Ditemukan 395 data

Urut Berdasarkan
 
Register : 14-03-2019 — Putus : 29-07-2019 — Upload : 18-09-2019
Putusan PN BANDUNG Nomor 26/Pid.Sus/TPK/2019/PN.Bdg
Tanggal 29 Juli 2019 — Sumargo, BE, SE Msi bin alm Suwardji
6933
  • 36,510.50 692,969.292Buangan Bekas Kupasan 18.98 18.98 ms 36,943.75 701,192.383Pasang lapisan Stenslaag 5/7 120.00 m2 30,664.13 3,679,695.604Pasang prime Coat 120.00 m2 10,135.45 1,216,254.005Pasang ATBL (Sporadis) 7.50 7.50 Ton 1,437,970.34 10,784,777.556Penghamparan Lataston (Tebal rata2 3cm) 3,472.00 1,491.62 m? 97,663.20 145,676,382.38Jumlah Sub Total 162,751,271.20Pek Konstruksi Dinding Penahan TanahB (DPT) P=45m T=1,502,50 m 1Galian tanah Kosntruksi 24.00 104.00 m?
Register : 30-01-2014 — Putus : 20-06-2014 — Upload : 20-03-2015
Putusan PN MATARAM Nomor 4/PID.SUS/TPK/2014/PN.MTR
Tanggal 20 Juni 2014 — - 1.JOKO WIDIGNO - 2.HERY WIJAYA, ST
6550
  • Expanolit Kg 30.000, 4,00 120.000,) 4,00 120.00 52 00 00 0,009. Pintu besi M2 2.100.0 18,46 38.766.0 19,24 40.404harmonika KW 00,00 00,00 .000,0010. Pintu aluminium) M2 300.000 10,40 3.120.000 0,00 00rolling door 00 0,0011. Tulisan nama Uni 0,00 00GOR warna temas Timbul12. Pek. Pabrikasi WF Kg 17.688, 17.310 306.181. /153,83 179.6000 14 756,32 0.945,0413. Goding Kanal Kg 17.688, 6.947, 122.895. 581,91 151.7900 96 514,71 6.824,0814.
Register : 14-03-2019 — Putus : 29-07-2019 — Upload : 09-10-2019
Putusan PN BANDUNG Nomor 27/Pid.Sus-TPK/2019/PN Bdg
Tanggal 29 Juli 2019 — Penuntut Umum:
ROHMAN
Terdakwa:
1.HM. SUYONO bin alm MASKANDI
2.DANIEL DEFRETES, SE Bin alm HENDRIK DEFRETES
3.KADILA bin alm KASARI
9847
  • 120.00 m 30,664.13 3,679,695.604Pasang prime Coat 120.00 m 10,135.45 1216 254.005 Pasang ATBL (Sporacdis) 7.50 7.50 Ton 1437 570.34 10,784, 777.556 /P enghamparan Lataston (Tebalrata2 3cmi 3,472.00 149162 m? 97 663.20 145,676,382 38Jumlah Sub Total 162,751,271.20Pek Konstruksi Dinding P enahan TanahB DPT) P=45m T=1,502,50 m 1)Galian tanah Kosritruksi 24.00 104.00 r? 36,510.50 3,797 ,092.002 Buangan Bekas Kupasan 24.00 104.00 m? 36,943.75 3,642,750.003Urugan Sirtu 12.00 60.00 m?
