Ditemukan 309 data

Urut Berdasarkan
 
Register : 11-11-2016 — Putus : 21-12-2016 — Upload : 17-01-2017
Putusan PT BENGKULU Nomor 13/PiD.Sus-TPK/2016/PT BGL
Tanggal 21 Desember 2016 — DONNY NOVERDI, ST BIN HERMAN MULYADI
9243
  • Tiang pancang baja 0 40 cm, T=9 mm, L=12 m.A Pengadaan tiang pancang @ panjang Btg 80,00 56,006,00 mB Pengelasan sambungan tiang pancang Bh 40,00 28,00C Sepatu tiang pancang Bh 40,00 28,00D Pemancangan M1 480,00 336,00E Beton F/C=19,3 Mpa (K225)+Molen M3 58,94 42,20.(dalam tiang pancang)F Besi beton dalam tiang pancang Kg 8.422,12 5.469,05G Besi beton dalam tiang pancang Kg 2.732,40 09. Poor beton 50/50 dan 40/60.A Beton F/C=19,3.
    Tiang pancang baja 0 40 cm, T=9 mm, L=12 m.A Pengadaan tiang pancang @ panjang Btg 80,00 56,006,00 mB Pengelasan sambungan tiang pancang Bh 40,00 28,00C Sepatu tiang pancang Bh 40,00 28,00D Pemancangan M1 480,00 336,00E Beton F/C=19,3 Mpa (K225)+Molen M3 58,94 42,20. Hal.17dari 50 Hal. Put. Tipikor Nomor :13/Pid.SusTPK/2016/PT.BGL.10.11.12.13. (dalam tiang pancang)F Besi beton dalam tiang pancang Kg 8.422,12 5.469,05G Besi beton dalam tiang pancang Kg 2.732,40 09.
Putus : 05-10-2015 — Upload : 08-03-2016
Putusan MAHKAMAH AGUNG Nomor 2059 K/PID.SUS/2014
Tanggal 5 Oktober 2015 — Ir. M. SYUKRON NAJIB bin ACHMAD TAS’IN
7038 Berkekuatan Hukum Tetap
  • Bt KI 1 Pc:4Ps (Bt mndtgkan) m3 341.250,00 41,10 81,604 6.3 Plesteran 1 Pc:3Ps Tebal 15 mm m2 18.549,00 17,75 32,705 6.35 Plesteran Siar Adukan Pc:2 Ps m2 12.217,50 62,73 110,35 6 Ls Drainase dengan PVC dan ijuk Bh 3.500,00 40,00 37,00SUB TOTAL BAGIAN IImm PEKERJAAN JALAN DANSALURAN TEPI1 Ls Pembersihan Lapangan m2 440,00 5.000,00 2.333,002. 6.4 Galian Tanah Keras m3 19.667,50 9.246,70 2.416,703 6.12 Urugan Tanah Dipadatkan m3 62.650,00 923,30 292,004 K.516 Telford m3 151.781,25 458,89 403,00i K.722
    Bt KI 1 Pc:4Ps (Bt mndtgkan) m3 341.250,00 41,10 81,604 6.3 Plesteran 1 Pc:3Ps Tebal 15 mm m2 18.549,00 17,15 32,705 6.35 Plesteran Siar Adukan 1 Pc:2 Ps m2 12.217,50 62,73 110,356 Ls Drainase dengan PVC dan ijuk Bh 3.500,00 40,00 37,00SUB TOTAL BAGIAN IIIl PEKERJAAN JALAN DANSALURAN TEPI1 Ls Pembersihan Lapangan m2 440,00 5.000,00 2.333,002 6.4 Galian Tanah Keras m3 19.667,50 9.246,70 2.416,703 6.12 Urugan Tanah Dipadatkan m3 62.650,00 923,30 292,004 K.516 Telford m3 151.781,25 458,89 403,00i K.722
Register : 13-10-2015 — Putus : 03-12-2015 — Upload : 30-05-2016
Putusan PT JAKARTA Nomor 36/PID/TPK/2015/PT.DKI
Tanggal 3 Desember 2015 — SAMSUL BAHRI
8857
  • Pembuatan gudang bahan dan 40,00 We 650.000,00 26.000.000,00peralatan, bahan dinding,triplek, rangka kaso finishingcat, pintu double triplek danram kawat 2. Pembuatan skat dinding partisi 40,00 Unit 310.000,00 12.400.000,00bahan triplek 4 mm rangka kaso3/6 finishing cat dinding padapintu lift 3 Pengadaan dan pemasangan 40,00 Unit 175.000,00 7.000.000,00ramburambu pada setiap lantaibahan triplek 4 mm kaso 4/6tinggi 80 cm 4.
Register : 15-04-2016 — Putus : 18-05-2016 — Upload : 02-08-2016
Putusan PT PALU Nomor 6/Pid.Sus-TPK/2016/PT PAL
Tanggal 18 Mei 2016 — WAHYUDIN M. GAGARAMUSU, S.Sos. alias Budo
7731
  • 181.863.25 545.589.75PEK.ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh /1.495.312,50 1.495.312,50Valve @ 4All Flanged tee 1,00 Bh 525.000,00 525.000,00PVC @4Flanged Socket 1,00 Bh 163.125,00 163.125,00PVC @ 4Flanged Sigot 1,00 Bh 163.125,00 163.125,00PVC 4All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 40,00 Bh 8.775,00 351.000,0034.302.394,06Pembuatan 1,00 PktBlock BetonGalian Tanah 3,00 M3 24.990,00 74.970,00BiasaUrugan Tanah 1,00 M3 11.980,00
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh = 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,00 4.302.394,06.
