Ditemukan 2835 data

Urut Berdasarkan
 
Putus : 31-05-2017 — Upload : 14-03-2018
Putusan MAHKAMAH AGUNG Nomor 674 K/PID.SUS/2017
Tanggal 31 Mei 2017 — DEKO H. BASIA ALIAS DEKO
7748 Berkekuatan Hukum Tetap
  • Direksi Keet 1,00 M 950.000,00 900.000,003. Papan Proyek 1,00 Bh 336.539,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 700.000,00 745.500,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat 7.502,30 M 23.321 ,68 174.966.250,58beratlll PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt 1,00 Set 286.000,00 286.000,00Drawing4. Pencetakan Asbuilt Drawing 1,00 Set 189.200,00 189.200,005.
    Direksi Keet 1,00 M 950.000,00 950.000,003. Papan Proyek 1,00 Bh 336.132,50 336.132,504. Pengukuran Lokasi / Uizet 1,00 Ls 719.000,00 719.000,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat 7.502,30 M 23.323,31 174.966.250,58beratlll PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt 1,00 Set 286.000,00 286.000,00Drawing4. Pencetakan Asbuilt Drawing 1,00 Set 189.695,00 189.695,005.
    Direksi Keet 1,00 M 985.000,00 985.000,003. Papan Proyek 1,00 Bh 337.440,40 337.440,404. Pengukuran Lokasi / Uizet 1,00 Ls 725.000,00 725.000,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat 7.502,30 Me 23.321,03 174.961.369,80beratlll PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt 1,00 Set 261.250,00 261.250,00Drawing4. Pencetakan Asbuilt Drawing 1,00 Set 187.550,00 187.550,005.
    Direksi Keet 1,00 M 900.000,00 900.000,003. Papan Proyek 1,00 Bh 335.742,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 745.500,00 745.500,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 M 23.321,68 174.966.250,58Ill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004. Pencetakan Asbuilt Drawing 1,00 Set 189.200,00 189.200,005.
    Direksi Keet 1,00 M 900.000,00 900.000,003. Papan Proyek 1,00 Bh 335.742,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 745.500,00 745.500,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 M3 23.321,68 174.966.250,58Ill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004. Pencetakan Asbuilt Drawing 1,00 Set 189.200,00 189.200,005.
Putus : 24-05-2011 — Upload : 18-10-2011
Putusan PT BENGKULU Nomor 29/PID.2011/PT.BKL.
Tanggal 24 Mei 2011 — Herman Achyar bin Achyar
5724
  • Pengukuran Ls Bh 1,00 ,00 03. Papan nama Kegiatan Ls Uni 1,00 250.000 250.000,0Direksi Keet dan t ,00 04. perlengkapan Ls 1,00 1.500.0 1.500.000Mobilisasi Ls 00,00 ,002.500.0 2.500.00000,00 ,004.400.000 ,00II Pekerjaan Tanah1. Membentuk Badan K.32 2.05 16.335, 33.622.75Jalan Dengan Galian 1 3,73 47 7,452. (Alat) MMembuat Parit K.11 120, 57.008, 6.840.988Galian Tanah 0 00 24 ,8040.463.746,25II PekerjaanI Konstruksi Y 15, 450.267 6.754.0081. Gorong gorong @ 40 K.12 00 ,22 30cm 32.
    Administrasi Ls Ls 1,00 1.000.0 1.000.0002. Kegiatan Ls Ls 1,00 00,00 ,003. Dokumentasi Ls Ls 1,00 500.000 500.000,04. Kegiatan Ls Ls 1,00 ,00 0Transportasi 500.000 500.000,0Kegiatan ,00 0Keamanan dan Obat 500.000 500.000,0obatan ,00 02.500.000,00Total Jumlah 81.324.19Ppn 10 % 1,72Total (termasuk ppn) 8.132.419Pembulatan oll89.456.610,8989.456.000,00RAB. PERUBAHANNo Uraian Pekerjaan Anal Sat Vol Harga Jumlahisa uan satuan harga(Rp) (Rp) I Pekerjaan1. Persiapan Ls Km 0,60 250.000 150.000,02.
    Perkerasan K.51 M 130, 127.813 16.732.04Perkerasan LPB Klas 5 91 537 8,27CSub jumlah 16.732.048,27V Pekerjaan Lain Lain Ls Ls 1,00 1.000.0 1.000.0001. Administrasi Ls Ls 1,00 00,00 ,002. Kegiatan Ls Ls 1,00 500.000 500.000,03. Dokumentasi Ls Ls 1,00 ,00 04.
    Administrasi Ls Ls 1,00 1.000.0 1.000.0002. Kegiatan Ls Ls 1,00 00,00 ,003. Dokumentasi Ls Ls 1,00 500.000 500.000,04. Kegiatan Ls Ls 1,00 ,00 0Transportasi 500.000 500.000,0Kegiatan ,00 0Keamanan dan Obat 500.000 500.000,0obatan ,00 02.500.000,00 15 Total Jumlah 81.324.19Ppn 10 % 1,72Total (termasuk ppn) 8.132.419Pembulatan ,1789.456.610,8989.456.000,00RAB PERUBAHANNo Uraian Pekerjaan Anal Sat Vol Harga Jumlahisa uan satuan harga(Rp) (Rp)I Pekerjaan1. Persiapan Ls Km ,60 250.000 150.000,02.
Putus : 22-03-2011 — Upload : 20-09-2012
Putusan MAHKAMAH AGUNG Nomor 660 K/Pid.Sus/2009
Tanggal 22 Maret 2011 — SOFYAN RODI bin SYAHIR
3415 Berkekuatan Hukum Tetap
  • Sus/2009 PlatbiPena MDUNe bh 1.600,00 180,00. 288.000,00 180,00. 288.000,00gel memanjang7omMur baut diHI Rau is bh 1.600,00 180,00. 288.000,00 180 288.000,00panjang 7 cmSub Jumlah III 151.461.347,12 118.612.343,02 32.849.004,10PEKERJAANDAN ERECTIONBANG ATASErection/penyetelan Ls 200,000,00 42,00. 8.400.000,00 42,00. 8.400.000,00 komponenjembatanPengecatan&penggetaran Ls 200.000,00 1,00. 200.000,00 0,33 66.000,00 0,67 134,000,00jembatanPengangkutank kioe add e Ls 1.200.000,00 1,00. 1.200.000,00 1,00
    1,00, 300.000,00 Pembuatan Aarava Ls 300.000,00 1,00. 300.000,00 1,00. 300.000,00built drawing Mix desidesign Ls 3.000.000,00 1,00. 3.000.000,00 1,00. 3.000.000,00beton K 175Sub Jumlah VI 4.300.000,00 1.000.000,00 3,300.000,00Jumlah 330.199.636,16 180.438.772,44 149.760.863,72 Bahwa Terdakwa selaku kontraktor pelaksana, melaksanakan pekerjaantidak sesuai dengan volume serta spesifikasi yang telah ditetapkan dalamkontrak kerja akan tetapi Terdakwa bersamasama dengan saksi Ir.
    . 200.000,00 0,33 66.000,00 0,67 134.000,00jembatanPengangkutank ki3 o icies Ls 1.200.000,00 1,00. 1.200.000,00 1,00. 1.200.000,00 pekerjaanSub Jumlah IV 9.800.000,00 9.666.000,00 134.000,00y PEKERIAANOPRIT Hal. 10 dari 32 hal.