Putus : 24-11-2014 — Upload : 12-01-2015
Putusan PN PALEMBANG Nomor Nomor 114/Pdt.G/2014/PN.Plg
Tanggal 24 Nopember 2014 — DRS. AFFANDI BENAIM, Lawan 1. SULAIMAN SALIM, , dkk
271
  • (11) 1(11) TaETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 338.00 155.00 Tm/F12 1 TE(27) TodETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 341.00 155.00 Tm/E1lZ 2 DE(11) 1(11) 1(11) ToETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 351.00 155.00 Tm21TJ/F12 1 TE(73) 2(67) 2(40) 1(46) 2(46) 2(46) 2(37) TdETQqBT0.000 0.000 0.000 rg8.00 0.00 0.00 8.00 398.00 158.00 Tm/F12 1 TE(60) TJETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 161.00 120.00 Tm/F12 1 TE(43) 1(35) 2(22) 1(5) 2(10) 1(id) 1(51) 1(5
    ) 2(134) 2(5S) 2(11) 1(3321) 2(ye 2(10) 1(11) 1(43) 1(S) 2(3) 2(5) 2( KTQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 287.00 120.00 Im/F12 1 TE(11) ToETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 290.00 120.00 Im/F12 1 TE(27) TdETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 293.00 120.00 Tm/F12 1 TE(11) ToETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 297.00 120.00 Tm/F12 1 TE(42) 1(23) 2(67)(40) 1(50) 2(46) 2(46) 2(40) 1(46) 2(46) 2(46) 2(40) 1(46) 2(46) 2(46) 2(24) 1(77) TdETQendstreamendobj52
Putus : 17-02-2014 — Upload : 18-11-2014
Putusan PN SAMARINDA Nomor 24/Pid.Tipikor/2013/PN.Smda
Tanggal 17 Februari 2014 — ILHAM GANI, M.Pd Bin IMBRAN GANI
8214
  • 0 kontrak3 Kompor unit 1.500.00 1 1.500.0 0 Tidak ada 1.500.000Listrik 0 004 Wash Basin set 1.500.00 1 1.500.0 0 Tidak ada 1.500.0000 005 Tempat set 3.250.00 1 3.250.0 1 Sesuai Tidur 0 00 kontrak6 Tempat set 3.250.00 4 13.000. 0 Tidak ada 13.000.000Tidur 0 0007 Kasur, set 1.995.00 9 17.955. 0 Tidak ada 17.955.000bantal, sprei 0 000& sarungbantal8 Toilet buah 1.500.00 1 1.500.0 0 Tidak ada 1.500.000Jongkok 0 009 Lemari set 1.700.00 1 1.700.0 0 Tidak ada 1.700.000Dapur 0 0010 Wajan buah 120.000 1 120.00
    Kunci Pass set 450.000 450.00 Tidak ada 450.000Ring 06 Kunci Shock set 450.000 450.00 Tidak ada 450.00007 Obeng Plus set 100.000 100.00 Tidak ada 100.00008 Obeng set 100.000 100.00 Tidak ada 100.000Minus 09 Gerinda unit 1.500.00 1.500.0 Tidak ada 1.500.000Listrik 0 0010 Mata Bor set 200.000 200.00 Tidak ada 200.000011 Bor Listrik unit 1.500.00 1.500.0 Tidak ada 1.500.0000 0012 Palu 1 kg ea 340.000 340.00 Tidak ada 340.000013 Palu 2 kg ea 334.000 334.00 Tidak ada 334.000 83 14 Tang ea 120.000 1 120.00
    0 Tidak ada 120.000Kakaktua 015 Avo meter unit 670.000 1 670.00 0 Tidak ada 670.000016 Tool Box ea 1.600.00 1 1.600.0 0 Tidak ada 1.600.0000 0017 Senter ea 195.000 2 390.00 0 Tidak ada 390.000018 Solder ea 120.000 1 120.00 0) Tidak ada 120.000Listrik 019 Aerometer unit 1.500.00 1 1.500.0 0 Tidak ada 1.500.0000 00I Sistem Pipa1 Pipa Bahan set 3.250.00 1 3.250.0 1 Sesuai Bakar 0 00 kontrak2 Pipa Air set 1.650.00 1 1.650.0 1 Sesuai Tawar 0 00 kontrak3 Pipa set 1.650.00 1 1.650.0 0 Tidak ada 1.650.000Pembuangan
Putus : 13-02-2014 — Upload : 18-11-2014
Putusan PN SAMARINDA Nomor 25/PID.TIPIKOR/2013/PN.SMDA
Tanggal 13 Februari 2014 — HASNELY HAMZAH Binti HAMZAH
10222
