Ditemukan 2835 data

Urut Berdasarkan
 
Register : 28-12-2015 — Putus : 06-04-2016 — Upload : 28-07-2016
Putusan PN TERNATE Nomor 37/Pid.Sus-TPK/2015/PN Tte
Tanggal 6 April 2016 — MAMANG MOHAMMAD TAUFIK
6025
  • Tali PE dia 24 untuk pengikat 4 buah Jangkar Rol 1,00 1,00 8) Pas.
Putus : 10-09-2014 — Upload : 12-05-2015
Putusan MAHKAMAH AGUNG Nomor 1002 K/Pid.Sus/2013
Tanggal 10 September 2014 — RAHMAN FAUZI Alias MAMAN Bin MAHYUDIN NANUNG
2221 Berkekuatan Hukum Tetap
  • Biaya Dokumentasi 1,00 Ls 250.000,00 250.000,002. Penggandaan Dokumen 1,00 Ls 450.000,00 450.000,003. Biaya P3K 1,00 Ls 450.000,00 450.000,004. Biaya Adm & Kantor 1,00 Ls 4.000.000,00 4.000.000,005. Meja + Kursi Siswa 60,00 Unit 500.000,00 30.000.000,006. Meja+Kursi Guru 3,00 Unit 700.000,00 2.100.000,007. Lemari Kelas 5,00 Bh 1.500.000,00 7.500.000,008.
    Biaya Dokumentasi 1,00 Ls 250.000,00 250.000,002. Penggandaan Dokumen 1,00 Ls 450.000,00 450.000,003. Biaya P3K 1,00 Ls 450.000,00 450.000,004. Biaya Adm & Kantor 1,00 Ls 4.000.000,00 /4.000.000,005. Meja+ Kursi Siswa 60,00 Unit 500.000,00 30.000.000,006. Meja+ Kursi Guru 3,00 Unit 700.000,00 2.100.000,007. Lemari Kelas 5,00 Bh 1.500.000,00 7.500.000,008.
    Sarana Pipa dan sambungan 1,00 Ls 100.000,00 100.000,007. Pas. Floor Drain 2,00 Bh 3.423,56 6.847,128. Septic Tank 1,00 Unit 1.100.000,00 1.100.000,009. Mesin Air 1,00 Unit 1.888.000,00 1.888.000,0010. Tangki Air Polythline 1000 L 1,00 Unit 1.260.224,00 = 1.260.224,0011. Tiang Toren 1,00 Ls 3.000.000,00 3.000.000,00Jumlah 9.452.893,17VIL PEKERJAAN CAT 10 Pek. Cat Tembok 61,18 M 17.957,83 1.098.659,73Pek. Cat Plafon 9,00 Me 13.183,08 118.647,74Pek.
    Meja+ Kursi 1,00 Unit 700.000,00 700.000,002. Lemari obat 1,00 Bh 1.500.000,00 = 1.500.000,003. Ranjang UKS + Kasur dan bantal 1,00 Unit 1.700.000,00 1.700.000,004.
    Pek sarana pipa dan sambungan 1,00 Ls 100.000,00 100.000,007. Pas. Floor drain 2,00 Bh 3.423,56 6.847,128. Septic tank 1,00 Unit 1.100.000,00 1.100.000,009. Mesin air 1,00 Unit 1.888.000,00 1.888,000,0010. Tangki air polythlline kap 1000 L 1,00 Unit 1.260.224.00 1.260.224,0011. Tiang toren 1,00 Ls 3.000.000,00 3.000.000,00Jumlah 9.452.893,17VIL PEKERJAAN CATPek. Cat Tembok 61,18 M 17.957,83 1.098.659,73Pek. Cat Plafon 9,00 M 13.183,00 118.647,74Pek.
Register : 17-11-2016 — Putus : 15-12-2016 — Upload : 04-09-2020
Putusan PT PALU Nomor 23/PID.TPK/2016/PT PAL
Tanggal 15 Desember 2016 — Pembanding/Terbanding/Penuntut Umum : ALEXANDER TANAK, SH
Terbanding/Pembanding/Terdakwa : JIBRAN HAMADI, SE
10429
  • Direksi Keet 1,00 M 950.000,00 900.000,003 Papan Proyek 1,00 Bh 336.539,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 700.000,00 745.500,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,3 Me 23.321,68 174.966.250,580Ill PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 895.500,00 895.500,002 Dokumentasi 1,00 Set 136.950,00 136.950,003.
    Direksi Keet 1,00 M 985.000,00 985.000,003. Papan Proyek 1,00 Bh 337.440,40 337.440,40Pengukuran Lokasi / Uizet 1,00 Ls 725.000,00 725.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,3 Me 23.321,03 174.961.369,800Il PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003.
    Direksi Keet 1,00 M 900.000,00 900.000,003. Papan Proyek 1,00 Bh 335.742,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 745.500,00 745.500,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat rene Ms 23.321,68 174.966.250,58III PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003.
    Direksi Keet 1,00 M 904.000,00 904.000,003. Papan Proyek 1,00 Bh 335.610,00 335.610,004. Pengukuran Lokasi / Uizet 1,00 Ls 730.000,00 730.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7902.8 Me 23.321,03 174.961.369,80III PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 135.850,00 135.850,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004 Pencetakan Asbuilt Drawing 1,00 Set 189.200,00 189.200,005.
    Direksi Keet 1,00 M 900.000,00 900.000,003. Papan Proyek 1,00 Bh 335.742,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 745.500,00 745.500,00Il PEKERJAAN NORMALISASI1.
Register : 12-11-2020 — Putus : 31-03-2021 — Upload : 01-04-2021
Putusan PN BENGKULU Nomor 33/Pid.Sus-TPK/2020/PN Bgl
Tanggal 31 Maret 2021 — Penuntut Umum:
NOPRIDIANSYA,SH
Terdakwa:
JANUNG ASMADI Bin Alm. BANADI
13861
  • 100.000,00 2.500.000,00TowerOperasional Pk 2,00 500.000,00 1.000.000,00 2,00 500.000,00 1.000.000,00akomodasiJasa Pasang Pk 1,00 3.250.000,00 3.250.000,00 1,00 3.250.000,00 3.250.000,00antena & settingkoneksiRadio M5 Pcs 2,00 1.695.000,00 3.390.000,00 2,00 1.695.000,00 3.390.000,00(Akses Point toPoint)Wifi Indor Pcs 1,00 500.000,00 500.000,00 1,00 500.000,00 500.000,00UPS 600 Va Pcs 1,00 750.000,00 750.000,00 750.000,00 Kabel UTP Pcs 1,00 585.000,00 585.000,00 1,00 585.000,00 585.000,00Belden +
    RJ 45Microtik Pcs 1,00 995.000,00 995.000,00 1,00 995.000,00 995.000,00Vertikal besi12 Bt 11,00 80.000,00 880.000,00 6,00 80.000,00 480.000,00Horizontal besi Bt 12,00 55.000,00 660.000,00 12,00 55.000,00 660.000,008Besi Strip Bt 6,00 35.000,00 210.000,00 2,00 35.000,00 70.000,00Elektroda Kotak 1,00 225.000,00 225.000,00 1,00 225.000,00 225.000,00Pipa cincin Bt 1,00 85.000,00 85.000,00 1,00 85.000,00 85.000,00sambungan 1/2Pipa cor tarikan Bt 1,00 200.000,00 200.000,00 1,00 200.000,00 200.000,00seling
    1,00 178.000,00 178.000,00 1,00 178.000,00 178.000,00batu kali m?
