188 — 113 — Berkekuatan Hukum Tetap
No. 93 PK/Pid.Sus/2017 A.1 Beton plat lantai 12 cm 6,048 m3 78,860 m3A.2 Beton plat entrance 12,472 m3A.3 Balok beton 30/70 (B2) 6,216 m3A.4 Balok beton 20/40 (B1) 102,785 m3A.5 Beton balok 15/40 (B6) 5,352 M3 4,400 m3A& Beton kolom 30/60 (K2) 23,844 m3 30,24 m3A.7 Beton kolom 60/60 (K3) 5,040 m3A8 Pasang rangka atap 8,179,89 kg 7selasarPasang gording atasA.9 selasar 6,784,88 kg Pasang treksatangA.10 kudakuda dan ikatan 456,75 kg angin D 16Pondasi plat setempatAA (dudukan sapot) 8,266) riePasang
m3 31,971 m3C.6 Beton kolom 30/60 K2 23,844 m3 17,301 m3C.7 Beton Kolom 60/60 K3 7,980 m3 6,189 m3C.8 Beton Plat tangga 11,710 m3PEKERJAAND PASANGAN DANPLESTERANPasangan dinding bataD.1 191,620 m31:32 LANTAI 2A PEKERJAAN BETONLANTAI 2A.1 Beton plat lantai 12 cm 6,048 m3 78,860 m3A.2 Beton plat entrance 12,472 m3A.3 Balok beton 30/70 (B2) 6,216 m3A.4 Balok beton 20/40 (B1) 102,785 m3A.5 Beton balok 15/40 (B6) 5,352 M3 4,400 m3A6 Beton kolom 30/60 (K2) 23,844 m3 30,24 m3A.7 Beton kolom 60/60 (K3) 5,040
pasangan dan PlesteranPasangan diding Bata 1: 3 M2 180,921 10,699Pekerjaan Lantai Il 131,620Pekerjaan BetonBeton Plat Lantai t=12 cm M3 74,817 4,043Beton Plat Entrance M3 78,860 9,821 2,651Beton Plat Tribune M3 12,472 Beton Balok 30/70 (B2) M3 6,216 Beton Balok 20/40 (B1) M3 6,216 101,452 1,333Beton Balok 15/40 (B6) M3 102,785 4,440 (0,040)Beton kolom 30/30 (K1) M3 4,400 21,129 5,016Beton kolom 30/60 (K2) M3 26,145 26,146 4,094Beton Kolom 60/60 (K3) M3 30,240 4,710 0,330Beton Kolom 15/15 (KP) M3 5,040
4.753.500,00 os 12,472 59.285.652,00 9,821 46.684.123,503 Beton Balok Me 4.500.200,00 = S 6,216 27.973.243,20 6,216 27.973.243,204 Beton Balok Me 4.698.000,00 102,785 482.883.930,0 101,452 476.621.496,005 Beton Balok Me 7.775.900,00 5,352 41.616.616, 4,400 34.213.960,00 4,440 34.524.996,006 Beton Kolom Mo 7.295.400,00 36,840 268.762.53 26,145 190.738.233,0 21,129 154.144.506,607 Beton Kolom Me 6.353.100,00 23,844 151.483.31 30,240 192.117.744,0 26,146 166.108.152,608 Beton Kolom Me 5.410.700,00 5,040
No. 93 PK/Pid.Sus/2017 4 Beton Balok 20/40 (B1) Me 4.698.000,00 102,785 482.883.930,00 102,820 483.048.360,005 Beton Balok 15/40 (B6) Me 7.775.900,00 5,352 41.616.616,80 4,400 34.213.960,00 4,788 37.231.009,206 Beton Kolom 30/30 (K1) Me 7.295.400,00 36,840 268.762.536,00 26,145 190.738.233,00 26,148 190.760.119,207 Beton Kolom 30/60 (K2) Me 6.353.100,00 23,844 151.483.316,40 30,240 192.117.744,00 30,240 192.117.744,008 Beton Kolom 60/60 (K3) Me 5.410.700,00 5,040 27.269.928,00 5,248 28.394.487,899
