Ditemukan 198 data

Urut Berdasarkan
 
Register : 09-03-2015 — Putus : 19-10-2015 — Upload : 21-01-2016
Putusan PN DENPASAR Nomor 201/ Pdt.G / 2015 / PN.Dps.
Tanggal 19 Oktober 2015 — I NYOMAN YUDHIAWAN melawan PT. MATAHARI KORIN TOUR & TRAVEL
318239
  • Pengembalian lampu Rp. 2.16.000,00 dengan rincian volume 48.00 ttk hargasatuan 42.000,009.
Register : 06-02-2018 — Putus : 14-05-2018 — Upload : 03-07-2019
Putusan PN AMBON Nomor 2/Pid.Sus-TPK/2018/PN Amb
Tanggal 14 Mei 2018 — Penuntut Umum:
1.DJINO D. TALAKUA, SH
2.MOURITS PALIJAMA, SH
3.SESCA TABERIMA, SH
Terdakwa:
JOHANIS OKTOVIANUS PUTTILEIHALAT,S.P
10297
  • Plesteran1 Pasangan Batu Kosong 16.00 494,942.53 7,919,080.48 1,138,367.822 ack Pondes Baty kall 48.00 841,913.11 40,411,829.28 8,579,094.593 a belt Beit Beteshh 514.00 334,538.91 171,952,999.74 31,734,361.004 Plesteran dinding ad. 1.5 1,028.00 55,824.89 57,387,986.82 19,769,826.935 Plesteran dinding ad. 1: 3 55.50 59,328.31 3,292,721.13 61.221.650,34lll.
    Plesteran1 Pasangan Batu Kosong 16.00 494,942.53 7,919,080.48 1,138,367.822 a Pondas bata kall 48.00 841,913.11 40,411,829.28 8,579,094.59oa Gotu Boks Merah 514.00 334,538.91 171,952,999.74 31,734,361.004 Plesteran dinding ad. 1:5 1.028.00 55,824.89 57,387,986.82 19,769,826.935 Plesteran dinding ad. 1 : 3 55.50 59,328.31 3,292,721.13 61.221.650,34 Hal 43 dari 125 hal Putusan Nomor 2/Pid.SusTPK/2018/PN AMB Pekerjaan Beton Bertulang 1 Balok Sloof~ Balok Sloot Betoa Lopae 5.60 4,827,610.11 27,034,616.62
    Pekerjaan Pasangan dan Hal 89 dari 125 hal Putusan Nomor 2/Pid.SusTPK/2018/PN AMB Plesteran 1 Pasangan Batu Kosong 16.00 494,942.53 7,919,080.48 1,138,367 .822 resangan Pondasi batu Kall 48.00 841,913.11 40,411,829.28 8,579,094.59ia batu Bata merah 514.00 334,538.91 171,952,999.74 31,734,361.004 Plesteran dinding ad. 1.5 1.028.00 55,824.89 57,387,986.82 19,769,826.935 Plesteran dinding ad. 1: 3 55.50 59,328.31 3,292,721.13 61.221.650,34lll.
    Pekerjaan Pasangan dan Plesteran1 Pasangan Batu Kosong 16.00 494,942.53 7,919,080.48 1,138,367.822 Pasangan Pondasi batu kali ad. 1:5 48.00 841,913.11 40,411,829.28 8,579,094.593 Pasangan batu Bata merah ad. 1: 4 514.00 334,538.91 171,952,999.74 31,734,361.004 Plesteran dinding ad. 1:5 1.028.00 55,824.89 57,387,986.82 19,769,826.935 Plesteran dinding ad. 1:3 55.50 59,328.31 3,292,721.13 61.221.650,34Ul.
Putus : 05-10-2016 — Upload : 04-08-2017
Putusan MAHKAMAH AGUNG Nomor 1552 K/PID.SUS/2016
Tanggal 5 Oktober 2016 — Andi Sianto alias Baba Anga
7853 Berkekuatan Hukum Tetap
  • PEKERJAAN TEMBOK PENAHAN (Bagian Utara)= 48.00 M11. Pekerjaan Galian Tanah Ms 30.92 42,208.88 1.305.098.422. Pekerjaan Pasangan Pondasi M8 34.01 779.657.81 26.516.162.08Jumlah pekerjaan Tembok penahan 27.821.260.50REKAPITULAS!
    No.1552 K/Pid.Sus/2016 H Pekerjaan Penggantungan dan Pengunci 1.726.104.07 Pekerjaan Mekanikal Elektikal 1.521.090.00J Pekerjaan Sanitasi dan KM/WC (2 Unit) 27.214.773.13K Pekerjaan Pengecatan dan Finising 6.242.368.82Jumlah 127.815.203.073 Pembangunan Tembok Penahan (Bagian Utara)A Pekerjaan Tembok Penahan (bagian utara) = 48.00 M 27.821.260.50Jumlah 27.821.260.50Jumlah 1 + Jumlah 2 + Jumlah 3 711.046.264.80B Pajak Pertambahan Nilai (PPN) = 10% x A 71.104.626.48C Jumlah Total Harga Pekerjaan = A
    PEKERJAAN TEMBOK PENAHAN (Bagian Utara)= 48.00 M!1. Pekerjaan Galian Tanah M8 30.92 42,208.88 1.305.098.422. Pekerjaan Pasangan Pondasi Ms 34.01 779.657.81 26.516.162.08Jumlah pekerjaan Tembok penahan 27.821.260.50REKAPITULAS!