    . 700.000,00 1,00. 700.000,00 PPPK Ls 300.000,00 1,00. 300.000,00 1,00. 300.000,00 Pembuatan Asbuilt drawing Ls 300.000,00 1,00. 300.000,00 1,00. 300.000,00Mix design Lsbeton K 175 3.000.000,00 1,00. 3.000.000,00 os = 1,00. 3.000.000,00Sub Jumlah V1 4.300.000,00 1.000.000,00 3.300.000,00Jumlah 330.199.636,16 180.438.772,44 149.760.863,72 Bahwa Terdakwa selaku kontraktor pelaksana, melaksanakan pekerjaantidak sesuai dengan volume serta spesifikasi yang telah ditetapbkan dalamkontrak kerja akan tetapi
    60,00. 1.583.628,00 60,00. 1.583.628,00 Pengoralan5 oprit 15cmdgn M 148.199, 60 18,75 2.778.742,50 12,6 1.867.314,96 6,15 911.427,54klas CSub Jumlah V 45.433.997,32 9.076.470,76 36.357.526,56v PEKERIAAN LAIN LAIN1 Administrasi 700.000,00 1,00. 700.000,00 1,00. 700.000,00 2 PPPK 300.000,00 1,00. 300.000,00 1,00. 300.000,00 Pembuatan A3 buitt drawt re Ls 300.000,00 1,00. 300.000,00 1,00. 300.000,00Mix design4 wks Ls 3.000.000,00 1,00. 3.000.000,00 1,00. 3.000.000,00Sub Jumlah VI 4.300.000,00 1.000.000,00
Register : 12-11-2020 — Putus : 31-03-2021 — Upload : 01-04-2021
Putusan PN BENGKULU Nomor 33/Pid.Sus-TPK/2020/PN Bgl
Tanggal 31 Maret 2021 — Penuntut Umum:
NOPRIDIANSYA,SH
Terdakwa:
JANUNG ASMADI Bin Alm. BANADI
13861
  • 100.000,00 2.500.000,00TowerOperasional Pk 2,00 500.000,00 1.000.000,00 2,00 500.000,00 1.000.000,00akomodasiJasa Pasang Pk 1,00 3.250.000,00 3.250.000,00 1,00 3.250.000,00 3.250.000,00antena & settingkoneksiRadio M5 Pcs 2,00 1.695.000,00 3.390.000,00 2,00 1.695.000,00 3.390.000,00(Akses Point toPoint)Wifi Indor Pcs 1,00 500.000,00 500.000,00 1,00 500.000,00 500.000,00UPS 600 Va Pcs 1,00 750.000,00 750.000,00 750.000,00 Kabel UTP Pcs 1,00 585.000,00 585.000,00 1,00 585.000,00 585.000,00Belden +
    RJ 45Microtik Pcs 1,00 995.000,00 995.000,00 1,00 995.000,00 995.000,00Vertikal besi12 Bt 11,00 80.000,00 880.000,00 6,00 80.000,00 480.000,00Horizontal besi Bt 12,00 55.000,00 660.000,00 12,00 55.000,00 660.000,008Besi Strip Bt 6,00 35.000,00 210.000,00 2,00 35.000,00 70.000,00Elektroda Kotak 1,00 225.000,00 225.000,00 1,00 225.000,00 225.000,00Pipa cincin Bt 1,00 85.000,00 85.000,00 1,00 85.000,00 85.000,00sambungan 1/2Pipa cor tarikan Bt 1,00 200.000,00 200.000,00 1,00 200.000,00 200.000,00seling
    1,00 178.000,00 178.000,00 1,00 178.000,00 178.000,00batu kali m?
    3.500.000,00Torn 1000 bh 1,00 2.500.000,00 2.500.000,00 1,00 2.500.000,00 2.500.000,00literBiaya unit 1,00 3.000.000,00 3.000.000,00 3.000.000,00 pemasanganKWH danAdmKabel NYM M!
Register : 17-11-2016 — Putus : 15-12-2016 — Upload : 03-09-2020
Putusan PT PALU Nomor 26/PID.TPK/2016/PT PAL
Tanggal 15 Desember 2016 — Pembanding/Terbanding/Penuntut Umum : ALEXANDER TANAK, SH
Terbanding/Pembanding/Terdakwa : DEKO H. BASIA Als. DEKO
9126
  • Direksi Keet 1,00 M 904.000,00 904.000,003. Papan Proyek 1,00 Bh 335.610,00 335.610,004. Pengukuran Lokasi / Uizet 1,00 Ls 730.000,00 730.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7028 Me 23.321,03 174.961.369,80Ill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 135.850,00 135.850,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004.
    Direksi Keet 1,00 M 950.000,00 900.000,003. Papan Proyek 1,00 Bh 336.539,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 700.000,00 745.500,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,3 M 23.321,68 174.966.250,580lll PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004.
    Direksi Keet 1,00 M 950.000,00 950.000,003. Papan Proyek 1,00 Bh 336.132,50 336.132,504. Pengukuran Lokasi / Uizet 1,00 Ls 719.000,00 719.000,00i PEKERJAAN NORMALISASI1, Galian Tanah dengan alat berat 7.502,3 M 23.323,31 174.966.250,580Ul PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004. Pencetakan Asbuilt Drawing 1,00 Set 189.695,00 189.695,005.
    Direksi Keet 1,00 M 985.000,00 985.000,003. Papan Proyek 1,00 Bh 337.440,40 337.440,404. Pengukuran Lokasi / Uizet 1,00 Ls 725.000,00 725.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,3 Me 23.321,03 174.961.369,800Ul PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt Drawing 1,00 Set 261.250,00 261.250,004. Pencetakan Asbuilt Drawing 1,00 Set 187.550,00 187.550,005.
    Direksi Keet 1,00 M 900.000,00 900.000,003. Papan Proyek 1,00 Bh 335.742,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 745.500,00 745.500,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat Me 23.321,68 174.966.250,58Ill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004.