  • 0 kontrak3 Kompor unit 1.500.00 1 1.500.0 0 Tidak ada 1.500.000Listrik 0 004 Wash Basin set 1.500.00 1 1.500.0 0 Tidak ada 1.500.0000 005 Tempat set 3.250.00 1 3.250.0 1 Sesuai Tidur 0 00 kontrak6 Tempat set 3.250.00 4 13.000. 0 Tidak ada 13.000.000Tidur 0 0007 Kasur, set 1,995.00 9 17.955. 0 Tidak ada 17.955.000bantal, sprei 0 000& sarungbantal8 Toilet buah 1.500.00 1 1.500.0 0 Tidak ada 1.500.000Jongkok 0 009 Lemari set 1.700.00 1 1.700.0 0 Tidak ada 1.700.000Dapur 0 0010 Wajan buah 120.000 1 120.00
    Kunci Pass set 450.000 450.00 Tidak ada 450.000Ring 06 Kunci Shock set 450.000 450.00 Tidak ada 450.00007 Obeng Plus set 100.000 100.00 Tidak ada 100.00008 Obeng set 100.000 100.00 Tidak ada 100.000Minus 09 Gerinda unit 1.500.00 1.500.0 Tidak ada 1.500.000Listrik 0 0010 Mata Bor set 200.000 200.00 Tidak ada 200.000011 Bor Listrik unit 1.500.00 1.500.0 Tidak ada 1.500.0000 0012 Palu 1 kg ea 340.000 340.00 Tidak ada 340.000013 Palu 2 kg ea 334.000 334.00 Tidak ada 334.000 83 14 Tang ea 120.000 1 120.00
    0 Tidak ada 120.000Kakaktua 015 Avo meter unit 670.000 1 670.00 0 Tidak ada 670.000016 Tool Box ea 1.600.00 1 1.600.0 0 Tidak ada 1.600.0000 0017 Senter ea 195.000 2 390.00 0 Tidak ada 390.000018 Solder ea 120.000 1 120.00 0 Tidak ada 120.000Listrik 019 Aerometer unit 1.500.00 1 1.500.0 0 Tidak ada 1.500.0000 00I Sistem Pipa1 Pipa Bahan set 3.250.00 1 3.250.0 1 Sesuai Bakar 0 00 kontrak2 Pipa Air set 1.650.00 1 1.650.0 1 Sesuai Tawar 0 00 kontrak3 Pipa set 1.650.00 1 1.650.0 0 Tidak ada 1.650.000Pembuangan
Register : 01-07-2015 — Putus : 10-11-2015 — Upload : 02-12-2015
Putusan PTUN AMBON Nomor 13/G/2015/PTUN.ABN
Tanggal 10 Nopember 2015 — ELISA RIEUWPASSA, DKK, Sebagai Para Penggugat M E L A W A N 1. SANIRI NEGERI SAMETH, Sebagai Tergugat I 2. BUPATI MALUKU TENGAH, Sebagai Tergugat II
263119
  • 825.00 Tm/F10 1 TF(4) 157(14) TdETQgBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 512.00 825.00 Tm/F10 1 TE(25) TdETQqBI((((0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 520.00 825.00 Tm/F10 1 TE(15) 3(4) ToETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 530.00 825.00 Tm/F10 1 TE(110) 2(105) 1(122) TJETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 552.00 825.00 Tm/F10 1 TE(4) TuETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 113.00 797.00 Tm/ELO 2 DE(111) ToETQqBr0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 120.00
Upload : 13-09-2018
Putusan PN BANDUNG Nomor 89/Pid.Sus-TPK/2017/PN.Bdg
ASEP RIDWANSYAH Bin AMIR ;
4922
  • ADDn 000, onalTPPKK 3.4 Penunjang 16 Oran 150.00 2.400.000, ADDOperasi g 0, onal RT 3.5 PenunjangOran 125.00) 1.250.000,Operasi 10 ADDg 0, onalLinmas 3.6 Pembinaan Tahu 609.601 609.600, ADDGenera n 0,si Muda Sub Total 3 4 BelanjaPembanguna Halaman 11 dari 116 Putusan Nomor :89/Pid.Sus/TPK / 2017/PN.Bdg nInfrastrukturDesa4.1 PlesterisasiGang4.1.1 Batu 3 213.00 17.466.00082 m ADDSplit 2/3 0, 74.1.2 Pasir 5 200.00 9.600.000,48 m ADDBeton 0, 4.1.3 Semen 40 70.000 28.000.000Zak ADD0 :~4.1.4 Pasir g 120.00
Register : 06-11-2014 — Putus : 24-12-2014 — Upload : 30-12-2014
Putusan PA TRENGGALEK Nomor 1624/Pdt.G/2014/PA.TL.