    ACCESSIRIESPENGURASAll Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50g4All Flanged tee PVC @ 4 1,00 Bh 525.000,00 = 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @/1,00 Bh 375.000,00 = 375.000,00APaking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block 1,00 PktBetonGalian Tanah Biasa 3,00 M3 24.990,00 74.970,00Urugan Tanah 1,00 M3 11.980,00 11.980,00Beton
Putus : 06-12-2012 — Upload : 21-10-2013
Putusan MAHKAMAH AGUNG Nomor 1955 K/PID.SUS/2012
Tanggal 6 Desember 2012 — IDRIS TALAWO Alias IDI
6663 Berkekuatan Hukum Tetap
  • No. 1955 K/Pid.Sus/2012 @bang Resapan Biopr@4,00 1,728,000.0 10,080.00 13,920.00 1,002,240.039 0.00 0 0Makanan Ikan 40,00 2,880,000.0 16,800.00 23,200.00 1,670,400.040 0.00 0 041 M@laria: 12,00 864,000.00 /5,040.00 6,960.00 501,120.000.00Mencegah dan MengatasinyaMmbuat Alat Penjernf5A00 1,080,000.0 6,300.00 8,700.00 626,400.0042 0.00 043 M@mbuat Aneka Abon24,00 1,728,000.0 10,080.00 13,920.00 1,002,240.00.00 0 0Mmbuat Aneka DodoldBi fh 1,908,000.0 11,130.00 15,370.00 1,106,640.044 0.00 0 045 M@mbuat
    15,105.00 1,087,560.000.00 033 /K@trampilan Praktis Una4kadatyatalea@esd 0,578.00 14,022.00 1,009,584.000.00 034 DAasarDasar Pertukan(R84dPi764,800.0 16,512.00 21,888.00 1,575,936.000.00 035 M@mbuat Manisan Seg#,20 1,382,400.0 /8,256.00 10,944.00 787,968.000.00 O36 /KBeka Olahan Dari Keddldi0 1,044,000.0 /6,235.00 8,265.00 595,080.000.00 037 = S@hat Dengan Jamu Tit@ji@@oNal52,000.0 /6,880.00 9,120.00 656,640.000.00 0I38 M@nopause Tanpa Stre2,50 900,000.00 5,375.00 7,125.00 513,000.000.0039 I72 40,00
    034 RAdelai: 28,00 2,016,000.0 11,760.00 16,240.00 1,169,280.00.00 0 0Budidaya Dengan Pemupukan Yang..K@ntang Varietas Dan R@;O0uti6ag8200.0 (9,660.00 13,340.00 960,480.0035 0.00 0R@rajinan Dari Kain P&a00 1,512,000.0 8,820.00 12,180.00 876,960.0036 0.00 037 K@rajinan Kain Teknik 28)0S659,200.0 12,012.00 16,588.00 1,194,336.00.00 0 0R@dapan Berbahan Sink60g1,332,000.0 7,770.00 10,730.00 772,560.0038 0.00 0Z@bang Resapan Biopr@4,00 1,728,000.0 10,080.00 13,920.00 1,002,240.039 0.00 0 0Makanan Ikan 40,00
    No. 1955 K/Pid.Sus/2012 37 = S@hat Dengan Jamu Trt@ji@@oNal 52,000.0 6,880.00 9,120.00 656,640.000.00 038 /M@nopause Tanpa Sitre2,50 900,000.00 5,375.00 7,125.00 513,000.000.0039 I72 40,00 2,880,000.0 17,200.00 22,800.00 1,641,600.00blis Pun Ingin Bertobai0.00 040 /B@rkenalan Dengan Kot@p@B,024,000.0 18,060.00 23,940.00 1,723,680.000.00 041 /Barkenalan Dengan Wi#t@0@s3,024,000.0 18,060.00 23,940.000.00 0 1,723,680.0042 M@ngenal Hama Dan Pe gakit ;BGMHON 7,955.00 10,545.00 759,240.000.00 043.
Register : 12-06-2013 — Putus : 05-02-2014 — Upload : 24-06-2014
Putusan PENGADILAN PAJAK Nomor PUT.50319/PP/M.X/16/2014
Tanggal 5 Februari 2014 — Pemohon Banding dan Terbanding
10728
  • persidangan, Majelis memberikan kesempatan kepada Terbandingdan Pemohon Banding untuk melaksanakan Uji Kebenaran Materi, dengan hasilsebagai berikut :bahwa jumlah koreksi karena jawaban konfirmasi "tidak ada" sebesar Rp.319.866.941,00 telah dibatalkan pada proses keberatan sebesar Rp. 28.818.450,00sehingga Koreksi yang masih menjadi Sengketa Banding sebesar Rp.291.048.491,00;bahwa Jumlah Faktur Yang Masih Sengketa Banding 30 faktur senilai Rp.291.048.491,00 Sample minimal 30% : Faktur Pajak (12 faktur) = 40,00
Register : 01-07-2013 — Putus : 19-09-2013 — Upload : 09-01-2017
Putusan PT BANGKA BELITUNG Nomor 7/PID/TPK/2013/PT.BABEL
Tanggal 19 September 2013 — - IMRON, SST Bin RADEN SALEH
8525
  • Pek Aggregat Klas A 8.1 (1) 40,00 m 1,89 100,00 1,89 34. Pek Lapis Perekat 5.1 (1) 2.133,75 m 2:5 100,00 2,505. Pek HRS Base Pek. Lataston Lapis Pondasi (HRS6. Base) 6.34) A 902,25 Ton 38,45 100,00 38,457. Pek. Aspal Minyak 6.3. (8) A 58,52 Ton 53,13 73,33 38,96 Pek. Bahan Pengisi (Filler) Tambahan 6.3.10 14,63 Ton 1,76 100,00 1,76. 38. Pek Timbunan Berm 3.2 (2),a 174,96 m 1,38 7 7. 39. Pek Galian Avour 2.1 68,06 m 0,22 100,00 0,22JUMLAH 100,00 84,45Ill. PEKERJAAN BANGUNAN PELENGKAPB.