Register : 04-09-2019 — Putus : 16-10-2019 — Upload : 31-10-2019
Putusan PN BATULICIN Nomor 202/Pid.B/LH/2019/PN Bln
Tanggal 16 Oktober 2019 — Penuntut Umum:
RUSNEN HELDAWATI, SH
Terdakwa:
YUNI als IYUN bin KASTAN
38327
  • 0,047877 Ulin 1 1,30 24 15 0,046878 Ulin mn 1,30 2 16 0,043779 Ulin dl 1,20 31 15 0,055880 Ulin 1 1,20 23 22 0,060781 Ulin 1 1,20 44 26 0,137382 Ulin 1 1,20 26 22 0,068683 Ulin i 1,20 19 19 0,043384 Ulin 1 1,20 25) 16 0,048085 Ulin 1 1,20 23 20 0,055286 Ulin 1 1,20 23 22 0,060787 Ulin 1 1,20 18 17 0,036788 Ulin if 1,20 40 25 0,120089 Ulin mn 1,20 25 a 0,033090 Ulin 1 1,20 41 22 0,108291 Ulin 1 1,20 3 3 0,147092 Ulin 1 1,20 27 22 0,071393 Ulin 1 1,20 35 10 0,042094 Ulin mn 1,20 28 23 0,077395 Ulin 1 1,00
    44 20 0,088096 Ulin 1 1,00 23 17 0,039197 Ulin 1 1,00 23 23 0,052998 Ulin 1 1,00 27 16 0,043299 Ulin 2 1,00 30 19 0,1140100 Ulin dl 1,00 24 9 0,0216101 Ulin 1 1,00 17 17 0,0289102 Ulin 1 1,00 24 17 0,0408103 Ulin 1 1,00 23 15 0,0345104 Ulin i 1,00 34 22 0,0748105 Ulin aL 1,00 18 17 0,0306106 Ulin 1 1,00 21 19 0,0399107 Ulin 1 1,00 17 16 0,0272108 Ulin 1 1,00 18 18 0,0324109 Ulin 1 1,00 23 14 0,0322110 Ulin mn 1,00 27 18 0,0486111 Ulin dl 1,00 20 18 0,0360112 Ulin 1 1,00 20 16 0,0320113 Ulin 1 1,00
    34 26 0,0884114 Ulin 1 1,00 24 21 0,0504115 Ulin i 1,00 17 14 0,0238116 Ulin 1 1,00 20 16 0,0320117 Ulin 1 1,00 28 27 0,0756118 Ulin 1 1,00 24 18 0,0432MLS) Ulin 1 1,00 21 15 0,0315120 Ulin if 1,00 25 Za 0,0525120 Ulin mn 1,00 22 13 0,0286122 Ulin mn 1,00 25 16 0,0400 Halaman 6 dari 19 putusan pidana nomor 202/Pid.B/LH/2019/PN Bin. 123 Ulin i 1,00 20 19 0,0380124 Ulin aL 1,00 24 23 0,0552125 Ulin 1 1,00 26 11 0,0286126 Ulin 1 1,00 25 12 0,0300127 Ulin 1 1,00 33 19 0,0627128 Ulin 1 1,00 30 23 0,0690129
    Ulin mn 1,00 2 18 0,0378Jumlah 155 86,172 Bahwa kayu kayu yang Terdakwa angkut tersebut, setelah dilakukanpemeriksaan ternyata merupakan jenis kayu yang berasal dari hutan negaraatau hutan rakyat, sehingga dalam pengangkutannya diwajibkan denganSKSHH.Perbuatan Terdakwa YUNI Als IYUN Bin KASTAN tersebut sebagaimanadiatur dan diancam pidana dalam Pasal 88 Ayat (1) huruf a UU RI No. 18 Tahun2013 tentang Pencegahan dan Pemberantasan Perusakan Hutan.Menimbang, bahwa Terdakwa terhadap dakwaan tersebut
Register : 15-11-2016 — Putus : 15-12-2016 — Upload : 02-09-2020
Putusan PT PALU Nomor 22/PID.TPK/2016/PT PAL
Tanggal 15 Desember 2016 — Pembanding/Terbanding/Penuntut Umum : ALEXANDER TANAK, SH
Terbanding/Pembanding/Terdakwa : MOH. DALLE SUTOMO,ST., MT.
8637
  • Direksi Keet 1,00 M 904.000,00 904.000,003. Papan Proyek 1,00 Bh 335.610,00 335.610,004. Pengukuran Lokasi / Uizet 1,00 Ls 730.000,00 730.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 702.8 Me 23.321,03 174.961.369,80Ill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 135.850,00 135.850,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004.
    Direksi Keet 1,00 M 950.000,00 950.000,003. Papan Proyek 1,00 Bh 336.132,50 336.132,504. Pengukuran Lokasi / Uizet 1,00 Ls 719.000,00 719.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,3 Me 23.323,31 174.966.250,580ll PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003.
    Direksi Keet 1,00 M 900.000,00 900.000,003. Papan Proyek 1,00 Bh 335.742,00 335.742,004 Pengukuran Lokasi / Uizet 1,00 Ls 745.500,00 745.500,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat eae Me 23.321,68 174.966.250,58ll PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003.
    Direksi Keet 1,00 M 904.000,00 904.000,003 Papan Proyek 1,00 Bh 335.610,00 335.610,004. Pengukuran Lokasi / Uizet 1,00 Ls 730.000,00 730.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat tates Me 23.321,03 174.961.369,80Ill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 135.850,00 135.850,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004.
    Direksi Keet 1,00 M 900.000,00 900.000,003. Papan Proyek 1,00 Bh 335.742,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 745.500,00 745.500,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 M3 23.321,68 174.966.250,58Il PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004 Pencetakan Asbuilt Drawing 1,00 Set 189.200,00 189.200,005.
Register : 03-09-2013 — Putus : 09-10-2013 — Upload : 06-07-2019
Putusan PT SEMARANG Nomor 71/PID.TPK/2013/PT SMG
Tanggal 9 Oktober 2013 — Pembanding/Jaksa Penuntut : BAMBANG PUTRA SANTOSO, SH
Terbanding/Terdakwa : Ir.SUNAR WIBOWO,M.Sc
6235
  • AKOMODASI+ Jendela, pintu dan tangga 1,00 lot IRp. 6.700.000 IRp. 6.700.000+ Plafon dan dinding 1,00 lot IRp. 1.350.000 IRp. 1.350.000+ Perlengkapan akomodasi 1,00 lot Rp. 335.000 IRp. 335.000+ Perlengkapan kamar mandi 1,00 set IRp. 110.000 IRp. 110.000+ Meja dan kursi juru mudi 1,00 set IRp. 645.000 IRp. 645.000+ Rak / lemari dapur 1,00 set IRp. 450.000 IRp. 450.000+ Peralatan dapur/makan (lengkap) 1,00 set IRp. 335.000 IRp. 335.000+ Peralatan kamar mesin 1,00 set IRp. 340.000 IRp. 340.000Total
    buah Rp.2.400.000 IRp. 4.800.000+ Baterry swich 1,00 buah Rp. 135.000 IRp. 135.000+ Horn 1,00 buah Rp. 245.000 IRp. 245.000+ Shore cornection 1,00 buah Rp.1.500.000 IRp. 1.500.000+ Lampu penerangan 1,00 set IRp. 1.500.000 IRp. 1.500.000+ Lampu sorot (search light) 1,00 set IRp. 2.450.000 IRp. 2.450.000+ Blower (outin) 1,00 set IRp. 210.000 IRp. 210.000(Total Biaya Peralatan Listrik dan Penerangan IRp. 11.565.000(7.
    PERALATAN NAVIGASI DANIKESELAMATAN+ Kompas magnit 6 marine use 1,00 set IRp. 3.465.000 Rp. 3.465.000+ Peta laut dan perlengkapannya 1,00 set IRp. 2.875.000 Rp. 2.875.000+ Bola tanda labuh 1,00 set IRp. 1.350.000 IRp. 1.350.000+ Radio komunikasi dan instalasi 1,00 unit Rp. 14.000.000 Rp. 14.000.000+ GPS + fishfinder 1,00 unit IRp. 22.400.000 Rp. 22.400.000+ Bendera nasional 1,00 buah IRp. 140.000 IRp. 140.000+ Teropong binacular (7 x 50 mm) 1,00 buah IRp. 2.470.000 Rp. 2.470.000Total Biaya Peralatan
    AKOMODASI Jendela, pintu dan tangga 1,00 lot Rp. 6.700.000 Rp. 6.700.000 Plafon dan dinding 1,00 lot Rp. 1.350.000 Rp. 1.350.000 Perlengkapan akomodasi 1,00 lot Rp. 335.000 Rp. 335.000 Perlengkapan kamar mandi 1,00 set Rp. 110.000 Rp. 110.000 Meja dan kursi juru mudi 1,00 set Rp. 645.000 Rp. 645.000 Rak / lemari dapur 1,00 set Rp. 450.000 Rp. 450.000 Peralatan dapur/makan 1,00 set Rp. 335.000 Rp. 335.000(engkap) Peralatan kamar mesin 1,00 set Rp. 340.000 Rp. 340.000Total Biaya Akomodasi Rp. 10.265.0005
    Rp. 4.800.000 Baterry swich 1,00 buah Rp. 135.000 Rp. 135.000 Horn 1,00 buah Rp. 245.000 Rp. 245.000 Shore cornection 1,00 buah Rp.1.500.000 Rp. 1.500.000 Lampu penerangan 1,00 set Rp.1.500.000 Rp. 1.500.000 Lampu sorot (search light) 1,00 set Rp. 2.450.000 Rp. 2.450.000 Blower (outin) 1,00 set Rp. 210.000 Rp. 210.000Total Biaya Peralatan Listrik dan Penerangan Rp. 11.565.0007.