    Tunggu 308.30 283.78 24.52 1.53%Pekerjaan Plesteran Kolom veR.Tunggu 1 PC : 3 PSR 42.00 48.00 6.00 0.26%Pekerjaan Acian Tembok + Kolom veR.tunggu 308.30 331.78 23.48 1.09%PEKERJAAN LANTAIPekerjaan Urungan Tanah MsPeninggian Lantai 46.43 23.62 22.81 0.50%Pekerjaan Urungan Pasir di Bawah MeLantai 23.22 8.40 14.82 0.22%Pekerjaan Urungan Pasir di Dalam MaTempat Duduk R.Tunggu 13.80 7.26 6.54 0.19%Pekerjaan Cor Lantai Rabat Beton MaLantai 1 PC :3 PSR: 5 KRL 11.61 8.40 3.21 1.20%Pekerjaan Pasang Lantai
    PEKERJAAN UMUM DAN PERSIAPANPengukuran dan Pemasangan Me1 Bouwplank 48.00 50.00 2.00 0.21%B. PEKERJAAN TANAH DAN PONDASI. PEKERJAAN TANAHPekerjaan Galian Tanah Saluran + MB1 Galian Pondasi Selasar 20.352 13.14 7.21 0.08%Pekerjaan Urungan Pasir Di Ma2 Pondasi 1.264 1.80 0.54 0.05%Pekerjaan Urungan Kembali Tanah Me3 Bekas Galian Pondasi 5.088 271 2.38 0.01% Hal. 57 dari 167 hal. Put.
Register : 21-07-2009 — Putus : 03-11-2009 — Upload : 24-06-2015
Putusan PN BATURAJA Nomor 461/PID.B/2009/PN.Bta
Tanggal 3 Nopember 2009 — - SAMSUL FUAD Bin H. BERLIAN - HARMAIN, SKM Bin M. ROMLI - MAT SARIM, SKM Bin A. HAKIM
716
  • 1.500.00 3.500.00 2.400.00 8.400.000.00mg/Sml24 Docicyclin kapsul 100 mg Box/100 kapsul 100.00 35.00 65.00 21.550.00 1.400.750.0025 Efedrin HCL tablet 25 mg Botol/1000 tab 100.00 30.00 70.00 35.393.00 2.477.510.0026 Extrak Beladon tab 10mg Botol/1000 tab 100.00 30.00 70.00 17.892.00 1.252.440.0027 Epineprin HCL injeksi Box/30 ampl 50.00 16.67 33.33 10.371.00 345.665.4328 Erytomicin kapsul 250 mg Box/100 kap 100.00 35.00 65.00 33.782.00 2.195.830.0029 Erytomicin kapsul 500 mg Box/100 kap 200.00 48.00
    Box/100 tab 50.00 15.00 35.00 37.063.00 1.297.205.00mg33 Fitomonadion (vit K) injeksil0 Box/30 ampl 400.00 40.00 360.00 29.300 10.548.000.00mg34 Fludane syrup Botol/60 ml 1.100.00 370.00 730.00 9.000.00 6.570.000.0035 Fludaneforte capsul Box/100 kapsul 2.200.00 734.00 1.466.00 54.000.00 79.164.000.0036 Furosemid inj iv/im 10 mg Box/25 ampl 20.00 6.00 14.00 25.876.00 362.264.0037 Furosemide tab 40 mg Botol/100 tab 100.00 35.00 65.00 6.542.00 425.230.0038 Garam oralit untuk ml air Box/100 150.00 48.00
    1.500.00 3.500.00 2.400.00 8.400.000.00mg/Sml24 = Docicyclin kapsul 100 mg Box/100 kapsul 100.00 35.00 65.00 21.550.00 1.400.750.0025 Efedrin HCL tablet 25 mg Botol/1000 tab 100.00 30.00 70.00 35.393.00 2.477.510.0026 Extrak Beladon tab 10mg Botol/1000 tab 100.00 30.00 70.00 17.892.00 1.252.440.0027 Epineprin HCL injeksi Box/30 ampl 50.00 16.67 33.33 10.371.00 345.665.4328 Erytomicin kapsul 250 mg Box/100 kap 100.00 35.00 65.00 33.782.00 2.195.830.0029 Erytomicin kapsul 500 mg Box/100 kap 200.00 48.00
    Box/100 tab 50.00 15.00 35.00 37.063.00 1.297.205.00mg33 Fitomonadion (vit K) injeksi 10 Box/30 ampl 400.00 40.00 360.00 29.300 10.548.000.00mg34 Fludane syrup Botol/60 ml 1.100.00 370.00 730.00 9.000.00 6.570.000.0035 Fludaneforte capsul Box/100 kapsul 2.200.00 734.00 1.466.00 54.000.00 79.164.000.0036 Furosemid inj iv/im 10 mg Box/25 ampl 20.00 6.00 14.00 25.876.00 362.264.0037 Furosemide tab 40 mg Botol/100 tab 100.00 35.00 65.00 6.542.00 425.230.0038 Garam oralit untuk ml air Box/100 150.00 48.00
Register : 24-10-2017 — Putus : 20-11-2017 — Upload : 22-08-2019
Putusan PT PADANG Nomor 15/PID.TPK/2017/PT PDG
Tanggal 20 Nopember 2017 — Pembanding/Penuntut Umum : DIMAS ADITYA, SH
Terbanding/Terdakwa : MARINDRA PGL IN BIN JUFRI
6221
  • 2017/PT PDG 23 Ags 789.0 789.000. 39.058.20 0 0 0011 0 0.0 =0015 Sep 21.12 444.6 444.600. 22.017.20 8 0 0011 0 0.4 0025 Sep 36.18 761.0 761.000. 37.704.20 2 0 0011 0 0.oO ~0027 Okt 70.05 1.450.00 71.500.20 0 0. 0011 0.0002 Nop 43.86 923.0 923.100. 45.715.20 8 0 0011 0 0.9 0012 Des 40.08 843.7 843.000. 41.768.20 1 5 0011 0 0.2 =5024 Jan 29.74 = 595.000. 30.340.20 5 00 Halaman 6 dari 64 Putusan Nomor 15/TIPIKOR/2017/PT PDG 12 0.O0010 26 Jan 10.00 800.0 200.000. 11.000.20 O O 0012 0 0.O 0O11 6 Feb 48.00