Tanggal 24 Desember 2014 — PEMOHON DAN TERMOHON
132
  • 5) 2(55) 1(56) 2(23) 1(5) 2(472) 2(6) 276(51) 2(4) 1(502) 2(54) 2(6) TJETQgBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 134.00 725.00 Tm/F8 1 TE(23) 144) 21251) 22) 223) 16) 123) 14) 15) 245) 245) 22) 23) 16) 154) 24) 15) 245)45)2) 26) 15044) 2462) 2132) 25) 2((((((((((((((((( 2( 2(((((((45) TJETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 301.00 725.00 Tm/F8 1 Tf(62) ToETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 113.00 705.00 Tm/F8 1 Tf(17) ToETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 120.00
    0.000 rg12.00 0.00 0.00 12.00 276.00 685.00 Tm/E8 1 TE(61) 2(2) 2(72) 1(22) 2(2) 2(22) 2(56) 2(4654) 2(56) 2(3) TdETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 340.00 685.00 Tm/F8 1 Tf(736) TaoETQqBr0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 348.00 685.00 Tm/F8 1 Tf(23) 12) 25) 2472) 26) 10.000 0.000 0.000 rg12.00 0.00 0.00 12.00 468.00 685.00 Tm/F8 1 Tf(62) 1(6) 1(62) TdETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 113.00 665.00 Tm/F8 1 Tf(67) ToETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 120.00
    525.00 Tm/F8 1 Tf(6) TuETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 441.00 525.00 Tm/F8 1 Tf(23) 1(44) 2(131211) 2(54) 2(11) 2(5) 2(6) 305(23) 1(4) 1(22) 2(2) 2(466) TJKTQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 134.00 505.00 Tm/F8 1 Tf(1244) 2(VS) 2(45) 2(2) 2(4656) 2(4) 1(Ye) 2(472) TJKTQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 205.00 505.00 Tm/F8 1 Tf(62) TJETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 113.00 485.00 Tm/F8 1 Tf(15) ToETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 120.00
Register : 21-05-2019 — Putus : 09-10-2019 — Upload : 21-10-2019
Putusan PN BANDA ACEH Nomor 35/Pid.Sus-TPK/2019/PN Bna
Tanggal 9 Oktober 2019 — Penuntut Umum:
ZILZALIANA, SH.
Terdakwa:
SAPTA MARGA, ST Bin Alm. RABUMAN SANTOSO
11958
  • M2 20,818.0 Bertamb00 0 ahLaston Lapis Pengikat (AC M3 904.40 M3 1,040.90 BertambBC) ahLapis Pengikat Aspal Beton Ton 120.00 Ton 96.45 Kurang(ACBC) LevellingLapis Pondasi (ACBase) M3 985.16 M3 896.61 BerkurangDIVISI 7 STRUKTURBeton K250 M3 1,261.6 M3 1,1300.90 Tambah2Beton K175 M3 56.32 M3 6.53 Kurang Halaman 18 dari 234 Putusan Nomor 35/Pid.SusTPK/2019/PN Bna Baja tulangan U24 Polos M3 63,081.
    M2 20,818.0 Bertamb00 0 ahLaston Lapis Pengikat (AC M3 904.40 M3 1,040.90 BertambBC) ahLapis Pengikat Aspal Beton Ton 120.00 Ton 96.45 Kurang(ACBC) LevellingLapis Pondasi (ACBase) M3 985.16 M3 896.61 BerkurangDIVISI 7 STRUKTURBeton K250 M3 1,261.6 M3 1,1300.90 Tambah2Beton K175 M3 56.32 M3 6.53 KurangBaja tulangan U24 Polos M3 63,081. M3 58,407.04 Kurang00Pasangan Batu (Manual) M3 753.22 M3 00.00 KurangDIVISI 8 PENGEMBALIAN KONDISI dan PEK.
Register : 06-08-2014 — Putus : 17-12-2014 — Upload : 12-01-2015
Putusan PA SLAWI Nomor 1945_Pdt.G_2014_PA.Slw
Tanggal 17 Desember 2014 — PENGGUGAT vs TERGUGAT
2133
  • 44133747) 1(46) 2(5046) 2(L31) 2(43) 2(L15146) 2(1146) TdKTQ0.000 0.000 0.000 RG1.10 w0 J 0345 11.00 M0.00 d113.00 692.00 m221.00 692.00 1SqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 221.00 695.00 Tm/F8 1 Tf(13) ToETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 224.00 695.00 Tm/F8 1 Tf(12) TuETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 110.00 666.00 Tm/F8 1 TE(1423) TdETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 117.00 666.00 Tm/F8 1 Tf(13) ToETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 120.00
    2(22) 2(46) 1(11) 2(46) 1(44) TJETQqBT0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 194.00 666.00 Tm/F8 1 Tf(13) ToETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 311.00 666.00 Tm/F8 1 Tf(40) 2(5323) TdETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 339.00 666.00 Tm/F8 1 Tf(6626232626266154) TdKTQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 110.00 651.00 Tm/F8 1 Tf(2523) TdETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 117.00 651.00 Tm/F8 1 Tf(13) ToETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 120.00
