Ditemukan 2838 data

Urut Berdasarkan
 
Putus : 07-12-2016 — Upload : 31-05-2017
Putusan MAHKAMAH AGUNG Nomor 2181 K/PID.SUS/2016
Tanggal 7 Desember 2016 — Ir. BARTHOL DA CUNHA, M.Eng.
8255 Berkekuatan Hukum Tetap
  • Pembuatan Direksi Ls 1,00 1,00 1,00 3.543.000,00 3.543.000,00 Keat2. Pembersihaan/perataa Ls 1,00 1,00 1,00 3.000.000,00 3.000.000,00 ntanah3. Pemasangan Ls 1,00 1,00 1,00 2.300.000,00 2.300.000,00 Bouwplank4. Pengadaan air kerja Ls 1,00 1,00 1,00 2.000.000,00 2.000.000,00 5. Pengadaan listrik kerja Ls 1,00 1,00 1,00 1.500.000,00 1.500.000,00 :6. Pembuatan papan Ls 1,00 1,00 1,00 350.000,00 350.000,00 nama proyekJumlah A 12.693.000,00 B PEKERJAAN KONSTRUKSI PEKERJAAN TANAH1.
    Pembuat Ls 1,00 1,00 1,00 5.000.000,00 5.000.000,00 an Direksi Keat2. Pembersi Ls 1,00 1,00 1,00 5.000.000,00 5.000.000,00 haan/perataantanah3. Pemasan Ls 1,00 1,00 1,00 2.696.000,00 2.696.000,00 gan Bouwplank4. Pengada Ls 1,00 1,00 1,00 2.100.000,00 2.100.000,00 an air kerja5: Pengada Ls 1,00 1,00 1,00 1.500.000,00 1.500.000,00 an listrik kerja6. Pembuat Ls 1,00 1,00 1,00 500.000,00 500.000,00 an papan namaproyekJumlah A 16.796.000,00 B PEKERJAANKONSTRUKSI : PEKERJAAN TANAHA.
    Pembuatan Ls 1,00 1,00 1,00 3.543.000,00 3.543.000,00 Direksi Keat2. Pembersihaan Ls 1,00 1,00 1,00 3.000.000,00 3.000.000,00 /perataan tanah3. Pemasangan Ls 1,00 1,00 1,00 2.300.000,00 2.300.000,00 Bouwplank4. Pengadaan Ls 1,00 1,00 1,00 2.000.000,00 2.000.000,00 air kerja5. Pengadaan Ls 1,00 1,00 1,00 1.500.000,00 1.500.000,00 listrik kerja6.
    Administrasi Ls 1,00 1,00 1,00 700.000,00 700.000,00 dan Dokumentasi 2: Pemasangan Ls 1,00 1,00 1,00 500.000,00 500.000,00 Bouwplank 3. Pengadaan Ls 1,00 1,00 1,00 500.000,00 500.000,00 air kerja 4.
    Pembuatan Ls 1,00 1,00 1,00 2.800.000,00 2.800.000,00 Direksi Keat 2. Pembersih Ls 1,00 1,00 1,00 1.800.000,00 1.800.000,00 aan/perataan tanah 3. Pemasang Ls 1,00 1,00 1,00 2.300.000,00 2.300.000,00 an Bouwplank 4. Pengadaan Ls 1,00 1,00 1,00 1.500.000,00 1.500.000,00 air kerja 5: Pengadaan Ls 1,00 1,00 1,00 750.000,00 750.000,00 listrik kerja 6. Pembuatan Ls 1,00 1,00 1,00 237.000,00 237.000,00 papan nama proyek Jumlah A 9.387.000,00 : PEKERJAANKONSTRUKSI PEKERJAAN TANAH 4.
Register : 28-06-2022 — Putus : 23-08-2022 — Upload : 25-08-2022
Putusan PN TANGERANG Nomor 1027/Pid.Sus/2022/PN Tng
Tanggal 23 Agustus 2022 — Penuntut Umum:
ADIB FACHRI DILLI,SH.
Terdakwa:
NURDIANSYAH Bin H. SIDIK
163
    1. Paket 2 yang terdapat 10 (sepuluh) bungkus plastik klip bening dengan perincian sebagai berikut :
    • Kode (2A) 1 (satu) bungkus plastik klip bening berisikan narkotika jenis shabu dengan berat brutto 1,00 gram;
    • Kode (2B) 1 (satu) bungkus plastik klip bening berisikan narkotika jenis shabu dengan berat brutto 1,00 gram;
    • Kode (2C) 1 (satu) bungkus plastik klip bening berisikan narkotika jenis shabu dengan berat brutto 1,00 gram;
    • Kode
    (2D) 1 (satu) bungkus plastik klip bening berisikan narkotika jenis shabu dengan berat brutto 1,00 gram;
  • Kode (2E) 1 (satu) bungkus plastik klip bening berisikan narkotika jenis shabu dengan berat brutto 1,00 gram;
  • Kode (2F) 1 (satu) bungkus plastik klip bening berisikan narkotika jenis shabu dengan berat brutto 1,00 gram;
  • Kode (2G) 1 (satu) bungkus plastik klip bening berisikan narkotika jenis shabu dengan berat brutto 1,00 gram;
  • Kode (2H) 1 (satu) bungkus
    plastik klip bening berisikan narkotika jenis shabu dengan berat brutto 1,00 gram;
  • Kode (2I) 1 (satu) bungkus plastik klip bening berisikan narkotika jenis shabu dengan berat brutto 1,00 gram;
  • Kode (2J) 1 (satu) bungkus plastik klip bening berisikan narkotika jenis shabu dengan berat brutto 1,00 gram;

Dengan berat netto seluruhnya 8,8924 gram.

  1. Paket 3 yang terdapat 10 (sepuluh) bungkus plastik klip bening dengan perincian sebagai berikut :
  • Kode (3A) 1 (satu) bungkus plastik klip bening berisikan narkotika jenis shabu dengan berat brutto 1,00 gram;
  • Kode (3B) 1 (satu) bungkus plastik klip bening berisikan narkotika jenis shabu dengan berat brutto 1,00 gram;
  • Kode (3C) 1 (satu) bungkus plastik klip bening berisikan narkotika jenis shabu dengan berat brutto 1,00 gram;
  • Kode
) 1 (satu) bungkus plastik klip bening berisikan narkotika jenis shabu dengan berat brutto 1,00 gram;
  • Kode (4E) 1 (satu) bungkus plastik klip bening berisikan narkotika jenis shabu dengan berat brutto 1,00 gram;
  • Dengan berat netto seluruhnya 4,4088 gram.

    Putus : 07-06-2016 — Upload : 09-06-2016
    Putusan PT MALUKU UTARA Nomor 7/PID.SUS-TPK/2016/PT TTE
    Tanggal 7 Juni 2016 — ICHSAN KRIKHOFF, S.Pi
    8627
    • Tali PE dia 24 untuk pengikat 4 buah Rol 1,00 1,00 Jangkar8) Pas.
    Putus : 07-06-2016 — Upload : 09-06-2016
    Putusan PT MALUKU UTARA Nomor 9/PID.SUS-TPK/2016/PT TTE
    Tanggal 7 Juni 2016 — MUHAMMAD SETIAWAN KAPLALE, S.Pi
    7638
    • Tali PE dia 24 untuk pengikat 4 buah Jangkar Rol 1,00 1,00 8) Pas.