    PDG 7 00 00 =23 Ags 37.48 789.0 789.000. 39.058.20 0 0 0011 0 0oO ~0015 Sep 21.12 444.6 444.600. 22.017.20 8 0 0011 0 0.4 0025 Sep 36.18 761.0 761.000. 37.704.20 2 0 0011 0 0.oO 0027 Okt 70.05 1.450.00 71.500.20 0 0. 0011 00002 Nop 43.86 923.0 923.100. 45.715.20 8 0 0011 0 0.9 =0012 Des 40.08 843.7 843.000. 41.768.20 1 5 0011 0 02 ~50 Halaman 18 dari 64 Putusan Nomor 15/TIPIKOR/2017/PT PDG 9 24 Jan 595.000. 30.340.20 5 0012 0.O0O10 26 Jan 10.00 800.0 200.000. 11.000.20 0 O 0012 O 0.O sOO11 6 Feb 48.00
Register : 29-03-2017 — Putus : 21-06-2017 — Upload : 08-08-2017
Putusan PN BANDUNG Nomor 76/Pdt.Sus-PHI/2017/PN.Bdg
Tanggal 21 Juni 2017 — BAHRUM RANGKUTI; Melawan; PT. VIA MOTIF;
7914
  • diberi tanda bukti T 11 ;Foto Copy Upah PENGGUGAT bernama AGUS HERIYANTO (PENGGUGAT46) pada bulan September 2016 sejumlah Rp.1.903.771, selanjutnya diberitanda T 12;Foto Copy Upah PENGGUGAT bernama AGUS HERIYANTO (PENGGUGAT46) pada bulan Febmari 2017 sejumlah Rp.1.842.003, selanjuinya diberitanda bukti T 13 ;Foto Copy Slip Upah/Gajih atas nama BAHRUM RANGKUTI (PENGGUGAT1), bulan Oktober 2016, Upah Pokok sejumlah Rp.1.599.087, ditambahTunjangan Tidak Tetap Rp.81.100, ditambah Tunjangan KehadiranRp.48.00
    JAMSOSTEK dibayarTERGGUGAT) = jumlah total Rp.1.940.685, selanjutnya diberi tanda bukti T40;Foto Copy Slip upah/gajih atas nama MAMAT RUDIMAT (PENGGUGAT 3),bulan Februari 2017, Upah Pokok sejumlah Rp.1.814.188, ditambahRp.50.000, (Tunjangan Kehadiran) ditambah Rp.146.399, (BPJS danJAMSOSTEK dibayar TERGUGAT) = jumlah total Rp. 2.010.587, selanjutnyadiberi tanda bukti T 41 ;Foto Copy Slip upah/gajih atas nama IWA KARTIWA (PENGGUGAT 5) bulanFebruari 2017, Upah Pokok sejumlah Rp.2.042.545, ditambah Rp.48.00
Register : 26-06-2012 — Putus : 19-06-2012 — Upload : 08-08-2012
Putusan PN MANADO Nomor 18/Pid.Sus/2011/PN.Mdo
Tanggal 19 Juni 2012 — Drs. Hi. Muh. Mokoginta
8120
  • MOH.97 97HEIDY YUNITA63 91M.17 74YUNITA37 31ee 06 77IFRIANTY01 09MANOPPO23 66I WAYAN M. 91 34HERNA HELDA43 29L.63 77NIKMATULLAH 37 80L.03 31GITA SECILIA20 63M.ZUMRIYATI P.RISMAWATIOLIISRI HARTINI D.SRI WINANGSIM.TRESIA LINDAD.M.SUTRIANAPOTABUGAKIIMPAPUTUNGANAYUNITAMOKOAGOWTRISNOMAKISURATIPERAWAT S1 SITI SARAH 48.00 00 1LATAMAIPENGAWAS NIWAYAN wW. 55.29 29 3IFARMASI & 83 83LINDAWATIMAKANAN 94 94HASANNOVIYANTIPEMUDAASISTEN STEVANO P. 56.34 34 4IAPOTEKERMARGAKUAUDITOR SUSANTO, SH 58.00 .00 3S1 HUKUMIPENATA
    M. 63 77SUTRIANAPOTABUGA 37 80KIIM PAPUTUNGAN 03 3119.AYUNITAMOKOAGOW 20 6320.TRISNOMAKISURAT5 IPERAWAT S1 1.SITI SARAH 48.00 00 1LATAMA6 IPENGAWAS 1.NI WAYAN W. 55.29 29 3FARMASI &.LINDAWATI HASAN 83 .83MAKANAN NOVIYANTI 94 94PEMUDA7 IASISTEN APOTEKER 1.STEVANO P. 56.34 34 4MARGAKU8 AUDITOR 1. SUSANTO, SH 58.00 00 3S1 HUKUM9 IPENATA LAPORAN 1. MEIDA V. 61.74 60.60 20KEUANGAN DAMOPOLII/ RAHMAT AGU .60 60.
Putus : 04-10-2016 — Upload : 25-01-2017
Putusan PT SAMARINDA Nomor 112 /PDT/2016/PT.SMR.
Tanggal 4 Oktober 2016 —
538163
  • Bujur Timur (BT) Lintang Selatan (LS)1 116 46 0.00 1 4 22.002 116 46 0.00 1 4 0.003 116 46 20.00 1 4 0.004 116 46 20.00 1 3 30.005 116 46 30.00 1 3 30.006 116 46 30.00 1 3 0.007 116 46 40.00 1 3 0.008 116 46 40.00 1 2 40.009 116 46 50.00 1 2 40.0010 116 46 50.00 1 2 28.6411 116 47 2.02 1 2 28.6412 116 47 2.02 1 2 40.0013 116 47 10.00 1 2 40.0014 116 47 10.00 1 2 50.0015 116 47 20.00 1 2 50.0016 116 47 20.00 1 3 0.0017 116 47 52.00 1 3 0.0018 116 47 52.00 1 2 7.0019 116 48 48.00 1 2 7.00 Hal 5 dari
    84 hal putusan No. 112/PDT/2016/PT.SMR 20 116 48 48.00 0 59 41.0021 116 46 28.00 0 59 41.0022 116 46 28.00 1 1 4.0023 116 45 28.00 1 1 4.0024 116 45 28.00 1 2 3.0025 116 44 55.00 1 2 3.0026 116 44 55.00 1 3 7.002/7 116 44 25.00 1 3 7.0028 116 44 25.00 1 4 22.00 2.
Register : 24-05-2018 — Putus : 08-05-2018 — Upload : 20-05-2019
Putusan PT SAMARINDA Nomor 7/PID.TPK/2018/PT SMR
Tanggal 8 Mei 2018 — Pembanding/Penuntut Umum : DARWIS BURHANSYAH, S.H., M.H.