Register : 12-02-2016 — Putus : 23-03-2016 — Upload : 12-07-2016
Putusan PT JAKARTA Nomor 10/PID/TPK/2016/PT.DKI
Tanggal 23 Maret 2016 — RINI YULIANTHIE FATIMAH
7976
  • Unit 2.860.000.000, 2.860.000.000,Kapasitas 15 orang / 900 KgKpasitas Gerak 90 mtr / menitPelayanan : 9 lantai /9 open / 9 stopType Motor : ACVVVF : 15 Kwe. : 380/3/50 HzPekerjaan pemasangan lift baru 1,00 Unit 143.000.000, 143.000.000,Pengadaan traveling cable sesuai kebutuhan 1,00 Unit 119.427.000, 119.427.000,pabrikasiPengadaan wearing sistem ruang mesin dan 1,00 Unit 92.928.000, 92.928.000,hoistyway liftHandraild dinding belakang 1,00 Unit 4.500.000, 9.000.000,Handrail dinding samping kiri 1,00
    Unit 4.500.000, 9.000.000,Handrail dinding samping kanan 1,00 Unit 4.500.000, 9.000.000,Jumlah I1.D 3.228.855.000,Pekerjaan dan Pemasangan Lift BarangLift Penumpang Gedung 9 lantai 1,00 Unit 2.860.000.000, 2.860.000.000, Kapasitas 15 orang / 900 KgKpasitas Gerak 90 mtr / menitPelayanan : 9 lantai /9 open / 9 stopType Motor : ACVVVF : 15 Kwe. : 380/3/50 HzPekerjaan pemasangan lift baru 1,00 Unit 143.000.000, 143.000.000,Pengadaan traveling cable sesuai kebutuhan 1,00 Unit 119.427.000, 119.427.000
    ,pabrikasiPengadaan wearing sistem ruang mesin dan 1,00 Unit 92.928.000, 92.928.000,hoistyway liftHandraild dinding belakang 1,00 Unit 4.500.000, 9.000.000,Handrail dinding samping kiri 1,00 Unit 4.500.000, 9.000.000,Handrail dinding samping kanan 1,00 Unit 4.500.000, 9.000.000,Jumlah I.E 3.228.855.000,SUB TOTAL JUMLAH III 21.273.135.000,IV.
    1,00 Unit 4.500.000, 9.000.000,Handrail dinding samping kanan 1,00 Unit 4.500.000, 9.000.000,Jumlah I1.D 3.228.855.000,Pekerjaan dan Pemasangan Lift BarangLift Penumpang Gedung 9 lantai 1,00 Unit 2.860.000.000, 2.860.000.000,Kapasitas 15 orang / 900 KgKpasitas Gerak 90 mtr / menitPelayanan : 9 lantai /9 open / 9 stopType Motor : ACVVVF : 15 Kwe. : 380/3/50 HzPekerjaan pemasangan lift baru 1,00 Unit 143.000.000, 143.000.000,Pengadaan traveling cable sesuai kebutuhan pabrikasi 1,00 Unit 119.427.000
    , 119.427.000,Pengadaan wearing sistem ruang mesin dan 1,00 Unit 92.928.000, 92.928.000,hoistyway liftHandraild dinding belakang 1,00 Unit 4.500.000, 9.000.000,Handrail dinding samping kiri 1,00 Unit 4.500.000, 9.000.000, Handrail dinding samping kanan 1,00 Unit 4.500.000, 9.000.000,Jumlah I.E 3.228.855.000,SUB TOTAL JUMLAH III 21.273.135.000,IV.
Register : 16-10-2015 — Putus : 25-01-2016 — Upload : 29-07-2016
Putusan PN PALU Nomor 54/Pid.Sus-TPK/2015/PN.Pal
Tanggal 25 Januari 2016 — KADIR, ST Alias KADIR NURDN
13351
  • Flanged Socket @1,00 bh 163.125,00 163.125,004 Halaman 3 dari 51 Putusan Nomor 4/Pid.SusTPK/2016/PT.PAL 3. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee = 2,00 bh 177.500,00 355.000,00PVC 4 x 35. All Socket Tee 1,00 bh 185.000,00 185.000,00PVC 4 x 46. All Socket Tee 2,00 bh 148.000,00 296.000,00PVC 3 x 37. All Socket Tee 2,00 Bh 85.000,00 170.000,00PVC 28. Gate Valve @ 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC @3 /2,00 Bh /38.062,50 76.125,0010.
    181.863.25 545.589.75PEK.ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh 1.495.312,50 1.495.312,50Valve @ 4All Flanged tee 1,00 Bh 525.000,00 525.000,00PVC @4Flanged Socket 1,00 Bh 163.125,00 163.125,00PVC @4Flanged Sigot 1,00 Bh 163.125,00 163.125,00PVC @ 4All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 40,00 Bh 8.775,00 351.000,0034.302.394,06Pembuatan 1,00 PktBlock BetonGalian Tanah 3,00 M3 24.990,00 74.970,00BiasaUrugan Tanah 1,00 M3 11.980,00
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 = 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00 Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    Flanged Socket @ 4 1,00 bh 163.125,00 163.125,003. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee PVC @ 4 2,00 bh 177.500,00 355.000,00x 35. All Socket Tee PVC @ 4 1,00 bh 185.000,00 185.000,00x 46. All Socket Tee PVC @ 3 2,00 bh 148.000,00 296.000,00x 37. All Socket Tee PVC @ 2 2,00 Bh 85.000,00 170.000,008. Gate Valve 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC @ 3 2,00 Bh 38.062,50 76.125,0010. Dop PVC @ 2 2,00 bh = 32.625,00 65.250,0011.
    ACCESSIRIESPENGURASAll Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50@4All Flanged tee PVC @ 4 1,00 Bh 525.000,00 = 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @/1,00 Bh = 375.000,00 375.000,00APaking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block 1,00 PktBetonGalian Tanah Biasa 3,00 M3 24.990,00 74.970,00Urugan Tanah 1,00 M3 11.980,00 11.980,00
Putus : 26-03-2014 — Upload : 24-03-2015
Putusan MAHKAMAH AGUNG Nomor 231 K/Pid.Sus/2014
Tanggal 26 Maret 2014 — Ir. BAMBANG SANTOSA, MM
8152 Berkekuatan Hukum Tetap
  • INSTALASIINSTALASIInstalasi listrik 1,00 lot Rp 9.500.000 Rp9.500.000Instalasi pipa air tawar 1,00 lot Rp 7.500.000 Rp7.500.000Instalasi pipa pendingin mesin 1,00 lot Rp 8.250.000 Rp8.250.000Instalasi pipa BBM 1,00 lot Rp 7.400.000 Rp7.400.000Instalasi gas buang 1,00 lot Rp 4.500.000 Rp4.500.000Total Biaya Instalasi Rp 37.150.0004.
