Ditemukan 475 data

Urut Berdasarkan
 
Register : 14-01-2021 — Putus : 03-06-2021 — Upload : 09-06-2021
Putusan PN DENPASAR Nomor 2/Pid.Sus-TPK/2021/PN Dps
Tanggal 3 Juni 2021 — Penuntut Umum:
I Ketut Kartika Widnyana, SH
Terdakwa:
I WAYAN WIANTARA, SP
162121
  • PanjarBP Aset Humas Kesra . inta Umumbang kum ngan sasi olehhan BPPSelisihpencairanPanjar JAN 4.212.627.6 oy 60 50.00 85.00 115.00 co.00 125.00 600.00 850.00 4.212.62 4.586.801.5 374.173.9000 , 0 0.000 0.000 0.000 , 0 0.000 0.000 0.000 7.600 00 0FEB 2.971.900.0 80.00 105.0 275.00 860.00 200.00 135.90 1.316. 2.971.90 3.726.000.0 754.100.0000 0.000 00.00 0.000 0.000 0.000 0.000 000.00 0.000 00 0 Halaman 48 dari 270 Putusan Nomor 2/Pid.SusTPk/2021/PN Dps 0 0MAR 3.375.000.0 0.00 00 600.00 ccooe 100.00
    PanjarBP Aset Humas Kesra . inta Umumbang kum ngan sasi olehhan BPPSelisihpencairanPanjar JAN 4.212.627.6 60 50.00 85.00 115.00 co 00 125.00 600.00 850.00 4.212.62 4.586.801.5 374.173.9000 , 0 0.000 0.000 0.000 , 0 0.000 0.000 0.000 7.600 00 0FEB 2.971.900.0 80.00 105.0 275.00 860.00 200.00 135.90 1.316. 2.971.90 3.726.000.0 754.100.0000 0.000 00.00 0.000 0.000 0.000 0.000 000.00 0.000 00 0 Halaman 56 dari 270 Putusan Nomor 2/Pid.SusTPk/2021/PN Dps 0 0MAR 3.375.000.0 o0.00 p00 600.00 co 06 100.00
Register : 28-05-2019 — Putus : 16-10-2019 — Upload : 02-12-2019
Putusan PN AMBON Nomor 11/Pid.Sus-TPK/2019/PN Amb
Tanggal 16 Oktober 2019 — Penuntut Umum:
1.M. RUSLAN MARASABESSY, SH
2.ENDANG ANAKODA, SH
3.TONNY ROMY LESNUSSA, SH
4.RASYID WIRAPUTRA, SH
Terdakwa:
JOHAR BOINAUW Alias Jo
9850
  • Biaya rapat 2,000.0 2,000.0 2,000.0Musrembang 00. 00. 00.800,0 550,00 250,00 250,00 Megaphone 00. 0. 0. 0.4,000,0 900,00 900,00/ Mesin genset 00. 3,100,000. 0. 0. 2,500,0 1,900,00 600.00 600.00+ Kursi Biro 00. 0. 0. 0.4,590,0 4,590,00/ Kursi rapat lipat 00. 0.9,000.0 6,500.00 2,500.00 2,500.0 Kursi plastic 00. 0. 0. 00. Pakaian dinas) 11,600,0 4,900,00 6,700,00 6,700,0perangkat 00. 0. O. 00.