Terbanding/Terdakwa : H. MAHYUDIN, S.T., M.T. Bin H. MASTAWI ISMAIL
9148
  • 2,911,201.20 1,147.95Atap danlistplank41,310Beton K225 m3 27.59 1,497,410.00 aay 08 27.59 1,497,410.00 41,313,541.90 2,994.82 94,217Pembesian U24 kg 4,912.27 19,180.00 arog, 4912.27 19,180.00 94,217,338.60 38.36m 60,106Bekisting m2 261.80 229,590.00 562.00 261.80 229,590.00 60,106,662.00 0.00Dudukan tangkibulananBeton K225 m3 5.40 Pembesian U32 kg 1,193.15 Bekisting m2 6.32 PekerjaanpasanganPasangan batu 42,268bate La m2 307.65 137,390.00 083.50 307.65 137,390.00 42,268,033.50 0.00Pasangan Balu m2 48.00
    137,390.00 6,594,720.00 48.00 137,390.00 6,594,720.00 0.00bata roolag19,769Plesteran 1:4 m2 615.30 32,130.00 86,00 615.30 32,130.00 19,769,589.00 0.009,007Acian m2 615.30 14,640.00 993.00 615.30 14,640.00 9,007,992.00 0.00Pasang keramik 128.00 16,920.00 21,664 108.00 16,920.00 1,827,360.00 19,836,640.00lantai ,000.00 Pekerjaan cat Hal. 80 dari 203 hal.
    Bekisting m2 6.32 Pekerjaan pasangan42,268Pasangan batu bata 1:4 m2 307.65 137,390.00 033.50 307.65 137,390.00 42,268,033.50 0.00Pasangan batu bata roolag m2 48.00 137,390.00 sono 48.00 137,390.00 6,594,720.00 0.0019,769Plesteran 1;4 m2 615.30 32,130.00 589.00 615.30 32,130.00 19,769,589.00 0.00Acian m2 615.30 14,640.00 e007 615.30 14,640.00 9,007 ,992.00 0.00,992.00Pasang keramik lantai m2 128.00 16,920.00 an 108.00 16,920.00 1,827,360.00 19,836,640.00Pekerjaan catcatanFloor hardener m2 1,275,160.00
Register : 13-11-2015 — Putus : 24-02-2016 — Upload : 14-03-2016
Putusan PN KUPANG Nomor 92/Pid.Sus-TPK/2015/PN.Kpg
Tanggal 24 Februari 2016 — SUGIARTO PRAYITNO Alias DAUD Alias VIKTOR PURNOMO
109107
  • 213.035.250,0016 PDA Test Titik 1.00 Rp Rp28.000.000,00 28,000,000.0017 Dilatasi m' 21.00 Rp Rp380.800,00 7.996.800,0018 Test Beton Ls 1.00 Rp RpMaterial 28.000.00,00 28.000.000,0019 Lampu buah 3.00 Rp RpPenerangan Solar 36.000.000,00 108.000.000,00System20 Pengecatan m2 26.46 Rp RpKansteen 166.680,00 4.410.352,80JUMLAH RpPEKERJAAN 3.802. 304.1 67,50PEMBANGUNANTRESTLEll PEKERJAANDERMAGA (8X54)M21 Pengadaaan Tiang Kg 247,104.00 Rp RpPancang Baja 26,380,00 6.518.603.520,00045,7cm t=12mm2 Pembuatan buah 48.00
    KPG 7 Pemotongan Tiangbuah 48.00 Rp RpPancang 881.550,00 42.314.400,008 Pelat Baja Alas Kg 618.85 Rp RpBeton Isi Tiang 58.300,00 36.078.955,009 Tulangan Stek buah 48.00 Rp RpUntuk Tiang 791.110.00 37.973.280,00Pancang dia 22"10 Beton Isi Tiang m3 14.95 Rp RpPanjang Isian=2 m 5.261.430,00 78.658.378,5011 Pembuatan Poer m3 95.94 Rp RpBeton 8.094.410,00 776.577.695,4012 Pembuatan Balok m3 46.44 Rp RpBeton 35/60 9.130.640,00 424.026.921,60(melintang danmemangjang)13 Pembuatan Lantai m3 129.60 Rp RpBeton
    Pemotongan bh 48.00 48.00TiangPancang8.
    Pengadaan Kg 247,104.00 158,088.00Tiang PancangBaja Dia45,7mm; t = 12mmDes Pembuatan Bh 48.00 48.00Sepatu TiangPancang3. Pengecatan m2 2,689.90 1,782.00Tiang PancangPipa Baja4. Pengangkutan m' 1,872.00 1,200.00Tiang Pancagke TitikPancang5. Pemancangan m' 1,584.00 960.00Tiang Tegak6. PenyambungaBh 96.00 48.00n TiangPancang bajaTs Pemotongan /Bh 48.00 48.00Tiang Pancang8.