    144131) 143) 1da 25146) 111) 246) TdETQqBT0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 260.00 651.00 Tm/F8 1 Tf(13) TuETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 311.00 651.00 Tm/F8 1 Tf(40) 2(5323) TdETQqBr0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 339.00 651.00 Tm/F8 1 TE(1726232626266154) TJETQgqBT0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 110.00 637.00 Tm/F8 1 Tf(6623) TdETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 117.00 637.00 Tm/F8 1 Tf(13) ToETQqBr0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 120.00
    10.00 186.00 637.00 Tm/F8 1 Tf(13) ToETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 311.00 637.00 Tm/F8 1 Tf(40) 2(5323) TdETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 339.00 637.00 Tm/F8 1 TE(25142623262626) TdETQqBT0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 372.00 637.00 Tm/F8 1 Tf(6154) TdETQqBr0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 110.00 622.00 Tm/F8 1 Tf(1623) TdETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 117.00 622.00 Tm/F8 1 Tf(13) ToETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 120.00
    (40) 2(43) 1(2146) 1(S152) 1(47) TJETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 152.00 622.00 Tm/F8 1 Tf(13) ToETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 311.00 622.00 Tm/F8 1 Tf(40) 2(5323) TdETQqBr0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 339.00 622.00 Tm/F8 1 Tf(17232626266154) TdETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 110.00 608.00 Tm/F8 1 TE(1723) TdETQqBI0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 117.00 608.00 Im/F8 1 Tf(13) ToETQqBr0.000 0.000 0.000 rg10.00 0.00 0.00 10.00 120.00
Register : 22-01-2019 — Putus : 11-06-2019 — Upload : 31-07-2019
Putusan PN MAKASSAR Nomor 9/Pid.Sus-TPK/2019/PN Mks
Tanggal 11 Juni 2019 — Penuntut Umum:
H.Nasaruddin Agussalim,SH.MH
Terdakwa:
H. BANTENG KADANG, SE Alias BANTENG Alias BAPA ANDA Alias NENE PADEL Bin KADANG
10848
  • .347.00 00.000 7.847.0Mekanisme Negeri (UIN) 2015 0 00Pengaturan Alauddin ditentang Makassar, MakassaKeuangan Desa Charakter rberdasarkan BildingPermendagri ProgramNomor 23 (CBP)Tahun 2000Menilai LKP Lembaga 25 s/d 92 222.dan Fungsi Penelitian 28 Juni .312.25 130.50 812.Pemeriksaan dan 2015 0 0.000 250BPK Pengemban diberdasarkan gan Sumber MakassaUU No.15 daya rTahun 2004 Yayasandan UU No.15 Wakaf UMITahun 2006 (UniversitasMuslimIndonesia)Peningkatan Universitas 05 s/d 3 4.5Kapasitas Islam 08 .120.00
Register : 04-02-2019 — Putus : 20-06-2019 — Upload : 26-06-2019
Putusan PN BENGKULU Nomor 20/Pid.Sus-TPK/2019/PN Bgl
Tanggal 20 Juni 2019 — Penuntut Umum:
RENOL WENDI SH
Terdakwa:
TASNUL IKHWAN Bin M. IDRUS NUR Alm
8552
  • 7,900.00 8,690.007.9.1 Pasangan Batu M3 110.00 598.1437.11.(6) Expansion Joint tipe baja M1 24.00 32.00bersudut7.12(2) Perletakan Elastromerik alam Bh 8.00 10.00Uk 1(00x350x36Mm)7.13.(1) Sandaran (Railing) M1 63.20 63.807.14.(1) Papan Nama Jembatan Bh 2.00 2.007.16(2)b Pipa Drainase baja diameter M3 8.00 8.00100 mmDIV.VIII PENGEMBALIANKONDISI DANPEK.MINOR8.4.(2) Marka Jalan Termoplastik M2 18.72 8.4.(3.a) Rambu jalan tunggal dengan Bh 2.00 2.00permukaan pemantul engineergrade8.4.(5) Patok Pengarah Bh 120.00
    120.00 Putusan Nomor 20/ Pid.SusTpk/2019/PN.Bgl Hal 101 dari 271 Bahwa serah terima pertama Pekerjaan (PHO) dilaksanakan padatanggal 16 september 2015 ;Bahwa hasil serah terima pertama Pekerjaan (PHO) berdasarkan beritaacara hasil penilaian Pekerjaan nomor ; 04.06/PANPHO/JBT/B.IV/DPU/2015 dan ada temuan beberapa item, sebagaiberikut :1.
