Ditemukan 81 data

Urut Berdasarkan
 
Putus : 09-09-2015 — Upload : 20-04-2017
Putusan MAHKAMAH AGUNG Nomor 1741 K/PID.SUS/2015
Tanggal 9 September 2015 — GERSON LAPENANGGA, dk
287 Berkekuatan Hukum Tetap
  • Sumber Tambang Indah Nomor : 002/DIR/STIKOE/IIV2012 tanggal 19 Maret 2012 perihal Tanggapan beserta datapendukung berupa : Brosur Asli Electric Resistance Welded Stell Pipe (ERW) dari PT.Steel Pipe Industry Of Indonesia (SPINDO) Kantor Pusat Surabaya ; Data Perbandingan Berat dan Tebal Pipa GIP SNI dan Medium(Bukan SNI) dari CV. Sumber Tambang Indah, dan ; 1 (satu) lembar Foto Copy Price List Penawaran Harga Pipa pertanggal 20 April 2010 ;33.
    Sumber Tambang Indah Nomor : 002/DIR/STIKOE/IV2012 tanggal 19 Maret 2012 perihal Tanggapan besertadata pendukung berupa : Brosur Asli Electric Resistance Welded Stell Pipe (ERW) dariPT. Steel Pipe Industry Of Indonesia (SPINDO) Kantor PusatSurabaya ; Data Perbandingan Berat dan Tebal Pipa GIP SNI danMedium (Bukan SNI) dari CV.
Putus : 09-09-2016 — Upload : 15-12-2016
Putusan MAHKAMAH AGUNG Nomor 906/B/PK/PJK/2016
Tanggal 9 September 2016 — PT. FSCM MANUFACTURING INDONESIA vs. DIREKTUR JENDERAL BEA DAN CUKAI
5631 Berkekuatan Hukum Tetap
  • 7315.11.11.007315.11.12.007315.11.19.007315.11.21.007315.11.22.007315.11.23.007315.11.29.007315.12.00.007315.197315.19.11.007315.19.12.007315.19.19.007315.19.91.007315.19.92.007315.19.99.007315.207315.20.10.007315.20.90.007315.807315.817315.81.10.007315.81.90.007315.827315.82.10.007315.82.90.007315.897315.89.11.007315.89.12.007315.89.19.007315.89.21.00 Of mild steel: Bicycle chains Motorcycle chains Other Other : Bicycle chains Motorcycle chains Other Transmission, Typeof pitch length not less than 6mm but not more than 32 mm Other Other chainParts :Of mild steelOf bicycle chainOf motorcycle chainOtherOtherOf bicycle chain Of motorcycle chain OtherSkid chainOf mild steel OtherOther chainStudlinkOf mild steel Other Other, welded
    chains Motorcycle chains Other 7315.11.10.007315.11.907315.11.91.007315.11.99.007315.127315.12.10.007315.12.90.007315.197315.19.10.007315.19.90.007315.20.00.007315.807315.81.00.007315.82.00.007315.897315.89.10.007315.89.90.007315.907315.90.20.007315.90.90.00 Bicycle or motorcyclechain Other : Other Transmission,Type of pitch length notless than 6 mm but notmore than 32 mm OtherOther chain Bicycle or motorcyclechain OtherParts : Of bicycle or motorcyclechain OtherSkid chainOther chain :StudlinkOther, welded
Register : 12-10-2023 — Putus : 21-12-2023 — Upload : 22-12-2023
Putusan PN PALEMBANG Nomor 1124/Pid.B/2023/PN Plg
Tanggal 21 Desember 2023 — Penuntut Umum:
HERMAN, SH
Terdakwa:
Vera anak dari Hamid Yusuf Tani
5137
  • Sentosa Jaya Anugerah No. 001/VI/2021 untuk pembayaran Pipa SS304 Uk.3/8 Sch.10x6 Mtr Welded ke PT. Pinago Utama senilai Rp 11.319.000,- (sebelas juta tiga ratus sembilan belas ribu rupiah).
  • 1 (satu) lembar surat jalan tertanggal 14 Juni 2021 untuk pengiriman barang berupa Pipa SSt Uk.3/8 mm x6 mtr berikut keterangan No. PO: 88494/PO/PO/V/2021.
  • Faktur Pajak Nomor: 010.004.21.42456153.
  • Surat Keterangan Pembayaran dari CV. Sentoa Jaya Anugerah Kepada PT.