88 — 16
31,971 m3C.6 Beton kolom 30/60 K2 23,844 m3 17,301 m3C.7 Beton Kolom 60/60 K3 7,980 m3 6,189 m3C.8 Beton Plat tangga 11,710 m3D PEKERJAAN PASANGANDAN PLESTERAND.1 Pasangan dinding bata 1:3 191,620 m32 LANTAI 2A PEKERJAAN BETONLANTAI 2A.1 Beton platlantai 12 cm 6,048 m3 78,860 m3A.2 Beton plat entrance 12,472 m3A.3 Balok beton 30/70 (B2) 6,216 m3A.4 Balok beton 20/40 (B1) 102,785 m3A.5 Beton balok 15/40 (B6) 5,352 M3 4,400 m3A.6 Beton kolom 30/60 (K2) 23,844 m3 30,24 m3A.7 Beton kolom 60/60 (K3) 5,040
ete oO 6 Beton Balok BordesPekerjaan pasangan danPlesteranPasangan diding Bata 1: 3 M2 191,620 180,921 10,699Pekerjaan Lantai IlPekerjaan BetonBeton Plat Lantai t=12 cm M3 78,860 74,817 4,043Beton Plat Entrance M3 12,472 9,821 2,651Beton Plat Tribune M3 Beton Balok 30/70 (B2) M3 6,216 6,216 Beton Balok 20/40 (B1) M3 102,785 101,452 1,333Beton Balok 15/40 (B6) M3 4,400 4,440 (0,040)Beton kolom 30/30 (K1) M3 26,145 21,129 5,016Beton kolom 30/60 (K2) M3 30,240 26,146 4,094Beton Kolom 60/60 (K3) M3 5,040
m3C.6 Beton kolom 30/60 K2 23,844 m3 17,301 m3C.7 Beton Kolom 60/60 K3 7,980 m3 6,189 m3C.8 Beton Plat tangga 11,710 m3 187 D PEKERJAAN PASANGANDAN PLESTERAN D.1 Pasangan dinding bata 1:3 191,620 m32 LANTAI 2A PEKERJAAN BETONLANTAI 2A.1 Beton plat lantai 12 cm 6,048 m3 78,860 m3A.2 Beton plat entrance 12,472 m3A.3 Balok beton 30/70 (B2) 6,216 m3A.4 Balok beton 20/40 (B1) 102,785 m3A.5 Beton balok 15/40 (B6) 5,352 M3 4,400 m3A.6 Beton kolom 30/60 (K2) 23,844 m3 30,24 m3A.7 Beton kolom 60/60 (K3) 5,040
Pekerjaan pasangan danPlesteran1 Pasangan diding Bata 1: 3 M2 191,620 180,921 10,699B Pekerjaan Lantai IlB.1 Pekerjaan Beton1 Beton Plat Lantai t=12 cm M3 78,860 74,817 4,0432 Beton Plat Entrance M3 12,472 9,821 2,6513 Beton Plat Tribune M3 4 Beton Balok 30/70 (B2) M3 6,216 6,216 5 Beton Balok 20/40 (B1) M3 102,785 101,452 1,3336 Beton Balok 15/40 (B6) M3 4,400 4,440 (0,040)7 Beton kolom 30/30 (K1) M3 26,145 21,129 5,0168 Beton kolom 30/60 (K2) M3 30,240 26,146 4,0949 Beton Kolom 60/60 (K3) M3 5,040
53 — 21 — Berkekuatan Hukum Tetap
No. 2034 K/Pid.Sus/2015 Beton balok 15/40A.5 5,352 M3 4,400 M3(B6)Beton kolom 30/60A.6 23,844 M3 30,24 M3(K2)Beton kolom 60/60A.7 5,040 M3(K3)Pasang rangka ataA.8 9 Fang P 8.179,89 Kg selasarPasang gording atasA.Q ane 3 6.784,88 Kg selasarPasang treksatangA.10 kudakuda dan ikatan 456,75 Kg angin D 16Pondasi plat setempatA.11 5,288 M3(dudukan sapot)Pasang rangka atapA.12 1.296,00 M2 1.652,983 M2utama spes premAtapberubahdari atapA.13 1.059,2 M2 1.652,983 m2Penutup atap Gesdek spandekmenjadiGesdekBeton