Register : 02-07-2014 — Putus : 26-11-2014 — Upload : 14-01-2015
Putusan PN AMBON Nomor 212/Pid. B/2014/PN. Amb
Tanggal 26 Nopember 2014 — RETA LATBUAL alias RETA
2841
  • 1(45) 2(43) 2(1) 47(54) 1(42) 2(1220) 2(45) 2(5160) 1(45) 2(1) 47(1142) 2(46) 1(45) 2(S157) 2(S145) 2(43) 2(1) 47(50) 2(42) 2(1110) 2(54) 1(10)(43)(44)(45)(43)(((((((NNN NH4543) 21) 475142) 250) 2) 2) 245) 21)KTQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 269.00 630.00 Tm/F8 1 Tf(5110) 2(1225) 2(45) 2(43) 2(1l) 22(3334) 2(32) 1(6467) 1((((((TJ1) 225342) 254) 142) 246) 145) 2o5) 21) 221142) 246) 11735) 164) 11) 2234) 2e4) 1223) 1634) 21) TJETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 269.00 600.00
    Im/F8 1 Tf(45) 2(((((((((1) 22((((((((BT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 321.00 600.00 Tm/F8 1 Tf(1) 1(65) TdETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 329.00 600.00 Tm/F8 1 Tf(27) 1(277) TdETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 355.00 600.00 Tm/F8 1 Tf(661) TaETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 362.00 600.00 Im/F8 1 Tf(1142) 243) 24742)1245)43) 244) 21) 15110)1225)(( 2( 2((((((45) 2((KQ2243) 221) TdTqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 251.00 560.00 Tm
    qBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 467.00 630.00 Tm/F8 1 Tf(1) 668(1) ToETQqBr0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 490.00 630.00 Tm/F8 1 Tf(20) 2(42) 2(5145) 2(54) 1(1) ToKTQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 269.00 600.00 Im/F8 1 Tf(20) 2(42) 2(43) 2(44) 2(45) 2(43) 2(1) 105(56) 1(45) 2(46) 1(45) 2(43) 2(1) 105(4745) 2(43) 2(44) 2(1) 105(S342) 2(1217) 1(43) 2(44) 2(1) 105(20) 2(17) 1(46) 1(42) 2(60) 1(45) 254) 117) 11) 105BT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 519.00
    600.00 Im/F8 1 Tf(1) TuETQqBI0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 269.00 571.00 Tm/E8 1 TE(27) 1(45) 2(43) 2(1) 422(54) 1(42) 2(1150) 2(45) 2(54) 1(1) 422(S142) 2(56) 1(45(20((((((((((((NR N DN4543) 21) 42254) 142) 2125342) 225) 257) 254) 11) 42220) 2))L?)))
Register : 29-11-2021 — Putus : 16-12-2021 — Upload : 16-12-2021
Putusan PT PEKANBARU Nomor 37/PID.SUS-TPK/2021/PT PBR
Tanggal 16 Desember 2021 — Pembanding/Penuntut Umum : RINALDY ADRIANSYAH,SH.,MH
Terbanding/Terdakwa : INDRA AGUS LUKMAN ,AP,M.Si Bin LUKMAN
160148
  • Snack 2.100.000 2.100.000(44 org x 5 hr)13 398/284/ 22/03/13 Biaya 1.500.0 TU/2013 Transportasi 00 Fiktif 0,00 Ant :Transportasi 0,0014 430/302/ 22/03/13 peserta 600.00 Fiktif 0,00 iTU/2013 (20 org) 00,00TransportasiInstruktur 21.000.000 Fiktif 4.250.000 16.750.00015 434/300/ (4 org) 15.000.TU/2013 Biaya 000 0,00Akomodasi Akomodasi16 peserta417/298/ (10 kmr x 5 hr) 6.000.0 Tidak TU/2013 00 benar500.00Akomodasi 017 = isntruktur Benar (10 kmr x 5 hr) 3.750.000Sewa aulawismaJumlahKerugian =biaya SPJ
Register : 09-12-2019 — Putus : 03-03-2020 — Upload : 13-08-2021
Putusan PN MEDAN Nomor 3410/Pid.Sus/2019/PN Mdn
Tanggal 3 Maret 2020 — Penuntut Umum:
NURHAYATI ULFIA, S.H
Terdakwa:
INDAH TRIE UTAMI
8719