Register : 09-10-2018 — Putus : 28-02-2019 — Upload : 03-07-2019
Putusan PN MANOKWARI Nomor -19/Pid.Sus-TPK/2018/PN.Mnk
Tanggal 28 Februari 2019 — -H. Ir. ASRARUDIN KELIOBAS. Bin H. ENJTE MARSIDANG KELIOBAS alias H. ASNAWI
168157
  • Sakura Permai Jayauntukkeperluanpengadaanbarang/jasakegiatantersebutsebagaimana SuratHalaman13dari315PutusanNomor 19/Pid.SusTPK/2018/PN.MnkDeputy Director Marketing PT Steel Pipe Industry of Indonesia, Tok No.GH/19/V/2015 tanggal 08 Mei 2015 kepada Direktur PT Sakura PermaiJaya perihal Konfirmasi order pipa yang telah disepakati oleh pihak PTSakura Permai Jaya untuk konfirmasi order pipa spiral welded steel pipa,ASTM A 252 Gr2 tersebut sebesar Rp5.524.493.040,00 (termasuk PPNBahwa dalam proses lelang
    Sakura Permai Jayauntukkeperluanpengadaanbarang/jasakegiatantersebutsebagaimana SuratDeputy Director Marketing PT Steel Pipe Industry of Indonesia, Tok No.GH/19/V/2015 tanggal 08 Mei 2015 kepada Direktur PT Sakura PermaiJaya perihal Konfirmasi order pipa yang telah disepakati oleh pihak PTSakura Permai Jaya untuk konfirmasi order pipa spiral welded steel pipa,ASTM A 252 Gr2 tersebut sebesar Rp5.524.493.040,00(Lima miliar limaratusduapuluhempatjutaempatratus Sembilan puluhrigaribuempatpuluhrupiah)
Putus : 13-11-2012 — Upload : 27-08-2014
Putusan PT SEMARANG Nomor 63/Pid.Sus/2012/PT.TPK.Smg
Tanggal 13 Nopember 2012 — BASUKI ABDULLAH, SH bin M. KOSIM
5724
  • .8 Tangki Blotong ; Data Spesifikasi Rekanan : Kapsitas min 200 liter bahan carbonsteel tebal 3 mm, finishing dengan heat and acyd resistantcointing, dilengkapi dengan roda penggerak. hal 21 dari 93 hal Put.No.63/Pid.Sus/2012/PT.TPK.SmgData Faktual: Alat tidak ditemukan saat tim melakukaninvestigasi dalam Pabrik Gula. 2 Modul Penguapan ; 1 Pesawat Penguap / Pengental ; Data Spesifikasi Rekanan: Model calandria dengan luas panasmin 20 28 sq mtr, pipa pemanas 3 diameter SUS 304 pipe 1.5mm thicknes welded
    Modul Penguapan ;Pesawat Penguap/Pengental ; Data Spesifikasi Rekanan: Model calandria dengan luas panasmin 20 28 sq mtr, pipa pemanas 3 diameter SUS 304 pipe 1.5mm thicknes welded pipe, tebal tube plate min 19 mm, tebalshell min 8 mm, tinggi calandria min 0,6 mtr tinggi total min 3,6mtr dilengkapi dengan standart nozzle untuk operasi singleeffect, standart control consentrator, strandart sight glass 5 heatand pressure resistant, steam trap 1 insulation thickness min 25mm dengan aluminium cladding
Putus : 07-05-2013 — Upload : 21-12-2013
Putusan MAHKAMAH AGUNG Nomor 824 K/PID.SUS/2013
Tanggal 7 Mei 2013 — Ir. GATOT SUHENDRO, MM., MT
53187 Berkekuatan Hukum Tetap
  • Nomor 824 K/Pid.Sus/2013 BerupBaru,Dilen;Isuzu2500n3500n5700n270PS26000PowerHPPMSCRD,250 B1500K160 HDilen;Pomp:Brosu:RobusRIBOD 12518 inc15 Psi3000 Dilen; TangkiMialiKaba si tax3Kapaisitak Samgki air bersihKdpasitak famgki lumpurAMHetA0AMaKi JMnRslesign pressureRanRgest pressureBLid6 OadgiajattangkiWihithedktnesmketebalan platTangki diberi logo Dinas PSDA & ESDM Kota SemarangBentuk silinderBahan welded mild steel plate dan diperkuat dengan vacuum ringTangki dibagi 2 untuk air bersih dan lumpur dengan