    PEKERJAAN EFEKTIF SEP. 2,430 KM1. pa Tebasan Damija Dihit 500,00 m 0,08 100,00 0,082. 1 pox Penyiapan Badan Jalan 3.3 2.400,00 m 0,58 100,00 0,583.1 pa Aggregat Klas A 8.1 (1) 40,00 m? 1,89 100,00 1.894. Pek Lapis Perekat 5.1 (1) 2.133,75 m? 2:5 100,00 2,505: Pek HRS Base 18 Pek. Lataston Lapis Pondasi (HRS 6. Base) 6.34) A 902,25 Ton 38,45 100,00 38,45de Pek. Aspal Minyak 6.3. (8) A 58,52 Ton 53,13 73,33 38,96 Pek. Bahan Pengisi (Filler) Tambahan 6.3.10 14,63 Ton 1,76 100,00 1,76. 38.
Register : 05-09-2013 — Putus : 23-10-2013 — Upload : 06-07-2019
Putusan PT SEMARANG Nomor 73/PID.TPK/2013/PT SMG
Tanggal 23 Oktober 2013 — Pembanding/Terdakwa : LUKMAN HAKIM BIN ACHMAD
Terbanding/Jaksa Penuntut : Rohmadi,SH
3826
  • Bt K1 1 Pc:4Ps (Bt3 6.5 mndtgkan) m3 341.250,00 41,10 81,60Plesteran 1 Pc:3Ps Tebal 15 5m4 6.3 mm 18.549,00 17,75 32,70Plesteran Siar Adukan 1 Pc:2 5m5 6.35 Ps 12.217,50 62,73 110,35 hal 3 dari 36 hal Put.No.73 /Pid.Sus/2013/PT.TPK.Smg Drainase dengan PVC dan Li6 Ls juk 3.500,00 40,00 37,00SUB TOTAL BAGIAN IIPEKERJAAN JALAN DANIl SALURAN TEPI1 Ls Pembersihan Lapangan m2 440,00 5.000,00 2.333,002 6.4 Galian Tanah Keras m3 19.667,50 9.246,70 2.416,703 6.12 Urugan Tanah Dipadatkan m3 62.650,00 923,30
    Bt K1 1 Pc:4Ps (Bt3 6.5 mndtgkan) m3 341.250,00 41,10 81,60Plesteran 1 Pc:3Ps Tebal 154 6.3 mm me 18.549,00 17,75 32,70Plesteran Siar Adukan 1 Pc:25 6.35 Ps me 12.217,50 62,73 110,35Drainase dengan PVC dan hi6 Ls juk 3.500,00 40,00 37,00SUB TOTAL BAGIAN IIPEKERJAAN JALAN DANIl SALURAN TEPI1 Ls Pembersihan Lapangan m2 440,00 5.000,00 2.333,002 6.4 Galian Tanah Keras m3 19.667,50 9.246,70 2.416,703 6.12 Urugan Tanah Dipadatkan m3 62.650,00 923,30 292,004 K516 Telford m3 151.781,25 458,89 403,005 K.722
Register : 16-10-2015 — Putus : 25-01-2016 — Upload : 29-07-2016
Putusan PN PALU Nomor 54/Pid.Sus-TPK/2015/PN.Pal
Tanggal 25 Januari 2016 — KADIR, ST Alias KADIR NURDN
13851
  • 181.863.25 545.589.75PEK.ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh 1.495.312,50 1.495.312,50Valve @ 4All Flanged tee 1,00 Bh 525.000,00 525.000,00PVC @4Flanged Socket 1,00 Bh 163.125,00 163.125,00PVC @4Flanged Sigot 1,00 Bh 163.125,00 163.125,00PVC @ 4All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 40,00 Bh 8.775,00 351.000,0034.302.394,06Pembuatan 1,00 PktBlock BetonGalian Tanah 3,00 M3 24.990,00 74.970,00BiasaUrugan Tanah 1,00 M3 11.980,00
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 = 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00 Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    ACCESSIRIESPENGURASAll Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50@4All Flanged tee PVC @ 4 1,00 Bh 525.000,00 = 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @/1,00 Bh = 375.000,00 375.000,00APaking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block 1,00 PktBetonGalian Tanah Biasa 3,00 M3 24.990,00 74.970,00Urugan Tanah 1,00 M3 11.980,00 11.980,00
Register : 15-04-2016 — Putus : 18-05-2016 — Upload : 01-08-2016
Putusan PT PALU Nomor 5/Pid.Sus-TPK/2016/PT PAL
Tanggal 18 Mei 2016 — JONI B. RAMLI, S.T.