    AKOMODASIJendela, pintu dan tangga 1,00 lot Rp 6.700.000 Rp6.700.000Plafon dan dinding 1,00 lot Rp 1.350.000 Rp1.350.000Perlengkapan akomodasi 1,00 lot Rp 335.000 Rp335.000Perlengkapan kamar mandi 1,00 set Rp 110.000 Rp110.000Meja dan kursi juru mudi 1,00 set Rp 645.000 Rp645.000Rak / lemari dapur 1,00 set Rp 450.000 Rp 450.000 Peralatan dapur/makan (lengkap) 1,00 set Rp 335.000 Rp335.000Peralatan kamar mesin 1,00 set Rp 340.000 Rp340.000Total Biaya Akomodasi Rp 10.265.0005.
    1,00 buah Rp 135.000 Rp135.000Horn 1,00 buah Rp 245.000 Rp245.000Shore cornection 1,00 buah Rp1.500.000 Rp1.500.000Lampu penerangan 1,00 set Rp1.500.000 Rp1.500.000Lampu sorot (search light) 1,00 set Rp2.450.000 Rp2.450.000Blower (outin) 1,00 set Rp 210.000 Rp210.000Total Biaya Peralatan Listrik dan Penerangan Rp 11.565.0007.
    AKOMODASIJendela, pintu dan tangga 1,00 lot Rp 6.700.000 Rp6.700.000Plafon dan dinding 1,00 lot Rp 1.350.000 Rp1.350.000Perlengkapan akomodasi 1,00 lot Rp 335.000 Rp335.000Perlengkapan kamar mandi 1,00 set Rp 110.000 Rp110.000Meja dan kursi juru mudi 1,00 set Rp 645.000 Rp645.000Rak / lemari dapur 1,00 set Rp 450.000 Rp450.000Peralatan dapur/makan (lengkap) 1,00 set Rp 335.000 Rp335.000Peralatan kamar mesin 1,00 set Rp 340.000 Rp340.000Total Biaya Akomodasi Rp 10.265.0005.
    1,00 buah Rp 245.000 Rp245.000Shore comection 1,00 buah Rp1.500.000 Rp1.500.000Lampu penerangan 1,00 set Rp1.500.000 Rp1.500.000Lampu sorot (search light) 1,00 set Rp2.450.000 Rp2.450.000Blower (outin) 1,00 set Rp 210.000 Rp210.000Total Biaya Peralatan Listrik dan Penerangan Rp 11.565.0007.
Register : 16-10-2015 — Putus : 25-01-2016 — Upload : 28-07-2016
Putusan PN PALU Nomor 55/Pid.Sus-TPK/2015/PN Pal
Tanggal 25 Januari 2016 — JONI B. RAMLI, ST
9535
  • Flanged Socket @ 1,00 bh 163.125,00 163.125,0043. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee 2,00 bh 177.500,00 355.000,00PVC @ 4 x @35. All Socket Tee 1,00 bh = 185.000,00 185.000,00PVC 4 x O46. All Socket Tee 2,00 bh = 148.000,00 296.000,00PVC @ 3 x @37. All Socket Tee = 2,00 Bh 85.000,00 170.000,00PVC 28. Gate Valve @ 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC @ 3 2,00 Bh 38.062,50 76.125,0010. Dop PVC @ 2 2,00 bh = 32.625,00 65.250,0011.
    /181.863.25 545.589.75PEK.ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh 1.495.312,50 1.495.312,50Valve 4All Flanged tee 1,00 Bh 525.000,00 525.000,00PVC @ 4Flanged Socket 1,00 Bh 163.125,00 163.125,00PVC @ 4Flanged Sigot PVC 1,00 Bh 163.125,00 163.125,004All Flanged Bend /1,00 Bh 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,065Pembuatan Block 1,00 Pkt.
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh = 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh 1.495.312,50 1.495.312,50Valve @ 4All Flanged tee PVC /1,00 Bh 525.000,00 525.000,00O4Flanged Socket PVC 1,00 Bh 163.125,00 163.125,00O4Flanged Sigot PVC @ 1,00 Bh 163.125,00 163.125,00AAll Flanged Bend 1,00 Bh = 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,065.
    ACCESSIRIES PENGURASAll Flanged Gate Valve 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC 4 1,00 Bh 375.000,00 375.000,00Paking Karet 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block Beton 1,00 PktGalian Tanah Biasa 3,00 MSs 24.990,00 74.970,00Urugan Tanah 1,00 Ms 11.980,00 11.980,00Beton
Putus : 03-08-2015 — Upload : 02-11-2015
Putusan PN PALEMBANG Nomor 915/Pid.Sus/2015/PN.Plg
Tanggal 3 Agustus 2015 — Hendri als Hen Bin Ibrahim
184
  • Menetapkan barang bukti berupa : shabu seberat 1,00 gram (sisa dari laboratorium Forensik Palembang), 1 (satu) lembar celana levis warna hitam merk Lee Out dirampas untuk dimusnahkan;;6. Membebankan kepada terdakwa membayar biaya perkara sejumlah Rp.5.000,- (lima ribu rupiah);
    Bahwa barang bukti berupa shabu sebanyak 1,00 gram (sisa darilaboratorium forensik cabang Palembang),1 buah jaket dan 1 (satu)buah kotak rokok Sampoerna ditemukan pada badan terdakwa.Atas keterangan saksi tersebut, terdakwa membenarkannya;2. Saksi Deni Abdul Muin lahir di Palembang, 31 Desember 1984, PekerjaanPolri, Pendidikan terakhir SMA, Kewarganegaraan Indonesia, Agama Islam,alamat JI.
    dari membeli dengan Bayu (DPO);Bahwa menurut pengakuan terdakwa barang bukti berupa 3 (tiga) paketshabu 1,00 gram tersebut akan dikonsumsi/pakai bersama temannyaImam .Bahwa terdakwa menyimpan shabu tersbut tanpa seizing dari pihak yangberwenang.Bahwa barang bukti berupa shabu sebanyak 1,00 gram (sisa darilaboratorium forensik cabang Palembang),1 buah jaket dan 1 (satu) buahkotak rokok Sampoerna ditemukan pada badan terdakwa.Menimbang, bahwa Penuntut Umum mengajukan barang bukti sebagaiberikut: shabu
    peroleh dari membeli dengan Bayu (DPO); Bahwa menurut pengakuan terdakwa barang bukti berupa 3 (tiga) paketshabu 1,00 gram tersebut akan dikonsumsi/pakai bersama temannyaImam .
    Bahwa pada saat ditangkap saat itu sedang berada diatas sepeda motormiliknya dan mencurigakan; Bahwa setelah dilakukan penangkapan dan langsung dilakukanpenangkapan terhadap terdakwa dan dtemukan berupa 3 (tiga) paketshabu 1,00 gram didalam saku celana levis Lee Out yang terdakwa pakai.
    Menetapkan barang bukti berupa : shabu seberat 1,00 gram (sisa darilaboratorium Forensik Palembang), 1 (Satu) lembar celana levis warna hitammerk Lee Out dirampas untuk dimusnahkan;;6.
Putus : 07-03-2017 — Upload : 29-05-2019
Putusan MAHKAMAH AGUNG Nomor 2031 K/PID.SUS/2016
Tanggal 7 Maret 2017 — JONI B. RAMLI, S.T.