    3.500.000,00Torn 1000 bh 1,00 2.500.000,00 2.500.000,00 1,00 2.500.000,00 2.500.000,00literBiaya unit 1,00 3.000.000,00 3.000.000,00 3.000.000,00 pemasanganKWH danAdmKabel NYM M!
Putus : 24-05-2011 — Upload : 18-10-2011
Putusan PT BENGKULU Nomor 29/PID.2011/PT.BKL.
Tanggal 24 Mei 2011 — Herman Achyar bin Achyar
5724
  • Pengukuran Ls Bh 1,00 ,00 03. Papan nama Kegiatan Ls Uni 1,00 250.000 250.000,0Direksi Keet dan t ,00 04. perlengkapan Ls 1,00 1.500.0 1.500.000Mobilisasi Ls 00,00 ,002.500.0 2.500.00000,00 ,004.400.000 ,00II Pekerjaan Tanah1. Membentuk Badan K.32 2.05 16.335, 33.622.75Jalan Dengan Galian 1 3,73 47 7,452. (Alat) MMembuat Parit K.11 120, 57.008, 6.840.988Galian Tanah 0 00 24 ,8040.463.746,25II PekerjaanI Konstruksi Y 15, 450.267 6.754.0081. Gorong gorong @ 40 K.12 00 ,22 30cm 32.
    Administrasi Ls Ls 1,00 1.000.0 1.000.0002. Kegiatan Ls Ls 1,00 00,00 ,003. Dokumentasi Ls Ls 1,00 500.000 500.000,04. Kegiatan Ls Ls 1,00 ,00 0Transportasi 500.000 500.000,0Kegiatan ,00 0Keamanan dan Obat 500.000 500.000,0obatan ,00 02.500.000,00Total Jumlah 81.324.19Ppn 10 % 1,72Total (termasuk ppn) 8.132.419Pembulatan oll89.456.610,8989.456.000,00RAB. PERUBAHANNo Uraian Pekerjaan Anal Sat Vol Harga Jumlahisa uan satuan harga(Rp) (Rp) I Pekerjaan1. Persiapan Ls Km 0,60 250.000 150.000,02.
    Perkerasan K.51 M 130, 127.813 16.732.04Perkerasan LPB Klas 5 91 537 8,27CSub jumlah 16.732.048,27V Pekerjaan Lain Lain Ls Ls 1,00 1.000.0 1.000.0001. Administrasi Ls Ls 1,00 00,00 ,002. Kegiatan Ls Ls 1,00 500.000 500.000,03. Dokumentasi Ls Ls 1,00 ,00 04.
    Administrasi Ls Ls 1,00 1.000.0 1.000.0002. Kegiatan Ls Ls 1,00 00,00 ,003. Dokumentasi Ls Ls 1,00 500.000 500.000,04. Kegiatan Ls Ls 1,00 ,00 0Transportasi 500.000 500.000,0Kegiatan ,00 0Keamanan dan Obat 500.000 500.000,0obatan ,00 02.500.000,00 15 Total Jumlah 81.324.19Ppn 10 % 1,72Total (termasuk ppn) 8.132.419Pembulatan ,1789.456.610,8989.456.000,00RAB PERUBAHANNo Uraian Pekerjaan Anal Sat Vol Harga Jumlahisa uan satuan harga(Rp) (Rp)I Pekerjaan1. Persiapan Ls Km ,60 250.000 150.000,02.
Register : 17-11-2016 — Putus : 15-12-2016 — Upload : 03-09-2020
Putusan PT PALU Nomor 26/PID.TPK/2016/PT PAL
Tanggal 15 Desember 2016 — Pembanding/Terbanding/Penuntut Umum : ALEXANDER TANAK, SH
Terbanding/Pembanding/Terdakwa : DEKO H. BASIA Als. DEKO
9026
  • Direksi Keet 1,00 M 904.000,00 904.000,003. Papan Proyek 1,00 Bh 335.610,00 335.610,004. Pengukuran Lokasi / Uizet 1,00 Ls 730.000,00 730.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7028 Me 23.321,03 174.961.369,80Ill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 135.850,00 135.850,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004.
    Direksi Keet 1,00 M 950.000,00 900.000,003. Papan Proyek 1,00 Bh 336.539,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 700.000,00 745.500,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,3 M 23.321,68 174.966.250,580lll PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004.
    Direksi Keet 1,00 M 950.000,00 950.000,003. Papan Proyek 1,00 Bh 336.132,50 336.132,504. Pengukuran Lokasi / Uizet 1,00 Ls 719.000,00 719.000,00i PEKERJAAN NORMALISASI1, Galian Tanah dengan alat berat 7.502,3 M 23.323,31 174.966.250,580Ul PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004. Pencetakan Asbuilt Drawing 1,00 Set 189.695,00 189.695,005.
    Direksi Keet 1,00 M 985.000,00 985.000,003. Papan Proyek 1,00 Bh 337.440,40 337.440,404. Pengukuran Lokasi / Uizet 1,00 Ls 725.000,00 725.000,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,3 Me 23.321,03 174.961.369,800Ul PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt Drawing 1,00 Set 261.250,00 261.250,004. Pencetakan Asbuilt Drawing 1,00 Set 187.550,00 187.550,005.
    Direksi Keet 1,00 M 900.000,00 900.000,003. Papan Proyek 1,00 Bh 335.742,00 335.742,004. Pengukuran Lokasi / Uizet 1,00 Ls 745.500,00 745.500,00Il PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat Me 23.321,68 174.966.250,58Ill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt Drawing 1,00 Set 286.000,00 286.000,004.