6222
  • 181.863.25 545.589.75PEK.ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh /1.495.312,50 1.495.312,50Valve @ 4All Flanged tee 1,00 Bh 525.000,00 525.000,00PVC @ 4Flanged Socket 1,00 Bh 163.125,00 163.125,00PVC 4Flanged Sigot 1,00 Bh 163.125,00 163.125,00PVC @ 4All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 40,00 Bh 8.775,00 351.000,0034.302.394,06Pembuatan 1,00 PktBlock BetonGalian Tanah 3,00 M3 24.990,00 74.970,00BiasaUrugan Tanah 1,00 M?
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh 375.000,00 375.000,00Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    ACCESSIRIESPENGURASAll Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50g4All Flanged tee PVC @ 4 1,00 Bh 525.000,00 = 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @/1,00 Bh 375.000,00 = 375.000,00APaking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block 1,00 PktBetonGalian Tanah Biasa 3,00 M3 24.990,00 74.970,00Urugan Tanah 1,00 M3 11.980,00 11.980,00Beton
Register : 14-03-2018 — Putus : 25-07-2018 — Upload : 04-09-2018
Putusan PN AMBON Nomor 9/Pid.Sus-TPK/2018/PN Amb
Tanggal 25 Juli 2018 — 1. Nama lengkap : ABDUL JABAR RUMBOUW; 2. Tempat lahir : Kotasiri; 3. Umur/tanggal lahir : 44 tahun/07 Mei 1973; 4. Jenis kelamin : Laki-laki 5. Kebangsaan : Indonesia 6. Tempat tinggal : Negeri Kotasiri Kecamatan Gorom Timur Kabupaten Seram Bagian Timur; 7. Agama : Islam 8. Pekerjaan : Kepala Pemerintahan Negeri Kota Siri;
347336
  • Besi8 STAP 5,22 41,80 40,00 1,880,8209. Pakucampur KG 1,55 12,41 35,000 488,75410. Bendrat KG 1,52 12,17 35,000 479,11511. Kayu Klas III M3 0,42 3,35 2,500,000 9,429,07512. Senk Gelombang LMBR 10,57 84,57 60,000 5,708,57113. Papan M3 0,56 4,44 2,500,000 12,487,50014. Tehel 20x 25 DOS 19,00 152,00 115,000 19,665,00015. Kloset BH 1,00 8,00 300,000 2,700,00016. Kusen 5 x12 M3 0,03 0,22 2,500,000 618,75017. Pintu UNIT 1,00 8,00 750,000 6,750,00018. Tripleks LEMBAR 3,30 26,40 80,000 2,376,00019.
    Besi 8 STAP 5,22 41,80 40,00 1,880,8209. Paku campur KG 1,55 12,41 35,000 488,75410. Bendrat KG 1,52 12,17 35,000 479,11511. Kayu Klas Ill M3 0,42 3,35 2,500,000 9,429,07512. Senk LMBR 10,57 84,57 60,000 5,708,571 Halaman 15 dari 174 hal Putusan Nomor 9/Pid.SusTPK/2018/PN Amb Gelombang13. Papan M3 0,56 4,44 2,500,000 12,487,50014. Tehel 20 x 25 DOS 19,00 152,00 115,000 19,665,00015. Kloset BH 1,00 8,00 300,000 2,700,00016. Kusen 5 x 12 M3 0,03 0,22 2,500,000 618,75017.
    Besi8 STAP 5,22 41,80 40,00 1,880,3209. Pakucampur KG 1,55 12,41 35,000 488,75410. Bendrat KG 1,52 12,17 35,000 479,11511. KayuKlas III M3 0,42 3,35 2,500,000 9,429,07512. Senk Gelombang LMBR 10,57 84,57 60,000 5,708,57113. Papan M3 0,56 4,44 2,500,000 12,487,50014. Tehel 20x25 DOS 19,00 152,00 115,000 19,665,000 Halaman 24 dari 174 hal Putusan Nomor 9/Pid.SusTPK/2018/PN Amb 15. Kloset BH 1,00 8,00 300,000 2,700,00016. Kusen5 x12 M3 0,03 0,22 2,500,000 618,75017.
    Besi 8 STAP 5,22 41,80 40,00 1,880,820 Halaman 89 dari 174 hal Putusan Nomor 9/Pid.SusTPK/2018/PN Amb 9. Pakucampur KG 1,55 12,41 35,000 488,75410. Bendrat KG 1,52 12,17 35,000 479,11511. Kayu Klas III M3 0,42 3,35 2,500,000 9,429,07512. Senk Gelombang LMBR 10,57 84,57 60,000 5,708,57113. Papan M3 0,56 4,44 2,500,000 12,487,50014. Tehel 20x 25 DOS 19,00 152,00 115,000 19,665,00015. Kloset BH 1,00 8,00 300,000 2,700,00016. Kusen 5 x12 M3 0,03 0,22 2,500,000 618,75017.
    Besi8 STAP 5,22 41,80 40,00 1,880,8209. Pakucampur KG 1,55 12,41 35,000 488,75410. Bendrat KG 1,52 12,17 35,000 479,11511. Kayu Klas Ill M3 0,42 3,35 2,500,000 9,429,07512. Senk Gelombang LMBR 10,57 84,57 60,000 5,708,57113. Papan M3 0,56 4,44 2,500,000 12,487,50014. Tehel 20x 25 DOS 19,00 152,00 115,000 19,665,000 Halaman 90 dari 174 hal Putusan Nomor 9/Pid.SusTPK/2018/PN Amb 15. Kloset BH 1,00 8,00 300,000 2,700,00016. Kusen 5 x12 M3 0,03 0,22 2,500,000 618,75017.