    Pomp:Dilampiri brosur BrosuVacuum Blower/ RobusVacuum pump 149004500 m3/hrMk2Mamch HgADsofuftsPressureBdwesb9OsKetMhaft PTO TorqueDilengkapi brosur dan kurva performaTangkiMialikabpa 3 tax3WMpasttak Samgki air bersihKMdpasitak famgki LumpurAMHetA0ANaKi MnRslesign pressureRanR4sest pressureBid OadedagattangkiWahithadlinesmketebalan platBentuk silinderSuction BoomSAA oft Ripe chiameterBxtiemsieh 1350 mmtelescopicmovement mivealie@AOhowament Tangki diberi logo Dinas PSDA & ESDM Kota SemarangBahan welded
Putus : 14-05-2013 — Upload : 21-12-2013
Putusan MAHKAMAH AGUNG Nomor 797 K /Pid.Sus/ 2013
Tanggal 14 Mei 2013 — IR. IGN. ARIF RIYANTO, MM
7149 Berkekuatan Hukum Tetap
  • No. 797 K/Pid.Sus/2013 KdipaisitdY tarayki lumpuriACetEs GAngkiTnPRsiesign pressureT2nPsest pressureBlisbDateylepattangkiWaihithadkitessn (ketebalan plat)Tangki diberi logo Dinas PSDA & ESDM Kota SemarangBentuk silinderBahan welded mild steel plate dan diperkuat dengan vacuum ringTangki dibagi 2 untuk air bersih dan lumpur dengan indicator level air bersih dan lumpurDilengkapi pintu belakang untuk operasi secara hidrolisTangki dapat diisi dengan 2 cara yakni lewat Manhole dan melalui saluran hydrant.Buction
    Pompa Penyemprot HPP 1205150 L/mindials barBattiBORkeMPiet TotakeDilengkapi alarm peringatan air habisPompa mati otomatisDilampiri brosuracuum Blower/ Vacuum pump400@i4500 m3/hrTekadanch HgNits bitedPressureAdincSOG0Swithb haft PTO TorqueDilengkapi brosur dan kurva performaTangki.asia Starhki air bersihKdasitay targgki lumpuriSACetEs GAngkiTnPsiesign pressureT2nPsest pressureBlisbDateylepattangkiWaiithakhessn (ketebalan plat)Tangki diberi logo Dinas PSDA & ESDM Kota SemarangBentuk silinderBahan welded
Putus : 26-02-2013 — Upload : 21-12-2013
Putusan MAHKAMAH AGUNG Nomor 152 K/Pid.Sus/2013
Tanggal 26 Februari 2013 — Ir. FAUZI, MT ; Jaksa/Penuntut Umum pada Kejaksaan Negeri Semarang
5438 Berkekuatan Hukum Tetap
  • Blower/Vacuum pumpLaju airTekananAbsolutePressurePower by SplitShaft PTOTorqueTangkiTotal KapasitasKapasitas tangkiair bersihKapasitas tangkilumpurDiameter tangkiTankpressureTankpressureSuduttangkiWall(ketebalan plat)designtestangkatthickness otomatisDilam piri brosur40004500 m3/hr1520 inch Hg1015 PsiMin 3000 Kg.MDilengkapi brosurdan kurva performaMinimal 12 m3Minimal 5 msMinimal 7 ms15001800 mm15 Psi22 Psi4550 derajatMinimal 6 mmTangki diberi logoDinas PSDA &ESDM KotaSemarangBentuk silinderBahan welded
    No. 152 K/Pid.Sus/2013 Laju airTekananAbsolutePressurePower by SplitShaft PTOTorqueTangkiTotal KapasitasKapasitas tangkiair bersihKapasitas tangkilumpurDiameter tangkiTankpressureTankpressureSuduttangkiWall(ketebalan plat)designtestangkatthickness 40004500 m3/hr1520 inch Hg1015 PsiMin 3000 Kg.MDilengkapi brosurdan kurva performaMinimal 12 m3Minimal 5 msMinimal 7 ms15001800 mm15 Psi22 Psi4550 derajatMinimal 6 mmTangki diberi logoDinas PSDA &ESDM KotaSemarangBentuk silinderBahan welded milddansteel
Register : 21-04-2016 — Putus : 02-06-2016 — Upload : 08-08-2021
Putusan PN SAMARINDA Nomor 14/Pid.Sus-TPK/2016/PN Smr
Tanggal 2 Juni 2016 — Penuntut Umum:
1.R. JOHARCA DWIPUTRA, S.H.
2.ALEXANDER KRISTIAN SILAEN, S.H, M.H.
3.M. YOGEN PANGKEY, S.H.
4.HERU APRIANTO, S.H.
5.MELATI WARNA DEWI, S.H.
6.AMIR GIRI MURYAWAN, S.H.