  • melakukan transaksi TARIKAN TUNAI dengan rinciansebagai berikut :MutaTARIKAN TUNAI VIA ATM BCATanggal29Apr> Bahwa berdasarkan Mutasisebagai berikut :yiDNomin Keterangan1.000.000,Rekening BCA 3491399706 atas namaAGUSTINA, terdakwa melakukan transaksi Tarik Tunai VIAATM dengan rincian Tanggal D/K Nomina Keteranga14Jan19/TRANSFER VIA ATM KE D 50.000.000520275088/ERIKA29Mar TRANSFER VIA ATM KE D 10.000.007875106970SUHIL03May TRANSFER VIA ATM KE D 2.000.00 3491409019/AGUSTINA06May TRANSFER VIA ATM KE D 600.00
    8250266457ALIYA SYAHYAN13May TRANSFER VIA ATM KE D 600.00 3491409019AGUSTINA Halaman 41 dari 114 Putusan Nomor 3410/Pid.Sus/2019/PN Mdn > Berdasarkan data mutasi rekening BCA 3491399706 atas nama AGUSTINA,terdakwa melakukan transaksi SETORAN TUNAI dengan rincian sebagaiberikut : 63.200.000, 28Nov18DecSETORAN TUNAI DGNSETORAN TUNAI VIA ATMSETORAN TUNAI TNP BUKUSETORAN TUNAI VIA ATM5.000.000,050.000,008430290321/CHAIRUNNISAH50.000.000,0 82802363665.000.000,0 8430313691/AGUNG TRIBOWO> Berdasarkan data
Register : 25-02-2019 — Putus : 19-06-2019 — Upload : 08-07-2019
Putusan PN PALU Nomor 7/Pid.Sus-TPK/2019/PN Pal
Tanggal 19 Juni 2019 — Penuntut Umum:
ILMIAWAN TIBE HAFID, S.H.
Terdakwa:
SUBU SOSONO
5724
  • Kegiatan Pembangunan Jalan Desa 81,786,600.00 81,786 ,600.00 71,514,236.17 10,272,363.832. Pembangunan Riol / Drainase 122,328,000.00 122,328,000.00 119,929,400.00 2,398,600.00Total 204.114.600 191,443 636.17 12.670.963.83 Rekapaitulasi perhitungan pekerjaan terpasang Pembangunan jalan Rabat T.A 2016 No. Item Pekerjaan SatuanVolume dalamRAB Hasil Pemeriksaan Fisik VolumeTerpasang Selisih lebih/(Kurang)Volume HargaSatuan Jumlah Harga Halaman 19 dari 162 Putusan Nomor 7/Pid.SusTPK/2019/PN.
    Kegiatan Pembangunan Jalan Desa 81,786 ,600.00 81,786,600.00 71,514,236.17 10,272,363.832. Pembangunan Riol / Drainase 122,328,000.00 122,328,000.00 119,929,400.00 2,398,600.00Total 204.114.600 191,443,636.17 12.670.963.83Rekapaitulasi perhitungan pekerjaan terpasang Pembangunan jalan Rabat T.A 2016Hasil Pemeriksaan Fisik. Volume dalam SelisihNo. Item Pekerjaan Satuan RAB Volume lebih /Terpasang (Kurang) Harga Satuan Jumlah HargaVolume1 2 3 4 5 6=(54) 7 8=(6x7)1 Pek.
Putus : 06-08-2014 — Upload : 04-08-2017
Putusan PN BANJARMASIN Nomor Nomor 33 / Pid.Sus-TPK / 2014 / PN.Bjm.
Tanggal 6 Agustus 2014 — HENDRIYANI, SH bin ABDUL HAMID
547
  • Bahwa untuk sewa kantor dan pemeliharaan setiap bulan ada biayamaterai sebesar Rp 6.000,(enam ribu rupiah), administrasi sebesar Rp100.000,(seratus ribu rupiah) serta pajak sebesar Rp 100.000,(seratusribu rupiah, jadi untuk sewa kantor dan pemeliharaan yang diterimaadalah Rp 794.000,(tujun ratus sembilan pulunh empat ribu rupiah) perbulan dan bukan Rp 1.000.000,(satu juta rupiah), uang itu kemudianterdakwa bayarkan sebesar Rp 400.000,(empat ratus ribu rupiah) perbulan untuk biaya pemeliharaan, Rp 600.00
Register : 06-12-2018 — Putus : 26-04-2019 — Upload : 06-05-2019
Putusan PN PADANG Nomor 38/Pid.Sus-TPK/2018/PN Pdg
Tanggal 26 April 2019 — Penuntut Umum:
PERRY RITONGA,SH
Terdakwa:
Drs. ERIZAL, MM Pgl PAK JIM Bin BASRI.