Register : 01-10-2014 — Putus : 19-01-2015 — Upload : 02-06-2016
Putusan PN TANJUNG PINANG Nomor 24/PID.SUS/TPK/2014/PN TPG
Tanggal 19 Januari 2015 — Binsar Simanjuntak Bin A. Simanjuntak
8121
  • LSLSLSM1M1M3KGUNITUNITKGKGKGKGBHKGUNITBHUNITKGKGKGBH 3,075.20 1.001.001.00144.00128.005:2220.00227.504.0016.003,346.4039,485.50120.5556.5224.009.428.0032.002.0023.637,144.00757.8716.00 144.00128.003.8610.90127.602.008.001,673.2039,485.50120.5556.5224.009.428.008.002.0023.633,752.00370.668.00 25,000.00 96,000,000.00750,000.002,000,000.003,505,700.00259,400.002,323,000.0016,473.0016,473.0012,804,000.007,804,000.0033,400.0033,400.0033,400.0033,400.0026,160.0033,400.0015,502,160.0026,160.0012,804,000.0033,400.0033,400.0033,400.00252,310.00 5,685, 120.00
    1.001.001.00144.00128.005.2220.00227.504.0016.003,346.4039,485.50120.5556.5224.009.428.0032.002.0023.637,144.00757.8716.00119,8917.58918.72149.331,235.5915.00 144.00128.003.8610.90127.602.008.001,673.2039,485.50120.5556.5224.009.428.008.002.0023.633,752.00370.668.0049.0517.58918.72134,39494.248.49 25,000.00 96,000,000.00750,000.002,000,000.003,505,700.00259,400.002,323,000.0016,473.0016,473.0012,804,000.007,804,000.0033,400.0033,400.0033,400.0033,400.0026,160.0033,400.0015,502,160.0026,160.0012,804,000.0033,400.0033,400.0033,400.00252,310.0033,400.0033,400.0033,400.0033,400.0033,400.0013,460.00Hal 173 dari 236 Putusan. 5,685, 120.00
Putus : 20-02-2018 — Upload : 19-09-2018
Putusan PN SAMARINDA Nomor 49/Pid.Sus-TPK/2017/PN.Smr
Tanggal 20 Februari 2018 —
8923
  • 1.28 1,497,410.00 1.918.182.21 1.28 1,497,410.00 1,916,684.80 1,497.41Beton K 225 dengan besi tulanganuntuk balok 20/35Bekisting m2 144.72 229,590.00 33,226,264.80 144.72 229,590.00 33,226,264.80 0.00Pembesian U 32 kg 3,150.07 20,010.00 63,032,868.68 3,150.07 20,010.00 63,032,900.70 32.02Beton K225 m3 13.86 1,497,410.00 20,754,102.60 13.86 1,497,410.00 20,754, 102.60 0.00Beton K 225 dengan besi tulanganuntuk atap dan listplankBekisting m2 610.48 229,590.00 140,160,103.20 468.00 229,590.00 107,448, 120.00
    1.28 1,497,410.00 1,918,182.21 1.28 1,497,410.00 1,916,684.80 1,497.41Beton K 225 dengan besitulangan untuk balok 20/35Bekisting m2 144.72 229,590.00 33,226,264.80 144.72 229,590.00 33,226,264.80 0.00Pembesian U 32 kg 3,150.07 20,010.00 63,032,868.68 3,150.07 20,010.00 63,032,900.70 32.02Beton K225 m3 13.86 1,497,410.00 20,754, 102.60 13.86 1,497,410.00 20,754,102.60 0.00Beton K 225 dengan besitulangan untuk atap danlistplankBekisting m2 610.48 229,590.00 140,160,103.20 468.00 229,590.00 107,448, 120.00
    luarLampu penerangan jalanmercury 250 watt buah 16.00 6,110,750.00 97,772,000.00 14.00 6,110,750.00 85,550,500.00 12,221 ,500.00Tiang lampu jalan GIP H=9m, i1 cabang unit 16.00 6,606, 180.00 105,698,880.00 14.00 6,606, 180.00 92,486,520.00 13,212,360.00Pondasi tiang lampu unit 16.00 1,793,870.00 28,701 ,920.00 14.00 1,793,870.00 25,114,180.00 3,587, 740.00Panel penerangan luar unit 2.00 3,313,320.00 6,626,640.00 2.00 3,313,320.00 6,626,640.00 0.00Instalasi lampu jalan asNYFGBY 3x2,5m titik 16.00 385, 120.00
Putus : 18-01-2016 — Upload : 02-03-2017
Putusan PN SERANG Nomor 34/Pid.Sus-TPK/2015/PN.SRG.