Terdakwa:
ARMIN EFENDY Bin Alm BANGSIR
12321
  • DIVISI 2(masuk pada Rekapitulasi Perkiraan Harga 268.322.981,1Pekerjaan) 0DIVISI 3 PEKERJAAN TANAH3.2.2 Timbunan Pilihan Me 349,20 141.032,83 49 .248.664,24Jumlah harga pekerjaan DIVISI 3(masuk pada Rekapitulasi Perkiraan Harga 49.248.664,24Pekerjaan)DIVISI 7 PEKERJAAN STRUKTUR7.1 (7) Beton Mutu Rendah dengan Me 698,40 1.648.418,1 1.151.255.235,9fc=20 Mpa (K250) 5 67.3 (1) Baja Tulangan B 24 Polos Kg 3.677,1 13.813,00 50.792.058,5627.3 (6) Anyaman Kawat yang Dilas Kg 10.713, 16.742,00 179.364.747,32(Welded
    DIVISI 2(masuk pada Rekapitulasi Perkiraan Harga 268.322.981,1Pekerjaan) 0DIVISI 3 PEKERJAAN TANAH3.2.2 Timbunan Pilihan Me 349,20 141.032,83 49.248.664,24Jumlah harga pekerjaan DIVISI 3(masuk pada Rekapitulasi Perkiraan Harga 49.248.664,24Pekerjaan)DIVISI 7 PEKERJAAN STRUKTUR7.1 (7) Beton Mutu Rendah dengan Me 698,40 1.648.418,1 1.151.255.235,9fc=20 Mpa (K250) 5 67.3 (1) Baja Tulangan B 24 Polos Kg 3.677,1 13.813,00 50.792.058,5627.3 (6) Anyaman Kawat yang Dilas Kg 10.713, 16.742,00 179.364.747,32(Welded
    2(masuk pada Rekapitulasi Perkiraan Harga268.322.981,1 Pekerjaan) OoDIVISI 3 PEKERJAAN TANAH3.2.2 Timbunan Pilihan Me 349,20 141.032,83 49.248.664,24Jumlah harga pekerjaan DIVISI 3(masuk pada Rekapitulasi Perkiraan Harga 49.248.664,24Pekerjaan)DIVISI 7 PEKERJAAN STRUKTUR7.1 (7) Beton Mutu Rendah Me 698,40 1.648.418,15 1.151.255.235,9dengan fc=20 Mpa (K 6250)7.3 (1) Baja Tulangan B) 24 Kg 3.677,12 13.813,00 50.792.058,56Polos7.3 (6) Anyaman Kawat yang Kg 10.713,46 16.742,00 179.364.747,32Dilas (Welded
Register : 07-08-2017 — Putus : 02-11-2017 — Upload : 14-11-2017
Putusan PT JAKARTA Nomor 466/PDT/2017/PT.DKI
Tanggal 2 Nopember 2017 — PT.SATYA PERMAI >< PT.ASURANSI UMUM BUMI PUTERA MUDA 1967 CS
11375
  • (permanent doubling welded) menjadi pemasangan pelat rangkapdalam status perbaikan sementara (temporary repair) danmengkondisikan seolaholah tambalan tersebut berpotensimenimbulkan bahaya bagi keselamatan kapal dan sesuai tujuandilaksanakannya pemeriksaan bawah air/undervater survey sebagaidasar surveyor dapat/tidaknya menunda survey pengedokan yang telahjatuh tempo; tanpa Tim Kajian CMC KM. ldola Nusantaramengetahui/menyadari bahwa:Hal 12 dari 53 hal.No.466/Pdt /2017/PT.DKI27.127.227.3Bahwa PT.
Register : 16-03-2018 — Putus : 11-04-2018 — Upload : 06-01-2020
Putusan PT BANDUNG Nomor 6/PID.TPK/2018/PT BDG
Tanggal 11 April 2018 — Pembanding/Penuntut Umum : TASJRIFIN M.A HALIM,SH.,MH
Terbanding/Terdakwa : Ir. YAYAT AHMAD SUDRAJAT
3231206
  • drain)Fittings Welded joint, flanged 1 lot 1 lot& screwedStop kran flanged cast iron (12kg/cm?) : 6" 8 bh 8 bh 4" 6 bh 6 bh 242" 2 bh 2 bh 1" (screwed bronze 12 kg/cm?) 8 bh 8 bhLantai 1Pipa, black steel pipe (Shcedule40):Black steel pipe Sch 40 4" 170 M? 170 M?Black steel pipe Sch 40 2%" 643 M? 643 M?Black steel pipe Sch 40 1%" 66 Mt 66 MtFittings Welded joint, flanged & 1 lot 1 lotscrewed Halaman 41 dari 563 Putusan No. 6/TPK/2018/PT.BDG Stop kran flanged cast iron (12kg/cm?)