Register : 03-09-2013 — Putus : 09-10-2013 — Upload : 06-07-2019
Putusan PT SEMARANG Nomor 71/PID.TPK/2013/PT SMG
Tanggal 9 Oktober 2013 — Pembanding/Jaksa Penuntut : BAMBANG PUTRA SANTOSO, SH
Terbanding/Terdakwa : Ir.SUNAR WIBOWO,M.Sc
6235
  • AKOMODASI+ Jendela, pintu dan tangga 1,00 lot IRp. 6.700.000 IRp. 6.700.000+ Plafon dan dinding 1,00 lot IRp. 1.350.000 IRp. 1.350.000+ Perlengkapan akomodasi 1,00 lot Rp. 335.000 IRp. 335.000+ Perlengkapan kamar mandi 1,00 set IRp. 110.000 IRp. 110.000+ Meja dan kursi juru mudi 1,00 set IRp. 645.000 IRp. 645.000+ Rak / lemari dapur 1,00 set IRp. 450.000 IRp. 450.000+ Peralatan dapur/makan (lengkap) 1,00 set IRp. 335.000 IRp. 335.000+ Peralatan kamar mesin 1,00 set IRp. 340.000 IRp. 340.000Total
    buah Rp.2.400.000 IRp. 4.800.000+ Baterry swich 1,00 buah Rp. 135.000 IRp. 135.000+ Horn 1,00 buah Rp. 245.000 IRp. 245.000+ Shore cornection 1,00 buah Rp.1.500.000 IRp. 1.500.000+ Lampu penerangan 1,00 set IRp. 1.500.000 IRp. 1.500.000+ Lampu sorot (search light) 1,00 set IRp. 2.450.000 IRp. 2.450.000+ Blower (outin) 1,00 set IRp. 210.000 IRp. 210.000(Total Biaya Peralatan Listrik dan Penerangan IRp. 11.565.000(7.
    PERALATAN NAVIGASI DANIKESELAMATAN+ Kompas magnit 6 marine use 1,00 set IRp. 3.465.000 Rp. 3.465.000+ Peta laut dan perlengkapannya 1,00 set IRp. 2.875.000 Rp. 2.875.000+ Bola tanda labuh 1,00 set IRp. 1.350.000 IRp. 1.350.000+ Radio komunikasi dan instalasi 1,00 unit Rp. 14.000.000 Rp. 14.000.000+ GPS + fishfinder 1,00 unit IRp. 22.400.000 Rp. 22.400.000+ Bendera nasional 1,00 buah IRp. 140.000 IRp. 140.000+ Teropong binacular (7 x 50 mm) 1,00 buah IRp. 2.470.000 Rp. 2.470.000Total Biaya Peralatan
    AKOMODASI Jendela, pintu dan tangga 1,00 lot Rp. 6.700.000 Rp. 6.700.000 Plafon dan dinding 1,00 lot Rp. 1.350.000 Rp. 1.350.000 Perlengkapan akomodasi 1,00 lot Rp. 335.000 Rp. 335.000 Perlengkapan kamar mandi 1,00 set Rp. 110.000 Rp. 110.000 Meja dan kursi juru mudi 1,00 set Rp. 645.000 Rp. 645.000 Rak / lemari dapur 1,00 set Rp. 450.000 Rp. 450.000 Peralatan dapur/makan 1,00 set Rp. 335.000 Rp. 335.000(engkap) Peralatan kamar mesin 1,00 set Rp. 340.000 Rp. 340.000Total Biaya Akomodasi Rp. 10.265.0005
    Rp. 4.800.000 Baterry swich 1,00 buah Rp. 135.000 Rp. 135.000 Horn 1,00 buah Rp. 245.000 Rp. 245.000 Shore cornection 1,00 buah Rp.1.500.000 Rp. 1.500.000 Lampu penerangan 1,00 set Rp.1.500.000 Rp. 1.500.000 Lampu sorot (search light) 1,00 set Rp. 2.450.000 Rp. 2.450.000 Blower (outin) 1,00 set Rp. 210.000 Rp. 210.000Total Biaya Peralatan Listrik dan Penerangan Rp. 11.565.0007.
Register : 05-09-2019 — Putus : 19-12-2019 — Upload : 07-02-2020
Putusan PN DENPASAR Nomor 1041/Pid.Sus/2019/PN Dps
Tanggal 19 Desember 2019 — Penuntut Umum:
Gusti Ngurah Arya Surya Diatmika, SH.
Terdakwa:
1.Putu Wide Astawa
2.Komang Astrawan
4517
  • 800.000.000,- (Delapan ratus juta rupiah) dengan ketentuan apabila pidana denda tersebut tidak dibayar maka diganti dengan pidana penjara selama 6 bulan;
  • Menetapkan lamanya Terdakwa berada dalam masa penangkapan, penahanan dikurangkan seluruhnya dari pidana yang dijatuhkan;
  • Menetapkan agar barang bukti berupa :
    • 3 (tiga) potongan pipet berisi masing-masing plastic klip yang didalamnya berisi Kristal bening diduga Narkotika jenis shabu dengan berat keseluruhan 1,00
      BOSuntuk mengambil tempelan di daerah Sesetan kemudian ParaTerdakwaPUTU WIDE ASTAWA bersama dengan Para TerdakwaKOMANGASTRAWAN menuju Sesetan untuk mengambil paket Shabu seberat 1,00Gram Brutto atau 0,31 Gram Netto yang sudah ditempel, setelahmengambil paket shabu seberat 1,00 Gram Brutto atau 0,31 Gram Nettotersebut Para TerdakwaPUTU WIDE ASTAWA bersama dengan ParaTerdakwaKOMANG ASTRAWAN pergi ke Legian Village Hotel di JalanPadma sambil membawa paket Shabu seberat 1,00 Gram Brutto atau 0,31Gram
      BOS dengan cara sebanyak 1,00 Gram Brutto atau0,31 Gram Netto demngan tujuan untuk digunakan sendiri oleh paraterdakwa.