    KPG Penyambunga Bh 96.00 48.00n Tiang 48.00Pancang bajaPemotongan /Bh 48.00 48.00 Tiang PancangPelat Baja Kg 618.85 618.85Alas Beton IsiTiang Bahwa akibat adanya selisih volume kurang diatas biladikalikan dengan harga satuan masingmasing itempekerjaan sebagaimana tertuang dalam Kontrak makadiperoleh selisih biaya kurang pada AreaTrestle sebesar Rp.1.119.897.452,sedangkan selisih biaya kurang pada AreaDermaga sebesar Rp. 3.022.435.332, Dengan demikian,total jumlah selisih biaya kurang akibat selisih
Register : 27-11-2014 — Putus : 07-04-2015 — Upload : 28-11-2016
Putusan PN MEDAN Nomor 104/Pid.Sus-TPK/2014/PN Mdn
Tanggal 7 April 2015 — - BERMAN SITORUS
3812
  • 48.00 meter 15.920,00 764.160,003 Timer 1.00 bh 150.000,00 150.000,004 Kontaktor 1.00 bh 350.000,00 350.000,005 MCB 50A 1.00 bh 38.000,00 38.000,006 Kabel TIC 2 x 16 mm* 800.00 meter 12.000,00 9.600.000,007 Bundle Connector 2.00 bh 13.900,00 27.800,00Conduktor8 Small (x1) 14.00 bh 12.350,00 172.900,009 Dead End (x4) 2.00 bh 12.350,00 24.700,0010 Asessories 1.00 Is 700.000,00 700.000,00Sub Total II 13.327.560,00il PEKERJAAN LAINLAIN1 Upah Kerja 1.00 Is 1.750.000 1.750.0002 Biaya Penyambungan (BP)
    48.00 meter 15.920,00 764.160,003 Timer 1.00 bh 150.000,00 150.000,004 Kontaktor 1.00 bh 350.000,00 350.000,005 MCB 50A 1.00 bh 38.000,00 38.000,006 Kabel TIC 2 x16 mm 800.00 meter 12.000,00 9.600.000,007 Bundle Connector Conduktor 2.00 bh 13.900,00 27.800,008 Small (x1) 14.00 bh 12.350,00 172.900,009 Dead End (x4) 2.00 bh 12.350,00 24.700,0010 Asessories 1.00 Is 700.000,00 700.000,00Sub Total Il 13.327.560,00il PEKERJAAN LAINLAIN1 Upah Kerja 1.00 Is 1.750.000 1.750.0002 Biaya Penyambungan (BP) 22.000,00
    48.00 meter 15.920,00 764.160,003 Timer 1.00 bh 150.000,00 150.000,004 Kontaktor 1.00 bh 350.000,00 350.000,005 MCB 50A 1.00 bh 38.000,00 38.000,006 Kabel TIC 2x 16 mm?
    48.00 meter 15.920,00 764.160,003 Timer 1.00 bh 150.000,00 150.000,004 Kontaktor 1.00 bh 350.000,00 350.000,005 MCB 50A 1.00 bh 38.000,00 38.000,006 Kabel TIC 2x 16 mm* 800.00 meter 12.000,00 9.600.000,007 Bundle Connector 2.00 bh 13.900,00 27.800,00Conduktor8 Small (x1) 14.00 bh 12.350,00 172.900,009 Dead End (x4) 2.00 bh 12.350,00 24.700,0010 Asessories 1.00 Is 700.000,00 700.000,00Sub Total II 13.327.560,00Ml PEKERJAAN LAINLAIN1 Upah Kerja 1.00 Is 1.750.000 1.750.0002 Biaya Penyambungan (BP) 22.000,00
Register : 01-10-2014 — Putus : 19-01-2015 — Upload : 02-06-2016
Putusan PN TANJUNG PINANG Nomor 25/PID.SUS/TPK/2014/PN TPG
Tanggal 19 Januari 2015 — Firmansyah Chomsani, S. Sos
10919
  • Plesteran dinding M2 2,384.96 1,685.96 41,148.00 98, 136,334.08 69,374,038.44 (28,762,295.64)1:4 tebal 15 mm44 Pasangan dinding M2 192.75 174.92 313,748.00 60,474,927.00 54,879,702.04 (5,595,224.96) HargaPartisi lapis SatuanGlaswool TimpangBAB 5.PEKERJAAN ATA5.1 Pekerjaan Kuda Kg 6,420.90 5,842.76 24,405.00 156,702,064.50 142,592,655.42 (14,109,409.08)Kuda Baja IWF5.2 Pekerjaan Gording Kg 4,250.40 2,913.98 103,960,533.60 71,273,061.28 (32,687,472.32)Canal 24,459.005.3 Pekerjaan Ikatan Bh 68.00 48.00
    LantaiDasar43 Plesteran dinding M2 2,384.96 1,685.96 41,148.00 98,136,334.08 69,374,038.44 (28,762,295.64)1;4 tebal 15 mm44 Pasangan dinding M2 192.75 174.92 313,748.00 60,474,927.00 54,879,702.04 (5,595,224.96) HargaPartisi lapis SatuanGlaswool TimpangBAB 5.PEKERJAAN ATA5.1 Pekerjaan Kuda Kg 6,420.90 5,842.76 24,405.00 156,702,064.50 142,592,655.42 (14,109,409.08)Kuda Baja IWF52 Pekerjaan Gording Kg 4,250.40 2,913.98 103,960,533.60 71,273,061.28 (32,687,472.32)Canal 24,459.005.3 Pekerjaan Ikatan Bh 68.00 48.00
    PEKERJAAN ATAP5.1 Pekerjaan KudaKuda Baja IWF Kg 6,420.90 5,842.76 24,405.00 142,592,655.42 (14,109,409.08)156,702,064.505.2 Pekerjaan Gording Canal Kg 4,250.40 2,913.98 24,459.00 71,273,061.28 (32,687,472.32)103,960,533.605.3 Pekerjaan Ikatan anginangin/ Bh 68.00 48.00 126,702.00 6,08 1,696.00 (2,534,040.00)Trekstang 8,615,736.005.4 Pekerjaan Plat Strip M2 24.94 6.49 150,000.00 973,200.00 (2,767,050.00)3,740,250.005:5 Pekerjaan Atap Genteng Metal M2 554.32 534.85 196,175.00 104,924,198.75 (3,819,527.25
    16,473.00 6,472,571.16 6,472,571.16 Dia 815 Kg 331.20 331.20 16,473.00 5,455,857.60 5,455,857.60 3.4 Poer beton bertulang K.250 M3 8.13 1.44 2,323,000.00 18,885,990.00 3,345,120.00 (15,540,870.00)3.5 Plat lantai beton bertulang, t = 17 M3 5.60 4.76 2,323,000.00 13,008,800.00 11,057,480.00 (1,951,320.00)cm K.2503.6 Dia 10 Kg 19.62 19.62 16,473.00 323,200.26 323,200.26 3.7 Tiang pancang beton 25/25 M3 6.00 6.00 2,323,000.00 13,938,000.00 13,938,000.00 K.300 (Utk Border)3.8 Pemancangan tiang pancang MI 48.00
    48.00 259,400.00 12,451,200.00 12,451,200.00 B.Bertulang 25/253.9 Bolder 25 (padat) UNIT 8.00 8.00 16,002,310.00 128,018,480.00 128,018,480.00 BAB 4.PEKERJAAN TIANG PANCANG BAJA4.1 Pengadaan tiang pancang baja@ M1 18.00 18.00 3,505,700.00 63,102,600.00 63,102,600.00 80cm, t.12 mm4.2 Pemancangan tiang pancang baja M1 18.00 18.00 259,400.00 '4,669,200.00 '4,669,200.00 80cm4.3 Beton isian (Beton K.250) M3 1.20 1.20 2,323,000.00 2,787,600.00 2,787,600.00 4.4 Baja tulangan U32 Ulir KG 65.85 65.85 16,473.00
Putus : 19-05-2014 — Upload : 13-10-2014
Putusan PN KUPANG Nomor 13/PID.SUS/TPK/2014/PN.KPG
Tanggal 19 Mei 2014 — - UMBU NEKA PAJA
6331
  • Murbaut 5/8 x 3 Bh 48.00 6.500.00 312.000.00metal + ringSub jumlah 378.907.180.50B. Asessories Penguras1. Bend 90 all flange Bh 6.00 180.000.00 1.080.000.0075mm2. Flange 90 mm Bh 6.00 75.000.00 450.000.003. Gate valve All flange Bh 3.00 2.025.000.00 6.075.000.00CI. 690 mm Kitz4. Murbaut 5/8 x 3 Bh 24.00 6.500.00 156.000.00metal + ringSub jumlah 7.761.000.00C. AsessoriesPengambilan1. Bend 90 all flange Bh 6.00 180.000.00 1.080.000.0075mm2. Flange 90 mm Bh 6.00 75.000.00 450.000.003.