    Black steel pipe Sch 40 1%" 63 Mt 63 MtFittings Welded joint, flanged & 1 lot 1 lotscrewedPerlengkapan, Stop kran flanged 8 bh 8 bhcast iron (12 kg/cm?), 4Lantai 3Pipa, black steel pipe (Shcedule40):Black steel pipe Sch 40 4" 124 M? 124 M?Black steel pipe Sch 40 2%" 412 Mt 412 M?Black steel pipe Sch 40 1%" 51M? 51M?Fittings Welded joint, flanged & 1 lot 1 lotscrewedPerlengkapan, Stop kran flanged 8 bh 8 bhcast iron (12 kg/cm?)
    , 4"Lantai TribunePipa, black steel pipe (Shcedule40):Black steel pipe Sch 40 2%" 289 Mt 289 MtBlack steel pipe Sch 40 1%" 34 Mt 34 MtFittings Welded joint, flanged & 1 lot 1 lotscrewedPemipaan TegakPipa, black steel pipe (Shcedule40):Black steel pipe Sch 40 6" 144 M? 144 M?GIP kelas medium 1" 8 Mt 8 MtGIP kelas medium %" 8 Mt 8 MtFittings Welded joint, flanged & 1 lot 1 lotscrewedPerlengkapanStop kran flanged cast iron (12 8 bh Stop krankg/cm?), 1" screwedbronzeataukuningan(12kg/cm?)
    drain)Fittings Welded joint, flanged & 1 lot 1 lotscrewedStop kran flanged cast iron (12kg/cm?) : 6" 8 bh 8 bh Halaman 204 dari 563 Putusan No. 6/TPK/2018/PT.BDG 4" 6 bh 6 bh 242" 2 bh 2 bh 1" (screwed bronze 12 kg/cm?) 8 bh 8 bhLantai 1Pipa, black steel pipe (Shcedule 40) :Black steel pipe Sch 40 4" 170 M? 170 M?Black steel pipe Sch 40 2%" 643 M? 643 M?Black steel pipe Sch 40 17%" 66 M? 66 M?Fittings Welded joint, flanged & 1 lot 1 lotscrewedStop kran flanged cast iron (12kg/cm?)
    Fittings Welded joint, flanged & 1 lot 1 lotscrewedPemipaan TegakPipa, black steel pipe (Shcedule 40) :Black steel pipe Sch 40 6" 144 M? 144 M?GIP kelas medium 1" 8 Mt 8 MtGIP kelas medium %4" 8 Mt 8 MtFittings Welded joint, flanged & 1 lot 1 lotscrewedPerlengkapanStop kran flanged cast iron (12 8 bh Stop krankg/cm?), 1" screwedbronzeataukuningan(12kg/cm),1",8bh Halaman 205 dari 563 Putusan No. 6/TPK/2018/PT.BDG Three way valve katup 3 arahscrewed bronze atau kuningan (12kg/cm?)
Putus : 17-11-2014 — Upload : 05-01-2015
Putusan PN SURABAYA Nomor 2064/PID.B/2014/PN.SURABAYA
Tanggal 17 Nopember 2014 — RATNAWATI
6626
  • Sumbawa ) = 5.000.000,00 ;- 06-May-11 Paid Nata Teknik ( various packing for Bima ) = 11.802.500,00 ;- 06-May-11 Paid Nata Teknik ( packing klingrit for Sumbawa ) = 325.000,00 ;- 06-May-11 Pay Ralona-Crane for Bima ( 24 April - 23 May ) + 25.000 = 52.025.000,00 ;- 09-May-11 Packing Tombo + Packing Klingrit for Sumbawa = 13.725.000,00 ;- 09-May-11 Petty Cash Bima + B Charge 25.000 = 135.345.000,00 ;- 09-May-11 Petty Cash Sumbawa + B Charge 25.000 = 313.025.000,00 ;- 09-May-11 Pipe SCH 20 10" welded
    -11 Franklin 670 - scale remover ( chemical cooler Bima ) + 10,000 = 9.570.000,00 ;- 09-May-11 Paid Mr Bent Expenses -Inv 2138/2139-11-79 + B Charge 10.000 = 19.335.247,00 ;- 09-May-11 Paid Inv Nor April S$ 38.975 Rate 6.950 + B charge 35.000 = 270.911.250,00 ;- 10-May-11 WF,INP,UNP,Angle Bar ( Materials for Sumbawa ) + 25,000 = 94.947.727,00 ;- PPn Material Sumbawa = 9.492.273,00 ;- 12-May-11 DP 50% Special Elbow ( Bima Materia l ) + 10,000 = 41.860.000,00 ;- 12-May-11 DP 50% Pipe SCH 40 welded