      BOSuntuk mengambil tempelan di daerah Sesetan kemudian ParaTerdakwabersama dengan Para TerdakwaKOMANG ASTRAWAN menujuSesetan untuk mengambil paket Shabu seberat 1,00 Gram Brutto atau 0,31Gram Netto yang sudah ditempel, setelah mengambil paket shabu seberat1,00 Gram Brutto atau 0,31 Gram Netto tersebut Para Terdakwabersamadengan Para TerdakwaKOMANG ASTRAWAN pergi ke Legian Village Hoteldi Jalan Padma sambil membawa paket Shabu seberat 1,00 Gram Bruttoatau 0,31 Gram Netto tersebut dengan tujuan untuk
      BOS untukmengambil tempelan di daerah Sesetan kemudian Para TerdakwaPUTUWIDE ASTAWA bersama dengan Para TerdakwaKOMANG ASTRAWANmenuju Sesetan untuk mengambil paket Shabu seberat 1,00 Gram Bruttoatau 0,31 Gram Netto yang sudah ditempel, setelah mengambil paketshabu seberat 1,00 Gram Brutto atau 0,31 Gram Netto tersebutTerdakwaPUTU WIDE ASTAWA bersama dengan Terdakwa KOMANGASTRAWAN pergi ke Legian Village Hotel di Jalan Padma sambilmembawa paket Shabu seberat 1,00 Gram Brutto atau 0,31 Gram Nettotersebut
      BOSuntuk mengambil tempelan di daerah Sesetan kemudian Terdakwa PUTUWIDE ASTAWA bersama dengan Para Terdakwa KOMANG ASTRAWANmenuju Sesetan untuk mengambil paket Shabu seberat 1,00 Gram Bruttoatau 0,31 Gram Netto yang sudah ditempel, setelah mengambil paketshabu seberat 1,00 Gram Brutto atau 0,31 Gram Netto tersebut TerdakwaPUTU WIDE ASTAWA bersama dengan Terdakwa KOMANG ASTRAWANpergi ke Legian Village Hotel di Jalan Padma sambil membawa paketShabu seberat 1,00 Gram Brutto atau 0,31 Gram Netto tersebut
Putus : 26-03-2014 — Upload : 24-03-2015
Putusan MAHKAMAH AGUNG Nomor 231 K/Pid.Sus/2014
Tanggal 26 Maret 2014 — Ir. BAMBANG SANTOSA, MM
8152 Berkekuatan Hukum Tetap
  • INSTALASIINSTALASIInstalasi listrik 1,00 lot Rp 9.500.000 Rp9.500.000Instalasi pipa air tawar 1,00 lot Rp 7.500.000 Rp7.500.000Instalasi pipa pendingin mesin 1,00 lot Rp 8.250.000 Rp8.250.000Instalasi pipa BBM 1,00 lot Rp 7.400.000 Rp7.400.000Instalasi gas buang 1,00 lot Rp 4.500.000 Rp4.500.000Total Biaya Instalasi Rp 37.150.0004.
    AKOMODASIJendela, pintu dan tangga 1,00 lot Rp 6.700.000 Rp6.700.000Plafon dan dinding 1,00 lot Rp 1.350.000 Rp1.350.000Perlengkapan akomodasi 1,00 lot Rp 335.000 Rp335.000Perlengkapan kamar mandi 1,00 set Rp 110.000 Rp110.000Meja dan kursi juru mudi 1,00 set Rp 645.000 Rp645.000Rak / lemari dapur 1,00 set Rp 450.000 Rp 450.000 Peralatan dapur/makan (lengkap) 1,00 set Rp 335.000 Rp335.000Peralatan kamar mesin 1,00 set Rp 340.000 Rp340.000Total Biaya Akomodasi Rp 10.265.0005.
    1,00 buah Rp 135.000 Rp135.000Horn 1,00 buah Rp 245.000 Rp245.000Shore cornection 1,00 buah Rp1.500.000 Rp1.500.000Lampu penerangan 1,00 set Rp1.500.000 Rp1.500.000Lampu sorot (search light) 1,00 set Rp2.450.000 Rp2.450.000Blower (outin) 1,00 set Rp 210.000 Rp210.000Total Biaya Peralatan Listrik dan Penerangan Rp 11.565.0007.
    AKOMODASIJendela, pintu dan tangga 1,00 lot Rp 6.700.000 Rp6.700.000Plafon dan dinding 1,00 lot Rp 1.350.000 Rp1.350.000Perlengkapan akomodasi 1,00 lot Rp 335.000 Rp335.000Perlengkapan kamar mandi 1,00 set Rp 110.000 Rp110.000Meja dan kursi juru mudi 1,00 set Rp 645.000 Rp645.000Rak / lemari dapur 1,00 set Rp 450.000 Rp450.000Peralatan dapur/makan (lengkap) 1,00 set Rp 335.000 Rp335.000Peralatan kamar mesin 1,00 set Rp 340.000 Rp340.000Total Biaya Akomodasi Rp 10.265.0005.
    1,00 buah Rp 245.000 Rp245.000Shore comection 1,00 buah Rp1.500.000 Rp1.500.000Lampu penerangan 1,00 set Rp1.500.000 Rp1.500.000Lampu sorot (search light) 1,00 set Rp2.450.000 Rp2.450.000Blower (outin) 1,00 set Rp 210.000 Rp210.000Total Biaya Peralatan Listrik dan Penerangan Rp 11.565.0007.
Register : 04-09-2019 — Putus : 16-10-2019 — Upload : 31-10-2019
Putusan PN BATULICIN Nomor 202/Pid.B/LH/2019/PN Bln
Tanggal 16 Oktober 2019 — Penuntut Umum:
RUSNEN HELDAWATI, SH
Terdakwa:
YUNI als IYUN bin KASTAN
38327
  • 0,047877 Ulin 1 1,30 24 15 0,046878 Ulin mn 1,30 2 16 0,043779 Ulin dl 1,20 31 15 0,055880 Ulin 1 1,20 23 22 0,060781 Ulin 1 1,20 44 26 0,137382 Ulin 1 1,20 26 22 0,068683 Ulin i 1,20 19 19 0,043384 Ulin 1 1,20 25) 16 0,048085 Ulin 1 1,20 23 20 0,055286 Ulin 1 1,20 23 22 0,060787 Ulin 1 1,20 18 17 0,036788 Ulin if 1,20 40 25 0,120089 Ulin mn 1,20 25 a 0,033090 Ulin 1 1,20 41 22 0,108291 Ulin 1 1,20 3 3 0,147092 Ulin 1 1,20 27 22 0,071393 Ulin 1 1,20 35 10 0,042094 Ulin mn 1,20 28 23 0,077395 Ulin 1 1,00
    44 20 0,088096 Ulin 1 1,00 23 17 0,039197 Ulin 1 1,00 23 23 0,052998 Ulin 1 1,00 27 16 0,043299 Ulin 2 1,00 30 19 0,1140100 Ulin dl 1,00 24 9 0,0216101 Ulin 1 1,00 17 17 0,0289102 Ulin 1 1,00 24 17 0,0408103 Ulin 1 1,00 23 15 0,0345104 Ulin i 1,00 34 22 0,0748105 Ulin aL 1,00 18 17 0,0306106 Ulin 1 1,00 21 19 0,0399107 Ulin 1 1,00 17 16 0,0272108 Ulin 1 1,00 18 18 0,0324109 Ulin 1 1,00 23 14 0,0322110 Ulin mn 1,00 27 18 0,0486111 Ulin dl 1,00 20 18 0,0360112 Ulin 1 1,00 20 16 0,0320113 Ulin 1 1,00