8343
  • PEKERJAAN TANAH 3.1.1 Galian biasa (tebing) M3 1.046.7 21.75 22.768.098.6 1.00 003.2.1 Timbunan biasa (belakang M3 146.00 104.900.0 15.399.382.pasangan batu) 0 003.2.2 Timbunan pilihan (belakang M3 2.293.1 149.038.0 341.766.374.2dinding penahan tanah) 5 0 03.3 Penyiapan Badan Jalan M3 600.00 3.88 2.332.800.08.00 0jJumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi 382.266.655.3Perkiraan Harga Pekerjaan) 2 DIVISI 5.
    PEKERJAAN TANAH3.1.1 Galian biasa (tebing) M3 1.046.7 21.75 22.768.098.6 1.00 003.2.1 Timbunan biasa (belakang M3 146.00 104.900.0 15.399.382.pasangan batu) 0 003.2.2 Timbunan pilihan (belakang M3 2.293.1 149.038.0 341.766.374.2dinding penahan tanah) 5 0 03.3 Penyiapan Badan Jalan M3 600.00 3.88 2.332.800.08.00 0jJumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi 382.266.655.3Perkiraan Harga Pekerjaan) 2DIVISI 5.
    Timbunan pilihan M3 2.293.1 149.038.) 341.766.372 (belakang dinding 5 00 4.20penahan tanah)3.3 Penyiapan Badan M3 600.00 3.8 2.332.80Jalan 88.00 0.00Jumlah Harga Pekerjaan DIVIS! 3 (masuk pada 382.266.65Rekapitulasi Perkiraan Harga Pekerjaan) 5.32DIVISI 5. PERKERASAN BERBUTIR5.2. Lapis pondasi M3 45.45 326.406. 14.835.152.1 Agregat Kelas C 00 70 Hal 197 Putusan Nomor : 38/Pid.SusTPK/2018/PN.Pdg (pondasi dibawahrigidt, t=20 cm)5.2.
Register : 06-12-2018 — Putus : 26-04-2019 — Upload : 14-05-2019
Putusan PN PADANG Nomor 40/Pid.Sus-TPK/2018/PN Pdg
Tanggal 26 April 2019 — Penuntut Umum:
PERRY RITONGA,SH
Terdakwa:
1.Ir. SJAFRI MUCHTAR bin MUCHTAR NOER Pgl. PAK EPI
2.ARIS WIBOWO,ST Bin SOETIRMAN PAG ARIS
11153
  • Timbunan pilihan (belakang M3 2.293.15 149.038.00 341.766.3742 dinding penahan tanah) .203.3 Penyiapan Badan Jalan M3 600.00 3.888 2.332.800.00 .00jJumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi 382.266.655Perkiraan Harga Pekerjaan) 32DIVISI 5. PERKERASAN BERBUTIR5.2.
    Timbunan pilihan (belakang M3 2.293.15 149.038.00 341.766.3742 dinding penahan tanah) .203.3 Penyiapan Badan Jalan M3 600.00 3.888 2.332.800.00 .00jJumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi 382.266.655Perkiraan Harga Pekerjaan) 32DIVISI 5. PERKERASAN BERBUTIR5.2. Lapis pondasi Agregat Kelas C M3 45.45 326.406.00 14.835.152.1 (pondasi dibawah rigidt, t=20 70cm)5.2.
    Timbunan pilihan (belakang M3 2.293.15 149.038.00 341.766.374.202 dinding penahan tanah)3.3 Penyiapan Badan Jalan M3 600.00 3.888.00 2.332.800.00Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga 382.266.655.32Pekerjaan)DIVISI 5. PERKERASAN BERBUTIR5.2.