10653 Berkekuatan Hukum Tetap
  • Flanged Socket @ 4 1,00 bh 163.125,00 163.125,003. Flanged Spigot 1,00 bh 163.125,00 163.125,00 Hal. 2 dari 55 hal. Putusan Nomor 2031 K/PID.SUS/2016 4, All Socket Tee PVC 2,00 bh 177.500,00 355.000,00G4 x G35. All Socket Tee PVC 1,00 bh 185.000,00 185.000,00O4"x@46. All Socket Tee PVC 2,00 bh 148.000,00 296.000,00G3 xO 37. All Socket Tee PVC 2,00 Bh 85.000,00 170.000,00@ 28. Gate Valve @ 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC 3 2,00 Bh 38.062,50 76.125,0010.
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 1,00 Bh 1.495.312,50 1.495.312,504All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00a. Flanged Sigot PVC @ 1,00 Bh 163.125,00 163.125,004b. All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4c. Paking Karet 4 * 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block Beton 1,00 PktGalian Tanah Biasa 3,00 M? 24.990,00 74.970,00Urugan Tanah 1,00 M?
    1,00 550.000,00 550.000,00 Pengecetan M2 20,13 0,00 20,13 23.004,45 463.079,58Pekerjaan6.
    ACCESSIRIESPENGURASAll Flanged Gate Valve 1,00 Bh 1.495.312,50 1.495.312,504All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00 Hal. 15 dari 55 hal. Putusan Nomor 2031 K/PID.SUS/2016 d. Flanged Sigot PVC 1,00 Bh 163.125,00 163.125,004e. All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @4*f.
    ACCESSIRIESPENGURASAll Flanged Gate Valve 1,00 Bh 1.495.312,50 1.495.312,504All Flanged tee PVC 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00g. Flanged Sigot PVC @ 1,00 Bh 163.125,00 163.125,004h. All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @4*i. Paking Karet 4 5,00 Bh 17.500,00 87.500,00ur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block Beton 1,00 PktGalian Tanah Biasa 3,00 M? 24.990,00 74.970,00Urugan Tanah 1,00 M?
Register : 28-01-2019 — Putus : 09-05-2019 — Upload : 13-05-2019
Putusan PN DENPASAR Nomor 90/Pid.Sus/2019/PN Dps
Tanggal 9 Mei 2019 — Penuntut Umum:
I Wayan Sutarta, SH
Terdakwa:
Moch. Rizal
2313
  • 7) 1 (Satu) plastik klip didalamnya berisi berisi 19 (Sembilan belas)paket plastik klip masing-masing berisi kristal bening yang mengandung sediaan Narkotika (Shabu) (Kode C7) dengan rincian :

    • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7a);
    • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7b);
    • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7c);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7d);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7e);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7f);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7g);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7h);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7i);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7j);
  • Berat
    1,00 gram brutto atau 0,77 gram netto Kode (C7k)
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7l);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7m);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7n);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7o);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7p);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7q);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode
    (C7r);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7s).
  • Berat 1,00 gram brutto atau 0,78 gram netto Kode (C9b1);
  • Berat 1,00 gram brutto atau 0,78 gram netto Kode (C9b2);
  • Berat 1,00 gram brutto atau 0,78 gram netto Kode (C9b3);
  • Berat 1,00 gram brutto atau 0,78 gram netto Kode (C9b4);
  • Berat 1,00 gram brutto atau 0,78 gram netto Kode (C9b5);
  • Berat 1,00 gram brutto atau 0,78 gram netto Kode (C9b6).
    gram brutto atau 0,77 gram netto Kode (C7a); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7b); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7c); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7d); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7e); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7f); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7Q); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7h); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C71); Berat 1,00
    gram brutto atau 0,77 gram netto Kode (C7)); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7k) Berat 1,00 gram brutto atau 0,77 gram netto Kode (C71); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7m); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7n); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C70); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7p); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7q); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7r); Berat 1,00
    gram brutto atau 0,77 gram netto Kode (C7a);Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7b);Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7c);Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7d);Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7e);Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7f);Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7Q);Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7h);Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7i);Berat 1,00 gram
    gram brutto atau 0,77 gram netto Kode(C7a); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7b); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7c); Berat 1,00 gram brutto atau 0,77 gram netto Kode(C7d); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7e); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7f); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7g); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7h); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7i); Berat 1,00
    (C9b1);= Berat 1,00 gram(C9b2); Berat 1,00 gram(C9b3);.
Register : 14-08-2019 — Putus : 17-09-2019 — Upload : 18-09-2019
Putusan PT PEKANBARU Nomor 17/PID.SUS.TPK/2019/PT PBR
Tanggal 17 September 2019 — Pembanding/Penuntut Umum : Budi Sastera, SH
Terbanding/Terdakwa : BERTO RIAWAN, ST Bin LUKITO
7736
  • Meja Kerja 1 Biro Unit 1,00 ,00 ,002.730.000 2.730.0002). Kursi Kerja Putar Unit 1,00 ,00 ,003). Filing Kabinet Flat Baja 5 3.991.757 3.991.757Rak Unit 1,00 ,00 ,004). Gambar Figura Gantung 1.096.000 1.096.000Presiden dan Wakil Presiden Set 1,00 ,00 ,00215.085 430.1705). Kursi Stainless Steel Unit 2,00 ,00 ,008.912.240 8.912.2406). Kulkas 2 Pintu Unit 1,00 ,00 ,0011.318.000 11.318.0007). TV 32 Inc Unit 1,00 ,00 ,0093.717 93.7178). Tempat Sampah Unit 1,00 ,00 ,00b. Ruang Rapat :1).
    Tempat Sampah Unit 1,00 ,00 ,00i. Ruang KPLP :4.294.070 4.294.0701). Meja Kerja 1 Biro Unit 1,00 ,00 ,002.730.000 2.730.0002). Kursi Kerja Putar Unit 1,00 ,00 ,003). Filing Kabinet Flat Baja 5 3.991.757 3.991.757Rak Unit 1,00 ,00 ,004). Gambar Figura Gantung 1.096.000 1.096.000Presiden dan Wapres Set 1,00 ,00 ,00215.085 430.1705). Kursi Stainless Steel Unit 2,00 ,00 ,0093.717 93.7176). Tempat Sampah Unit 1,00 ,00 ,00j. Ruang Konter Ticket :2.977.730 8.933.1901).
    Meja Kerja 1 Biro Unit 1,00 4.294.070,00 4.294.070,002). Kursi Kerja Putar Unit 1,00 2.730.000,00 2.730.000,003). Filing Kabinet Flat Baja 5 3.991.75 3.991.757Rak Unit 1,00 7,00 ,004). Gambar Figura Gantung 1.096.00 1.096.000Presiden dan Wapres. Set 1,00 0,00 ,005). Kursi Stainless Steel Unit 2,00 215.085,00 430.170,006). Kulkas 2 Pintu Unit 1,00 8.912.240,00 8.912.240,007). TV 32 Inc Unit 1,00 11.318.000,00 11.318.000,008). Tempat Sampah Unit 1,00 93.717,00 93.717,00b. Ruang Rapat :1).
    Tempat Sampah Unit 1,00 93.717,00 93.717,00i. Ruang KPLP :1). Meja Kerja 1 Biro Unit 1,00 4.294.070,00 4.294.070,002). Kursi Kerja Putar Unit 1,00 2.730.000,00 2.730.000,003). Filing Kabinet Flat Baja 5 3.991.75 3.991.757Rak Unit 1,00 7,00 ,004). Gambar Figura Gantung 1.096.00 1.096.000Presiden dan Wapres. Set 1,00 0,00 ,005). Kursi Stainless Steel Unit 2,00 215.085,00 430.170,006). Tempat Sampah Unit 1,00 93.717,00 93.717,00j. Ruang Konter Ticket :1).