No. 2034 K/Pid.Sus/2015 ooOP otgoewmnaanrowon = Pekerjaan Lantai IIPekerjaan BetonBeton Plat Lantai t=12 cm M3 78,860 74,817 4,043Beton Plat Entrance M3 12,472 9,821 2,651Beton Plat Tribune M3 E = =Beton Balok 30/70 (B2) M3 6,216 6,216 Beton Balok 20/40 (B1) M3 102,785 101,452 1,333Beton Balok 15/40 (B6) M3 4,400 4,440 (0,040)Beton Kolom 30/80 (K1) M3 26,145 21,129 5,016Beton Kolom 30/60 (K2) M3 30,240 26,146 4,094Beton Kolom 60/60 (K3) M3 5,040 4,710 0,330Beton Kolom 15/15 (KP) M3 :Beton Balok Latei
No. 2034 K/Pid.Sus/2015 A.7Beton Kolom 60/60 (K3) 5,040 M3 Pasang Rangka Atap A.8 8.179,89 kg SelasarPasang Gording AtasA.Q 6.784,88 kg SelasarPasang treksatang kudaA.10 kuda dan ikatan angin D 456,75 kg 16Pondasi Plat SetempatA.11 5,288 M3(dudukan sapot)Pasang Rangka AtapA.12 1.296,00 M2 1,652,983 M2utama spes premAtapberubahPenutup atap Gesdek dari atapA.13 1.059,2 M2 1,652,983 M2spandekmenjadiGesdekBeton kolom 28/33A.14 5,654 M3(dudukan sapot)Pasang rangka atap usukA.15 480,00 M2 dan renggal paluA
No. 2034 K/Pid.Sus/2015 ooOP otgoewmnaanrowon = Pekerjaan Lantai IIPekerjaan BetonBeton Plat Lantai t=12 cm M3 78,860 74,817 4,043Beton Plat Entrance M3 12,472 9,821 2,651Beton Plat Tribune M3 E = =Beton Balok 30/70 (B2) M3 6,216 6,216 Beton Balok 20/40 (B1) M3 102,785 101,452 1,333Beton Balok 15/40 (B6) M3 4,400 4,440 (0,040)Beton Kolom 30/30 (K1) M3 26,145 21,129 5,016Beton Kolom 30/60 (K2) M3 30,240 26,146 4,094Beton Kolom 60/60 (K3) M3 5,040 4,710 0,330Beton Kolom 15/15 (KP) M3 : Beton Balok
124 — 57 — Berkekuatan Hukum Tetap
No. 37 PK/PID.SUS/2017 A.7 Beton kolom 60/60 (K3) 5,040 m3Pasang rangka atap A8 8,179,89 kg selasarAg Pasang gording atas 6,784,88 kg selasarM10 Pasang treksatang kuda 456,75 kg kuda dan ikatan angin D 16 Pondasi plat setempatAN (dudukan sapot) 5,288 m3Pasang rangka atap utama A.12 1,296 ,00 m2 1,652,983 m2spes premAtap berubahdari atapA.13 Penutup atap Gesdek 1,059,2 m2 1,652,983 m2 spandekmenjadiGesdek Beton kolom 28/33A14 (dudukan sapot) 5,654 m3 Pasang rangka atap usuk A.15 480,00 m2 dan renggal
No. 37 PK/PID.SUS/2017 OONOUSA= OoC.1 Beton Balok 30/70 (B2) M3 6,216 6,216 Beton Balok 20/40 (B1) M3 102,785 101,452 1,333Beton Balok 15/40 (B6) M3 4,400 4,440 (0,040)Beton kolom 30/30 (K1) M3 26,145 21,129 5,016Beton kolom 30/60 (K2) M3 30,240 26,146 4,094Beton Kolom 60/60 (K3) M3 5,040 4,710 0,330Beton Kolom 15/15 (KP) M3 Beton Kolom Latei 15/20 M3 Pekerjaan AtapPekerjaan rangka dan PenutupatapPasang rangka Utama Space M2 1.652,98345 1.280,000 373,983FrameAtap Gesdeck 0,35 mm M2 1.652,98345 1.652,000