Upload : 10-03-2011
Putusan MAHKAMAH AGUNG Nomor 2235 K/PID.SUS/2010
Jaksa Penuntut Umum pada Kejari; Drs. Irwan Hanafi, M.Si
5625 Berkekuatan Hukum Tetap
  • Hi Class V for Teacher Station, EnglishVersion (IK1800T ) Unit 1 9.693.695 9.693.695HiClass V for Teacher control panelTeacher External BoxEzcontrol Software for control functionCable Accessories :1 set 600 600.00 HiClass V for Student Stations, EnglishVersion ( IK2200S) Unit 10 4.606.095 46.060.950HiClass V Student External Box HiClass V IK180 Teacher External Box Unit 1 4.606.095 4.606.095 HiClass V Data Repeater ( IK288 ) Unit 1 6.177.800 6.177.800 Multimedia Centralized Control System (IK3000V
Putus : 16-12-2014 — Upload : 12-01-2015
Putusan PN STABAT Nomor 651/Pid.Sus/2014/PN.Stb
Tanggal 16 Desember 2014 — Muliadi Adi Alias Depo dan Ridwan Alias Iwan
4156
  • rg12.00 0.00 0.00 12.00 484.00 622.00 Tm/F20 1 Tf (20) TuETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 487.00 622.00 Tm/F20 1 Tf (3723) 2(3227) 2(52) 1(20) 4(35) 2(23) 2(433320) 4(35) 2(23) 2(4333) TJETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 563.00 622.00 Tm/F20 1 Tf (20) TuETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 566.00 622.00 Tm/F20 1 Tf (64) TuETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 569.00 622.00 Tm/F20 1 Tf (20) TuETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 177.00 600.00
    Tm/F20 1 Tf (313323) 2(20433323) 2(24203223) 2(62) 2(23) 2(203726) 1(3027) 2(32203123) 2(412035) 2(23) 2(52) 1(3320433323) 2(242057) 1(23) 2(303344) 1(2035) 2(334152) 1(26) 1(32) TuETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 406.00 600.00 Tm/F20 1 Tf (20) TJETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 409.00 600.00 Tm/F20 1 Tf(2) TuETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 159.00 572.00 Tm/F31 1 Tf(1) TuETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 177.00 572.00 Tm/F20 1 Tf (2223)
    2(374020) 237(3123) 2(4120) 237(35) 2(23) 2(3235) 2(26) 1(20) 237(1426) 1(3125) 1(23) 2(4120) 237(16) 1(34) 1(35) 2(20) 237(4225) 1(23) 2(412) TJETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 401.00 622.00 Tm/F20 1 Tf (20) TJETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 407.00 622.00 Tm/F20 1 Tf(47) 2(27) 2(34) 1(23) 2(4157) 1(3352) 1(415623) 2(20) 237(35) 2(23) 2(3235) 2(26) 1(20) 237(61) 1(23) 2(44) 1(23) 2(44) 1(3033313126) 1(4120) TJETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 177.00 600.00
    Tm/F20 1 Tf(17) 2(23) 2(4126) 1(3220) 304(44) 1(27) 2(44) 1(23) 2(4141464626) 1(34) TuETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 275.00 600.00 Tm/F20 1 Tf (20) TJETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 282.00 600.00 Tm/F20 1 Tf(15) 1(27) 2(303123) 2(3225) 1(23) 2(20) 300(424220) 300(1426) 1(3125) 1(23) 2(4120) 300(16) 1(34) 1(35) 2(20) 300(4225) 1(23) 2(41) TuETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 443.00 600.00 Tm/F20 1 Tf (20) TuETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00
    449.00 600.00 Tm/F20 1 Tf (3123) 2(4120) 300(44) 1(27) 2(4127) 2(34) 1(27) 2(37404120) 300(3727) 2(52) 1(334623) 2(35) 2(20) TuETQqBT0.000 0.000 0.000 rg12.00 0.00 0.00 12.00 177.00 578.00 Tm/F20 1 Tf(61) 1(27) 2(374034) 1(26) 1(35) 2(26) 1(23) 2(4120) 96(47) 2(27) 2(3252) 1(403020) 96(15) 1(23) 2(4157) 1(33414620) 96(12) 2(333023) 2(20) 96(3123) 2(4120) 96(35) 2(27) 2(52) 1(27) 2(34) 1(23) 2(2420) 96(3727) 2(52) 1(334623) 2(35) 2(20) 96(61) 1(27) 2(374034) 1(26) 1(35) 2(26) 1(23) 2(4120) 96(35)
Register : 14-12-2017 — Putus : 09-05-2018 — Upload : 08-08-2021
Putusan PN SAMARINDA Nomor 86/Pid.Sus-TPK/2017/PN Smr
Tanggal 9 Mei 2018 — Penuntut Umum:
ROMZA SEPTIAWAN, SH,. MH.