Tanggal 18 Januari 2016 — LAILY DWIYANI Binti H. MARHADI
8619
  • 59,200.00 0 190,985, 120.00 . 3,226.10 190,985,120.00Ul WATER JUMP.A RUN WAY1 Galian Tanah m 37,100.00 70.49 2,615,179.00 70.49 2,615,179.00 70.49 2,615,179.002 Buang Tanah Galian m 27,500.00 70.49 1,938,475.00 70.49 1,938,475.00 70.49 1,938,475.003 Base Course m 273,600.00 42.29 11,571,638.40 42.29 11,571,638.40 42.29 11,571,638.404 Polyteline m? 5,000.00 140.98 704,900.00 140.98 704,900.00 140.98 704,900.00Beton Bertulang (85 cm) m?
    37,100.00 27.20 1,009, 120.00 27.20 1,009,120.00 27.20 1,009,120.00Urug Tanah Kembali2 Dipadatkan m? 47,200.00 13.60 641,920.00 13.60 641,920.00 13.60 641,920.00Lapisan Pasir Bawah3 Penjepit m 107,500.00 3.20 344,000.00 3.20 344,000.00 3.20 344,000.004 Beton Penjepit m 6,770,415.33 15.60 105,618,479.20 15.60 105,618,479.20 15.60 105,618,479.20LONG JUMPCc BASKET1 Beton Bertulang m 6,595,428.00 1.44 9,497,416.32 1.44 9,497,416.32 1.44 9,497,416.322 Polyteline m?
Register : 16-03-2020 — Putus : 16-07-2020 — Upload : 11-11-2020
Putusan PN MATARAM Nomor 10/Pid.Sus-TPK/2020/PN Mtr
Tanggal 16 Juli 2020 — . Pidana - I WAYAN SURYAWAN, SH - LALU AZRIL SOPANDI, SE. (Terdakwa)
237143
  • m217.98.1b235,164.004,220,415.41 Bubungangentengkeramik45.28.5663,272.002,862,425.28 Rangka plafondmetal furingm2180.9611.23.a47,071.478,518,052.61 Penutup plafondKalsiboardm2180.969.747,933.008,673,955.68 List gipsum9.841,745.00 SUB TOTAL(VII)PEKERJAANATAP /PLAFOND24,274,848.98 VillPEKERJAANBESI BAJA Konci Pintuutama ( hendle+ body )bh12.2a1,257,600.00 Konci Pintu (hendle + body )bh7.0012.2b344,600.002,412,200.00 Engsel pintusekwalitasbh24.012.551,936.001,246,464.00 Engsel jendelakls bh36.012.835,920.001,293, 120.00
    m217.958.1b235,164.004,220,415.41 Bubungangenteng keramik45.248.563,272.002,862, 425.28 Rangka plafondmetal furingm2180.9611.23.a47,071.478,518,052.61 Penutup plafondKalsiboardm2180.969.747,933.008,673,955.68 List gipsum9.841,745.00 SUB TOTAL(Vil)PEKERJAANATAP /PLAFOND24,274,848.98 VillPEKERJAANBESI BAJA Konci Pintuutama ( hendle +body )bh12.2a1,257,600.00 Konci Pintu (hendle + body )bh7.0012.2b344,600.002,412,200.00 Engsel pintusekwalitasbh24.0012.551,936.001,246,464.00 Engsel jendelakls bh36.0012.835,920.001,293, 120.00
Register : 30-08-2017 — Putus : 05-12-2017 — Upload : 11-01-2018
Putusan PN KUPANG Nomor 52/Pid.Sus-TPK/2017/PN.Kpg
Tanggal 5 Desember 2017 — Drs. BENEDIKTUS BAPA SINUNG
11430
  • Pemasangan Pintu Air Bh 120.00 99.800.00 11.976.000.00Pipa PVC AW @ 3 +Acc3. Pemasangan Me 324.300.0 2.151.44 697.711.992.00Geomembrane HPDE 00,5 mm4. Pemasangan Saluran Mi 1.980.00 19.084.23 37.786.775.40Pengambilan Pipa PVCAW @ 4 + AccJumlah 762.444.767C.4 Pekerjaan TempatPenjemuran1. Pasangan Batu Kosong Ms 720.00 499.316.07 359.507.570.40Jumlah 359.507.570D. PEKERJAAN UJI COBA1. Pekerja OB 120.00 1.405.000.00 168.600.000.002. Sorkot Kayu Bh 120.00 188.000.00 22.560.000.003.