31,971 m3C.6 Beton kolom 30/60 K2 23,844 m3 17,301 m3C.7 Beton Kolom 60/60 K3 7,980 m3 6,189 m3C.8 Beton Plat tangga 11,710 m3D PEKERJAAN PASANGANDAN PLESTERAND.1 Pasangan dinding bata 1:3 191,620 m32 LANTAI 2A PEKERJAAN BETONLANTAI 2A.1 Beton plat lantai 12 cm 6,048 m3 78,860 m3A.2 Beton plat entrance 12,472 m3A.3 Balok beton 30/70 (B2) 6,216 m3A.4 Balok beton 20/40 (B1) 102,785 m3A.5 Beton balok 15/40 (B6) 5,352 m3 4,400 m3A.6 Beton kolom 30/60 (K2) 23,844 m3 30,24 m3A.7 Beton kolom 60/60 (K3) 5,040
No. 37 PK/PID.SUS/2017 FAR OWONDUARWNWOo N Pekerjaan BetonBeton Plat Lantai t=12 cm M3 78,860 74,817 4,043Beton Plat Entrance M3 12,472 9,821 2,651Beton Plat Tribune M3 Beton Balok 30/70 (B2) M3 6,216 6,216 Beton Balok 20/40 (B1) M3 102,785 101,452 1,333Beton Balok 15/40 (B6) M3 4,400 4,440 (0,040)Beton kolom 30/30 (K1) M3 26,145 21,129 5,016Beton kolom 30/60 (K2) M3 30,240 26,146 4,094Beton Kolom 60/60 (K3) M3 5,040 4,710 0,330Beton Kolom 15/15 (KP) M3 Beton Kolom Latei 15/20 M3 Pekerjaan AtapPekerjaan
No. 37 PK/PID.SUS/2017 A.1 Beton plat lantai 12 cm 6,048 m3 78,860 m3A.2 Beton plat entrance 12,472 m3A.3 Balok beton 30/70 (B2) 6,216 m3AA Balok beton 20/40 (B1) 102,785 m3A.5 Beton balok 15/40 (B6) 5,352 m3 4,400 m3A.6 Beton kolom 30/60 (K2) 23,844 m3 30,24 m3A.7 Beton kolom 60/60 (K3) 5,040 m3A.8 Pasang rangka atap selasar 8,179,89 kg A.9 Pasang gording atas selasar 6,784,88 kg Pasang treksatang kudakuda danA.10 456,75 kg ikatan angin D 16Pondasi plat setempat (dudukanA.11 5,288 m3sapot)Pasang
23 — 15 — Berkekuatan Hukum Tetap
Atas transaksi ini kamimemotong dan melaporkan PPh Pasal 4 (2) Final pada masa pajakJuli 2002 sebesar USD 5,040 (10% x USD 50,400) ;Sementara itu pembenanan biaya sewa pada laporan keuanganperusahaan kami untuk tahun pajak 2002 adalah sebesar USD18.900. biaya sewa ini merupakan hasil amortisasi biaya sewaselama 9 bulan (juli 2002 s/d maret 2003) ;Di tahun pajak selanjutnya yaitu tahun pajak 2003 dan 2004pembebanan biaya sewa apartemen tersebut masingmasingsebesar USD 25,200 (selama 12 bulan) dan
23 — 14 — Berkekuatan Hukum Tetap
Atas transaksi ini kamimemotong dan melaporkan PPh Pasal 4 (2) Final pada masa pajakJuli 2002 sebesar USD 5,040 (10% x USD 50,400) ;Sementara itu pembenanan biaya sewa pada laporan keuanganperusahaan kami untuk tahun pajak 2002 adalah sebesar USD18.900. biaya sewa ini merupakan hasil amortisasi biaya sewaselama 9 bulan (juli 2002 s/d maret 2003) ;Di tahun pajak selanjutnya yaitu tahun pajak 2003 dan 2004pembebanan biaya sewa apartemen tersebut masingmasingsebesar USD 25,200 (selama 12 bulan) dan