Terdakwa:
Drs. ABDUSSAMAD Bin ARMIN
9523
  • Bouplank & Pematokan 35,000,000.00 1.94 1.942 Papan Identitas 1,225,000.00 0.07 0.073 Bongkar Rumah Existing dan Pembersihan 14,000,000.00 0.77 0.774 Mobilisasi material ke lokasi rumah 43,750,000.00 2.42 2.42TOTAL 93,975,000.00 5.20 5.20Il PEKERJAAN TANAH1 Galian tanah untuk pondasi 3,796 ,485.00 0.21 0.212 Urugan tanah dalam bangunan 45,183 ,600.00 2.50 2.503 Urugan pasir bawah lantai 18,608,940.00 1.03 0.00TOTAL 67,589,025.00 3.74 2.71Ul PEKERJAAN PONDASI1 Pancang Ulin 8/8 1m 13,662,250.00 0.76
    Bouplank & Pematokan 35,000,000.00 1.94 1.942 Papan Identitas 1,225,000.00 0.07 0.073 Bongkar Rumah Existing dan Pembersihan 14,000,000.00 0.77 0.774 Mobilisasi material ke lokasi rumah 43,750,000.00 2.42 2.42TOTAL 93,975,000.00 5.20 5.20 PEKERJAAN TANAH Halaman 256 dari 290 Putusan Nomor 86/Pid.SusTPK/2017/PN Smr 1 Galian tanah untuk pondasi 3,796 485.00 0.21 0.212 Urugan tanah dalam bangunan 45,183 ,600.00 2.50 2.503 Urugan pasir bawah lantai 18,608 ,940.00 1.03 0.00TOTAL 67,589,025.00 3.74 2.71Ul
Register : 17-12-2012 — Putus : 24-05-2013 — Upload : 12-09-2015
Putusan PN BANDUNG Nomor 81/Pid.Sus/TPK/2012/PN.Bdg.
Tanggal 24 Mei 2013 — -Dra. Hj. NONENG SITI KURAESIN, M.Si.