    Murbaut 5/8 x 3 metal Bh 48.00 6.500.00 312.000.00+ ringSub jumlah 378.907.180.50B. Asessories Penguras1. Bend 90 all flange @75 Bh 6.00 180.000.00 1.080.000.0mm 02. Flange 90 mm Bh 6.00 75.000.00 450.000.003. Gate valve All flange CI. Bh 3.00 2.025.000. 6.075.000.090 mm Kitz 00 04. Murbaut 5/8 x 3 metal Bh 24.00 6.500.00 156.000.00+ ringSub jumlah 7.761.000.00 35 C. Asessories PengambilanBend 90 all flange @75 Bh 6.00 180.000.00 1.080.000.0mm 02. Flange 90 mm Bh 6.00 75.000.00 450.000.003.
    ~ 1.597.1 150.000.00 239.577.000.0p90 mm 8 0Sock Draft GIP 3 Bh 57.00 57.435.00 3.273.795.00Straight Coupler 63 x Bh 77.00 120.00000 9.240.000.0063Flange 90 mm Bh 6.00 75.000.00 450.000.00Stub Flange 90 mm Bh 6.00 176.700.00 1.060.200.00Murbaut 5/8 x 3 Bh 48.00 6.500.00 312.000.00metal + ringSub jumlah 378.907.180.50Asessories PengurasBend 90 all flange Bh 6.00 180.000.00 1.080.000.0075mmFlange 90 mm Bh 6.00 75.000.00 450.000.00Gate valve All flange Bh 3.00 2.025.000.00 6.075.000.00CI. 690 mm KitzMurbaut
    PIPA DISTRIBUSIPENGADAAN PIPADAN ASESSORIESPipa dan AsessoriesPipa GIP@3 Mi 341.00 164.87.50 56.124.337.50Pipa HDPE PE(PN 16) 2 925.67 74.400.00 68.869.848.0063 mmPipa HDPE PE(PN 16) M3 1.597.1 150.000.00 239.577.000.0p90 mm 8 0Sock Draft GIP 3 Bh 57.00 57.435.00 3.273.795.00Straight Coupler 63 x Bh 77.00 120.00000 9.240.000.0063Flange 90 mm Bh 6.00 75.000.00 450.000.00Stub Flange 90 mm Bh 6.00 176.700.00 1.060.200.00Murbaut 5/8 x 3 Bh 48.00 6.500.00 312.000.00metal + ringSub jumlah 378.907.180.50Asessories
Putus : 12-05-2014 — Upload : 22-10-2014
Putusan MAHKAMAH AGUNG Nomor 497 K/Pid.Sus/2014
Tanggal 12 Mei 2014 — : Ir. H. SYAFRINAL HEDY, MM. bin (alm) H. SYAMSANI
4019 Berkekuatan Hukum Tetap
  • No. 497 K/Pid.Sus/2014 Jumlah SPK 304.000 251.0 26.00 17.00 598.00 19.174.00 0 0 0 106.000PPTK (DISHUTBUN) 19.000 41.00 22.00 82.000 2.634.80 0 02.000Jumlah Total 323.000 292.0 48.00 17.00 680.00 21.808.00 0 0 0 908.000 Bahwa Terdakwa tidak menetapkan pelaksanaan pembuatan tanggul mekanik,saluran trio tata air, tanggul mekanik luncuran dan saluran trio tata airluncuran harus dilakukan pengawasan, sehingga mengakibatkan mitra kerjaberdasarkan SPK hanya melaksanakan pekerjaan pembuatan tanggul dansaluran
    37.000 1.192.60 03.00012. 24/03/08 325 Agusm 41.000 41.000 1.225.1an 21.00013. 26/03/08 313 Helmi 4.000 13.00 17.000 574.510 1.00014. 28/03/08 327 Ismail 38.500 938.500 1.150.418.50015. 07/04/08 328 Afriadi 20.500 16.00 36.500 1.172.50 44.50016. 14/04/08 329 llyas 4.000 4.000 8.000 234.452.00017. 02/05/08 330 Syahril 15.00 15.000 524.980 5.000Jumlah SPK 304.000 251.0 26.00 17.00) 598.00 19.174.00 0 0 0 106.000PPTK (DISHUTBUN) 19.000 41.00 22.00 82.000 2.634.80 0 02.000Jumlah Total 323.000 292.0 48.00
Register : 23-05-2018 — Putus : 07-01-2019 — Upload : 18-01-2019
Putusan PTUN MEDAN Nomor 82/G/2018/PTUN.MDN
Tanggal 7 Januari 2019 — Penggugat:
MASITOH ARITONANG, S.Pd
Tergugat:
KEPALA KANTOR PERTANAHAN KABUPATEN ASAHAN
Intervensi:
IBRAHIM FADIL
4420
  • (lima ribuseratus sembilan puluh dua koma lima meter persegi) yangterletak setempat dikenal dengan nama Jalan Seh Ismail AWahab, Dusun XVI, Desa Bagan Asahan, KecamatanTanungbalai, Kabupaten Asahan, dengan batas batas danukuran sebagai berikut: sebelah Utara dengan tanah Ahliwaris Taib.................00070.00 m;1 sebelah Timur dengan tanah Ahli waris Uyub/tanah SDInpres No.OLGA S2vscsmcecissscviiiiscieriestesedceed 22mm anommnatemmnnateenanncc mr 48.00 m; sebelah Selatan dengan tanah SD Inpres No