    Meja Kursi Sofa Set 1,00 3.529.600,00 3.529.600,002). Meja Dorong untuk 1.158.15 1.158.150Hidangan Unit 1,00 0,00 ,003). Kursi Stainless Steel Unit 5,00 215.085,00 1.075.425,004). Gambar Figura Gantung 1.096.00 1.096.000Presiden dan Wapres. Set 1,00 0,00 ,005). Tempat Sampah Unit 1,00 93.717,00 93.717,00s. Ruang Menyusui :1). Meja Kursi Sofa Set 1,00 3.529.600,00 3.529.600,002). Tempat Sampah Unit 1,00 93.717,00 93.717,00t. Ruang Kru / Pemeriksa :1).
Register : 15-04-2016 — Putus : 18-05-2016 — Upload : 01-08-2016
Putusan PT PALU Nomor 3/Pid.Sus-TPK/2016/PT PAL
Tanggal 18 Mei 2016 — YUSNITA FITARINI SIBAY, S.T.
5925
  • Flanged Socket @1,00 bh 163.125,00 163.125,0043. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee = 2,00 bh 177.500,00 355.000,00PVC 4 x 35. All Socket Tee 1,00 bh 185.000,00 185.000,00PVC 4 x @ 46. All Socket Tee 2,00 bh 148.000,00 296.000,00PVC @ 3 x 37. All Socket Tee 2,00 Bh 85.000,00 170.000,00PVC 28. Gate Valve @ 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC @3 2,00 Bh 38.062,50 76.125,0010.
    181.863.25 545.589.75PEK.ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh /1.495.312,50 1.495.312,50Valve @ 4All Flanged tee 1,00 Bh 525.000,00 525.000,00PVC @4Flanged Socket 1,00 Bh 163.125,00 163.125,00PVC 4Flanged Sigot 1,00 Bh 163.125,00 163.125,00PVC @ 4All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 40,00 Bh 8.775,00 351.000,0034.302.394,06Pembuatan 1,00 PktBlock BetonGalian Tanah 3,00 M3 24.990,00 74.970,00BiasaUrugan Tanah 1,00 M3 11.980,00
    Flanged Socket @ 4 1,00 bh 163.125,00 163.125,003. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee PVC @ 4 x @/2,00 bh 177.500,00 355.000,0035. All Socket Tee PVC @ 4 x @1,00 bh 185.000,00 185.000,0046. All Socket Tee PVC @ 3 x @2,00 bh 148.000,00 296.000,0037. All Socket Tee PVC @ 2 2,00 Bh 85.000,00 170.000,008. Gate Valve 4 1,00 bh 1.495.312,501.495.312,509. Dop PVC @ 3 2,00 Bh 38.062,50 =76.125,0010. Dop PVC @ 2 2,00 bh = /32.625,00 65.250,0011.
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh = 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    ACCESSIRIESPENGURASAll Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50BaAll Flanged tee PVC @ 4 1,00 Bh 525.000,00 = 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @1,00 Bh 375.000,00 = 375.000,00APaking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block 1,00 PktBetonGalian Tanah Biasa 3,00 M3 24.990,00 74.970,00Urugan Tanah 1,00 M3 11.980,00 11.980,00Beton
Register : 17-11-2016 — Putus : 15-12-2016 — Upload : 29-03-2017
Putusan PT PALU Nomor 25/Pid.Sus-TPK/2016/PT PAL
Tanggal 15 Desember 2016 — Tipikor - HEIN MOPANTAW alias KO HEIN
8156
  • Direksi Keet 1,00 M 904.000,00 904.000,003. Papan Proyek 1,00 Bh 335.610,00 335.610,004. Pengukuran Lokasi/ Uizet 1,00 Ls 730.000,00 730.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.50230 M 23.321,03 174.961.369,80Ill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 135.850,00 135.850,003. Penggambaran Asbuilt Draw ing 1,00 Set 286.000,00 286.000,004. Pencetakan Asbuilt Draw ing 1,00 Set 189.200,00 189.200,005.
    Direksi Keet 1,00 M 950.000,00 950.000,003. Papan Proyek 1,00 Bh 336.132,50 336.132,504. Pengukuran Lokasi/ Uizet 1,00 Ls 719.000,00 719.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 MP 23.323,31 174.966.250,58Ill PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt Draw ing 1,00 Set 286.000,00 286.000,004. Pencetakan Asbuilt Draw ing 1,00 Set 189.695,00 189.695,005.
    Direksi Keet 1,00 M 985.000,00 985.000,003. Papan Proyek 1,00 Bh 337.440,40 337.440,404. Pengukuran Lokasi/ Uizet 1,00 Ls 725.000,00 725.000,00 Il PEKERJAAN NORMALISASI 1. Galian Tanah dengan alat berat 7.502,30 Mr 23.321,03 174.961.369,80Il PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt Draw ing 1,00 Set 261.250,00 261.250,004. Pencetakan Asbuilt Draw ing 1,00 Set 187.550,00 187.550,005.
    Direksi Keet 1,00 M 900.000,00 900.000,003. Papan Proyek 1,00 Bh 335.742,00 335.742,004. Pengukuran Lokasi/ Uizet 1,00 Ls 745.500,00 745.500,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 M 23.321,68 174.966.250,58Il PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt Draw ing 1,00 Set 286.000,00 286.000,004. Pencetakan Asbuilt Draw ing 1,00 Set 189.200,00 189.200,005.