    Sekop Bh 120.00 114.500.00 13.740.000.004. Bahan Bakar Solar Lir 4.500.00 10.850.00 48.825.000.005. Bahan Bakar Bensin Lir 3.000.00 7.900.00 23.700.000.00Jumlah 277.425.000Jumlah Total 23.975.788.000 Bahwa dalam pelaksanaan pekerjaan pembangunan fisik Tambak Garam30 Ha di Raijua ada konsultan pengawas yang melakukan pengawasanterhadap pekerjaan tersebut, yaitu CV. Gakesa Konsulindo dengan kuasadirektur MELIANUS M.
Register : 04-02-2019 — Putus : 20-06-2019 — Upload : 26-06-2019
Putusan PN BENGKULU Nomor 16/Pid.Sus-TPK/2019/PN Bgl
Tanggal 20 Juni 2019 — Penuntut Umum:
RENOL WENDI SH
Terdakwa:
1.Ir. JHOINHARD Bin K. SITOMPUL Alm
2.VENY MARDIANSYAH, ST Bin SUDIRMAN JASID
7145
  • 7,900.00 8,690.007.9.1 Pasangan Batu M3 110.00 598.1437.11.(6) Expansion Joint tipe baja M1 24.00 32.00bersudut7.12(2) Perletakan Elastromerik alam Bh 8.00 10.00Uk 1(800x350x36Mm)7.13.(1) Sandaran (Railing) Mi 63.20 63.807.14.11) Papan Nama Jembatan Bh 2.00 2.007.16(2)b Pipa Drainase baja diameter M3 8.00 8.00100 mmDIV.VIII PENGEMBALIANKONDISI DANPEK.MINOR8.4.2) Marka Jalan Termoplastik M2 18.72 8.4.(3.a) Rambu jalan tunggal dengan Bh 2.00 2.00permukaan pemantul engineergrade8.4.65) Patok Pengarah Bh 120.00
    120.00 Bahwa serah terima pertama Pekerjaan(PHO) dilaksanakan pada tanggal 16 september 2015 ;Bahwa hasil serah terima pertama Pekerjaan (PHO) berdasarkan beritaacara 04.06/PANPHO/JBT/B.IV/DPU/2015 dan ada temuan beberapa item, sebagaiberikut :hasil penilaian Pekerjaan nomor1.
Register : 28-11-2019 — Putus : 17-04-2020 — Upload : 04-06-2020
Putusan PN AMBON Nomor 30/Pid.Sus-TPK/2019/PN Amb
Tanggal 17 April 2020 — Penuntut Umum:
1.ROLLY MANAMPIRING, SH
2.I GEDE WIDHARTAMA, SH
3.YE OCENG ALMAHDALY, S.H.,M.H
4.ARIF MIRRA KANAHAU, SH
5.WAHYUDI KAREBA.S.Sos.SH
6.NOVITA TATIPIKALAWAN, SH.,MH
Terdakwa:
ANGGANOTO URA, SE
181185
  • Pembangunan bangsal kerja 120.00 M2 690.902.50 82.908.300.005 Pek. Gudang barang 56.00 M2 690.902.50 38.690.540.006 Papan proyek, dokumentasi dan pelaporan 1.00 Ls 4.000.000.00 4.000.000.00203.998.840.00B BANGUNAN TERMINAL BBANGUNAN TERMINAL A LANTAI 11 Pek.
    Pintu rolling door aluminium + pengunci 120.00 Bh 3,350,000.00 402,000,000.005 Pek. Kunci pintu lengkap pegangan 22.00 Bh 235,00.00 5,170,000.006 Pek. Engsel pntu type kupu2 44.00 Bh 50,000.00 2,200,000.007 Pek. Grendel pintu 22.00 Bh 35,000.00 770,000.008 Pek. Kaca polos tebal 12 + rangka 553.00 M2 360,000.00 199,402,560.00639,689,778.65IV PEKERJAAN PLUMBING DAN SANITASI1 Pek. closed duduk lengkap 12.00 Bh 1,950,000.00 23,400,000.002 Pek.
    Pembangunan bangsal kerja 120.00 M2 690.902.50 82.908.300.00 Hal215 dari 325 hal Putusan Nomor 30/Pid.SusTPK/2019/PN Amb 5 Pek. Gudang barang 56.00 M2 690.902.50 38.690.540.006 Papan proyek, dokumentasi dan pelaporan 1.00 Ls 4.000.000.00 4.000.000.00203.998.840.00B BANGUNAN TERMINAL BBANGUNAN TERMINAL A LANTAI 11 Pek.