    34 26 0,0884114 Ulin 1 1,00 24 21 0,0504115 Ulin i 1,00 17 14 0,0238116 Ulin 1 1,00 20 16 0,0320117 Ulin 1 1,00 28 27 0,0756118 Ulin 1 1,00 24 18 0,0432MLS) Ulin 1 1,00 21 15 0,0315120 Ulin if 1,00 25 Za 0,0525120 Ulin mn 1,00 22 13 0,0286122 Ulin mn 1,00 25 16 0,0400 Halaman 6 dari 19 putusan pidana nomor 202/Pid.B/LH/2019/PN Bin. 123 Ulin i 1,00 20 19 0,0380124 Ulin aL 1,00 24 23 0,0552125 Ulin 1 1,00 26 11 0,0286126 Ulin 1 1,00 25 12 0,0300127 Ulin 1 1,00 33 19 0,0627128 Ulin 1 1,00 30 23 0,0690129
    Ulin mn 1,00 2 18 0,0378Jumlah 155 86,172 Bahwa kayu kayu yang Terdakwa angkut tersebut, setelah dilakukanpemeriksaan ternyata merupakan jenis kayu yang berasal dari hutan negaraatau hutan rakyat, sehingga dalam pengangkutannya diwajibkan denganSKSHH.Perbuatan Terdakwa YUNI Als IYUN Bin KASTAN tersebut sebagaimanadiatur dan diancam pidana dalam Pasal 88 Ayat (1) huruf a UU RI No. 18 Tahun2013 tentang Pencegahan dan Pemberantasan Perusakan Hutan.Menimbang, bahwa Terdakwa terhadap dakwaan tersebut
Register : 16-10-2015 — Putus : 25-01-2016 — Upload : 29-07-2016
Putusan PN PALU Nomor 54/Pid.Sus-TPK/2015/PN.Pal
Tanggal 25 Januari 2016 — KADIR, ST Alias KADIR NURDN
13351
  • Flanged Socket @1,00 bh 163.125,00 163.125,004 Halaman 3 dari 51 Putusan Nomor 4/Pid.SusTPK/2016/PT.PAL 3. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee = 2,00 bh 177.500,00 355.000,00PVC 4 x 35. All Socket Tee 1,00 bh 185.000,00 185.000,00PVC 4 x 46. All Socket Tee 2,00 bh 148.000,00 296.000,00PVC 3 x 37. All Socket Tee 2,00 Bh 85.000,00 170.000,00PVC 28. Gate Valve @ 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC @3 /2,00 Bh /38.062,50 76.125,0010.
    181.863.25 545.589.75PEK.ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh 1.495.312,50 1.495.312,50Valve @ 4All Flanged tee 1,00 Bh 525.000,00 525.000,00PVC @4Flanged Socket 1,00 Bh 163.125,00 163.125,00PVC @4Flanged Sigot 1,00 Bh 163.125,00 163.125,00PVC @ 4All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 40,00 Bh 8.775,00 351.000,0034.302.394,06Pembuatan 1,00 PktBlock BetonGalian Tanah 3,00 M3 24.990,00 74.970,00BiasaUrugan Tanah 1,00 M3 11.980,00
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 = 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00 Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    Flanged Socket @ 4 1,00 bh 163.125,00 163.125,003. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee PVC @ 4 2,00 bh 177.500,00 355.000,00x 35. All Socket Tee PVC @ 4 1,00 bh 185.000,00 185.000,00x 46. All Socket Tee PVC @ 3 2,00 bh 148.000,00 296.000,00x 37. All Socket Tee PVC @ 2 2,00 Bh 85.000,00 170.000,008. Gate Valve 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC @ 3 2,00 Bh 38.062,50 76.125,0010. Dop PVC @ 2 2,00 bh = 32.625,00 65.250,0011.
    ACCESSIRIESPENGURASAll Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50@4All Flanged tee PVC @ 4 1,00 Bh 525.000,00 = 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @/1,00 Bh = 375.000,00 375.000,00APaking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block 1,00 PktBetonGalian Tanah Biasa 3,00 M3 24.990,00 74.970,00Urugan Tanah 1,00 M3 11.980,00 11.980,00
Register : 12-02-2016 — Putus : 23-03-2016 — Upload : 12-07-2016
Putusan PT JAKARTA Nomor 10/PID/TPK/2016/PT.DKI
Tanggal 23 Maret 2016 — RINI YULIANTHIE FATIMAH
7976
  • Unit 2.860.000.000, 2.860.000.000,Kapasitas 15 orang / 900 KgKpasitas Gerak 90 mtr / menitPelayanan : 9 lantai /9 open / 9 stopType Motor : ACVVVF : 15 Kwe. : 380/3/50 HzPekerjaan pemasangan lift baru 1,00 Unit 143.000.000, 143.000.000,Pengadaan traveling cable sesuai kebutuhan 1,00 Unit 119.427.000, 119.427.000,pabrikasiPengadaan wearing sistem ruang mesin dan 1,00 Unit 92.928.000, 92.928.000,hoistyway liftHandraild dinding belakang 1,00 Unit 4.500.000, 9.000.000,Handrail dinding samping kiri 1,00
    Unit 4.500.000, 9.000.000,Handrail dinding samping kanan 1,00 Unit 4.500.000, 9.000.000,Jumlah I1.D 3.228.855.000,Pekerjaan dan Pemasangan Lift BarangLift Penumpang Gedung 9 lantai 1,00 Unit 2.860.000.000, 2.860.000.000, Kapasitas 15 orang / 900 KgKpasitas Gerak 90 mtr / menitPelayanan : 9 lantai /9 open / 9 stopType Motor : ACVVVF : 15 Kwe. : 380/3/50 HzPekerjaan pemasangan lift baru 1,00 Unit 143.000.000, 143.000.000,Pengadaan traveling cable sesuai kebutuhan 1,00 Unit 119.427.000, 119.427.000
    ,pabrikasiPengadaan wearing sistem ruang mesin dan 1,00 Unit 92.928.000, 92.928.000,hoistyway liftHandraild dinding belakang 1,00 Unit 4.500.000, 9.000.000,Handrail dinding samping kiri 1,00 Unit 4.500.000, 9.000.000,Handrail dinding samping kanan 1,00 Unit 4.500.000, 9.000.000,Jumlah I.E 3.228.855.000,SUB TOTAL JUMLAH III 21.273.135.000,IV.