    Putus : 24-07-2012 — Upload : 12-07-2013
    Putusan MAHKAMAH AGUNG Nomor 710 K/PID.SUS/2012
    Tanggal 24 Juli 2012 — JONIARTO Bin M. YATTA
    3018 Berkekuatan Hukum Tetap
    • Pembersihan dan Pengukuran Lokasi 1,00 Unit2. Perizinan dan IMB = 40 m? 1,00 Unit3. Pengadaan Air Kerja 1,00 Unit4. Papan nama proyek 1,00 Unit. Adm. dan dokumentasi proyek 1,00 Unit6. Pengadaan P3K dilokasi kerja 1,00 Unitil PEKERJAAN TANAH DAN PONDASI1. Galian Tanah Pondasi 9,35 m32. Urugan tanah kembali 4 nya 234 m33. Urugan pasir bawah pondasi 0,85 m34. ND7
      1,00 unit 20 Hal. 21 dari 43 hal. Put.
      Uraian Pekerjaan Satua Hargasatuan Volume Jumlah Volume Jumlah Selisih Jumlah selisih KETn (Rp) kontrak = kontrak(Rp) terpasang terpasang (Rp) Volume1 2 3 4 5 61 PEKERJAAN PERSIAPAN Ls 1.250.000 1,00 1.250.000,00 1,001. Pembersihan dan Pengukuran 1.250.000,00Cokes Ls 900.000 1,00 900.000,00 1,002. Perizinan dan IMB = 40 m? Ls 700.000 1,00 700.000,00 1,00 900.000,003. Pengadaan Air Kerja Ls 200.000 1,00 200.000,00 1,00 700.000,004.
      Panel Otomatis Unit 22.000.000 1,00 22.000.000 1,00 23. Pembongkaran Instalasi Unit 2.000.000 1,00 2.000.000 1,004. Pemasangan mesin dan Unit 9.000.000 1,00 9.000.000 1,00instalasi 42.122.00035.000.000Il Pengadaan Panel Kontrol Unit 3.450.000 1,00 3.450.000m Kabel NYFGBY 4 x 35 MM1. Pengadaan kabel Unit 177.360 200.00 35.472.000 164.00 36 Hal. 33 dari 43 hal. Put.
      No. 710 K/Pid.Sus/2012 1 PEKERJAAN PERSIAPAN Ls 1.250.000 1,00 1.250.000,00) 1,00 : 21. Pembersihan dan Pengukuran 1.250.000,00Lokasi Ls 900.000 1,00 900.000,00 1,00 2. Perizinan dan IMB = 40 m? Ls 700.000 1,00 700.000,00 1,00 900.000,00) a.3. Pengadaan Air Kerja Ls 200.000 1,00 200.000,00 1,00 700.000,00 : 4. Papan nama proyek Ls 1.300.000 1,00 1.300.000,00 1,00 200.000,00 s 75. Adm. dan dokumentasi proyek 1.300.000,00Pengadaan P3K dilokasi kerja Ls 450.000 1,00 150.000,00!
    Register : 05-09-2019 — Putus : 30-10-2019 — Upload : 31-10-2019
    Putusan PN BATULICIN Nomor 210/Pid.B/LH/2019/PN Bln
    Tanggal 30 Oktober 2019 — Penuntut Umum:
    MAYANG RATNASARI, S.H.
    Terdakwa:
    IWANSYAH bin SAMLAN alm
    36819
    • 1,50 15 10 0,022580 Ulin 1 1,50 24 12 0,043281 Ulin 1 1,50 19 13 0,037182 Ulin 1 1,50 26 10 0,039083 Ulin 1 1,50 26 11 0,042984 Ulin il 1,50 DT 8 0,032485 Ulin 1 1,50 27 13 0,052786 Ulin 1 1,50 22 22. 0,072687 Ulin 1 1,50 ai 16 0,064888 Ulin 1 1,25 18 11 0,024889 Ulin 1 1,25 31 16 0,0620 Halaman 4 dari 16 putusan pidana nomor 210/Pid.B/LH/2019/PN Bin. 90 Ulin 1 1,25 29 16 0,058091 Ulin 1 1,25 34 17 0,072392 Ulin 1 1,25 15 14 0,026393 Ulin 1 1,25 25 18 0,056394 Ulin 1 1,25 25 10 0,031395 Ulin 1 1,00
      15 10 0,015096 Ulin p 1,00 20 20 0,080097 Ulin 1 1,00 19 12 0,022898 Ulin 1 1,00 25 19 0,047599 Ulin 2 1,00 27 22. 0,1188100 Ulin 1 1,00 Al 18 0,0738101 Ulin 1 1,00 23 9 0,0207102 Ulin 1 1,00 34 2D. 0,0748103 Ulin 1 1,00 30 24 0,0720104 Ulin 1 1,00 20 11 0,0220105 Ulin 1 1,00 30 20 0,0600106 Ulin 1 1,00 22 19 0,0418107 Ulin 1 1,00 36 15 0,0540108 Ulin 1 1,00 26 14 0,0364109 Ulin 1 1,00 30 18 0,0540110 Ulin 1 1,00 20 15 0,0300111 Ulin 1 1,00 25 15 0,0375112 Ulin 1 1,00 32 16 0,0512113 Ulin 1 1,00
      33 20 0,0660114 Ulin 1 1,00 29 14 0,0406115 Ulin 1 1,00 28 19 0,0532116 Ulin 2 1,00 29 12 0,0696117 Ulin 1 1,00 33 om 0,0726118 Ulin 1 1,00 37 19 0,0703119 Ulin 1 1,00 33 21 0,0693120 Ulin 1 1,00 24 12 0,0288121 Ulin 2 1,00 DD. 22 0,0748122 Ulin il 1,00 21 21 0,0336123 Ulin 1 1,00 2D, 22 0,0330124 Ulin 1 1,00 34 34 0,0442125 Ulin 1 1,00 15 15 0,0165126 Ulin 1 1,00 36 36 0,0684127 Ulin 1 1,00 36 36 0,0612128 Ulin 1 1,00 24 24 0,0408129 Ulin 1 1,00 28 28 0,0448130 Ulin 1 1,00 26 26 0,0442131 Ulin
      2 1,00 23 23 0,0782132 Ulin il 1,00 24 24 0,0480133 Ulin 1 1,00 19 19 0,0247134 Ulin 1 1,00 18 18 0,0288135 Ulin 1 1,00 19 19 0,0361Jumlah 167 79,459 Halaman 5 dari 16 putusan pidana nomor 210/Pid.B/LH/2019/PN Bin.Dengan jumlah 167 batang dan total kubikasi berjumlah 7,9459 M3, selanjutnya1 (Satu) unit Truck merk Mitsubishi dengan Nopol DA 8452 TLA yangdikemudikan oleh Terdakwa diberhentikan oleh petugas kepolisian untukdiminta menunjukkan Surat Keterangan sahnya Hasil Hutan (SKSHH), namunTerdakwa
    Register : 17-11-2016 — Putus : 15-12-2016 — Upload : 29-03-2017
    Putusan PT PALU Nomor 23/Pid.Sus-TPK/2016/PT PAL
    Tanggal 15 Desember 2016 — Tipikor - JIBRAN HAMADI, SE
    8439
    • Direksi Keet 1,00 M 950.000,00 950.000,003. Papan Proyek 1,00 Bh 336.132,50 336.132,504. Pengukuran Lokasi/ Uizet 1,00 Ls 719.000,00 719.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 MP 23.323,31 174.966.250,58Il PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt Draw ing 1,00 Set 286.000,00 286.000,004. Pencetakan Asbuilt Draw ing 1,00 Set 189.695,00 189.695,005.