Putus : 29-05-2017 — Upload : 19-09-2017
Putusan MAHKAMAH AGUNG Nomor 906 K/Pdt/2017
Tanggal 29 Mei 2017 — PT MANDIRI SEJAHTERA ENERGINDO VS PT PASIR PRIMA COAL INDONESIA,DKK
202137 Berkekuatan Hukum Tetap
  • Nomor 906 K/Pdt/2017 9 116 46 50.00 1 2 40.0010 116 46 50.00 1 2 28.6411 116 47 2.02 1 2 28.6412 116 47 2.02 1 2 40.0013 116 47 10.00 1 2 40.0014 116 47 10.00 1 2 50.0015 116 47 20.00 1 2 50.0016 116 47 20.00 1 2 0.0017 116 47 52.00 1 2 0.0018 116 47 52.00 1 2 7.0019 116 48 48.00 1 2 7.0020 116 48 48.00 0 59 41.0021 116 46 28.00 0 59 41.0022 116 46 28.00 1 1 4.0023 116 45 28.00 1 1 4.0024 116 45 28.00 1 2 3.0025 116 44 55.00 1 2 3.0026 116 44 55.00 1 3 7.0027 116 44 25.00 1 3 7.0028 116 44 25.00
Register : 09-05-2018 — Putus : 14-08-2018 — Upload : 06-09-2018
Putusan PN JAMBI Nomor 15/Pid.Sus-TPK/2018/PN Jmb
Tanggal 14 Agustus 2018 — Penuntut Umum:
Ardhi Haryoputranto
Terdakwa:
MASRIL, ST BIN MUHAMMAD NUR
23934
  • TR.1 set 48.00 48.00 0.004. TR.2 set 6.00 6.00 0.005. TR.3 set 3.00 3.00 0.006. TR.4 set 3.00 3.00 0.007. TR.7 set 3.00 3.00 0.008. Ardhe TR.2 set 12.00 12.00 0.009. Schoor/GWTR set 12.00 12.00 0.0010. Cross/HGWTR set 6.00 6.00 0.00Ll. Joint Compression bh 12.00 12.00 0.0012. Transformasi/Mobilisasi Is 1.00 1.00 0.00SubTotal Bahwa perbuatan saksi Awaluddin selaku direktur PT.
    Tiang Kabel 7 m btg 66.00 68.00 2.00100 daN3 TR.1 set 48.00 48.00 0.004 TR.2 set 6.00 6.00 0.005. TR.3 set 3.00 3.00 0.006. TR.4 set 3.00 3.00 0.007 TR.7 set 3.00 3.00 0.008 Ardhe TR.2 set 12.00 12.00 0.009. Schoor/GWTR set 12.00 12.00 0.0010. Cross/HGWTR set 6.00 6.00 0.0011.
Putus : 19-10-2017 — Upload : 13-11-2018
Putusan MAHKAMAH AGUNG Nomor 1618 K/PID.SUS/2017
Tanggal 19 Oktober 2017 — IDA GEDE ALOR SANTIYASA alias YASA
5724 Berkekuatan Hukum Tetap
  • Urugan Tanah Pondasi Tembok 48.00 M 178.875,00 41.624.212.50Penahan (Tipe6)4. Urugan Tanah Kembali 27.22 M 8.160,00 1.318.615.205. Urugan Pasir di Bawah Pondasi biasa 27.64 M 221.925,00 6.384.782.25+Footplat6. Urugan Pasir dibawah Lantai M 221.925,00 32.023.777.507. Urugan Sirtu Peninggian Lantai selasar M 157.025,00 5.341.990.50Bangunan.8. Urugan Sirtu dipadatkan M?
    Urugan Tanah Pondasi Tembok 48.00 M? 178.875,00 41.624.212.50Penahan (Tipe6)4. Urugan Tanah Kembali 27.22 M 8.160,00 1.318.615.205. Urugan Pasir di Bawah Pondasi biasa 27.64 MP 221.925,00 6.384.782.25+Footplat6. Urugan Pasir dibawah Lantai M 221.925,00 32.023.777.507. Urugan Sirtu Peninggian Lantai selasar M 157.025,00 5.341.990.50Bangunan.8. Urugan Sirtu dipadatkan Me 157.025,00 56.646.768.75Jumlah 1 35.955.455.04II PEKERJAAN PASANGAN DANPLESTERAN1.
Putus : 19-05-2014 — Upload : 13-10-2014
Putusan PN KUPANG Nomor 12/PID.SUS/TPK/2014/PN.KPG
Tanggal 19 Mei 2014 — - PETRUS K.U. DEMU, ST.
4739
  • Murbaut 5/8 x 3 metal Bh 48.00 6.500.00 312.000.00+ ringSub jumlah 378.907.180.50B. Asessories Penguras1. Bend 90 all flange 75 Bh 6.00 180.000.00 1.080.000.00mm2. Flange 90 mm Bh 6.00 75.000.00 450.000.003. Gate valve All flange CI. Bh 3.00 2.025.000. 6.075.000.0090 mm Kitz 004. Murbaut 5/8 x 3 metal Bh 24.00 6.500.00 156.000.00+ ringSub jumlah 7.761.000.00C. Asessories PengambilanBend 90 all flange @75 Bh 6.00 180.000.00 1.080.000.00mm2. Flange 90 mm Bh 6.00 75.000.00 450.000.003.