    1,00 Unit 4.500.000, 9.000.000,Handrail dinding samping kanan 1,00 Unit 4.500.000, 9.000.000,Jumlah I1.D 3.228.855.000,Pekerjaan dan Pemasangan Lift BarangLift Penumpang Gedung 9 lantai 1,00 Unit 2.860.000.000, 2.860.000.000,Kapasitas 15 orang / 900 KgKpasitas Gerak 90 mtr / menitPelayanan : 9 lantai /9 open / 9 stopType Motor : ACVVVF : 15 Kwe. : 380/3/50 HzPekerjaan pemasangan lift baru 1,00 Unit 143.000.000, 143.000.000,Pengadaan traveling cable sesuai kebutuhan pabrikasi 1,00 Unit 119.427.000
    , 119.427.000,Pengadaan wearing sistem ruang mesin dan 1,00 Unit 92.928.000, 92.928.000,hoistyway liftHandraild dinding belakang 1,00 Unit 4.500.000, 9.000.000,Handrail dinding samping kiri 1,00 Unit 4.500.000, 9.000.000, Handrail dinding samping kanan 1,00 Unit 4.500.000, 9.000.000,Jumlah I.E 3.228.855.000,SUB TOTAL JUMLAH III 21.273.135.000,IV.
Register : 14-07-2016 — Putus : 16-08-2016 — Upload : 08-09-2016
Putusan PT PALU Nomor 18/Pid.Sus-TPK/2016/PT PAL
Tanggal 16 Agustus 2016 — PIEN THIONO, S.T
9565
  • MejaRapat Staff 1,00 Bh 29.000.000,00 29.000.000,00JUMLAH I!)
    4 Lain Lain Ls 1,00 15.000.000,00 15.000.000,00Total 271.500.000,00Pengadaan Kursi Kerja1 Pembelian Kayu Ms 10,00 4.500.000,00 45.000.000,00Jati / Mohogani2 Pembelian Bahan Ls 1,00 12.000.000,00 12.000.000,00Finishing3 Pembelian Kain Ls 1,00 23.500.000,00 23.500.000,004 Lain Lain Ls 1,00 3.500.000,00 3.500.000,00Total 84.000.000,00Pengadaan Kursi Sofa1 Pembelian Kayu Ms 20,00 4.500.000,00 90.000.000,00Jati / Mohogani2 Pembelian Bahan Ls 1,00 24.000.000,00 24.000.000,00Finishing3 Pembelian Kain Ls
    MejaRapat Staff 1,00 Bh 29.000.000,0029.000.000,00 JUMLAH !
    Lain Lain Ls 1,00 15.000.000,00 15.000.000,00Total 271.500.000,00Pengadaan Kursi Kerja1 Pembelian NS) 10,00 4.500.000,00 45.000.000,00Kayu Jati /Mohogani2 Pembelian Ls 1,00 12.000.000,00 12.000.000,00BahanFinishing3 Pembelian Ls 1,00 23.500.000,00 23.500.000,00Kain4 Lain Lain Ls 1,00 3.500.000,00 3.500.000,00Total 84.000.000,00Pengadaan Kursi Sofa1 Pembelian VB 20,00 4.500.000,00 90.000.000,00Kayu Jati /Mohogani2 Pembelian Ls 1,00 24.000.000,00 24.000.000,00BahanFinishing3 Pembelian Ls 1,00 41.000.000,00
    Pembelian Kain Ls 1,00 4 Lain Lain Ls 1,00 15.000.000,00 15.000.000,00Total 271.500.000,00Pengadaan Kursi Kerja1 Pembelian Kayu M3 10,00 4.500.000,00 45.000.000,00Jati / Mohogani2 Pembelian Bahan Ls 1,00 12.000.000,00 12.000.000,00Finishing3 Pembelian Kain Ls 1,00 23.500.000,00 23.500.000,004 Lain Lain Ls 1,00 3.500.000,00 3.500.000,00Total 84.000.000,00Pengadaan Kursi Sofa1 Pembelian Kayu Ms 20,00 4.500.000,00 90.000.000,00Jati / Mohogani2 Pembelian Bahan Ls 1,00 24.000.000,00 24.000.000,00Finishing3
Register : 24-07-2013 — Putus : 16-09-2013 — Upload : 07-10-2013
Putusan PN MARABAHAN Nomor 123/Pid.Sus/2013/PN.Mrb
Tanggal 16 September 2013 — TAUFIK RIDANIANSYAH BIN JUMANSYAH
369
  • Memerintahkan agar barang bukti berupa : - 1 (satu) paket narkotika Gol I jenis sabu seberat 1,00 gram (1 koma nol ), - 1 (satu) buah HP Noxia tipe X2 Dirampas untuk dimusnahkan.6. Membebankan kepada Terdakwa untuk membayar biaya perkara sebesar Rp. 2.000,00 (dua ribu rupiah) ;
    Menyatakan barang bukti berupa : 1 (satu) paket narkotika Gol I jenis sabu seberat 1,00 gram (1 koma nol ); 1 (satu) buah HP Noxia tipe X2, dirampas untuk dimusnahkan.5.
    Batola;e Bahwa benar terdakwa membawa Narkotika Golongan I jenis sabusebanyak 1 (satu) paket dengan berat kotor 1,00 (satu koma nol nol) gramyang terdakwa masukkan ke dalam kantong celana depan sebelah kiri;e Bahwa benar Narkotika Golongan I jenis sabu sebanyak 1 (satu) paketdengan berat kotor 1,00 (satu koma nol nol) gram terdakwa dapatkan dariSdr. AHIM yang berada di daerah Pekapuran yang menyuruh terdakwauntuk mengantarkannya kepada Sdr.
    AHIM menyerahkan (satu) paket dengan beratkotor 1,00 (satu koma nol nol) gram sabu, diamengatakan bahwa barangtersebut seharga Rp. 1.800.000, (satu juta delapan ratus ribu rupiah) untukpembayaran dan upah terdakwa sebesar Rp. 100.000, (seratus ribu rupiah)akan diberikan oleh Sdr.
    Batola;Bahwa benar terdakwa membawa Narkotika Golongan I jenis sabusebanyak 1 (satu) paket dengan berat kotor 1,00 (satu koma nol nol) gramyang terdakwa masukkan ke dalam kantong celana depan sebelah kiri;Bahwa benar Narkotika Golongan I jenis sabu sebanyak (satu) paketdengan berat kotor 1,00 (satu koma nol nol) gram terdakwa dapatkan dariSdr. AHIM yang berada di daerah Pekapuran yang menyuruh terdakwauntuk mengantarkannya kepada Sdr.
    Memerintahkan agar barang bukti berupa :e 1 (satu) paket narkotika Gol I jenis sabu seberat 1,00 gram (1 koma nol ),e 1 (satu) buah HP Noxia tipe X2Dirampas untuk dimusnahkan.6.