      Direksi Keet 1,00 M 985.000,00 985.000,003. Papan Proyek 1,00 Bh 337.440,40 337.440,404. Pengukuran Lokasi/ Uizet 1,00 Ls 725.000,00 725.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.50230 M 23.321,03 174.961.369,80Il PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt Draw ing 1,00 Set 261.250,00 261.250,004. Pencetakan Asbuilt Draw ing 1,00 Set 187.550,00 187.550,005.
      Direksi Keet 1,00 M 950.000,00 950.000,003. Papan Proyek 1,00 Bh 336.132,50 336.132,504. Pengukuran Lokasi/ Uizet 1,00 Ls 719.000,00 719.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 M 23.323,31 174.966.250,58Il PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt Draw ing 1,00 Set 286.000,00 286.000,004. Pencetakan Asbuilt Draw ing 1,00 Set 189.695,00 189.695,005.
      Direksi Keet 1,00 M 985.000,00 985.000,003. Papan Proyek 1,00 Bh 337.440,40 337.440,404. Pengukuran Lokasi/ Uizet 1,00 Ls 725.000,00 725.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.50230 M 23.321,03 174.961.369,80Ill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt Draw ing 1,00 Set 261.250,00 261.250,004. Pencetakan Asbuilt Draw ing 1,00 Set 187.550,00 187.550,005.
      Direksi Keet 1,00 M 900.000,00 900.000,003. Papan Proyek 1,00 Bh 335.742,00 335.742,004. Pengukuran Lokasi/ Uizet 1,00 Ls 745.500,00 745.500,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.50230 M 23.321 ,68 174.966.250,58Ill PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt Draw ing 1,00 Set 286.000,00 286.000,004. Pencetakan Asbuilt Draw ing 1,00 Set 189.200,00 189.200,005.
    Putus : 19-10-2016 — Upload : 14-02-2017
    Putusan MAHKAMAH AGUNG Nomor 431 K/PID.SUS/2016
    Tanggal 19 Oktober 2016 — Penuntut Umum pada Kejaksaan Negeri Maumere ; ZAKARIAS HERIANDO SIKU, ST alias HERI SIKU
    7999 Berkekuatan Hukum Tetap
    • Pembuatan Direksi Keat Ls 1,00 1,00 1,00 3.543.000,00 3.543.000,002. Pembersihaan/perataan tanah Ls 1,00 1,00 1,00 3.000.000,00 3.000.000,003. Pemasangan Bouwplank Ls 1,00 1,00 1,00 2.300.000,00 2.300.000,004. Pengadaan air kerja Ls 1,00 1,00 1,00 2.000.000,00 2.000.000,005. Pengadaan listrik kerja Ls 1,00 1,00 1,00 1.500.000,00 1.500.000,006. Pembuatan papan nama Ls 1,00 1,00 1,00 350.000,00 350.000,00proyekJumlah A 12.693.000,00B PEKERJAAN KONSTRUKSI PEKERJAAN TANAH1.
      Pembuatan Direksi Keat Ls 1,00 1,00 1,00 5.000.000,00 5.000.000,002. Pembersihaan/perataan tanah Ls 1,00 1,00 1,00 5.000.000,00 5.000.000,003. Pemasangan Bouwplank Ls 1,00 1,00 1,00 2.696.000,00 2.696.000,004. Pengadaan air kerja Ls 1,00 1,00 1,00 2.100.000,00 2.100.000,005. Pengadaan listrik kerja Ls 1,00 1,00 1,00 1.500.000,00 1.500.000,006. Pembuatan papan nama Ls 1,00 1,00 1,00 500.000,00 500.000,00proyekJumlah A 16.796.000,00B PEKERJAAN KONSTRUKSI : PEKERJAAN TANAH :1.
      Pembuatan Direksi Keat Ls 1,00 1,00 1,00 2.800.000,00 2.800.000,002. Pembersihaan/perataan tanah Ls 1,00 1,00 1,00 1.800.000,00 1.800.000,003. Pemasangan Bouwplank Ls 1,00 1,00 1,00 2.300.000,00 2.300.000,004. Pengadaan air kerja Ls 1,00 1,00 1,00 1.500.000,00 1.500.000,005. Pengadaan listrik kerja Ls 1,00 1,00 1,00 750.000,00 750.000,006. Pembuatan papan nama Ls 1,00 1,00 1,00 237.000,00 237.000,00proyekJumlah A 9.387 .000,00B. PEKERJAAN KONSTRUKSII. PEKERJAAN TANAH1.
    Register : 19-05-2015 — Putus : 29-10-2015 — Upload : 21-07-2016
    Putusan PN JAKARTA UTARA Nomor 851/Pid.Sus/2015/PN Jkt.Utr
    Tanggal 29 Oktober 2015 — GULZAR SHAHBAZ bin GULZAR HUSSAIN alias PAKIS
    12575
    • Kristal (1-A) 1.036 1,00 1.035,00 0,8879 0,86952. Kristal (1-B) 1.019 1,00 1.018,00 0,8215 0,79783. Kristal (1-C) 1.022 1,00 1.021,00 0,8601 0,83424. Kristal (1-D) 1.020 1,00 1.019,00 0,8524 0,84165. Kristal (1-E) 1.016 1,00 1.015,00 0,8835 0,87576. Tablet (1-F) 4.500 1.329 10 3,12 4.490 1.325,88 2,9404 8 2,35067. Tablet (1-G) 4.500 1.328 10 3,12 4.490 1.324,88 2,8999 8 2,30568. Kristal (2-A) 1.019 1,00 1.018,00 0,8111 0,78989.
      Kristal (2-B) 1.016 1,00 1.015,00 0,7848 0,756710. Kristal (2-C) 1.020 1,00 1.019,00 0,8844 0,859411. Kristal (2-D) 1.024 1,00 1.023,00 0,8981 0,874012. Kristal (2-E) 1.040 1,00 1.039,00 0,8712 0,845713. Kristal (3-A) 1.008 1,00 1.007,00 0,8966 0,880014. Kristal (3-B) 1.013 1,00 1.012,00 0,8396 0,821315. Kristal (3-C) 1.021 1,00 1.020,00 0,8352 0,799216. Kristal (3-D) 1.018 1,00 1.017,00 0,8352 0,799217.
      Kristal (3-E) 1.021 1,00 1.020,00 0,8313 0,812018. Tablet (3-F) 4.500 1.328 10 3,12 4.490 1.324,88 2,9286 8 2,344019. Tablet (3-G) 4.500 1.328 10 3,12 4.490 1.324,88 2,9387 8 2,343420. Tablet (3-H) 4.500 896 10 3,12 3.990 892,88 2,9312 8 2,3453TOTAL KRISTAL 15.313 15,00 15.298,00 12,7929 12,4561TOTAL TABLET 22.000 1.036 50 15,60 21.950 6.193,40 14,6388 40 11,6889TOTAL BERAT KRISTAL & TABLET 21.522 30,60 21.491,40 27,4317 24,1450dirampas untuk dimusnahkan;6.