6112
  • Rangka/curtain wall terpasang 429 m'alumunium + karet, m' 524,4 (=(2 *60*(0.740.4silicone (vertikal) 70.794.00000 57.915.00000 12.879.00000 +1.2+0.95))*1.1)135.00000Perkuatan pasangan kg 226rangka kaca (best siku) 17.50000 3.955.000 00 000 3.955.000 00 tidak adaPasangan kaca 6 mm bukan blue green(Blue/Green) tampak luar m2 421,36 tp rayband hargabancunan Asahimas 122.30500 51.534.43480 46.349 60000 5.184.834 80 RollO 000.00/m2126 283 434.80 104 264 600.00 22 018 834.80PEKERJAANPASANGANSCLAPTUREperkiraan
    Rangka/curtain wall terpasang 429 m'alumunium + karet, m' 524.4 (=(2* 60*(0.7+0.4silicone (vertikal) 70.794.00000 57.915.00000 12.879.00000 + 1.2+0.95 *1.1)135.00000Perkuatan pasangan kg 226ranaka kaca (best siku) 17.50000 3.955.00000 000 3.955.000 00 tidak adaPasangan kaca 6mm bukan blue green(Blue/Green) tampak luar m2 421,36 tp rayband hargabanqunan Asahimas 122.30500 51.534.434 80 46 .349.60000 5.184.834 80 RollO 000.00/m2126 283 434.80 104 264 600.00 22 018 834.80PEKERJAANPASANGANSCLAPTUREperkiraan
Putus : 13-06-2012 — Upload : 17-11-2016
Putusan PN SEMARANG Nomor 17/Pid.Sus/2012/PN.Tipikor.Smg
Tanggal 13 Juni 2012 — TRIJOKO AGUS SISWANTO bin SURYONO
8314
  • Juta Rupiah) susuk / kembaliBahwa ,Yang membuka kumpulan pertama adalah pertama yang membuka pakLurah kemudian dilanjutkan oleh Terdakwa dan dibicarakan tentang biaya sertiikatmassal dan disepakati Rp, 600.00, (Enam ratus ribu rupiah)Bahwa ,Warga mendaftar pada TerdakwaBahwa ,Warga tidak membayar dengan musyawarah Bahwa ...31) 31 Bahwa ,Warga membayar langsung lain hari dan membayar Rp.600.000, (Enamratus ribu rupiah) Bahwa ,Saat membayar tidak diikuti dengan permohonanDidengar atas keterangan saksi
Register : 08-10-2019 — Putus : 06-04-2020 — Upload : 29-05-2020
Putusan PN BATAM Nomor 237/Pdt.G/2019/PN Btm
Tanggal 6 April 2020 — Penggugat:
1.PT. BARUNA BAHARI INDONESIA
2.SAFE HAVEN MARITIME PTE. LTD
3.SAFE HAVEN MARITIMEINC
Tergugat:
1.PT. TRI SAKTI LAUTAN MAS
2.HARIS YUDI HELMI
3.AZWAR ANAS
4.IBNU HAJAR
5.SARI DWIASTUTI BINTI MUBANDI Alm
384545
  • Halaman 11 dari 169 Putusan Perdata Gugatan Nomor 237/Pdt.G/2019/PN Btm Uang18/2/11 800.00kontan18/2/11 10.000.000 Uangkontan= = Uang2/3/11 7,862.00kontan12/4/11 12,562.00 Transfer12/5/11 10,168.00 TransferA/8/11 5,630.00 Uangkontan18/8/11 9,600.00 Uangkontan27/8/11 900.00 Uangkontan27/8/11 900.00 Uangkontan27/8/11 3,800.00 Uangkontan27/8/11 1,500.00 Uangkontan27/8/11 340.00 Uangkontan Uang27/8/11 4,191.04kontan27/8/11 1,800.00 Uangkontan17/9/11 900.00 Uangkontan17/9/11 900.00 Uangkontan17/9/11 600.00
    Uangkontan17/9/11 600.00 Uangkontan17/9/11 300.00 Uangkontan17/9/11 350.00 Uangkontan17/9/11 480.00 Uangkontan17/9/11 290.00 Uangkontan17/9/11 290.00 Uangkontan Halaman 12 dari 169 Putusan Perdata Gugatan Nomor 237/Pdt.G/2019/PN Btm 27/9/11 11,331.04 Transfer25/10/11 6,200.00 Transfer4/11/11 6,150.98 Transfer9/11/11 15,111.43 Transfer16/12/11 13,832.46 Transfer27/12/11 23,036.54 Transfer30/1/12 39,188.00 Transfer15/5/12 10.000.000 Uangkontan8/6/12 10,000.00 = Transfer13/6/12 8,546.07 Transfer22/
Register : 24-01-2017 — Putus : 13-07-2017 — Upload : 23-08-2017
Putusan PN SEMARANG Nomor 60/Pid. B/2017/PN.Smg
Tanggal 13 Juli 2017 — ONG BUDIONO;
20862
  • B/2017/PN.Smg.Bahwa setelah saksi mencabut laporan, saksi malah digugat perdata olehTerdakwa dkk;Bahwa Saksi baru bilang agar bak sampah saksi digeser dan saksi akanmenyumbang untuk taman yang rusak;Bahwa Terdakwa datang pada waktu peresmian Ruko saksi yaitu padatanggal 15 Juli 2012;Bahwa terdakwa pernah menghubungi saksi melalui surat untuk mintasumbangan/luran, kemudian saksi mentransfer uang Rp. 1.500.000,diserahkan oleh staf saksi tapi bukan Terdakwa yang menerima dan saksijuga membayar Rp. 600.00
Register : 16-03-2021 — Putus : 20-05-2021 — Upload : 07-08-2021
Putusan PN KENDARI Nomor 9/Pid.Sus-TPK/2021/PN Kdi
Tanggal 20 Mei 2021 — Penuntut Umum:
ARIFIN DIKO, S.H.