Register : 15-04-2016 — Putus : 18-05-2016 — Upload : 01-08-2016
Putusan PT PALU Nomor 4/Pid.Sus-TPK/2016/PT PAL
Tanggal 18 Mei 2016 — KADIR, S.T. alias KADIR NURDIN
10451
  • 181.863.25 545.589.75PEK.ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh 1.495.312,50 1.495.312,50Valve @ 4All Flanged tee 1,00 Bh 525.000,00 525.000,00PVC @4Flanged Socket 1,00 Bh 163.125,00 163.125,00PVC @4Flanged Sigot 1,00 Bh 163.125,00 163.125,00PVC @ 4All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 40,00 Bh 8.775,00 351.000,0034.302.394,06Pembuatan 1,00 PktBlock BetonGalian Tanah 3,00 M3 24.990,00 74.970,00BiasaUrugan Tanah 1,00 M3 11.980,00
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 = 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00 Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    ACCESSIRIESPENGURASAll Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50@4All Flanged tee PVC @ 4 1,00 Bh 525.000,00 = 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @/1,00 Bh = 375.000,00 375.000,00APaking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block 1,00 PktBetonGalian Tanah Biasa 3,00 M3 24.990,00 74.970,00Urugan Tanah 1,00 M3 11.980,00 11.980,00
Register : 05-09-2013 — Putus : 23-10-2013 — Upload : 22-07-2014
Putusan PT SEMARANG Nomor 73/Pid.Sus/2013/PT.TPK.Smg
Tanggal 23 Oktober 2013 — LUKMAN HAKIM bin ACHMAD
3721
  • Bt KI 1 Pc:4Ps (Bt m3 341.250,00 41,10 81,60mndtgkan)4 6.3 Plesteran Pc:3Ps Tebal 15 mm m2 18.549,00 17,75 32,70635 Plesteran Siar Adukan 1 Pc:2 Ps m2 12.217,50 62,73 110,35Ls Drainase dengan PVC dan juk bh 3.500,00 40,00 37,00SUB TOTAL BAGIAN IIIl PEKERJAAN JALAN DANSALURAN TEPI1 Ls Pembersihan Lapangan m2 440,00 5.000,00 2.333,002 6.4 Galian Tanah Keras m3 19.667,50 9.246,70 2.416,703 6.12 Urugan Tanah Dipadatkan m3 62.650,00 923,30 292,004 K.516 Telford m3 151.781,25 458,89 403,005 K.722 Beton
    Bt KI 1 Pc:4Ps (Bt m3 341.250,00 41,10 81,60mndtgkan)6.3 Plesteran Pc:3Ps Tebal 15 mm m2 18.549,00 17,75 32,706.35 Plesteran Siar Adukan Pc:2 Ps m2 12.217,50 62,73 110,35Ls Drainase dengan PVC dan juk bh 3.500,00 40,00 37,00SUB TOTAL BAGIAN IIIl PEKERJAAN JALAN DANSALURAN TEPI1 Ls Pembersihan Lapangan m2 440,00 5.000,00 2.333,002 6.4 Galian Tanah Keras m3 19.667,50 9.246,70 2.416,703 6.12 Urugan Tanah Dipadatkan m3 62.650,00 923,30 292,004 K.516 Telford m3 151.781,25 458,89 403,005 K.722 Beton struktur
Register : 08-09-2020 — Putus : 19-10-2020 — Upload : 26-10-2020
Putusan PN KAYUAGUNG Nomor 41/Pdt.G/2020/PN Kag
Tanggal 19 Oktober 2020 — Pemohon:
Kamil Umar Esa
Termohon:
1.1) Kementerian Agraria Dan Tata Ruang/Badan Pertanahan Nasional Cq Kepala Kantor Pertanahan Kabupaten Ogan Ilir selaku Ketua Pelaksana Pengadaan Tanah Jalan Tol Simpang Indralaya Muara Enim Tahap I
2.2) Kementerian Pekerjaan Umum Dan Perumahan Rakyat Cq (PPK) Pengadaan Tanah Jalan Tol Simpang Indralaya Muara Enim Tahap I
6734
  • 3.500.000Pagar Bata Plaster 52,00 702.500 36.530.000T.1,5Tower Air 3,5 2,50 800.000 2.000.000Pemasangan PLN 1,00 2.165.000 2.165.0001300 WattSumur Galli 1,00 7.000.000 7.000.000Sumur Bor 1,00 7.000.000 7.000.000Tondon 1200 L 1,00 1.430.000 1.430.000Septictank 1,00 2.500.000 2.500.000Halaman Lantai Rabat 83,79 60.000 5.027.400Total Biaya Pembangunan Baru 936.728.400Tabel 4Perhitungan Nilai Premium Beban Depresiasi BangunanKeterangan Nilai Total NilaiBiaya Pembangunan Baru 936.728.400Depresiasi Bangunan 40,00%
    25.001Kolam Renang 25.001Paving Blok 25.001Garasi Non Permanen 5.00(Pagar Bata Plaster 50.00Tower Air 10.001Pemasangan PLN 1300 Watt + Instalasi Listik 10.00Csebanyak 20 titik Hal 12 dari 47 hal Putusan Nomor 41/Pdt.G/2020/PN Kag Sumur Gali 7.001Sumur Bor 15.001Tondon 1200 L 1.4315 Unit Septictank 15.001Halaman Lantai Rabat 5.02Total Biaya Pembangunan Baru 1.037.15:Perhitungan Nilai Premium Beban Depresiasi BangunanKeterangan Nilai Total NilaiBiaya Pembangunan Baru 1.037.153.400Depresiasi Bangunan 40,00%
    Bahwa dengan adanya perubahan nilai tanah dan bangunansebagaimana yang diuraikan di atas, maka terjadi perubahan hitunganterhadap perhitungan nilai premium beban depresiasi bangunan danperhitungan premium selisih nilai tanah, yakni :Perhitungan Nilai Premium Beban Depresiasi BangunanKeterangan Nilai Total NilaiBiaya Pembangunan Baru 1.037.153.400Depresiasi Bangunan 40,00%Indikasi Nilai Bangunan 60,00% 1.037.153.400 622.292.040Premium Beban Depresiasi 414.861.360 Perhitungan Premium Selisih Nilai
Register : 15-04-2016 — Putus : 18-05-2016 — Upload : 01-08-2016
Putusan PT PALU Nomor 3/Pid.Sus-TPK/2016/PT PAL
Tanggal 18 Mei 2016 — YUSNITA FITARINI SIBAY, S.T.