    to Rangka Raya ( Bima Material ) + 10,000 = 24.397.000,00 ;- 12-May-11 DP 50% Fitting,Valve,Boiler ( Bima Material ) + 25,000 = 184.113.300,00 ;- 12-May-11 DP 50% Pipe SCH 10 welded ( Various Bima Material ) + 25,000 = 203.945.975,00 ;- 12-May-11 Paid Pipe,WF,Angle Bar to Benteng Anugrah ( Bima Material ) = 234.540.181,00 ;- PPn Benteng Anugrah = 23.454.019,00 ;- 12-May-11 Airtickt Hendy, Santoso, Endy, Ratnawati, Echwanto - Traveling to Sumbawa = 7.369.800,00 ;- 12-May-11 Petty Cash Bali
    Sumbawa to Nata Teknik = 28.825.000,00 ;- 18-May-11 TT Petty Cash Dewi- order Gasket Tembaga + 5,000 = 9.705.000,00 ;- 18-May-11 Paid Telkomsel Mr Bent = 1.836.800,00 ;- 18-May-11 Duty Tax TNT - Part frm NOR (Temptr calibrator,Oring,Copper Sbw ) = 6.400.500,00 ;- 19-May-11 MHE Demag-Overhoul Travelling Crane Bima Euro 19,600 rate 12,228 + 35,000 = 239.703.800,00 ;- 19-May-11 PPn MHE Demag-Overhoul Travelling Crane Euro 1,960 rate 12,655 + 10,000 = 24.814.369,00 ;- 19-May-11 Pay Off Pipe SCH 40 welded
    to Rangka Raya ( Bima Material ) +10,000 = 24.397.000,00 ;- 19-May-11 Pay Off Pipe SCH 10 welded PT Benteng ( Various Bima Material ) + 25,000 = 203.261.975,00 ;- 19-May-11 DP 50% PT Benteng - Material for Silincer Kumafibre Bima = 25.419.000,00 ;- 19-May-11 Pay Off PT Arita - Fitting, Valve, Boiler ( Bima Material ) + 25,000 = 184.113.300,00 ;- 19-May-11 PT Arita Prima-Flanges Bima - Material for Silincer Kumafibre = 8.712.000,00 ;- 19-May-11 TT Transway -PIB Plate Heat Exchg Sbw
Register : 07-11-2018 — Putus : 11-02-2019 — Upload : 19-02-2019
Putusan PTUN BANDA ACEH Nomor 51/G/2018/PTUN.BNA
Tanggal 11 Februari 2019 — Penggugat:
PT. VENDE MESTIKA Dalam Hal ini diwakili oleh WIHANA SYAHPUTRA
Tergugat:
KEPALA DINAS PEKERJAAN UMUM DAN PENATAAN RUANG PEMERINTAH ACEH
17695
  • Citramasjaya Teknik Mandiri kesulitandalam mendapatkan material Plat SM 490 YB dan harus memesan pada pabrikKrakatau steel, dan untuk fabrikan Welded Beam memerlukan waktu produksi 34 minggu setelah kedatangan material plate SM 490 YB;D. Pada tanggal 03 November 2017 PT.
Register : 15-09-2009 — Putus : 05-08-2010 — Upload : 22-09-2015
Putusan PN JAKARTA SELATAN Nomor 1458/Pdt.G/2009/PN.Jkt.Sel
Tanggal 5 Agustus 2010 — PT. SAPTAWELL TECHNICATAMA Lawan PT. ELNUSA. Tbk.
8737
  • Oleh karenanya, agar Riser Spool tersebut dapat berfungsi dan sesuaidengan standar yang berlaku, atas dasar rekomendasi dari BKI demi keamanandan keselamatan kerja di lapangan, dilakukan pengelasan oleh Tergugat;Mohon perhatian Majelis Hakim, bahwa bentuk Riser Spool yang disewa olehTergugat adalah welded dimana memang sudah terdapat bagian di RiserSpoll yang dilas, sehingga jika yang dipersoalkan terdapat laslasan, makatanpa dilakukan pengelasan oleh Tergugat pun, laslasan akan tetap ada ;31.