Terdakwa:
KAREDO RAJAGUKGUK, S.T.
11760
  • Pengukuran Ls 1,0 600.00 600.000; 1,0 2.500. 2.500.0dan pasang 0 0,00 00; O 000,00 00,00bowplank /patok4. Pemb. Ls 1,0 1.200. 1.200.0 1,0 15.000; 15.000.Bangsal kerja, 0 000,00 00,00; O .000,0 000,00gudang, 0papan namaproyek, danrambu lalulintas5. Penyediaan Ls 1,0 1.000. 1.000.0 1,0 7.500. 7.500.0air kerja dan 0 000,00 00,00; O 000,00 00,00air minum6.
    91, 1.967, 179.048 36. 4.152, 153.005lokasi / land 00 57 .450,80 847 35 .268,95clearing ,88Pengukuran Ls 1,0 600.00 600.000 1,0 2.500. 2.500.0dan pasang 0 0,00 00; O 000,00 00,00bowplank /patokPemb.
Register : 16-03-2021 — Putus : 20-05-2021 — Upload : 07-08-2021
Putusan PN KENDARI Nomor 11/Pid.Sus-TPK/2021/PN Kdi
Tanggal 20 Mei 2021 — Penuntut Umum:
ARIFIN DIKO, S.H.
Terdakwa:
RAHMAT RIZAL JALAL, S.Sos
12372
  • Pengukuran Ls 1,0 600.00 600.000,0 1,0 2.500. 2.500.00dan pasang 0 0,00 0; O 000,00 0,00bowplank /patok4. Pemb. Ls 1,0 1.200. 1.200.000, 1,0 15.000 15.000.0 Hal. 16 dari 186 Hal.
    Pengukuran Ls 1,0 600.00 600.000,0 1,0 2.500. 2.500.00dan pasang 0 0,00 0; O 000,00bowplank /patok0,00 4. Pemb. Ls 1,0 1.200.; 1.200.000, 1,0 15.000 15.000.0Bangsal 0 000,00 00; O .000,0kerja, 0gudang,papannamaproyek, danrambulalulintas 00,00 Hal. 40 dari 186 Hal.
Putus : 18-12-2013 — Upload : 18-02-2014
Putusan PN KUPANG Nomor 49/Pid.Sus/2013/PN.KPG
Tanggal 18 Desember 2013 — MARTHINUS ADAM alias TINUS ADAM
4728
  • Urugan batu karang/ kali untuk pengisian T Vol 203.682 M8,HS 162, 600.00 JH 33.118.693.20Sub Jumlah Il Rp. 178.130.859.203. PEKERJAAN PASANGAN DAN PLESTERANf. Pasangan Aanstamping : Vol 0 M3, HS162.600.00 JH 0g. Pasangan pondasi campur1pc:3ps : Vol 120.957 M3, HS651.400.00 JH 78.791 .389.80h. Pas Batu Kali/ Gunung camp. 1:3 Vol 140.866 M2, HS651,400 .00 JH 91.760.112.40i. Plesteran untuk pas. Pondasi dan tangga 1 pc :3 psr Vol486.898 M2, HS 34,560.00 JH 16.827.194.88j.