      1.329 10 3,12 4.490 1.325,88 2,9404 8 2,3506(1F)Tablet 4.500 1.328 10 3,12 4.490 1.324,88 2,8999 8 2,3056(1G) Kristal 1.019 1,00 1.018,00 10,8111 0,7898(2A)Kristal 1.016 1,00 1.015,00 0,7848 0,7567(2B)Kristal 1.020 1,00 1.019,00 0,8844 0,8594(2C)Kristal 1.024 1,00 1.023,00 0,8981 0,8740(2D)Kristal 1.040 1,00 1.039,00 0,8712 0,8457(2E)Kristal 1.008 1,00 1.007,00 0,8966 0,8800(3A)Kristal 1.013 1,00 1.012,00 0,8396 0,8213(3B)Kristal 1.021 1,00 1.020,00 0,8352 0,7992(3C)Kristal 1.018 1,00 1.017,00 0,8352
      1.035,00 0,8879 0,8695(1A)Kristal 1.019 1,00 1.018,00 0,8215 0,7978(1B)Kristal 1.022 1,00 1.021,00 0,8601 0,8342(1C)Kristal 1.020 1,00 1.019,00 0,8524 0,8416(1D)Kristal 1.016 1,00 1.015,00 0,8835 0,8757(1E)Tablet 4.500 1.329 10 3,12 4.490 1.3258 29404 8 2,3506(1F)Tablet 4.500 1.328 10 3,12 4.490 1.32488 28999 8 2,3056(1G)Kristal 1.019 1,00 1.018,00 0,8111 0,7898(2A)Kristal 1.016 1,00 1.015,00 0,7848 0,7567(2B)Kristal 1.020 1,00 1.019,00 0,8844 0,8594(2C)Kristal 1.024 1,00 1.023,00 0,8981 0,8740(
      2D)Kristal 1.040 1,00 1.039,00 0,8712 0,8457(2E)Kristal 1.008 1,00 1.007,00 0,8966 0,8800(3A)Kristal 1.013 1,00 1.012,00 0,8396 0,8213(3B)Kristal 1.021 1,00 1.020,00 0,8352 0,7992(3C)Kristal 1.018 1,00 1.017,00 0,8352 0,7992(3D)Kristal 1.021 1,00 1.020,00 0,8313 0,8120(3E)Tablet 4.500 1.328 10 3,12 4.490 1.324,88 29286 8 2,3440(3F)Tablet 4.500 1.328 10 3,12 4.490 1.32488 29387 8 23434(3G)Tablet 4.500 896 10 3,12 3.990 892,88 2.9312 8 2,3453(3H)TOTAL 15.313 15,00 15.298,00 12,7929 12,4561KRISTALTOTAL
      1.035,00 0,8879 0,8695(1A)Kristal 1.019 1,00 1.018,00 0,8215 0,7978(1B)Kristal 1.022 1,00 1.021,00 0,8601 0,8342(1C)Kristal 1.020 1,00 1.019,00 0,8524 0,8416(1D)Kristal 1.016 1,00 1.015,00 0,8835 0,8757(1E)Tablet 4.500 1.329 10 3,12 4.490 1.325,88 2,9404 8 2,3506(1F)Tablet 4.500 1.328 10 3,12 4.490 1.324,88 2,8999 8 2,3056Gm)Kristal 1.019 1,00 1.018,00 0,8111 0,7898(2A)Kristal 1.016 1,00 1.015,00 0,7848 0,7567(2B)Kristal 1.020 1,00 1.019,00 0,8844 0,8594(2C)Kristal 1.024 1,00 1.023,00 0,8981 0,8740
      1.016 1,00 1.015,00 0,8835 0,8757(1E)Tablet 4.500 1.329 10 3,12 4.490 1.325,88 2,9404 8 2,3506(1F)Tablet 4.500 1.328 10 3,12 4.490 1.324,88 2,8999 8 2,3056(1G)Kristal 1.019 1,00 1.018,00 0,8111 0,7898(2A)Kristal 1.016 1,00 1.015,00 0,7848 0,7567(2B)Kristal 1.020 1,00 1.019,00 0,8844 0,8594(2C)Kristal 1.024 1,00 1.023,00 0,8981 0,8740(2D)Kristal 1.040 1,00 1.039,00 0,8712 0,8457(2E)Kristal 1.008 1,00 1.007,00 0,8966 0,8800(3A)Kristal 1.013 1,00 1.012,00 0,8396 0,8213(3B)Kristal 1.021 1,00 1.020,00
    Register : 07-05-2021 — Putus : 29-06-2021 — Upload : 29-06-2021
    Putusan PT BANDA ACEH Nomor 48/PDT/2021/PT BNA
    Tanggal 29 Juni 2021 — Pembanding/Tergugat : PT. Perkebunan Nusantara I Diwakili Oleh : Binsar Simbolon, sh
    Terbanding/Penggugat I : PT GALATTA LESTARINDO
    Terbanding/Penggugat II : PT SARANA ADYABOGA AGUNG
    Terbanding/Penggugat III : CV ANUGERAH JAYA
    Terbanding/Penggugat IV : CV BERSAMA JAYA
    Terbanding/Penggugat V : CV PRIMA INDAH LESTARI
    Terbanding/Penggugat VI : CV NUSA ABADI JAYA
    Terbanding/Penggugat VII : CV DWI PUTRA MANDIRI
    Terbanding/Penggugat VIII : CV TUNAS PELITA JAYA
    Terbanding/Penggugat IX : CV GRAHA PRIMA LESTARI
    14693
    • S 760.427.550 Olbulan 1,00% 0,00% =Sub Jumlah Tahun 2015 2.943.5912 2016 760.427.550 12bulan 1,00% 12,00% 91.251.306Sub Jumlah Tahun 2016 91.251.3063 2017 760.427.550 12bulan 1,00%J 12,00% 91.251.306Sub Jumlah Tahun 2017 91.251.3064 2018 760.427.550 7bulan 1,00% 7,00% 53.229.929. = 760.427.550 15hari 0,03% 0,48% 3.679.48816/08/2018 50.000.000 710.427.550 16hari 0,03% 0,52% 3.666.723= 5 710.427.550 Albulan 1,00% 4,00% 28.417.102Sub Jumlah Tahun 2018 88.993.2414 2019 S S 710.427.550 2bulan 1,00% 2,00%
      No Tahun Pembayaran Jumlah/Sisa Keterlambat DendaTanggal Jumlah Tagihan an Hari Bulan Nominal1 2013 280.098.000 Ofhari 0,04% 0,00% 280.098.000 Albulan 1,00% 4,00% 11.203.920Sub Jumlah Tahun 2013 11.203.9202 2014 280.098.000 12bulan 1,00% 12,00% 33.611.760Sub Jumlah Tahun 2014 33.611.7603 2015 280.098.000 12bulan 1,00%J 12,00% 33.611.760Sub Jumlah Tahun 2015 33.611.7604 2016 280.098.000 12bulan 1,00%J 12,00% 33.611.760Sub Jumlah Tahun 2016 33.611.7605 2017 280.098.000 11bulan 1,00% 11,00% 30.810.780
      No Tahun Pembayaran Jumlah/Sisa Keterlambat DendaTanggal Jumlah Tagihan an Hari Bulan Nominal1 2013 5 196.892.200 Ofhari 0,03% 0,00% :: : 196.892.200 4bulan 1,00% 4,00% 7.875.688Sub Jumlah Tahun 2013 7.875.6882 2014 ei) = 196.892.200 12bulan 1,00% 12,00% 23.627.064Sub Jumlah Tahun 2014 23.627.0643 2015 196.892.200 12bulan 1,00% 12,00% 23.627.064Sub Jumlah Tahun 2015 23.627.0644 2016 el ~ 196.892.200 12bulan 1,00% 12,00% 23.627.064Sub Jumlah Tahun 2016 23.627.0645 2017 : 2 196.892.200 11bulan 1,00%
      No Tahun Pembayaran Jumlah/Sisa Keterlambat DendaTanggal Jumlah Tagihan an Hari Bulan Nominal1 2013 288.756.217 Sfhari 0,03% 0,16% 465.736 288.756.217 2bulan 1,00% 2,00% 5.775.124Sub Jumlah Tahun 2013 6.240.8602 2014 arr 288.756.217 12bulan 1,00% 12,00% 34.650.746Sub Jumlah Tahun 2014 34.650.7463 2015 288.756.217 12bulan 1,00% 12,00% 34.650.746Sub Jumlah Tahun 2015 34.650.7464 2016 288.756.217 12bulan 1,00% 12,00% 34.650.746Sub Jumlah Tahun 2016 34.650.7465 2017 = 288.756.217 11bulan 1,00% 11,00%
      Perjanjian Jual Beli Pupuk Nomor : 01.8/X/SJAN/143/2014 tanggal 7Mei 2014:No Tahun Pembayaran Jumlah/Sisa Keterlambat DendaTanggal Jumlah Tagihan an Hari Bulan Nominal1 2014 2.107.634.500 26fhari 0,03% 0,87% 18.266.166 2.107.634.500 1fbulan 1,00% 1,00% 21.076.345Sub Jumlah Tahun 2014 39.342.5112 2015 2.107.634.500 12bulan 1,00% 12,00% 252.916.140Sub Jumlah Tahun 2015 252.916.1402 2016 2.107.634.500 12bulan 1,00% 12,00% 252.916.140Sub Jumlah Tahun 2016 252.916.1402 2017 2.107.634.500 12bulan 1,00%
    Register : 19-04-2016 — Putus : 18-05-2016 — Upload : 03-09-2020
    Putusan PT PALU Nomor 5/PID.TPK/2016/PT PAL
    Tanggal 18 Mei 2016 — Pembanding/Terbanding/Terdakwa : JONI B. RAMLI, ST Diwakili Oleh : JONI B. RAMLI, ST
    Terbanding/Pembanding/Penuntut Umum : PALUPI WIRYAWAN, SH
    9537
    • Flanged Socket 1,00 bh 163.125,00 163.125,0043. Elanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee 2,00 bh 177.500,00 355.000,00PVC B 4 x @35. All Socket Tee 1,00 bh 185.000,00 185.000,00 Halaman 3 dari 48 Putusan Nomor 5/Pid.SusTPK/2016/PT.PAL PVC 4" x @46. All Socket Tee 2,00 bh 148.000,00 296.000,00PVC 3 x @37. All Socket Tee 2,00 Bh 85.000,00 170.000,00PVC 28. Gate Valve 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC @ 3 2,00 Bh 38.062,50 76.125,0010.)