Register : 02-05-2016 — Putus : 21-09-2016 — Upload : 01-11-2016
Putusan PN DENPASAR Nomor 366 / Pid. Sus / 2016 / PN Dps
Tanggal 21 September 2016 — I MADE GEDE MARDIKAWAN
1810
  • netto;- 5,02 gram brutto atau 4,42 gram netto;- 5,02 gram brutto atau 4,42 gram netto; - 5,02 gram brutto atau 4,42 gram netto;- 5,02 gram brutto atau 4,42 gram netto. 2). 1(satu) buah dompet warna putih didalamnya terdapat amplop putih yang berisi kertas yang dibungkus lakban warna hitam didalamnya terdapat : 3 (tiga) plastik klip bening yang masing-masing berisi benda Kristal bening yang diduga mengandung sediaan narkotika jenis sabu dengan berat masing-masing adalah :- 1,00
    gram brutto atau 0,80 gram netto;- 1,06 gram brutto atau 0,80 gram netto;- 1,00 gram brutto atau 0,80 gram netto; 3). 1 (satu) buah dompet warna coklat motif sisik ular didalamnya terdapat 2 (dua) plastik klip bening yang masing-masing berisi benda Kristal bening yang diduga mengandung sediaan narkotika jenis sabu dengan berat masing-masing adalah :- 0,50 gram brutto atau 0,32 gram netto;- 1,00 gram brutto atau 0,80 gram netto; 4). 1 (satu) buah dompet plastik bening didalamnya berisi
    gram brutto atau 0,80 gram netto; 1,06 gram brutto atau 0,80 gram netto; 1,00 gram brutto atau 0,80 gram netto;3). 1 (satu) buah dompet warna coklat motif sisik ular didalamnyaterdapat 2 (dua) plastik klip bening yang masingmasing berisibenda Kristal bening yang diduga mengandung sediaan narkotikajenis sabu dengan berat masingmasing adalah : 0,50 gram brutto atau 0,32 gram netto; 1,00 gram brutto atau 0,80 gram netto;4). 1 (satu) buah dompet plastik bening didalamnya berisi : 2(dua)bungkus plastiK
    gram brutto atau 0,80 gram netto;e 1,06 gram brutto atau 0,80 gram netto;e 1,00 gram brutto atau 0,80 gram netto;3) 1 (Satu) dompet warna coklat motif sisik ular berisi 2 (dua) plastikklip masingmasing berisi benda kristal bening yang didugamengandung sedian narkotika jenis sabu seberat :e 0,50 gram brutto atau 0,32 gram netto;e 1,00 gram brutto atau 0,80 gram netto;4) 1 (satu) buah dompet plastik bening didalamnya berisi 2 (dua)bungkus plastik klip Kosong, 1 (satu) buah isolasi bening, 1 (satu)
    gram brutto atau 0,80 gram nettoe 1,06 gram brutto atau 0,80 gram nettoe 1,00 gram brutto atau 0,80 gram netto1 (satu) dompet warna coklat motif sisik ular berisi 2 (dua)plastik klip masingmasing berisi benda kristal bening yangdiduga mengandung sedian narkotika jenis sabu seberat :e 0,50 gram brutto atau 0,32 gram nettoe 1,00 gram brutto atau 0,80 gram netto1 (satu) buah dompet plastik bening didalamnya berisi 2 (dua)bungkus plastik klip kosong, 1 (Satu) buah isolasi bening, 1(satu) buah isolasi
    gram brutto atau 0,80 gram netto;e 1,06 gram brutto atau 0,80 gram netto;e 1,00 gram brutto atau 0,80 gram netto;3) 1 (satu) dompet warna coklat motif ular berisi 2 (dua) plastikklip masingmasing berisi benda kristal bening yang didugamengandung sedian narkotika jenis shabu seberat :e 0,50 gram brutto atau 0,32 gram netto;e 1,00 gram brutto atau 0,80 gram netto;sehingga berat total 10 (sepuluh) klip masingmasing berisibenda kristal bening yang diduga mengandung sediannarkotika jenis shabu adalah
    gram brutto atau 0,80 gram netto;e 1,06 gram brutto atau 0,80 gram netto;e 1,00 gram brutto atau 0,80 gram netto;> 1 (satu) dompet warna coklat motif ular berisi 2 (dua) plastikklip masingmasing berisi benda kristal bening yang didugamengandung sedian narkotika jenis shabu seberat :e 0,50 gram brutto atau 0,32 gram netto;e 1,00 gram brutto atau 0,80 gram netto;sehingga berat total 10 (sepuluh) klip masingmasing berisi bendakristal bening yang diduga mengandung sedian narkotika jenisshabu adalah
Register : 16-10-2018 — Putus : 11-02-2019 — Upload : 02-03-2020
Putusan PN JAKARTA UTARA Nomor 1151/Pid.Sus/2018/PN Jkt.Utr
Tanggal 11 Februari 2019 — Penuntut Umum:
ASTRI RAHMA YANTI, SH., M.P.d
Terdakwa:
TOHIRIN bin TOHA
188
  • tetap ditahan;

    5. Memerintahkan barang bukti berupa:

    • 1 (satu) buah plastik klip berisi kristal warna putih narkotika jenis sabu berat brutto 0,14 (nol koma empat belas) gram kode A1;
    • 1 (satu) buah plastik klip berisi kristal warna putih narkotika jenis sabu berat brutto 0,39 (nol koma tiga puluh sembilan) gram kode A2;
    • 1 (satu) buah plastik klip berisi kristal warna putih narkotika jenis sabu berat brutto 1,00
    (satu) gram kode A3;
  • 1 (satu) buah plastik klip berisi kristal warna putih narkotika jenis sabu berat brutto 1,00 (satu) gram kode A4;
  • 1 (satu) buah plastik klip berisi kristal warna putih narkotika jenis sabu berat brutto 1,00 (satu) gram kode A5;
  • 1 (satu) buah plastik klip berisi kristal warna putih narkotika jenis sabu berat brutto 1,03 (satu koma nol tiga) gram kode A6;
  • 1 (satu) buah
    Utr. 1 (satu) buah plastik klip berisi kristal warna putih narkotika jenissabu berat brutto 0,39 (nol koma tiga puluh sembilan) gram kode A2; 1 (satu) buah plastik klip berisi kristal warna putih narkotika jenissabu berat brutto 1,00 (satu) gram kode A3; 1 (satu) buah plastik klip berisi kristal warna putih narkotika jenissabu berat brutto 1,00 (satu) gram kode A4; 1 (satu) buah plastik klip berisi kristal warna putih narkotika jenissabu berat brutto 1,00 (satu) gram kode A5; 1 (satu) buah plastik
    (Satu) gram kode A3.d. 1 (Satu) buah plastik klip berisi kristal warna putih narkotika jenissabu berat brutto 1,00 (Satu) gram kode A4.e. 1 (satu) buah plastik klip berisi kristal warna putin narkotika jenissabu berat brutto 1,00 (Satu) gram kode A5.f.1 (Satu) buah plastik klip berisi kristal warna putih narkotika jenis sabuberat brutto 1,03 (Satu koma nol tiga ) gram kode A6.Berdasarkan Berita Acara Penimbangan tanggal 8 Juli 2018.Diatas lemari berupa:a. 1 (Satu) buah timbangan elektrik warna hitam.b
    (Satu) gram kode A3.d. 1 (Satu) buah plastik klip berisi kristal warna putin narkotika jenissabu berat brutto 1,00 (Satu) gram kode A4.e. 1 (Satu) buah plastik klip berisi kristal warna putin narkotika jenissabu berat brutto 1,00 (Satu) gram kode Ad.f.1 (Satu) buah plastik klip berisi kristal warna putin narkotika jenis sabuberat brutto 1,03 (Satu koma nol tiga ) gram kode A6.Berdasarkan Berita Acara Penimbangan tanggal 8 Juli 2018.Diatas lemari berupa:Hal.7 dari 21 halaman Putusan No.1151/Pid.Sus
    Utr.berisi kristal warna putih narkotika jenis sabu berat brutto 0,39 (nol koma tigapuluh sembilan) gram kode A2, 1 (Satu) buah plastik klip berisi kristal warnaputih narkotika jenis sabu berat brutto 1,00 (satu) gram kode A3, 1 (satu)buah plastik klip berisi kristal warna putih narkotika jenis sabu berat brutto1,00 (satu) gram kode A4, 1 (satu) buah plastik klip berisi kristal warna putihnarkotika jenis sabu berat brutto 1,00 (satu) gram kode A5, 1 (satu) buahplastik klip berisi kristal warna putih
    (satu) gram kodeA3, 1 (Satu) buah plastik klip berisi kristal warna putih narkotika jenis sabu beratbrutto 1,00 (satu) gram kode A4, 1 (satu) buah plastik klip berisi kristal warnaputih narkotika jenis sabu berat brutto 1,00 (satu) gram kode A5, 1 (satu) buahplastik klip berisi kristal warna putih narkotika jenis sabu berat brutto 1,03 (satukoma nol tiga) gram kode A6, 1 (Satu) buah timbangan elektrik warna hitam,Hal.18 dari 21 halaman Putusan No.1151/Pid.