69 — 50 — Berkekuatan Hukum Tetap
M3 31,971 M3C.6 Beton kolom 30/60 K2 23,844 M3 17,301 M3C.7 Beton Kolom 60/60 K3 7,980 M3 6,189 M3C.8 Beton Plat tangga 11,710 M3PEKERJAAND PASANGAN DANPLESTERANPasangan dinding bataD.1 191,620 M31:32 LANTAI 2i PEKERJAAN BETONLANTAI 2A.1 Beton plat lantai 12 cm 6,048 M3 78,860 M3A.2 Beton plat entrance 12,472 M3A.3 Balok beton 30/70 (B2) 6,216 M3A.4 Balok beton 20/40 (B1) 102,785 M3A.5 Beton balok 15/40 (B6) 5,352 M3 4,400 M3A.6 Beton kolom 30/60 (K2) 23,844 M3 30,24 M3A.7 Beton kolom 60/60 (K3) 5,040
No. 2118 K/Pid.Sus/2015 A.4 Balok beton 20/40 (B1) 102,785 M3A.5 Beton balok 15/40 (B6) 5,352 M3 4,400 M3A.6 Beton kolom 30/60 (K2) 23,844 M3 30,24 M3A.7 Beton kolom 60/60 (K3) 5,040 M3Pasang rangka ataA.8 9 9 P 8,179,89 kg selasarPasan ording atasAQ 9 9 9 6,784,88 kg selasarPasang treksatangA.10 kudakuda dan ikatan 456,75 kg angin D 16Pondasi plat setempatA.11 5,288 M3(dudukan sapot)Pasang rangka atapA.12 1,296,00 M2 1,652,983 M2utama spes premAtapberubah dariatapA.13 1,059,2 M2 1,652,983 M2Penutup
No. 2118 K/Pid.Sus/2015 7 Beton kolom 30/30 (K1) M3 30,240 26,146 4,0948 Beton kolom 30/60 (K2) M3 5,040 4,710 0,3309 Beton Kolom 60/60 (K3) M3 10 Beton Kolom 15/15 (KP) M3 11 Beton Kolom Latei 15/20C Pekerjaan AtapC.1 Pekerjaan rangka danPenutup atap1 Pasang rangka Utama M2 1.652,98345 1.280,000 373,983Space Frame2 Atap Gesdeck 0,35 mm M2 1.652,98345 1.652,000 0,983 Bahwa perbuatan Terdakwa MOH.
52 — 17
ete oO 6 Beton Balok BordesPekerjaan pasangan danPlesteranPasangan diding Bata 1: 3 M2 191,620 180,921 10,699Pekerjaan Lantai IlPekerjaan BetonBeton Plat Lantai t=12 cm M3 78,860 74,817 4,043Beton Plat Entrance M3 12,472 9,821 2,651Beton Plat Tribune M3 Beton Balok 30/70 (B2) M3 6,216 6,216 Beton Balok 20/40 (B1) M3 102,785 101,452 1,333Beton Balok 15/40 (B6) M3 4,400 4,440 (0,040)Beton kolom 30/30 (K1) M3 26,145 21,129 5,016Beton kolom 30/60 (K2) M3 30,240 26,146 4,094Beton Kolom 60/60 (K3) M3 5,040
92 — 57 — Berkekuatan Hukum Tetap
Nomor: 2 PK/KPUD/2008 13 LAPPARIAJA 8.253 2.271 1.051 11.575 9.778 2.271 1,051 12.914 1.52514 UJUN 9.217 1.717 1.419 12,353 10.317 1.717 1.419 10.821 1.100LAMARU15 TELLULIM 7.383 174 330 7.887 7.828 174 330 10.145 445POE16 BAREBBO 10.457 1.316 1.001 12.774 12.2B7 1.316 1.001 14.145 1.83017 PONRE 5,040 1.396 462 6.898 6,940 1.396 462 9.535 1.90018 SIBULUE 14.713 1.797 708 17.308 16213 1.797 798 18.808 1.50019 CIN 8.895 1.881 1492 12.268 10.267 1.881 1.492 12.310 1.39220 MARE 8.450 2.390 955 11.795