    Murbaut 5/8 x 3 metal + Bh 48.00 6.500.00 312.000.00ringSub 378.907.180.jumlah 50B. Asessories Penguras1. Bend 90 all flange p75 mm Bh 6.00 180.000. 1.080.000.00002. Flange 90 mm Bh 6.00 75.000.0 450.000.00 34 03. Gate valve All flange CI. Bh 3.00 2.025.00 6.075.000.0090 mm Kitz 0.004. Murbaut 5/8 x 3 metal + Bh 24.00 6.500.00 156.000.00ringSub 7.761.000.00jumlahC. Asessories PengambilanBend 90 all flange @75 mm Bh 6.00 180.000. 1.080.000.00002. Flange 90 mm Bh 6.00 75.000.0 450.000.0003.
    Murbaut 5/8 x 3 Bh 48.00 6.500.00 312.000.00metal + ringSub jumlah 378.907.180.5 56 0B. Asessories Penguras1. Bend 90 all flange Bh 6.00 180.000.00 1.080.000.0075mm2. Flange 90 mm Bh 6.00 75.000.00 450.000.003. Gate valve All flange Bh 3.00 2.025.000.00 6.075.000.00CI. 690 mm Kitz4. Murbaut 5/8 x 3 Bh 24.00 6.500.00 156.000.00metal + ringSub jumlah 7.761.000.00C. AsessoriesPengambilan1. Bend 90 all flange Bh 6.00 180.000.00 1.080.000.0075mm2. Flange 90 mm Bh 6.00 75.000.00 450.000.003.
    ~ 1.597.1 150.000.00 239.577.000.0p90 mm 8 0Sock Draft GIP 3 Bh 57.00 57.435.00 3.273.795.00Straight Coupler 63 x Bh 77.00 120.00000 9.240.000.0063Flange 90 mm Bh 6.00 75.000.00 450.000.00Stub Flange 90 mm Bh 6.00 176.700.00 1.060.200.00Murbaut 5/8 x 3 Bh 48.00 6.500.00 312.000.00metal + ringSub jumlah 378.907.180.50Asessories PengurasBend 90 all flange Bh 6.00 180.000.00 1.080.000.0075mmFlange 90 mm Bh 6.00 75.000.00 450.000.00Gate valve All flange Bh 3.00 2.025.000.00 6.075.000.00CI. 690 mm KitzMurbaut
Register : 07-09-2021 — Putus : 08-12-2021 — Upload : 07-02-2022
Putusan PN Cikarang Nomor 524/Pid.Sus/2021/PN Ckr
Tanggal 8 Desember 2021 — Penuntut Umum:
1.SURMA, SH
2.NELSON MANAHAN HASUDUNGAN MALAU, SH
Terdakwa:
MONALIA ISKANDAR
31316
  • 70.449.138.0JuMAHKOTA 0023.000 46.00 00 BANGUNALAM 411.000i ALAM PUTRA 84.157.050. 1000418893051 a Sul 46 72,157,0 MUSTIKA 70.449.138.0JuMAHKOTA 0023.000 61.00 00 BANGUNALAM 411.000uu ALAM PUTRA 84.157.050. 1000418893051 53Jul48 78,470,5 MUSTIKA 70.449.138.0JulMAHKOTA 0023.000 55.00 00 BANGUNALAM 411.000b ALAM PUTRA 84.157.050. 1000418893051 30Jul18 64,880,0 MUSTIKA 70.449.138.0JulMAHKOTA 0023.000 56.00 00 BANGUNALAM 411.000a ALAM PUTRA 84.157.050. 1000418893051 ee 27,857,6 MUSTIKA 70.449.138.0JuMAHKOTA 0023.000 48.00
    ASIA 7435.000 42.00 UTAMA 085.000ALAM SEJAHTERA 70.385.005. 1000518316188 BAKOMINDO 01.806.600.14 25Agu18 34,648,000INDAH ASIA 7435.000 30.00 UTAMA 085.000ALAM SEJAHTERA 70.385.005. 1000518316188 BAKOMINDO 01.806.600.15 23Agu18 31,920,000INDAH ASIA 7435.000 49.00 UTAMA 085.000ALAM SEJAHTERA 70.385.005. 1000518316188 BAKOMINDO 01.806.600.16 28Agu18 24,667,500INDAH ASIA 7435.000 32.00 UTAMA 085.000ALAM SEJAHTERA 70.385.005. 1000518316188 BAKOMINDO 01.806.600.17 22Agu18 31,460,000INDAH ASIA 7435.000 48.00
    80.00 UTAMA 085.000ALAM SEJAHTERA 70.385.005. 1000518894480 BAKOMINDO 01.806.600.119 23Nov18 24,200,000INDAH ASIA 7435.000 81.00 UTAMA 085.000ALAM SEJAHTERA 70.385.005. 1000518894480 CIPTA GRAHA 31.692.603.920 12Okt18 15,060,000INDAH ASIA 7435.000 46.00 KANAKA 411.000ALAM SEJAHTERA 70.385.005. 1000518894480 CIPTA GRAHA 31.692.603.921 15Okt18 42,112,500INDAH ASIA 7435.000 47.00 KANAKA 411.000ALAM SEJAHTERA 70.385.005. 1000518894480 CIPTA GRAHA 31.692.603.922 16Okt18 21,300,000INDAH ASIA 7435.000 48.00
    BAKOMINDO 01.806.600.1JaneMANDIRI 3429.000 70.00 000 UTAMA 085.000g TUNAS LINGGAR 86.522.187. 1000319412373 48,25 BAKOMINDO 01.806.600.1FebMANDIRI 3429.000 22.00 0,000 UTAMA 085.000TUNAS LINGGAR 86.522.187. 1000319412373 BAKOMINDO 01.806.600.14 18Feb19 43,250,000MANDIRI 3429.000 23.00 UTAMA 085.0005 TUNAS LINGGAR 86.522.187. 1000819412373 5 8,500,0 BAKOMINDO 01.806.600.1FebMANDIRI 3429.000 24.00 00 UTAMA 085.000g TUNAS LINGGAR 86.522.187. 1000319412373 9,500,0 BAKOMINDO 01.806.600.1MarMANDIRI 3429.000 48.00