1 (satu) sachet emollient 59 bekas pakai.
Register : 06-01-2023 — Putus : 02-02-2023 — Upload : 02-02-2023Putusan PT JAMBI Nomor 3/PID.SUS/2023/PT JMB
Tanggal 2 Februari 2023 — Pembanding/Terbanding/Terdakwa : MIRNA WATI BINTI H.HARISA
Terbanding/Pembanding/Penuntut Umum : AIDIL RAYA PUTERA, SH
219 — 614 PCS
13
TABITA SMOOTH LOTION (PUTIH DAN KUNING)
KRIM
106 PCS
14
KISS BEAUTY 99% ALOE VERA (NATURAL GEL MASCARA)
CAIR
7 PCS
15
KISS BEAUTY AVOCADO (MOIST & REPAIR