      181.863.25 545.589.75PEK.ACCESSIRIESPENGURASAll Flanged 1,00 Bh 1.495.312,50 1.495.312,50Gate Valve @ 4All Flanged tee 1,00 Bh 525.000,00 525.000,00PVC @ 4Flanged Socket 1,00 Bh 163.125,00 163.125,00PVC @ 4Flanged Sigot 1,00 Bh 163.125,00 163.125,00PVC @ 4All Flanged 1,00 Bh 375.000,00 375.000,00Bend PVC @ 4 Paking Karet @ 5,00 Bh 17.500,00 87.500,00AMur Baut 5/8 40,00 Bh 8.775,00 351.000,0034.302.394,06Pembuatan 1,00 PktBlock BetonGalian Tanah 3,00 M3 24.990,00 74.970,00BiasaUrugan Tanah 1,00 M2
      Flanged Socket @ 4 1,00 bh 163.125,00 163.125,003. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee PVC 4 x 2,00 bh 177.500,00 355.000,00 Halaman 16 dari 48 Putusan Nomor 5/Pid.SusTPK/2016/PT.PAL QO 35. All Socket Tee PVC 4 x 1,00 bh 185.000,00 185.000,00Q 46. All Socket Tee PVC @ 3 x 2,00 bh 148.000,00 296.000,00GO 37. All Socket Tee PVC @ 2 2,00 Bh 85.000,00 170.000,008. Gate Valve O 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC @ 3 2,00 Bh 38.062,50 76.125,0010.
      ACCESSIRIESPENGURASAll Flanged Gate Valve 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh 375.000,00 375.000,00Paking Karet 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
      ACCESSIRIESPENGURASAll Flanged Gate Valve 1,00 Bh 1.495.312,5 1.495.312,50@ 4 0All Flanged tee PVC @ 1,00 Bh 525.000,00 525.000,00AFlanged Socket PVC @ 1,00 Bh 163.125,00 163.125,00AFlanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC 1,00 Bh 375.000,00 375.000,00G4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block 1,00 PktBetonGalian Tanah Biasa 3,00 M8 24.990,00 74.970,00Urugan Tanah 1,00 M2 11.980,00 11.980,00Beton
    Register : 25-03-2015 — Putus : 10-08-2015 — Upload : 15-01-2016
    Putusan PN KUPANG Nomor 20/Pid.Sus-TPK/2015/PN.Kpg
    Tanggal 10 Agustus 2015 — ZAKARIAS HERIANDO SIKU, ST Alias HERI SIKU
    7730
    • Volume Kontrak Volume SelisihPekerjaan Total Investigasi (Lebih)(Tim Ahli KurangPoltek VolumeKupang) Unit PEKERJAANPENDAHULUAN Pembuatan Ls 1,00 1,00 1,00 Direksi Keat Pembersihaan/ Ls 1,00 1,00 1,00 perataan tanah Pemasangan Ls 1,00 1,00 1,00 Bouwplank Pengadaan air Ls 1,00 1,00 1,00 kerja Pengadaan Ls 1,00 1,00 1,00 listrik kerja Pembuatan Ls 1,00 1,00 1,00 papan namaproyek Jumlah A PEKERJAANKONSTRUKSI : PEKERJAANTANAH : Galian tanah M3 10,40 811,20 506,87 304,33biasa untukpondasi Urugan kembali
      156,00 156,00 78,00Jumlah VI Vil PEKERJAANPENGECATANMengecat M2 101,25 7.897,50 7.249,90 647,60tembok danplafond denganMatexMengecat M2 3,38 263,64 193,43 70,21listplank, jelusidengan catEmcoResidu rangka Ls 1,00 78,00 78,00 atapJumlah VIIJumlah B (I s/dVII)Untuk 78 unit Cc PEKERJAANLAINLAIN :Biaya Ls 1,00 1,00 1,00 administrasi,pelaporan dandokumentasiAsbuilt drawing Ls 1,00 1,00 1,00 Operasional Ls 1,00 1,00 1,00 direksiBiaya Ls 1,00 1,00 1,00 pembersihanakhir Jumlah C TOTALA + B+C 3.
      Volume Kontrak Volume SelisihTotal Investigasi (Lebih)(Tim Ahli KurangPoltek VolumeKupang)Unit UNTUK 1 UNIT WARUNGMAKAN Halaman 375 dari 480 Putusan Nomor 20/Pid.SusTPK/2015/PN.KPG PEKERJAAN PENDAHULUAN Administrasi dan Ls 1,00 1,00 1,00 DokumentasiPemasangan Bouwplank Ls 1,00 1,00 1,00 Pengadaan air kerja Ls 1,00 1,00 1,00 Pembuatan papan nama Ls 1,00 1,00 1,00 proyekJumlah AB. PEKERJAAN KONSTRUKSII.