6229
  • 181.863.25 545.589.75PEK.ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh /1.495.312,50 1.495.312,50Valve @ 4All Flanged tee 1,00 Bh 525.000,00 525.000,00PVC @4Flanged Socket 1,00 Bh 163.125,00 163.125,00PVC 4Flanged Sigot 1,00 Bh 163.125,00 163.125,00PVC @ 4All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 40,00 Bh 8.775,00 351.000,0034.302.394,06Pembuatan 1,00 PktBlock BetonGalian Tanah 3,00 M3 24.990,00 74.970,00BiasaUrugan Tanah 1,00 M3 11.980,00
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh = 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06.
    ACCESSIRIESPENGURASAll Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50BaAll Flanged tee PVC @ 4 1,00 Bh 525.000,00 = 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @1,00 Bh 375.000,00 = 375.000,00APaking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block 1,00 PktBetonGalian Tanah Biasa 3,00 M3 24.990,00 74.970,00Urugan Tanah 1,00 M3 11.980,00 11.980,00Beton
Register : 16-09-2015 — Putus : 25-01-2016 — Upload : 26-07-2016
Putusan PN PALU Nomor 56/Pid.Sus-TPK/2015/PN Pal
Tanggal 25 Januari 2016 — WAHYUDIN M. GAGARAMUSU, S.Sos Alias BUDO
7114
  • 181.863.25 545.589.75PEK.ACCESSIRIESPENGURASAll Flanged Gate 1,00 Bh /1.495.312,50 1.495.312,50Valve @ 4All Flanged tee 1,00 Bh 525.000,00 525.000,00PVC @4Flanged Socket 1,00 Bh 163.125,00 163.125,00PVC @ 4Flanged Sigot 1,00 Bh 163.125,00 163.125,00PVC 4All Flanged Bend 1,00 Bh 375.000,00 375.000,00PVC @ 4Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 40,00 Bh 8.775,00 351.000,0034.302.394,06Pembuatan 1,00 PktBlock BetonGalian Tanah 3,00 M3 24.990,00 74.970,00BiasaUrugan Tanah 1,00 M3 11.980,00
    ACCESSIRIESPENGURASAll Flanged Gate Valve @ 4 1,00 Bh 1.495.312,50 1.495.312,50All Flanged tee PVC @ 4 1,00 Bh = 525.000,00 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @ 4 1,00 Bh = 375.000,00 375.000,00Paking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,00 4.302.394,06.