Register : 21-06-2016 — Putus : 07-10-2016 — Upload : 29-03-2017
Putusan PN PALU Nomor 36/Pid.Sus-TPK/2016/PN Pal
Tanggal 7 Oktober 2016 — MOH. DALLE SUTOMO, ST.,MT
8611
  • Direksi Keet 1,00 M 904.000,00 904.000,003. Papan Proyek 1,00 Bh 335.610,00 335.610,004. Pengukuran Lokasi/ Uizet 1,00 Ls 730.000,00 730.000,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 i 23.321 ,03 174,961.369,80Ill PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 135.850,00 135.850,003.
    Direksi Keet 1,00 M 950.000,00 900.000,003. Papan Proyek 1,00 Bh 336.539,00 335.742,004. Pengukuran Lokasi/ Uizet 1,00 Ls 700.000,00 745.500,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 M 23.321 ,68 174,966.250,58lll PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003.
    Direksi Keet 1,00 M 950.000,00 950.000,003. Papan Proyek 1,00 Bh 336.132,50 336.132,504. Pengukuran Lokasi/ Uizet 1,00 Ls 719.000,00 719.000,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 M 23.323,31 174.966.250,58lll PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003.
    Direksi Keet 1,00 M 900.000,00 900.000,003. Papan Proyek 1,00 Bh 335.742,00 335.742,004. Pengukuran Lokasi/ Uizet 1,00 Ls 745.500,00 745.500,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 M 23.321 ,68 174.966.250,58lll PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003.
    Direksi Keet 1,00 M 985.000,00 985.000,003. Papan Proyek 1,00 Bh 337.440,40 337.440,404. Pengukuran Lokasi/ Uizet 1,00 Ls 725.000,00 725.000,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 MP 23.321,03 174.961.369,80Ill PEKERJAAN LAINLAIN1. Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003. Penggambaran Asbuilt Draw ing 1,00 Set 261.250,00 261.250,004. Pencetakan Asbuilt Draw ing 1,00 Set 187.550,00 187.550,005.
Register : 21-06-2016 — Putus : 07-10-2016 — Upload : 21-02-2017
Putusan PN PALU Nomor 31/Pid.Sus-TPK/2016/PN Pal
Tanggal 7 Oktober 2016 — HEIN MOPANTAW Alias KO'HEIN
162116
  • Direksi Keet 1,00 M 950.000,00 950.000,003. Papan Proyek 1,00 Bh 336.132,50 336.132,504. Pengukuran Lokasi/ Uizet 1,00 Ls 719.000,00 719.000,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 M 23.323,31 174.966.250,58lll PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003.
    Direksi Keet 1,00 M 985.000,00 985.000,003. Papan Proyek 1,00 Bh 337.440,40 337.440,404. Pengukuran Lokasi/ Uizet 1,00 Ls 725.000,00 725.000,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 M 23.321 ,03 174.961 .369,80Ill PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 897.000,00 897.000,002. Dokumentasi 1,00 Set 133.650,00 133.650,003.
    Direksi Keet 1,00 M 900.000,00 900.000,003. Papan Proyek 1,00 Bh 335.742,00 335.742,004. Pengukuran Lokasi/ Uizet 1,00 Ls 745.500,00 745.500,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.50230 M 23.321 ,68 174.966.250,58lll PEKERJAAN LAINLAIN1 Demobilisasi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003.
    Direksi Keet 1,00 M 950.000,00 900.000,003. Papan Proyek 1,00 Bh 336.539,00 335.742,004. Pengukuran Lokasi/ Uizet 1,00 Ls 700.000,00 745.500,00ll PEKERJAAN NORMALISASI1. Galian Tanah dengan alat berat 7.502,30 M 23.321 ,68 174,966.250,58Ill PEKERJAAN LAINLAIN1. Demobilis asi 1,00 Ls 895.500,00 895.500,002. Dokumentasi 1,00 Set 136.950,00 136.950,003. Penggambaran Asbuilt Draw ing 1,00 Set 286.000,00 286.000,004. Pencetakan Asbuilt Draw ing 1,00 Set 189.200,00 189.200,005.
Putus : 03-08-2015 — Upload : 02-11-2015
Putusan PN PALEMBANG Nomor 915/Pid.Sus/2015/PN.Plg
Tanggal 3 Agustus 2015 — Hendri als Hen Bin Ibrahim
184
  • Menetapkan barang bukti berupa : shabu seberat 1,00 gram (sisa dari laboratorium Forensik Palembang), 1 (satu) lembar celana levis warna hitam merk Lee Out dirampas untuk dimusnahkan;;6. Membebankan kepada terdakwa membayar biaya perkara sejumlah Rp.5.000,- (lima ribu rupiah);
    Bahwa barang bukti berupa shabu sebanyak 1,00 gram (sisa darilaboratorium forensik cabang Palembang),1 buah jaket dan 1 (satu)buah kotak rokok Sampoerna ditemukan pada badan terdakwa.Atas keterangan saksi tersebut, terdakwa membenarkannya;2. Saksi Deni Abdul Muin lahir di Palembang, 31 Desember 1984, PekerjaanPolri, Pendidikan terakhir SMA, Kewarganegaraan Indonesia, Agama Islam,alamat JI.
    dari membeli dengan Bayu (DPO);Bahwa menurut pengakuan terdakwa barang bukti berupa 3 (tiga) paketshabu 1,00 gram tersebut akan dikonsumsi/pakai bersama temannyaImam .Bahwa terdakwa menyimpan shabu tersbut tanpa seizing dari pihak yangberwenang.Bahwa barang bukti berupa shabu sebanyak 1,00 gram (sisa darilaboratorium forensik cabang Palembang),1 buah jaket dan 1 (satu) buahkotak rokok Sampoerna ditemukan pada badan terdakwa.Menimbang, bahwa Penuntut Umum mengajukan barang bukti sebagaiberikut: shabu
    peroleh dari membeli dengan Bayu (DPO); Bahwa menurut pengakuan terdakwa barang bukti berupa 3 (tiga) paketshabu 1,00 gram tersebut akan dikonsumsi/pakai bersama temannyaImam .
    Bahwa pada saat ditangkap saat itu sedang berada diatas sepeda motormiliknya dan mencurigakan; Bahwa setelah dilakukan penangkapan dan langsung dilakukanpenangkapan terhadap terdakwa dan dtemukan berupa 3 (tiga) paketshabu 1,00 gram didalam saku celana levis Lee Out yang terdakwa pakai.
    Menetapkan barang bukti berupa : shabu seberat 1,00 gram (sisa darilaboratorium Forensik Palembang), 1 (Satu) lembar celana levis warna hitammerk Lee Out dirampas untuk dimusnahkan;;6.
Putus : 07-03-2017 — Upload : 29-05-2019
Putusan MAHKAMAH AGUNG Nomor 2031 K/PID.SUS/2016
Tanggal 7 Maret 2017 — JONI B. RAMLI, S.T.