      Volume Kontrak Volume SelisihPekerjaan Total Investigasi (Lebih)(Tim Ahli KurangPoltek VolumeKupang) Unit PEKERJAANPENDAHULUAN Pembuatan Ls 1,00 1,00 1,00 Direksi Keat Pembersihaan/ Ls 1,00 1,00 1,00 perataan tanah Pemasangan Ls 1,00 1,00 1,00 Bouwplank Pengadaan air Ls 1,00 1,00 1,00 kerja Pengadaan Ls 1,00 1,00 1,00 listrik kerja Pembuatan Ls 1,00 1,00 1,00 papan namaproyek Jumlah A PEKERJAANKONSTRUKSI PEKERJAANTANAH Galian tanah M3 8,55 34,20 20,40 13,80biasa untukpondasi Urugan kembali M3 2,13
      Volume Kontrak Volume SelisihPekerjaan Total Investigasi (Lebih)(Tim Ahli KurangPoltek VolumeKupang) Unit PEKERJAANPENDAHULUAN Pembuatan Ls 1,00 1,00 1,00 Direksi Keat Pembersihaan/ Ls 1,00 1,00 1,00 perataan tanah Pemasangan Ls 1,00 1,00 1,00 Bouwplank Pengadaan air Ls 1,00 1,00 1,00 kerja Pengadaan Ls 1,00 1,00 1,00 listrik kerja Pembuatan Ls 1,00 1,00 1,00 papan namaproyek JumlahA PEKERJAANKONSTRUKSI : PEKERJAANTANAH : Galian tanah M3 10,40 811,20 506,87 304,33biasa untukpondasi Urugan kembali
    Register : 17-11-2016 — Putus : 15-12-2016 — Upload : 03-09-2020
    Putusan PT PALU Nomor 25/PID.TPK/2016/PT PAL
    Tanggal 15 Desember 2016 — Pembanding/Terbanding/Penuntut Umum : ALEXANDER TANAK, SH
    Terbanding/Pembanding/Terdakwa : HEIN MOPANTAW Alias KO'HEIN
    10230
    • Direksi Keet 1,00 M 904.000,00 904.000,003: Papan Proyek 1,00 Bh 335.610,00 335.610,004. Pengukuran Lokasi / Uizet 1,00 Ls 730.000,00 730.000,00Il PEKERJAAN NORMALISASI1; Galian Tanah dengan alat berat Benes Me 23.321,03 174.961.369,80Ill PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 895.500,00 895.500,002 Dokumentasi 1,00 Set 135.850,00 135.850,003.
      Direksi Keet 1,00 M 900.000,00 900.000,003. Papan Proyek 1,00 Bh 335.742,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 745.500,00 745.500,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat tee Me 23.321,68 174.966.250,58Ill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004.
      Direksi Keet 1,00 M 904.000,00 904.000,003 Papan Proyek 1,00 Bh 335.610,00 335.610,004. Pengukuran Lokasi / Uizet 1,00 Ls 730.000,00 730.000,00Il PEKERJAAN NORMALISASIi. Galian Tanah dengan alat berat totes Me 23.321,03 174.961.369,80Ill PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 135.850,00 135.850,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004 Pencetakan Asbuilt Drawing 1,00 Set 189.200,00 189.200,005.
      Direksi Keet 1,00 M 900.000,00 900.000,003. Papan Proyek 1,00 Bh 335.742,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 745.500,00 745.500 ,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 M3 23.321,68 eeeIll PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004 Pencetakan Asbuilt Drawing 1,00 Set 189.200,00 189.200,005.
      Direksi Keet 1,00 M 900.000,003. Papan Proyek 1,00 Bh ae 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls me 745.500,00 ll PEKERJAAN NORMALISASI i. Galian Tanah dengan alat berat 7.502,30 M3 23.321,68 174.966.250,58 Il PEKERJAAN LAINLAIN 1. Demobilisasi 1,00 Ls adel 895.500,002. Dokumentasi 1,00 Set +e 136.950,003. Penggambaran Asbuilt Drawing 1,00 Set ee 286.000,004.
    Putus : 23-09-2011 — Upload : 13-04-2012
    Putusan MAHKAMAH AGUNG Nomor 881 K/Pid.Sus/2011
    Tanggal 23 September 2011 — Drs. SUBKI YAHYA ;
    5032 Berkekuatan Hukum Tetap
    • bil 590.000 Rp 590.000,004 Aquadeststeril 500 ml 10 10,00 btl 12.000 Rp 120.000,005 Asam asetatglacial 0.50 0.50 ltr 1.000.000 Rp 500.000,006 Aseton 0.50 0.50 Itr 1.500.000 Rp 750.000,007 Billirubin 2,00 2,00 kit 980.000 Rp 1.960.000,008 Cholesterol 1,00 1,00 kit 1.956.000 Rp 1.956.000,009 Creatinin 1,00 1,00 kit 1.000.000 Rp 1.000.000,0010 Eosin25mg 1,00 1,00 btl 1.004.000 Rp 1.004.000,0011 Glukose 1,00 1,00 kit 1.884.450 Ro 1.884.450,0012 GolongandarahA, B, AB, O 1,00 1,00 set 772.200 Rp 772.200,0013
      GOT 2,00 kit 1.100.000 Rp 14 GPT 1,00 kit 1.100.000 Rp 15 HBsAg 1,00 1,00 box 1.658.850 Rp 1.658.850,0016 HCG 1,00 kit 1.250.000 Rp 17 Immersion oil 500 ml 1,00 1,00 btl 850.000 Rp 850.000,0018 Larutan Benedik 2,00 2,00 btl 750.000 Rp 1.500.000,0019 Methil red indikator 25 gr 1,00 1,00 btl 477.400 Rp 477.400,0020 Natrium karbonat 0.50 kg 3.500.000 Rp 21 Protein total 1,00 1,00 kit 1.150.000 Rp 1.150.000,0022 React Cuvette 10 10,00 10,00 pak 150.000 Rp 1.500.000,0023 Reagentbotle 20 ml (20/boks)
      1,00 1,00 box 215.000 Rp 215.000,0024 Reagentbotle 40 ml (20/boks) 1,00 1,00 box 215.000 Rp 215.000,0025 Reagentbotle 60 ml (20/boks) 1,00 1,00 box 215.000 Rp 215.000,0026 Reete Echer 1,00 1,00 liter 850.000 Rp 850.000,0027 Sample Cup 1000/boks 2,00 2,00 box 650.000 Rp 1.300.000,0028 Trigliserida 1,00 1,00 kit 2.150.000 Rp 2.150.000,0029 Urea 1,00 1,00 kit 525.000 Rp 525.000,00 Hal. 8 dari 41 hal.
      No.881 K/Pid.Sus/2011 30 Urid Acid 2,00 1,00 kit 1.850.000 Rp 1.850.000,0031 Urine Srips 1,00 1,00 box 1.056.000 Rp 1.056.000,0032 Widal 1,00 1,00 kit 1.257.000 Rp 1.257.000,00Bahan Laboratorium Rp 1 7onsa Pembesaran Objekt 1,00 1,00 bh 3.500.000 Rp 3.500.000,002 Tipclinipetbiru 100,00 100,00 bh 750 Rp 75.000,003 Tip clinipetkuning 100,00 100,00 bh 750 Rp 75.000,004 Cover glass ukuran 24 x 24 2,00 2,00 ktk 216.500 Rp 433.000,005 Kamarhitung 2,00 2,00 bh 524.000 Rp 1.048.000,006 Objek glass 5,00 5,00
      No. 881 K/Pid.Sus/2011 31 Silicat P/L/Fiji I/Fiji 1X 5 5,00 5,00 btl 435.000 Rp 2.175.000,0032 TKF 10 6,00 6,00 btl 63.000 Rp 378.000,0033 GOT 2,00 2,00 2,00 kit 1.100.000 Rp 2.200.000,0034 GPT 1,00 1,00 1,00 kit 1.100.000 Rp 1.100.000,0035 HCG 1,00 1,00 1,00 kit 1.250.000 Rp 1.250.000,0036 Natrium karbonat 0,50 0,50 0,50 kg 3.500.000 Rp 1.750.000,0037 Urid Acid 2,00 1,00 1,00 kit 1.850.000 Rp 1.850.000,0038 Nald Heachting E 000 F 2,00 2,00 2,00 lusin 142.500 Rp 285.000,0039 Spuit Disposible 10 CC
    Register : 16-09-2015 — Putus : 25-01-2016 — Upload : 26-07-2016
    Putusan PN PALU Nomor 56/Pid.Sus-TPK/2015/PN Pal
    Tanggal 25 Januari 2016 — WAHYUDIN M. GAGARAMUSU, S.Sos Alias BUDO
    7114
    • Flanged Socket @1,00 bh 163.125,00 163.125,0043. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee = 2,00 bh 177.500,00 355.000,00PVC @ 4 x 35. All Socket Tee 1,00 bh 185.000,00 185.000,00PVC 4 x 46. All Socket Tee 2,00 bh 148.000,00 296.000,00PVC @ 3 x 37. All Socket Tee 2,00 Bh 85.000,00 170.000,00PVC 28. Gate Valve @ 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC @3 /2,00 Bh /38.062,50 76.125,0010.;Dop PVC @ 2 2,00 bh 32.625,00 65.250,0011.