    ACCESSIRIESPENGURASAll Flanged Gate Valve /1,00 Bh 1.495.312,50 1.495.312,50g4All Flanged tee PVC @ 4 1,00 Bh 525.000,00 = 525.000,00Flanged Socket PVC @ 4 1,00 Bh 163.125,00 163.125,00Flanged Sigot PVC @ 4 1,00 Bh 163.125,00 163.125,00All Flanged Bend PVC @/1,00 Bh 375.000,00 = 375.000,00APaking Karet @ 4 5,00 Bh 17.500,00 87.500,00Mur Baut 5/8 3 40,00 Bh 8.775,00 351.000,004.302.394,06Pembuatan Block 1,00 PktBetonGalian Tanah Biasa 3,00 M3 24.990,00 74.970,00Urugan Tanah 1,00 M3 11.980,00 11.980,00Beton
Register : 13-08-2012 — Putus : 27-03-2013 — Upload : 30-05-2013
Putusan PTUN SAMARINDA Nomor 21/G/2012/PTUN-SMD
Tanggal 27 Maret 2013 — - PT. KALTIM JAYA MINERAL melawan - BUPATI PENAJAM PASER UTARA (T I) - PT. SENTIKA MITRA PERSADA (T II Intervensi)
139135
  • 116,4257 O1 28 20,00 1,472211 116 25 32,50 116,4257 O1 30 6,60 1,501812 116 26 32,46 116,4424 O1 30 6,60 1,501813 116 26 32,46 116,4424 O1 29 36,12 1,493414; 116 26 56,90 116,4491 O1 29 36,12 1,493415 116 26 56,90 116,4491 OL 29 12,50 1,486816 116 27 36,80 116,4602 OL 29 12,50 1,486817 116 27 36,80 116,4602 O1 28 52,20 1,481218 116 28 12,72 116,4702 O1 28 52,20 1481219 116 28 12,72 116,4702 O1 28 36,60 1,476820 116 29 0,00 116.4833 O1 28 36,60 1,476821 116 29 0,00 116,4833 O1 28 50,00 1,480622 116 28 40,00
    116,4778 O1 28 50,00 1,480623 116 28 40,00 116,4778 O1 29 0,00 1,483324 116 28 0,00 116,4667 O1 29 0,00 1,483325 116 28 0,00 116.4667 O01 29 30,00 1,491726 116 27 0,00 116,4500 O01 29 30,00 1,491727 116 27 0,00 116,4500 01 30 0,00 1,500028 116 26 34,80 116,4430 O1 30 0,00 1,500029 116 26 34,80 116,430 O1 30 10,00 1,5028 halaman 15 dari 98 halaman, Putusan Nomor : 21/G/2012/PTUNSMD 30 116 26 15,00 116,4375 O1 30 10,00 1,502831 116 26 15,00 116,4375 O01 30 40,00 1,511132 116 25. 25,00 116,4236 O1
    30 40,00 1,511133 116 25. 25,00 116,4236 O1 31 0,00 1,516734) 116 25 0,00 116.4167 O1 31 0,00 1,516735 116 2 0,00 116.4167 O1 31 30,00 1,525036 116 21 45,00 116,3625 O1 31 30,00 1,5250 5.
Putus : 23-03-2016 — Upload : 11-11-2016
Putusan MAHKAMAH AGUNG Nomor 30 K/Pid.Sus/2016
Tanggal 23 Maret 2016 — Ir. JUNAIDI ABBAS, MM Bin ABBAS
8451 Berkekuatan Hukum Tetap
  • Sekunder / Primer)Sub Total A 112.500.000,00Il PRASARANA JALAN1 Jalan Penghubung / Poros 1,75 Km 204.320.000,00 357.560.000,00(Lahan Kering)2 Jalan Desa (Lahan Kering) 2,00 Km 90.920.000,00, 181.840.000,00GorongGorong Diameter 40,00; M 1.415.000,00 56.600.000,0080 cm (7m")4 GorongGorong Diameter 30,00; M 943.000,00 28.290.000,0060 cm (4,5m")5 Jembatan Kayu 0,00 M 7.787.000,00 0,00Sub Total B 624.290.000,00Ill BANGUNANPERMUKIMAN1 Rumah Transmigran dan 25,00) Unit 32.532.276,14 813.306.903,44jamban
    Keluarga T36Sub Total C 813.306.903,44IV BANGUNAN FASILITASUMUM1 Rumah lIbadah (Masjid) 0,00 Unit 155.956.000,00 0,002 Gudang Unit 0,00 Unit 89.594.000,00 0,003 Rumah Petugas 0,00 Unit 147.800.000,00 0,004 Balai Desa 0,00 Unit 157.845.000,00 0,00Sub Total D 0,00V SARANA AIR BERSIH1 Sumur Gali 15,00 Paket 4.000.000,00 60.000.000,002 Gentong Plastik 40,00 Buah 585.000,00 23.400.000,00 Sub Total E 83.400.000,00 JUMLAH HARGA1.633.496.903,44 PEMBULATAN 1.633.496.000,00 Sembilan Puluh Enam riobu Rupiah.Terbilang
    Sekunder / Primer)Sub Total A 112.500.000,00Il PRASARANA JALAN1 Jalan Penghubung / Poros 1,75 Km 204.320.000,00 357.560.000,00(Lahan Kering)2 Jalan Desa (Lahan Kering) 2,00 Km 90.920.000,00, 181.840.000,00GorongGorong Diameter 40,00; M 1.415.000,00 56.600.000,0080 cm (7m"*)4 GorongGorong Diameter 30,00; M 943.000,00 28.290.000,0060 cm (4,5m')5 Jembatan Kayu 0,00 M 7.787 .000,00 0,00Sub Total B 624.290.000,00Ill BANGUNANPERMUKIMAN1 Rumah Transmigran dan 25,00) Unit 32.532.276,14 813.306.903,44jamban
    Nomor : 30 K/Pid.Sus/2016 Balai Desa 0,00 Unit 157.845.000,00 0,00Sub Total D 0,00V SARANA AIR BERSIHSumur Gali 15,00 Paket 4.000.000,00 60.000.000,00Gentong Plastik 40,00 Buah 585.000,00 23.400.000,00Sub Total E 83.400.000,00JUMLAH HARGA 1.633.496.903,44PEMBULATAN 1.633.496.000,00Terbilang : Satu Milyar Enam Ratus Tiga Puluh Tiga Juta Empat ratusSembilan Puluh Enam ribu Rupiah.