331 — 390 — Berkekuatan Hukum Tetap
702 13.978 1.108 816 15.902 1.20Q10 AMALI 9.647 1.469 433 11.549 10.779 1.469 433 12,681 1.13211 ULAWENG 7.548 1.552 4.349 13.449 8.998 1.552 4.349 14.063 1,45012 BENGO 8.477 2.766 1.220 12,463 10.077 2.766 1.220 13.399 1.60013 LAPPARIAJA 8.253 2.271 1.051 11.575 9.778 2.271 1,051 12.914 1.52514 UJUN 9.217 1.717 1.419 12,353 10.317 1.717 1.419 10.821 1.100LAMARU15 TELLULIM 7.383 174 330 7.887 7.828 174 330 10.145 445POE16 BAREBBO 10.457 1.316 1.001 12.774 12.2B7 1.316 1.001 14.145 1.83017 PONRE 5,040
85 — 22
diberi tanda bukti T30.25.Nomor :0178/AAILKRSCHBSP/8/10 kg. 4,600,diberi tanda bukti T30.26.Nomor :0179/AALKRSCHBSP/8/10 kg. 2,800,diberi tanda bukti T30.27.Nomor :0180/AALKRSCHBSP/8/10 kg12,960,diberi tanda bukti T30.28.31.Foto copy Bukti surat jalan bulan September 2010 ( tidakmenerima invoice) surat jalan, diberi tanda bukti T 31.Nomor : 0181/AAFKRSCHBSP/9/10 kg 4,620, diberi tanda bukti T31.1.Nomor :0182/AAl KRSC HBSP/8/10 kg. 5,060, diberi tanda bukti T31.2.Nomor : 0183/AALKRSCHBSP/8/10 kg 5,040
337 — 154
Tanah SHMNo.128,129,134,136,137,138,140,142,143,144,145,127 Matagara tanggal 21122004,2122004,7022005,01 032005,0 1032005,01 03 2005, 0403 20040403 200 5,040 3 2005,04032005,04032005,21122004 Luas 9.267m2 berlokasi di kel.Matagara, Kec.Tigaraksa TangerangBanten, pemegang hak adalah Dewiyana SupiantiTelah diikat HT dengan nilai pengikatan sebesarRp.4.268.820.000,Telah diikat HT ll sebesar Rp. 4.072.000.000, (untuk SHMNo. 128)d.
ferdian adi nugroho.SH
Terdakwa:
I KETUT SUARBAWA
712 — 435
file dengan judul 31.GENERAL ARRANGEMENT Work Line Main ARC.dwg, tipe file DWG File, ukuran 5,040 KB.
file dengan judul 32.GENERAL ARRANGEMENT Detail Cennection.dwg, tipe file DWG File, ukuran 3,482 KB.
ferdian adi nugroho.SH
Terdakwa:
ADNAN
179 — 0
file dengan judul 31.GENERAL ARRANGEMENT Work Line Main ARC.dwg, tipe file DWG File, ukuran 5,040 KB.
file dengan judul 32.GENERAL ARRANGEMENT Detail Cennection.dwg, tipe file DWG File, ukuran 3,482 KB.
ferdian adi nugroho.SH
Terdakwa:
I KETUT SUARBAWA
199 — 51
file dengan judul 31.GENERAL ARRANGEMENT Work Line Main ARC.dwg, tipe file DWG File, ukuran 5,040 KB.
file dengan judul 32.GENERAL ARRANGEMENT Detail Cennection.dwg, tipe file DWG File, ukuran 3,482 KB.
ferdian adi nugroho.SH
Terdakwa:
ADNAN
299 — 105
file dengan judul 31.GENERAL ARRANGEMENT Work Line Main ARC.dwg, tipe file DWG File, ukuran 5,040 KB.
file dengan judul 32.GENERAL ARRANGEMENT Detail Cennection.dwg, tipe file DWG File, ukuran 3,482 KB.