10653 Berkekuatan Hukum Tetap
  • Flanged Socket @ 4 1,00 bh 163.125,00 163.125,003. Flanged Spigot 1,00 bh 163.125,00 163.125,00 Hal. 2 dari 55 hal. Putusan Nomor 2031 K/PID.SUS/2016 4, All Socket Tee PVC 2,00 bh 177.500,00 355.000,00G4 x G35. All Socket Tee PVC 1,00 bh 185.000,00 185.000,00O4"x@46. All Socket Tee PVC 2,00 bh 148.000,00 296.000,00G3 xO 37. All Socket Tee PVC 2,00 Bh 85.000,00 170.000,00@ 28. Gate Valve @ 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC 3 2,00 Bh 38.062,50 76.125,0010.
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 1,00 Bh 1.495.312,50 1.495.312,504All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00a. Flanged Sigot PVC @ 1,00 Bh 163.125,00 163.125,004b. All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4c. Paking Karet 4 * 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block Beton 1,00 PktGalian Tanah Biasa 3,00 M? 24.990,00 74.970,00Urugan Tanah 1,00 M?
    1,00 550.000,00 550.000,00 Pengecetan M2 20,13 0,00 20,13 23.004,45 463.079,58Pekerjaan6.
    ACCESSIRIESPENGURASAll Flanged Gate Valve 1,00 Bh 1.495.312,50 1.495.312,504All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00 Hal. 15 dari 55 hal. Putusan Nomor 2031 K/PID.SUS/2016 d. Flanged Sigot PVC 1,00 Bh 163.125,00 163.125,004e. All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @4*f.
    ACCESSIRIESPENGURASAll Flanged Gate Valve 1,00 Bh 1.495.312,50 1.495.312,504All Flanged tee PVC 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00g. Flanged Sigot PVC @ 1,00 Bh 163.125,00 163.125,004h. All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @4*i. Paking Karet 4 5,00 Bh 17.500,00 87.500,00ur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block Beton 1,00 PktGalian Tanah Biasa 3,00 M? 24.990,00 74.970,00Urugan Tanah 1,00 M?
Register : 16-10-2015 — Putus : 25-01-2016 — Upload : 28-07-2016
Putusan PN PALU Nomor 55/Pid.Sus-TPK/2015/PN Pal
Tanggal 25 Januari 2016 — JONI B. RAMLI, ST
9535
  • Flanged Socket @ 1,00 bh 163.125,00 163.125,0043. Flanged Spigot 1,00 bh 163.125,00 163.125,004. All Socket Tee 2,00 bh 177.500,00 355.000,00PVC @ 4 x @35. All Socket Tee 1,00 bh = 185.000,00 185.000,00PVC 4 x O46. All Socket Tee 2,00 bh = 148.000,00 296.000,00PVC @ 3 x @37. All Socket Tee = 2,00 Bh 85.000,00 170.000,00PVC 28. Gate Valve @ 4 1,00 bh 1.495.312,50 1.495.312,509. Dop PVC @ 3 2,00 Bh 38.062,50 76.125,0010. Dop PVC @ 2 2,00 bh = 32.625,00 65.250,0011.
    /181.863.25 545.589.75PEK.ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh 1.495.312,50 1.495.312,50Valve 4All Flanged tee 1,00 Bh 525.000,00 525.000,00PVC @ 4Flanged Socket 1,00 Bh 163.125,00 163.125,00PVC @ 4Flanged Sigot PVC 1,00 Bh 163.125,00 163.125,004All Flanged Bend /1,00 Bh 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,065Pembuatan Block 1,00 Pkt.
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh = 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh 1.495.312,50 1.495.312,50Valve @ 4All Flanged tee PVC /1,00 Bh 525.000,00 525.000,00O4Flanged Socket PVC 1,00 Bh 163.125,00 163.125,00O4Flanged Sigot PVC @ 1,00 Bh 163.125,00 163.125,00AAll Flanged Bend 1,00 Bh = 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,065.
    ACCESSIRIES PENGURASAll Flanged Gate Valve 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC 4 1,00 Bh 375.000,00 375.000,00Paking Karet 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block Beton 1,00 PktGalian Tanah Biasa 3,00 MSs 24.990,00 74.970,00Urugan Tanah 1,00 Ms 11.980,00 11.980,00Beton
Register : 28-01-2019 — Putus : 09-05-2019 — Upload : 13-05-2019
Putusan PN DENPASAR Nomor 90/Pid.Sus/2019/PN Dps
Tanggal 9 Mei 2019 — Penuntut Umum:
I Wayan Sutarta, SH
Terdakwa:
Moch. Rizal
2313
  • 7) 1 (Satu) plastik klip didalamnya berisi berisi 19 (Sembilan belas)paket plastik klip masing-masing berisi kristal bening yang mengandung sediaan Narkotika (Shabu) (Kode C7) dengan rincian :

    • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7a);
    • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7b);
    • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7c);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7d);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7e);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7f);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7g);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7h);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7i);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7j);
  • Berat
    1,00 gram brutto atau 0,77 gram netto Kode (C7k)
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7l);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7m);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7n);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7o);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7p);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7q);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode
    (C7r);
  • Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7s).
  • Berat 1,00 gram brutto atau 0,78 gram netto Kode (C9b1);
  • Berat 1,00 gram brutto atau 0,78 gram netto Kode (C9b2);
  • Berat 1,00 gram brutto atau 0,78 gram netto Kode (C9b3);
  • Berat 1,00 gram brutto atau 0,78 gram netto Kode (C9b4);
  • Berat 1,00 gram brutto atau 0,78 gram netto Kode (C9b5);
  • Berat 1,00 gram brutto atau 0,78 gram netto Kode (C9b6).
    gram brutto atau 0,77 gram netto Kode (C7a); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7b); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7c); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7d); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7e); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7f); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7Q); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7h); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C71); Berat 1,00
    gram brutto atau 0,77 gram netto Kode (C7)); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7k) Berat 1,00 gram brutto atau 0,77 gram netto Kode (C71); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7m); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7n); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C70); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7p); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7q); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7r); Berat 1,00
    gram brutto atau 0,77 gram netto Kode (C7a);Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7b);Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7c);Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7d);Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7e);Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7f);Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7Q);Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7h);Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7i);Berat 1,00 gram
    gram brutto atau 0,77 gram netto Kode(C7a); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7b); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7c); Berat 1,00 gram brutto atau 0,77 gram netto Kode(C7d); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7e); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7f); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7g); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7h); Berat 1,00 gram brutto atau 0,77 gram netto Kode (C7i); Berat 1,00
    (C9b1);= Berat 1,00 gram(C9b2); Berat 1,00 gram(C9b3);.