Register : 23-05-2016 — Putus : 10-10-2016 — Upload : 07-02-2017
Putusan PN BENGKULU Nomor 29/Pid.Sus.TPK/2016/PN.Bgl
Tanggal 10 Oktober 2016 — Drs. As’ad Aksa Helmy Bin Gozali
10833
  • Tiang pancang baja 0 40 cm, T=9 mm, L=12 m.A Pengadaan tiang pancang @ panjang Btg 80,00 56,006,00 mB Pengelasan sambungan tiang pancang Bh 40,00 28,00C Sepatu tiang pancang Bh 40,00 28,00 Hal. 8 dari 106 Halaman Putusan Tipikor Nomor :29/Pid.SusTPK/2016/PN.Bgl. D Pemancangan M1 480,00 336,00E Beton F/C=19,3 Mpa (K225)+Molen M3 58,94 42,20.(dalam tiang pancang)F Besi beton dalam tiang pancang Kg 8.422,12 5.469,05G Besi beton dalam tiang pancang Kg 2.732,40 09.
    Tiang pancang baja 0 40 cm, T=9 mm, L=12 m.Pengadaan tiang pancang @ panjang 6,00 Btg 80,00 56,00mB Pengelasan sambungan tiang pancang Bh 40,00 28,00C Sepatu tiang pancang Bh 40,00 28,00D Pemancangan M1 480,00 336,00E Beton F/C=19,33 Mpa (K225)+Molen M3 58,94 42,20.(dalam tiang pancang)F Besi beton dalam tiang pancang Kg 8.422, 12 5.469,05G Besi beton dalam tiang pancang Kg 2.732,40 09. Poor beton 50/50 dan 40/60.A Beton F/C=19,3.
    3.590,745 galian tanah dengan tenaga manusia m3 0 06 Lempengan rumput m2 750,75 07 Sheet Pile W325 B500 H = 12,0mSheet Pile W325 B500 H = 12,0 mA (Beton F/C = 26,4 Mpa(k.300) + btg 248,00 111,00Molen)B Pemancangan m 2.976,00 1.015,47C Pasangan Geotextile m2 490,00 342,08D Bobokan beton sheet pile btg 248,00 245,00E Beton untuk lantai kerja 1: 3:6 n3 29,40 29,408 Tiang pancang baja @ 40cm, T=9mm,L 12mA Pengadaan tiang pancang @ panjang btg 80,00 56,006,00 mB Pengelasan sambungan tiang pancang bh 40,00
    28,00C Sepatu Tiang pancang bh 40,00 28,00D Pemancangan m 480,00 336,00Beton F/C = 19,3 Mpa (K22g Dende s ie Myake2)) + m3 58,94 42,20Molen (dalam tiang pancang)F Besi beton dalam tiang pancang kg 8.422, 12 5.469,05G Besi beton dalam tiang pancang kg 2.732,40 09 Poor beton 50/50 dan 40/60A Beton F/C = 19,3 Mpa (K225) + 13 40,48 2761MolenBekisting untuk permukaan betonB m2 214,80 138,51biasa dengan papan ukuran 3/20 cmC Bongkar 1 m2 bekisting secara hati ) 214,80 138,51hatiD pembesian dengan besi
    Pengelasan sambungan tiang pancang dengan satuan buah, Volumekontrak 40,00 sedangkan hasil Volume pekerjaan 28,00.Hal. 90 dari 106 Halaman Putusan Tipikor Nomor :29/Pid.SusTPK/2016/PN.Bgl.c. Sepatu Tiang pancang dengan satuan buah, Volume kontrak 40,00sedangkan hasil Volume pekerjaan 28,00.d. Pemancangan dengan satuan M Volume kontrak 480,00 sedangkanhasil Volume pekerjaan 336,00.e.
Putus : 11-05-2016 — Upload : 13-02-2017
Putusan MAHKAMAH AGUNG Nomor 28 PK/Pid.Sus/2016
Tanggal 11 Mei 2016 — WAHYU BUDI ANANTO
4839 Berkekuatan Hukum Tetap
  • Sandaran jembatan baja pipa Gl :Volume menurut kontrak 172 M1Volume pekerjaan tambah 40,00 M1Jumlah 212,08 M1Hal. 17 dari 93 hal. Put. Nomor 28 PK/Pid.Sus/2016. Pipa untuk pembuangan air dari jembatan :Volume menurut kontrak 40,00 M1Volume pekerjaan tambah 8,00 M1Jumlah 48,00 M1Pekerjaan kurang adalah sebagai berikut :a. Galian biasa :Volume menurut kontrak 900,00 M3Volume pekerjaan kurang 900,00 M3Jumlah 0,00 M3b.
    Sandaran jembatan baja pipa Gl :Volume menurut kontrak 172 M1Volume pekerjaan tambah 40,00 M1Jumlah 212,08 M1h. Pipa untuk pembuangan air dari jembatan :Volume menurut kontrak 40,00 M1Volume pekerjaan tambah 8,00 M1Jumlah 48,00 M1Pekerjaan kurang adalah sebagai berikut :a. Galian biasa :Volume menurut kontrak 900,00 M3Volume pekerjaan kurang 900,00 M3Jumlah 0,00 M3b.
    Sandaran jembatan baja pipa Gl :Volume menurut kontrak 172 M1Volume pekerjaan tambah 40,00 M1Jumlah 212,08 M1h. Pipa untuk pembuangan air dari jembatan :Volume menurut kontrak 40,00 M1Volume pekerjaan tambah 8,00 M1Jumlah 48,00 M1Pekerjaan kurang adalah sebagai berikut :a. Galian biasa :Volume menurut kontrak 900,00 M3Volume pekerjaan kurang 900,00 M3Jumlah 0,00 M3b. Galian struktur dengan kedalaman 0 2M:Volume menurut kontrak 1.223,40 M3Volume pekerjaan kurang 342,89 M3Jumlah 880,51 M3c.