Register : 13-10-2016 — Putus : 05-04-2017 — Upload : 02-05-2018
Putusan PN JAKARTA SELATAN Nomor 719/Pdt.G/2016/PN JKT.SEL
Tanggal 5 April 2017 — PT. SATYA PERMAI Lawan 1.PT. Asuransi Umum Bumiputera Muda Seribu Sembilan ratus Enam puluh Tujuh 2.PT. Biro Klasifikasi Indonesia Persero cq. Tim Kajian CMC. KM. Idola Nusantara 3.PT. Radita Hutama Internusa cq. Guntur Tampubolon, SH. 4.Otoritas Jasa Keuangan OJK
222356
  • (permanent doubling welded) menjadi pemasangan pelat rangkapdalam status perbaikan sementara (temporary' repair) danmengkondisikan seolaholah tambalan tersebut berpotensimenimbulkan bahaya bagi keselamatan kapal dan sesuai tujuandilaksanakannya pemeriksaan bawah air/underwater survey sebagaidasar surveyor dapat/tidaknya menunda survey pengedokan yang telahjatuh tempo; tanpa Tim Kajian CMC KM. ldola Nusantaramengetahui/menyadari bahwa:27.1 Bahwa PT.
Putus : 13-08-2012 — Upload : 06-10-2016
Putusan PN SEMARANG Nomor 41/Pid.Sus/2012/PN.Tipikor.Smg
Tanggal 13 Agustus 2012 — IR. IGN. ARIF RIYANTO, MM.(TERDAKWA)
9373
  • 18 inch Hg Absolute PressurePow er by Split ShaftPTO TorqueTangkiTotal KapasitasKapasitas tangki airbersihKapasitas tangkilumpurDiameter tangkiTank designpressureTank test pressureSudut angkat tangkiWall thickness(ketebalan plat)Suction BoomSuction PipediameterExtension(telescopic)movement 1015 PsiMin 3000 Kg.MDilengkapi brosur dan kurvaperformaMinimal 12 m3Minimal 5 m3Minimal 7 m315001800 mm15 Psi22 Psi4550 derajatMinimal 6 mmTangki diberi logo Dinas PSDA &ESDM Kota SemarangBentuk silinderBahan welded
    Kapasitas Minimal 7 m3 7mtangki lumpur4 Diameter tangki 15001800 mm 1700 mm5 Tank design 15 Psi 15 Psipressure6 Tank test 22 Psi 22 Psipressure7 Sudut angkat 4550 derajat 45 derajat tangki Wall thickness(ketebalan plat)Suction BoomSuction PipediameterExtension(telescopic)movementMax verticalmovementSudut putarJetting HoseReelDiameterselangPanjang selangWorkingpressureAuxillary HoseReelDiameterselangPanjang selangEquipment Minimal 6 mmTangki diberi logoDinas PSDA &ESDM KotaSemarangBentuk silinderBahan welded
Putus : 17-11-2020 — Upload : 13-08-2021
Putusan PN SURABAYA Nomor 8/Pdt.Sus.Gugatan Lain-Lain/2020/PN.Niaga.Sby
Tanggal 17 Nopember 2020 — 1. M. AGUNG BUDIMAN, S.H, dkk lawan 1. PT. CITRA GAIA, Dkk
24183
  • GAIAPT Bukit Jaya Abadi No 081/CGLGL/BJA/XII/2019 tgl 02 Desember 2019, dimana seluruh proses pekerjaandilakukan di lokasi milik Tergugat 2tidak melibatkan PT DutaciptaPakarperkasa selaku debitur pailit.Bahwa jasa fabrikasi dimaksud adalah seluruh bahan material utamamaupun material bantu adalah milik Tergugat sedangkan pihak Tergugat Ilmenyediakan jasa ketenagakerjaan saja.Bahwa jenis perkerjaan dimaksud adalah diatur dalam Pasal 1 LingkupPerjanjian meliputi pekerjaan cutting plate, pembuatan welded
Register : 01-09-2014 — Putus : 22-12-2014 — Upload : 09-05-2019
Putusan PN JAKARTA PUSAT Nomor 86/PID.SUS/TPK/2014/PN.JKT.PST
Tanggal 22 Desember 2014 — HERU SULAKSONO
918721
  • Pengadaan tiang pancang baja/spiral welded steel pipe ASTM A252 Grade 2, berdasarkan Kontrak Penjualan Nomor104/SBP/KP/IV/2008 tanggal 29 April 2008 dengan nilai pekerjaansebesar Rp42.699.019.374,00 (empat puluh dua milyar enamratus sembilan puluh sembilan juta sembilan belas ribu tiga ratustujuh puluh empat rupiah) termasuk pengiriman dan pekerjaanBlasting Coating.2.
    Pengadaan tiang pancang baja/spiral welded steel pipe ASTM A 252Grade 2, berdasarkan Kontrak Penjualan Nomor: 104/SBP/KP/IV/2008tanggal 29 April 2008 dengan nilai pekerjaan sebesar Rp.42.699.019.374, (empat puluh dua milyar enam ratus sembilan puluhsembilan juta sembilan belas ribu tiga ratus tujuh puluh empat rupiah)termasuk pengiriman dan pekerjaan Blasting Coating.2.