      181.863.25 545.589.75PEK.ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh /1.495.312,50 1.495.312,50Valve @ 4All Flanged tee 1,00 Bh 525.000,00 525.000,00PVC @4Flanged Socket 1,00 Bh 163.125,00 163.125,00PVC @ 4Flanged Sigot 1,00 Bh 163.125,00 163.125,00PVC 4All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 40,00 Bh 8.775,00 351.000,0034.302.394,06Pembuatan 1,00 PktBlock BetonGalian Tanah 3,00 M3 24.990,00 74.970,00BiasaUrugan Tanah 1,00 M3 11.980,00
      Flanged Socket 4 1,00 bh 163.125,00 163.125,003. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee PVC @ 4 x @/2,00 bh 177.500,00 355.000,0035. All Socket Tee PVC @ 4 x @1,00 bh 185.000,00 185.000,0046. All Socket Tee PVC @ 3 x @2,00 bh 148.000,00 296.000,0037. All Socket Tee PVC @ 2 2,00 Bh 85.000,00 170.000,008. Gate Valve 4 1,00 bh 1.495.312,501.495.312,509. Dop PVC @ 3 2,00 Bh 38.062,50 =76.125,0010. Dop PVC @ 2 2,00 bh = /32.625,00 65.250,0011.
      ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh = 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,00 4.302.394,06.
      ACCESSIRIESPENGURASAll Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50g4All Flanged tee PVC @ 4 1,00 Bh 525.000,00 = 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @/1,00 Bh 375.000,00 = 375.000,00APaking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block 1,00 PktBetonGalian Tanah Biasa 3,00 M3 24.990,00 74.970,00Urugan Tanah 1,00 M3 11.980,00 11.980,00Beton
    Register : 15-04-2016 — Putus : 18-05-2016 — Upload : 01-08-2016
    Putusan PT PALU Nomor 4/Pid.Sus-TPK/2016/PT PAL
    Tanggal 18 Mei 2016 — KADIR, S.T. alias KADIR NURDIN
    10451
    • Flanged Socket @1,00 bh 163.125,00 163.125,004 Halaman 3 dari 51 Putusan Nomor 4/Pid.SusTPK/2016/PT.PAL 3. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee = 2,00 bh 177.500,00 355.000,00PVC 4 x 35. All Socket Tee 1,00 bh 185.000,00 185.000,00PVC 4 x 46. All Socket Tee 2,00 bh 148.000,00 296.000,00PVC 3 x 37. All Socket Tee 2,00 Bh 85.000,00 170.000,00PVC 28. Gate Valve @ 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC @3 /2,00 Bh /38.062,50 76.125,0010.
      181.863.25 545.589.75PEK.ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh 1.495.312,50 1.495.312,50Valve @ 4All Flanged tee 1,00 Bh 525.000,00 525.000,00PVC @4Flanged Socket 1,00 Bh 163.125,00 163.125,00PVC @4Flanged Sigot 1,00 Bh 163.125,00 163.125,00PVC @ 4All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 40,00 Bh 8.775,00 351.000,0034.302.394,06Pembuatan 1,00 PktBlock BetonGalian Tanah 3,00 M3 24.990,00 74.970,00BiasaUrugan Tanah 1,00 M3 11.980,00
      ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 = 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00 Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
      Flanged Socket @ 4 1,00 bh 163.125,00 163.125,003. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee PVC @ 4 2,00 bh 177.500,00 355.000,00x 35. All Socket Tee PVC @ 4 1,00 bh 185.000,00 185.000,00x 46. All Socket Tee PVC @ 3 2,00 bh 148.000,00 296.000,00x 37. All Socket Tee PVC @ 2 2,00 Bh 85.000,00 170.000,008. Gate Valve 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC @ 3 2,00 Bh 38.062,50 76.125,0010. Dop PVC @ 2 2,00 bh = 32.625,00 65.250,0011.
      ACCESSIRIESPENGURASAll Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50@4All Flanged tee PVC @ 4 1,00 Bh 525.000,00 = 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @/1,00 Bh = 375.000,00 375.000,00APaking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block 1,00 PktBetonGalian Tanah Biasa 3,00 M3 24.990,00 74.970,00Urugan Tanah 1,00 M3 11.980,00 11.980,00
    Register : 15-11-2016 — Putus : 15-12-2016 — Upload : 03-11-2021
    Putusan PT PALU Nomor 21/PID.TPK/2016/PT PAL
    Tanggal 15 Desember 2016 — Pembanding/Terbanding/Penuntut Umum : ALEXANDER TANAK, SH
    Terbanding/Pembanding/Terdakwa : ERLY LIANGAN Diwakili Oleh : ERLY LIANGAN
    9030
    • Direksi Keet 1,00 M 904.000,00 904.000,003. Papan Proyek 1,00 Bh 335.610,00 335.610,004. Pengukuran Lokasi / Uizet 1,00 Ls 730.000,00 730.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7028 Me 23.321,03 174.961.369,80Ill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 135.850,00 135.850,003: Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004.
      Direksi Keet 1,00 M 950.000,00 900.000,003. Papan Proyek 1,00 Bh 336.539,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 700.000,00 745.500,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,3 M 23.321,68 174.966.250,580lll PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004. Pencetakan Asbuilt Drawing 1,00 Set 189.200,00 189.200,005.
      Direksi Keet 1,00 M 950.000,00 950.000,003. Papan Proyek 1,00 Bh 336.132,50 336.132,504. Pengukuran Lokasi / Uizet 1,00 Ls 719.000,00 719.000,00i PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,3 M 23.323,31 174.966.250,580Ul PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004. Pencetakan Asbuilt Drawing 1,00 Set 189.695,00 189.695,005.
      Direksi Keet 1,00 M 985.000,00 985.000,003. Papan Proyek 1,00 Bh 337.440,40 337.440,404. Pengukuran Lokasi / Uizet 1,00 Ls 725.000,00 725.000,00i PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,3 Me 23.321,03 174.961.369,800lll PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt Drawing 1,00 Set 261.250,00 261.250,004. Pencetakan Asbuilt Drawing 1,00 Set 187.550,00 187.550,005.
      Direksi Keet 1,00 M 900.000,00 900.000,003. Papan Proyek 1,00 Bh 335.742,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 745.500,00 745.500,00Il PEKERJAAN NORMALISASIi. Galian Tanah dengan alat berat = Me 23.321,68 174.966.250,58Ill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004.