    Pengadaan Tiang Pancang Baja/spiral welded steel pipe ASTM A 252Grade 2, yang dituangkan dalam Kontrak Nomor: 107/SBP/KP/V1/2010tanggal 21 Juni 2010 dengan nilai kontrak Rp. 28.568.493.439,20.
    Pengadaan Tiang Pancang Baja/spiral welded steel pipe ASTM A 252Grade 2, yang dituangkan dalam Kontrak Nomor: 107/SBP/KP/V1/2010Hal.1182 dari 1603 hal. PUTUSAN Nomor : 86/PID.SUS/TPK/2014/PN.JKT.PST +182tanggal 21 Juni 2010 dengan nilai kontrak Rp. 28.568.493.439,20.
Register : 09-04-2018 — Putus : 28-08-2018 — Upload : 29-08-2018
Putusan PN GORONTALO Nomor 8/Pid.Sus-TPK/2018/PN Gto
Tanggal 28 Agustus 2018 — VENTJE YUNUS ABBAS,S.ST,M.Si
216537
  • Sinar Bintang Surya Adhitya;6. 1 (satu) lembar Fotocopy Konfirmasi Order Spiral Welded Steel Pipe, SNI 0039 : 2013 (Medium) tanggal 6 Juli 2015;7. 1 (satu) eksemplar Fotocopy Pelunasan Tagihan Jasa Ekspedisi, pembongkaran dan angkutan No. 01/SBS-TAG/LGM/XI/2015 tanggal 30 Desember 2015;8. 1 (satu) bundel Asli Laporan Pra Kontrak Pengadaan Jasa Konstruksi Pekerjaan Pembangunan Bendung Dan Jaringan Transmisi Air Baku Longalo TA. 2015;9. 1 (satu) bundel Fotocopy Progress Pelaksanaan Lelang Paket
Register : 01-12-2016 — Putus : 19-04-2017 — Upload : 09-03-2021
Putusan PN TANJUNG KARANG Nomor 49/Pid.Sus-TPK/2016/PN Tjk
Tanggal 19 April 2017 — Penuntut Umum:
VELLYADANA TIWISIA, SH, MH
Terdakwa:
MOCHAMMAD FADLUN, ST
13838
  • Mitra Perkasa Jaya Nomor 165 /SBP/SD/ V/2013 tanggal 10 Mei 2013 dalam mengikuti tender Proyek Pekerjaan Pembangunan Pelabuhan Rakyat Sebalang SPIRAL WELDED STEEL PIPE ASTM A 252 Gr.2 Dia 600mm x t. 14mm x Pj.10 Mtr;
  • Fotocopy Legalisir 1 (satu) Lembar Surat Keterangan Jaminan Mutu PT. Swarna Bajapacific kepada PT. Mitra Perkasa Jaya No 228/SBP/ FAX/V/2013 tanggal 10 Mei 2013;
  • Fotocopy Legalisir 1 (satu) Lembar Surat PT. Mitra Perkasa Jaya Kepada PT.
    Mitra Engineering Grup No 167 /SBP/SD/ V/2013 tanggal 11 Mei 2013 dalam mengikuti tender Proyek Pekerjaan Pembangunan Pelabuhan Rakyat Sebalang SPIRAL WELDED STEEL PIPE ASTM A 252 Gr.2 Dia 457.2mm x t. 12mm x Pj.10 Mtr;
  • Fotocopy Legalisir 1 (satu) Lembar Surat Keterangan Jaminan Mutu PT. Swarna Bajapacific kepada PT. Mitra Engineering Grup Nomor 230/SBP/FAX/V/2013 tanggal 11 Mei 2013;
  • Fotocopy Legalisir 1 (satu) Lembar Surat PT. Mitra Engineering Grup Kepada PT.
    Chokki Karya Nomor 162 /SBP/SD/V/2013 tanggal 08 Mei 2013 dalam mengikuti tender Proyek Pekerjaan Pembangunan Pelabuhan Rakyat Sebalang SPIRAL WELDED STEEL PIPE ASTM A 252 Gr.2 Dia 457.2mm x t. 12mm x Pj.10 Mtr;
  • Fotocopy Legalisir 1 (satu) Lembar Surat Keterangan Jaminan Mutu PT. Swarna Bajapacific kepada PT. Chokki Karya Grup No 225/SBP/FAX/ V/2013 tanggal 08 Mei 2013;
  • Fotocopy Legalisir 1 (satu) Lembar Surat PT. Chokki Karya Grup Kepada PT.