    Register : 12-11-2020 — Putus : 31-03-2021 — Upload : 01-04-2021
    Putusan PN BENGKULU Nomor 33/Pid.Sus-TPK/2020/PN Bgl
    Tanggal 31 Maret 2021 — Penuntut Umum:
    NOPRIDIANSYA,SH
    Terdakwa:
    JANUNG ASMADI Bin Alm. BANADI
    14165
    • 100.000,00 2.500.000,00TowerOperasional Pk 2,00 500.000,00 1.000.000,00 2,00 500.000,00 1.000.000,00akomodasiJasa Pasang Pk 1,00 3.250.000,00 3.250.000,00 1,00 3.250.000,00 3.250.000,00antena & settingkoneksiRadio M5 Pcs 2,00 1.695.000,00 3.390.000,00 2,00 1.695.000,00 3.390.000,00(Akses Point toPoint)Wifi Indor Pcs 1,00 500.000,00 500.000,00 1,00 500.000,00 500.000,00UPS 600 Va Pcs 1,00 750.000,00 750.000,00 750.000,00 Kabel UTP Pcs 1,00 585.000,00 585.000,00 1,00 585.000,00 585.000,00Belden +
      RJ 45Microtik Pcs 1,00 995.000,00 995.000,00 1,00 995.000,00 995.000,00Vertikal besi12 Bt 11,00 80.000,00 880.000,00 6,00 80.000,00 480.000,00Horizontal besi Bt 12,00 55.000,00 660.000,00 12,00 55.000,00 660.000,008Besi Strip Bt 6,00 35.000,00 210.000,00 2,00 35.000,00 70.000,00Elektroda Kotak 1,00 225.000,00 225.000,00 1,00 225.000,00 225.000,00Pipa cincin Bt 1,00 85.000,00 85.000,00 1,00 85.000,00 85.000,00sambungan 1/2Pipa cor tarikan Bt 1,00 200.000,00 200.000,00 1,00 200.000,00 200.000,00seling
      1,00 178.000,00 178.000,00 1,00 178.000,00 178.000,00batu kali m?
      3.500.000,00Torn 1000 bh 1,00 2.500.000,00 2.500.000,00 1,00 2.500.000,00 2.500.000,00literBiaya unit 1,00 3.000.000,00 3.000.000,00 3.000.000,00 pemasanganKWH danAdmKabel NYM M!
    Register : 17-11-2016 — Putus : 15-12-2016 — Upload : 03-09-2020
    Putusan PT PALU Nomor 26/PID.TPK/2016/PT PAL
    Tanggal 15 Desember 2016 — Pembanding/Terbanding/Penuntut Umum : ALEXANDER TANAK, SH
    Terbanding/Pembanding/Terdakwa : DEKO H. BASIA Als. DEKO
    9327
    • Direksi Keet 1,00 M 904.000,00 904.000,003. Papan Proyek 1,00 Bh 335.610,00 335.610,004. Pengukuran Lokasi / Uizet 1,00 Ls 730.000,00 730.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7028 Me 23.321,03 174.961.369,80Ill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 135.850,00 135.850,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004.
      Direksi Keet 1,00 M 950.000,00 900.000,003. Papan Proyek 1,00 Bh 336.539,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 700.000,00 745.500,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,3 M 23.321,68 174.966.250,580lll PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004.
      Direksi Keet 1,00 M 950.000,00 950.000,003. Papan Proyek 1,00 Bh 336.132,50 336.132,504. Pengukuran Lokasi / Uizet 1,00 Ls 719.000,00 719.000,00i PEKERJAAN NORMALISASI1, Galian Tanah dengan alat berat 7.502,3 M 23.323,31 174.966.250,580Ul PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004. Pencetakan Asbuilt Drawing 1,00 Set 189.695,00 189.695,005.
      Direksi Keet 1,00 M 985.000,00 985.000,003. Papan Proyek 1,00 Bh 337.440,40 337.440,404. Pengukuran Lokasi / Uizet 1,00 Ls 725.000,00 725.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,3 Me 23.321,03 174.961.369,800Ul PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt Drawing 1,00 Set 261.250,00 261.250,004. Pencetakan Asbuilt Drawing 1,00 Set 187.550,00 187.550,005.
      Direksi Keet 1,00 M 900.000,00 900.000,003. Papan Proyek 1,00 Bh 335.742,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 745.500,00 745.500,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat Me 23.321,68 174.966.250,58Ill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004.
    Register : 02-04-2018 — Putus : 08-05-2018 — Upload : 20-06-2019
    Putusan PT BANDA ACEH Nomor 4/PID.SUS/TIPIKOR/2018/PT BNA
    Tanggal 8 Mei 2018 — Pembanding/Penuntut Umum I : EVAN MUNANDAR, SH
    Terbanding/Terdakwa : RANUDDIN ASANI, SE Bin Alm ABDULLAH SANI
    7925
    • 1,00, 0,002 Pengukuran dan Ls 1,00 1,00, 0,00Pemasangan Bawplank3 Pondok Kerja dan Gudang Ls 1,00 1,00, 0,004 Papan Nama Proyek Ls 1,00 1,00, 0,005 Mobilisasi dan Demobilisasi Ls 1,00 1,00, 0,006 Administrasi, Dokumentasi Ls 1,00 1,00, 0,00P3K7 Bobok Tiang Kolom Induk Ls 1,00 1,00, 0,0030x30cm Aula Kanotr8 Bobok Sloof 15x25 cm Aula Ls 1,00 1,00, 0,00Kantor9 Bobok Dinding Bata Aula Ls 1,00 1,00, 0,00Kantorlll Pekerjaan Beton Bertulang4 Tiang Beton Induk 30/30 cm M3 1,08 1,08 0,0010 Ring Balk 15/25
      1,00, 0,002 Pengukuran dan Ls 1,00 1,00, 0,00Pemasangan Bawplank3 Pondok Kerja dan Gudang Ls 1,00 1,00, 0,004 Papan Nama Proyek Ls 1,00 1,00, 0,005 Mobilisasi dan Ls 1,00 1,00, 0,00Demobilisasi6 Administrasi, Dokumentasi Ls 1,00 1,00, 0,00P3K7 Bobok Tiang Kolom Induk Ls 1,00 1,00, 0,0030x30cm Aula Kanotr8 Bobok Sloof 15x25 cm Ls 1,00 1,00, 0,00Aula Kantor9 Bobok Dinding Bata Aula Ls 1,00 1,00, 0,00Kantorlll Pekerjaan BetonBertulang4 Tiang Beton Induk 30/30 M3 1,08 1,08 0,00cm10 Ring Balk 15/25 cm
      Pekerjaan Persiapan 1 Administrasi, Gambar Ls 1,00 1,00 0,00Pengamanan, P3K2 Biaya Mobilisasi Ls 1,00 1,00 0,00IV.
      0,002 Pengukuran dan Ls 1,00 1,00, 0,00Pemasangan Bawplank3 Pondok Kerja dan Gudang Ls 1,00 1,00, 0,004 Papan Nama Proyek Ls 1,00 1,00, 0,005 Mobilisasi dan Demobilisasi Ls 1,00 1,00, 0,006 Administrasi, Dokumentasi Ls 1,00 1,00, 0,00P3K7 Bobok Tiang Kolom Induk Ls 1,00 1,00, 0,0030x30cm Aula Kanotr8 Bobok Sloof 15x25 cm Aula Ls 1,00 1,00, 0,00Kantor9 Bobok Dinding Bata Aula Ls 1,00 1,00, 0,00Kantorlll Pekerjaan Beton Bertulang4 Tiang Beton Induk 30/30 cm M3 1,08 1,08 0,0010 Ring Balk 15/25 cm M3
      1,00 0,00 1,00XII Pek.